These are final bid documents for an upgrade fire alarm system design project at the Veterans Affairs Medical Center in Tomah, Wisconsin (Project 676-22-110). The documents were prepared by PCG consultants and approved April 21, 2026.
The bid package includes comprehensive fire alarm system design drawings and demolition plans across multiple buildings (B400, B401, B402, B403, B404, and B405) within the VA Medical Center complex. The drawings provide detailed floor-by-floor plans—including first, second, third, fourth floors, attics, and basement areas—showing fire alarm device locations, signal notation matrices, installation requirements, and system specifications. Key components depicted include manual pull stations, horn/strobes, smoke detectors, relay modules, control panels, and interconnected wiring throughout the facilities. The documents establish general notes regarding contractor responsibilities for equipment installation, coordination with existing systems, protection of furnishings during construction, and adherence to fire alarm specifications. Specific keyed notes on each plan identify particular installation requirements, device locations, and system integration points. Additional diagrams include partial site plans showing building demolition areas and the overall facility layout with multiple building locations marked. The drawings reference compliance with NFPA 72 fire alarm standards and requirements for a fully functional fire alarm system capable of monitoring and controlling devices across all buildings included in the upgrade project.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
F001
JMD
FIRE PROTECTION
LEGEND, ABBREVIATIONS,
SCHEDULES, AND DETAILS
HFB
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
PROJECT LEADER:
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
D
C
B
A
97 8654321
Tomah, Wisconsin
676-22-110 Office of Facilities
Management
APRIL 21, 2026
CONSULTANTS:
500 E VETERANS ST
TOMAH, WI 54660
MEDICAL CENTER
VETERANS AFFAIRS
UPGRADE FIRE ALARM
SYSTEM DESIGN
1021 N. Superior Ave, Unit 11 Tomah, Wisconsin 54660
FINAL BID DOCUMENTS
AutoCAD SHX Text
LEGEND
AutoCAD SHX Text
EXISTING MATERIAL/EQUIPMENT TO BE REMOVED
AutoCAD SHX Text
EXISTING MATERIAL/EQUIPMENT TO REMAIN
AutoCAD SHX Text
FP
AutoCAD SHX Text
PENDENT SPRINKLER HEAD
AutoCAD SHX Text
ABBREVIATIONS
AutoCAD SHX Text
POINT OF CONNECTION
AutoCAD SHX Text
GENERAL NOTES
AutoCAD SHX Text
CODE SUMMARY
AutoCAD SHX Text APPLICABLE PORTIONS OF THE FOLLOWING NATIONAL CODES AND STANDARDS SHALL BE REFERENCED: VA FIRE PROTECTION DESIGN MANUAL, NOV. 1 2023, NINTH EDITION. NFPA 10, STANDARD FOR PORTABLE FIRE EXTINGUISHERS, 2022 EDITION. NFPA 13, INSTALLATION OF SPRINKLER SYSTEMS, 2025 EDITION. NFPA 25, STANDARD FOR THE INSPECTION, TESTING, AND MAINTENANCE OF WATER-BASED FIRE PROTECTION SYSTEMS, 2023 EDITION NFPA 70, NATIONAL ELECTRICAL CODE, 2023 EDITION. NFPA 72, NATIONAL FIRE ALARM CODE, 2025 EDITION. NFPA 80, STANDARD FOR FIRE DOORS AND OTHER OPENING PROTECTIVES, 2025 EDITION. NFPA 101, LIFE SAFETY CODE. 2024 EDITION. NFPA 110, STANDARD FOR EMERGENCY AND STANDBY POWER SYSTEMS, 2025 EDITION. NFPA 170, STANDARD FOR FIRE SAFETY AND EMERGENCY SYMBOLS, 2024 EDITION. ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS (ABAAS), LATEST EDITION.
AutoCAD SHX Text
TEE UP
AutoCAD SHX Text
ELBOW DOWN
AutoCAD SHX Text
TEE DOWN
AutoCAD SHX Text
ELBOW UP
AutoCAD SHX Text
BUTTERFLY VALVE, MANUAL
AutoCAD SHX Text
NEW MATERIAL/EQUIPMENT
AutoCAD SHX Text
SPRINKLER PIPING
AutoCAD SHX Text
GATE VALVE
AutoCAD SHX Text
FLOW INDICATOR
AutoCAD SHX Text
ALARM CHECK VALVE
AutoCAD SHX Text
AFF ABOVE FINISHED FLOOR
AutoCAD SHX Text
AHJ AUTHORITY HAVING JURISDICTION
AutoCAD SHX Text
AVG AVERAGE
AutoCAD SHX Text
CFM CUBIC FEET PER MINUTE
AutoCAD SHX Text
ELEV ELEVATION
AutoCAD SHX Text
FDC FIRE DEPARTMENT CONNECTION
AutoCAD SHX Text
FHV FIRE HOSE VALVE
AutoCAD SHX Text
FM FIRE MAIN
AutoCAD SHX Text
FR FIRE RISER
AutoCAD SHX Text
FVC FIRE VALVE CABINET
AutoCAD SHX Text
GALS GALLONS
AutoCAD SHX Text
GPH GALLONS PER HOUR
AutoCAD SHX Text
GV GATE VALVE
AutoCAD SHX Text
MAX MAXIMUM
AutoCAD SHX Text
MIN MINIMUM
AutoCAD SHX Text
NP NOT PERMITTED
AutoCAD SHX Text
NC NONCOMBUSTIBLE
AutoCAD SHX Text
OS&Y OUTSIDE SCREW AND YOKE
AutoCAD SHX Text
PSIG POUNDS PER SQUARE INCH GAUGE
AutoCAD SHX Text
SOV SOLENOID VALVE
AutoCAD SHX Text
SQFT SQUARE FEET
AutoCAD SHX Text
VLV VALVE
AutoCAD SHX Text
1. REFER TO SHEET F001 FOR GENERAL NOTES, SYMBOLS, AND ABBREVIATIONS. REFER TO SHEET F001 FOR GENERAL NOTES, SYMBOLS, AND ABBREVIATIONS. 2. THE DEMOLITION PLANS AND NOTES ARE INTEDED AS GENERAL DEMOLITION REQUIRMENTS AND ARE NOT ALL INCLUSIVE. THE DEMOLITION PLANS AND NOTES ARE INTEDED AS GENERAL DEMOLITION REQUIRMENTS AND ARE NOT ALL INCLUSIVE. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO VERIFY AND REMOVE ALL EXISTING FIRE ALARM SYSTEM DEVICES AND EQUIPMENT. 3. EXISTING DEVICES SHOWN ARE BASED ON FIELD OBSERVATIONS. NOT ALL DEVICES MAY BE SHOWN DUE TO ACCESS EXISTING DEVICES SHOWN ARE BASED ON FIELD OBSERVATIONS. NOT ALL DEVICES MAY BE SHOWN DUE TO ACCESS LIMITATIONS TO CERTAIN ROOMS/AREAS WITHIN THE FACILITY. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY ALL AREAS, DEVICES, AND COMPONENTS WITHIN THE PROJECT CONSTRUCTION BOUNDARY PRIOR TO BIDDING. 4. COORDINATE AND VERIFY EXACT EXTENTS OF DEMOLITION PHASING AND SCOPE WITH PHASING DRAWINGS. COORDINATE AND VERIFY EXACT EXTENTS OF DEMOLITION PHASING AND SCOPE WITH PHASING DRAWINGS. 5. THE EXISTING FIRE ALARM SYSTEM FUNCTIONALITY, EQUIPMENT, DEVICES, AND SEQUENCE OF OPERATIONS ARE TO THE EXISTING FIRE ALARM SYSTEM FUNCTIONALITY, EQUIPMENT, DEVICES, AND SEQUENCE OF OPERATIONS ARE TO REMAIN OPERATIONAL AND BE PROTECTED DURING ALL PHASES OF CONSTRUCTION UNLESS IDENTIFIED AS BEING DEMOLISHED. 6. IDENTIFIED EQUIPMENT TO BE DEMOLISHED IS SHOWN AS BOLD AND SHALL INCLUDE THE REMOVAL OF THE DEVICE, IDENTIFIED EQUIPMENT TO BE DEMOLISHED IS SHOWN AS BOLD AND SHALL INCLUDE THE REMOVAL OF THE DEVICE, WIRING, ACCESSIBLE CONDUIT, FITTINGS, SUPPORTS, AND SYSTEM JUNCTION BOXES. WIRING TO BE REMOVED BACK TO NEAREST POINT OF CONNECTION. CONTRACTOR SHALL EXTEND EXISTING CIRCUITS (PROVIDED THEY ARE WITHIN CAPACITY LIMITS) TO ACCOMMODATE NEW DEVICES TO LIMIT EXTENSIVE REWORK OF THE EXISTING CIRCUITS. 7. EXISTING FIRE ALARM DEVICES SHALL, CONDUIT, WIRING, AND PANELS NOT BE ABANDONED IN PLACE. EXISTING FIRE ALARM DEVICES SHALL, CONDUIT, WIRING, AND PANELS NOT BE ABANDONED IN PLACE. 8. WHERE WORK IS REQUIRED AROUND EXISTING FIRE ALARM DEVICES, DEVICES SHALL BE SECURED AND PROTECTED WHERE WORK IS REQUIRED AROUND EXISTING FIRE ALARM DEVICES, DEVICES SHALL BE SECURED AND PROTECTED UNTIL READY FOR REMOVAL. 9. THE CONTRACTOR IS RESPONSIBLE FOR REMOVING AND REINSTALLING EXISTING CEILING TILES WHERE REQUIRED TO THE CONTRACTOR IS RESPONSIBLE FOR REMOVING AND REINSTALLING EXISTING CEILING TILES WHERE REQUIRED TO COMPLETE THE WORK. CONTRACTOR IS RESPONSIBLE FOR REPLACING ANY DAMAGED CEILING TILES WITH NEW TO MATCH EXISTING. 10. CONTRACTOR SHALL BE RESPONSIBLE FOR DAMAGE TO INTERIOR FINISHES AND BUILDING ELEMENTS NOT INCLUDED IN CONTRACTOR SHALL BE RESPONSIBLE FOR DAMAGE TO INTERIOR FINISHES AND BUILDING ELEMENTS NOT INCLUDED IN THE SCOPE OF WORK RESULTING FROM FIRE ALARM SYSTEMS DEMOLITION AND NEW WORK. 11. CONTRACTOR SHALL ADHERE STRICTLY TO STATE AND FEDERAL OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION CONTRACTOR SHALL ADHERE STRICTLY TO STATE AND FEDERAL OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS. A MINIMUM OF 10-HOUR OSHA TRAINING IS REQUIRED FOR ALL CONTRACT WORKERS ON SITE. TRAINING MUST BE CURRENT WITHIN THE LAST TWO YEARS. 12. CONTRACTOR SHALL PROVIDE WRITTEN CERTIFICATION THAT ALL CONTRACT WORKERS ON SITE HAVE BEEN SCREENED CONTRACTOR SHALL PROVIDE WRITTEN CERTIFICATION THAT ALL CONTRACT WORKERS ON SITE HAVE BEEN SCREENED FOR TUBERCULOSIS WITHIN 90 DAYS PRIOR TO ASSIGNMENT TO THE WORKSITE AND HAVE BEEN FOUND TO HAVE NEGATIVE SCREENING REACTIONS. 13. ALL CONTRACTORS AND THEIR EMPLOYEES SHALL HAVE VA BADGES. ALL CONTRACTORS AND THEIR EMPLOYEES SHALL HAVE VA BADGES. 14. FIRE ALARM INSTALLER SHALL PROTECT AND MAINTAIN EXISTING FIRE ALARM SYSTEM EQUIPMENT AND DEVICES AND FIRE ALARM INSTALLER SHALL PROTECT AND MAINTAIN EXISTING FIRE ALARM SYSTEM EQUIPMENT AND DEVICES AND SHALL REMAIN IN OPERATION UNTIL THE NEW FIRE ALARM SYSTEM IS FULLY COMMISSIONED AND ACCEPTED BY THE TOMAH FD. WORK TO BE COMPLETED SHALL BE COORDINATED WITH THE VA FIRE DEPARTMENT PRIOR TO DEMOLITION AND INSTALLATION. 15. INCLUDE THE SERVICES OF A FACTORY CERTIFIED TECHNICIAN TO PROGRAM, UPDATE, AND CERTIFY COMMUNICATIONS OF INCLUDE THE SERVICES OF A FACTORY CERTIFIED TECHNICIAN TO PROGRAM, UPDATE, AND CERTIFY COMMUNICATIONS OF FIRE ALARM RADIO SYSTEM AT THE CAMPUS FIRE DEPARTMENT AND AT THE CAMPUS POLICE STATION. PROVIDE ALL NECESSARY SYSTEM UPDATES, INTEGRATE EXISTING AND NEW POINTS, AND ENSURE PROPER ANNUNCIATION OF ZONE IS IDENTIFIED IN TROUBLE AND OR ALARM CONDITIONS. COORDINATE ACCESS TO REMOTE SERVER WITH STATION ELECTRONICS TECHNICIANS AND COR. 16. PROTECT ALL DEVICES AND EQUIPMENT DURING CONSTRUCTION. PROTECT ALL DEVICES AND EQUIPMENT DURING CONSTRUCTION. 17. FIRE PROTECTION CONTRACTOR TO REVIEW ELECTRICAL PLANS FOR ADDITIONAL INFORMATION AND REQUIRED FIRE FIRE PROTECTION CONTRACTOR TO REVIEW ELECTRICAL PLANS FOR ADDITIONAL INFORMATION AND REQUIRED FIRE PROTECTION WORK NECESSARY TO FACILITATE A COMPLETE FIRE PROTECTION SYSTEM AND IS PART OF FIRE PROTECTION CONTRACTOR'S SCOPE OF WORK. 18. MAINTAIN CONTINUOUS UTILITY SERVICE TO ALL SPACES IN THE BUILDING NOT AFFECTED BY THIS WORK. COORDINATE MAINTAIN CONTINUOUS UTILITY SERVICE TO ALL SPACES IN THE BUILDING NOT AFFECTED BY THIS WORK. COORDINATE WITH VA COR ANY DISRUPTION IN SERVICES REQUIRED TO PERFORM WORK. 19. IT WILL BE THE ELECTRICAL CONTRACTOR'S RESPONSIBILITY TO PROVIDE ALL TESTING, PERMITS, LABOR, MATERIALS, IT WILL BE THE ELECTRICAL CONTRACTOR'S RESPONSIBILITY TO PROVIDE ALL TESTING, PERMITS, LABOR, MATERIALS, TOOLS, EQUIPMENT AND OTHER INCIDENTALS NECESSARY FOR FIRE ALARM SYSTEM INSTALLATION WORK AT THE TOMAH VAMC. EC SHALL COMPLY AND COORDINATE WITH ALL JURISDICTION REQUIREMENTS. 20. VERIFY EXISTING CONDITIONS AND LOCATIONS IN FIELD PRIOR TO SUBMITTING PROPOSAL. FAILURE TO DO SO SHALL VERIFY EXISTING CONDITIONS AND LOCATIONS IN FIELD PRIOR TO SUBMITTING PROPOSAL. FAILURE TO DO SO SHALL NOT RELIEVE THIS CONTRACTOR FROM PERFORMING THE WORK REQUIRED UNDER THIS CONTRACT. 21. CONTRACTOR SHALL ADJUST HIS WORK AS REQUIRED TO AVOID EXISTING UTILITIES, ROOF DRAINS, ACCESS COVERS, AND CONTRACTOR SHALL ADJUST HIS WORK AS REQUIRED TO AVOID EXISTING UTILITIES, ROOF DRAINS, ACCESS COVERS, AND OTHER STRUCTURES NOT PARTICULARLY SHOWN ON PLAN AT NO EXTRA COST. BEFORE CONSTRUCTION, INSPECT PREMISES AND MAKE A DETAILED EXAMINATION OF ALL LOCATIONS WHERE NEW WORK IS TO BE INSTALLED. EXAMINE EXISTING PIPING, CONDUITS, STRUCTURAL SUPPORTING BEAMS, AND OTHER CONDITIONS. 22. ACCESS TO ALL BUILDINGS AND PARKING AREAS MUST BE MAINTAINED THROUGHOUT THE PROJECT. ACCESS TO ALL BUILDINGS AND PARKING AREAS MUST BE MAINTAINED THROUGHOUT THE PROJECT. 23. THE GENERAL CONTRACTOR IS TO COORDINATE ALL WORK WITH THE VA'S COR AND CCR. SEE SEQUENCE AND THE GENERAL CONTRACTOR IS TO COORDINATE ALL WORK WITH THE VA'S COR AND CCR. SEE SEQUENCE AND REQUIREMENTS OF SEQUENCING, GENERAL REQUIREMENTS AND GENERAL CONTRACTORS REQUIRED TASKS FOR THIS PROJECT. 24. DO NOT INTERFERE WITH EXISTING BUILDING'S MECHANICAL, ELECTRICAL, PLUMBING, AND SECURITY SYSTEM OPERATIONS DO NOT INTERFERE WITH EXISTING BUILDING'S MECHANICAL, ELECTRICAL, PLUMBING, AND SECURITY SYSTEM OPERATIONS THAT IS NOT INCLUDED IN THIS PROJECTS REQUIREMENTS. IF IT IS NECESSARY TO SHUT DOWN FACILITY SYSTEMS AT ANY TIME, CONSULT VA COR AND CCR TO MAKE ARRANGEMENTS TO DO SO DURING OFF-HOUR WORKING PERIODS AT THE VA'S CONVENIENCE. PRIOR NOTICE SHALL BE GIVEN TO THE VA AND ARCHITECT/ENGINEER (15) WORKING DAYS IN ADVANCE OF THE DESIRED SHUT-DOWN TIME. ANY PREMIUM OR OVERTIME COSTS NECESSARY TO ACCOMPLISH THE ABOVE SHALL BE INCLUDED IN THIS BID. FAILURE TO PROCEED WITHOUT PROPER PRIOR NOTIFICATION MAY RESULT IN THE ASSESSMENT OF A CREDIT TO THE CONTRACT. 25. WHEN NECESSARY PATIENT AREA LOCK DOWNS FOR COVID/INFECTIOUS DISEASE CONTROL OR OUTBREAKS AS WHEN NECESSARY PATIENT AREA LOCK DOWNS FOR COVID/INFECTIOUS DISEASE CONTROL OR OUTBREAKS AS DETERMINED BY THE VA SHALL REQUIRE THE CONTRACTOR AND ALL SUB-CONTRACTORS TO FOLLOW ALL PUBLISHED AND ISSUED VA REQUIREMENTS FOR SELF PPE. 26. CONTRACTOR SHALL PARK ONLY IN THE DESIGNATED PARKING AREAS AND ARE NOT TO PARK ON THE LAWN AREAS; CONTRACTOR SHALL PARK ONLY IN THE DESIGNATED PARKING AREAS AND ARE NOT TO PARK ON THE LAWN AREAS; THE ONLY EXCEPTION IS TO LOAD AND UNLOAD SUPPLIES OR EQUIPMENT. 27. CONTRACTOR IS RESPONSIBLE FOR THE SAFEGUARDING OF THEIR TOOLS AND EQUIPMENT. ALL TOOLS AND EQUIPMENT CONTRACTOR IS RESPONSIBLE FOR THE SAFEGUARDING OF THEIR TOOLS AND EQUIPMENT. ALL TOOLS AND EQUIPMENT ARE NOT TO BE LEFT UNATTENDED AND ARE TO BE SECURED AT ALL TIMES WHEN THE CONTRACTOR IS NOT PRESENT. 28. CONTRACTOR MUST CONTROL DEMOLITION AND CONSTRUCTION DUST FROM FACILITY BY ERECTING A DUST BARRIER AND CONTRACTOR MUST CONTROL DEMOLITION AND CONSTRUCTION DUST FROM FACILITY BY ERECTING A DUST BARRIER AND VENTILATION WITH HEPA FILTERS. IF VENTING TO OUTSIDE, THE CONTRACTOR WILL INSURE NEGATIVE AIR PRESSURE IS MAINTAINED IN ENCAPSULATED WORK AREA. WHEN TRANSPORTING DEBRIS, WET DOWN SUFFICIENTLY TO PREVENT DUST SPREADING. 29. PROTECT ALL EXISTING SURFACES FROM DAMAGE. ANY DAMAGED SURFACES SHALL BE REPLACED TO MATCH ORIGINAL PROTECT ALL EXISTING SURFACES FROM DAMAGE. ANY DAMAGED SURFACES SHALL BE REPLACED TO MATCH ORIGINAL ITEM, OR REPAIRED TO MATCH EXISTING OR ADJACENT MATERIAL AS APPROVED BY THE VA COR. 30. CONTRACTOR IS RESPONSIBLE FOR REPAIRING AND REPLACING ANY DAMAGED LAWN. THE RESTORATION WILL BE CONTRACTOR IS RESPONSIBLE FOR REPAIRING AND REPLACING ANY DAMAGED LAWN. THE RESTORATION WILL BE PERFORMED BY A LANDSCAPE CONTRACTOR THAT REGULARLY DOES SODDING AS PART OF THEIR BUSINESS. ALL DAMAGED LAWN WILL BE OVERCUT BY 6" OR MORE TO ACCOMMODATE FULL WIDTH ROLLS OF SOD. TOPSOIL TO BE TILLED AND GRADED TO A SMOOTH MATCHING GRADE OF UNDAMAGED LAWN. SOD TO BE THOROUGHLY SATURATED WITH WATER UPON PLACEMENT. THE CONTRACTOR IS RESPONSIBLE FOR WATERING NEW SOD, 3 TIMES PER WEEK FOR 8 WEEKS. 31. CLEAN ALL DEBRIS FROM CONSTRUCTION SITES DAILY. CLEAN ALL DEBRIS FROM CONSTRUCTION SITES DAILY. 32. CONTRACTOR SHALL PROVIDE "SUBMITTAL EXCHANGE TYPE" SECURE ONLINE SYSTEM FOR EXCHANGING, REVIEWING, AND CONTRACTOR SHALL PROVIDE "SUBMITTAL EXCHANGE TYPE" SECURE ONLINE SYSTEM FOR EXCHANGING, REVIEWING, AND ARCHIVING SUBMITTALS, RFI'S, AND OTHER CONSTRUCTION COMMUNICATIONS ELECTRONICALLY. 33. ALL ALARM STROBES, ALARM STROBE ASSEMBLIES, EITHER WALL MOUNTED OR CEILING MOUNTED ARE 30 CANDELLA ALL ALARM STROBES, ALARM STROBE ASSEMBLIES, EITHER WALL MOUNTED OR CEILING MOUNTED ARE 30 CANDELLA INTENSITY, TYPICAL, UNLESS OTHERWISE NOTED.
AutoCAD SHX Text
POINT OF REMOVAL
AutoCAD SHX Text
EXISTING SPRINKLER HEAD
AutoCAD SHX Text
UPRIGHT SPRINKLER HEAD
AutoCAD SHX Text
SIDEWALL SPRINKLER HEAD
AutoCAD SHX Text
FIRE ALARM SYSTEM INPUT/OUTPUT MATRIX
AutoCAD SHX Text
OUTPUT
AutoCAD SHX Text
INPUT DEVICE
AutoCAD SHX Text
1. SOUND GENERAL BUILDING ALARM FOR OTHER AND HIGH RISE (NON-HEALTH CARE). SEE SECTION 7.2.1
AutoCAD SHX Text
2. NOTIFY NECESSARY STAFF FOR RESPONSE FOR HEALTH CARE AND HIGH RISE BUILDINGS ONLY (ALARM SIGNAL MAYBE DIFFERENT ON DIFFERENT FLOORS).
AutoCAD SHX Text
3. NOTIFY FIRE DEPARTMENT.
AutoCAD SHX Text
4. INITIATE SUPERVISORY SIGNAL TO A 24-HOUR MANNED POINT FOR IMMEDIATE RESPONSE.
AutoCAD SHX Text
5. CLOSE ASSOCIATE SMOKE BARRIER DOORS ON THE FLOOR.
AutoCAD SHX Text
6. CLOSE DAMPERS ON FAN APROXIMATE TO DETECTOR.
AutoCAD SHX Text
7. SHUT DOWN AIR HANDLER SERVED BY THE DETECTOR.
AutoCAD SHX Text
8. RECALL ELEVATOR.
AutoCAD SHX Text
DUCT SMOKE DETECTOR
AutoCAD SHX Text
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text
AREA SMOKE DETECTOR
AutoCAD SHX Text
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text
DOOR RELEASE SMOKE DETECTOR
AutoCAD SHX Text
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text
ELEVATOR SMOKE DETECTOR
AutoCAD SHX Text
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text
MANUAL PULL STATION
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text
ELEVATOR MACHINE ROOM HEAT DETECTOR
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text
GENERATOR ROOM HEAT DETECTOR
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text
SPRINKLER WATERFLOW / PRESSURE SWITCH
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text
WATER CONTROL VALVE TAMPER
AutoCAD SHX Text X
AutoCAD SHX Text
DRY-PIPE VALVE ROOM TEMPERATURE ALARM
AutoCAD SHX Text X
AutoCAD SHX Text
* WHILE NFPA 101 DOES NOT REQUIRE SOME DETECTORS TO NOTIFY BUILDING OCCUPANTS, VA REQUIRES ALL SMOKE DETECTORS, OTHER THAN DUCT SMOKE DETECTORS, TO NOTIFY BUILDING OCCUPANTS AS REQUIRED BY THE LIFE SAFETY CODE OR ITS REFERENCES. ** THOSE DOORS THAT ARE REQUIRED TO BE TIED TO THE FIRE ALARM SYSTEM SUCH AS DELAYED EGRESS AND ACCESS CONTROLLED DOORS. a - DO NOT PROVIDE DUCT DETECTORS IN DEDICATED (100%) EXHAUST FANS, THEY SHOULD CONTINUE TO RUN.
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text
9. INITIATE ELEVATOR SHUT DOWN AND DISCONNECT ELEVATOR POWER.
AutoCAD SHX Text
10. OPEN ** LOCKED EGRESS DOORS ON FLOOR OF FIRE ORIGIN.
AutoCAD SHX Text
11. DISCONNECT FUEL SOURCE FROM COOKING EQUIPMENT
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text
FLOW SWITCH
AutoCAD SHX Text
FS
AutoCAD SHX Text
ALARM, TAMPER SWITCH
AutoCAD SHX Text
SMOKE DETECTOR
AutoCAD SHX Text
DUCT SMOKE DETECTOR
AutoCAD SHX Text
TS
AutoCAD SHX Text
FIRE ALARM CONTROL PANEL
AutoCAD SHX Text
AutoCAD SHX Text
STROBE CANDELLA INTENSITY
AutoCAD SHX Text
AutoCAD SHX Text
STROBE CANDELLA INTENSITY
AutoCAD SHX Text
FA
AutoCAD SHX Text
FA
AutoCAD SHX Text
ALARM, SPEAKER ASSEMBLY, WALL MOUNT
AutoCAD SHX Text
FA
AutoCAD SHX Text
ALARM, FIRE, MANUAL PULL STATION: MOUNTED 48" AFF
AutoCAD SHX Text
ALARM, SPEAKER/STROBE, ONE ASSEMBLY, WALL MOUNT
AutoCAD SHX Text
ALARM, STROBE ASSEMBLY, WALL MOUNT
AutoCAD SHX Text
AutoCAD SHX Text
STROBE CANDELLA INTENSITY
AutoCAD SHX Text
FA
AutoCAD SHX Text
ALARM, SPEAKER/STROBE, ONE ASSEMBLY, CEILING MOUNT
AutoCAD SHX Text
AutoCAD SHX Text
STROBE CANDELLA INTENSITY
AutoCAD SHX Text
FA
AutoCAD SHX Text
ALARM, STROBE ASSEMBLY, CEILING MOUNT
AutoCAD SHX Text
ALARM, SPEAKER ASSEMBLY, CEILING MOUNT
AutoCAD SHX Text
FA
AutoCAD SHX Text
CLEAN AGENT DISPERSION HEAD
AutoCAD SHX Text
ECS EMERGENCY COMMUNICATION SYSTEM
AutoCAD SHX Text H
AutoCAD SHX Text
HEAT DETECTOR
AutoCAD SHX Text
KEY SWITCH
AutoCAD SHX Text
KS
AutoCAD SHX Text NOTE: ANY AND ALL FURNITURE, ON THE FLOOR, ON THE WALLS, OR IN THE WAY OF CONSTRUCTION, INVESTIGATION, OR RELATED TASKS MUST BE MOVED OUT OF THE WAY AND REPLACED TO ITS ORIGINAL POSITION BY THE GENERAL CONTRACTOR OR THEIR DESIGNATED AUTHORIZED SUB-CONTRACTOR.
AutoCAD SHX Text
MONITOR MODULE
AutoCAD SHX Text
MM
AutoCAD SHX Text
DOOR HOLD
AutoCAD SHX Text
DH
AutoCAD SHX Text
EXISTING WALLS TO REMAIN
AutoCAD SHX Text
EXISTING WALLS TO BE REMOVED
AutoCAD SHX Text
KEYED NOTE
AutoCAD SHX Text
EXISTING ITEM TO REMAIN
AutoCAD SHX Text
EXISTING ITEM TO BE REMOVED
AutoCAD SHX Text
EXISTING DOOR AND FRAME TO REMAIN
AutoCAD SHX Text
AutoCAD SHX Text
WALL TYPE / PARTITION TYPE
AutoCAD SHX Text
DETAIL REFERENCE
AutoCAD SHX Text
SECTION REFERENCE
AutoCAD SHX Text
NEW WALL / PARTITION
AutoCAD SHX Text
SHT
AutoCAD SHX Text
DTL
AutoCAD SHX Text
EQUIPMENT TAG
AutoCAD SHX Text
INTERIOR ELEVATION
AutoCAD SHX Text A5
AutoCAD SHX Text
SHT
AutoCAD SHX Text
DTL
AutoCAD SHX Text
SHT
AutoCAD SHX Text
DTL
AutoCAD SHX Text
CHR1
AutoCAD SHX Text
TWO HOUR FIRE RATING, 90 MINUTE "B" LABEL
AutoCAD SHX Text
DOORS
AutoCAD SHX Text
ONE HOUR FIRE RATING, 45 MINUTE "C" LABEL
AutoCAD SHX Text
DOORS
AutoCAD SHX Text
SMOKE-RESISTIVE WALLS, NON-FIRE RATED
AutoCAD SHX Text
ACCESS PANEL
AutoCAD SHX Text
ER ELEVATOR RECALL TIE-IN
AutoCAD SHX Text
SD
AutoCAD SHX Text
SMOKE DAMPER
AutoCAD SHX Text NOTE: CORRIDOR HORN/STROBES AND SMOKE DETECTORS ARE LOCATED ON EACH PLAN TO MEET THE REQUIREMENTS OF NFPA 72 AND THE VA FIRE ALARM DESIGN REQUIREMENTS. DIMENSIONS NOTED ARE MAXIMUM DISTANCES. COMPLIANCE WITH NFPA 72 IS REQUIRED REGARDLESS OF THE NUMBER AND LOCATION OF DEVICES SHOWN ON ALL PLANS. THE CONTRACTOR IS REQUIRED TO PROVIDE A FULLY FUNCTIONAL FIRE ALARM SYSTEM IN EACH BUILDING AND THE TOMAH VAMC CAMPUS WIDE FIRE ALARM SYSTEM UPGRADE.
AutoCAD SHX Text NOTE: ALL CRAWL SPACE WORK, IN ANY BUILDING, REQUIRES ALL JUNCTION BOXES BE WATERPROOF AND WATERTIGHT TYPE WITH ALL CONDUIT REQUIRED AS RED, LIQUID-TIGHT, FLEXIBLE, METAL CONDUIT. THIS REQUIREMENT SHALL BE STRICTLY ADHERED TO.
AutoCAD SHX Text NOTE: THE FIRE ALARM PROGRAM PROVIDER APPROVED AND INSTALLED IN THIS UPGRADE PROJECT MUST PROVIDE FACTORY AUTHORIZED TRAINING TO THE VA TOMAH ELECTRONICS TECHNICIANS FOR ALL ASPECTS OF THE FIRE ALARM PROGRAM. SEE FIRE ALARM SPECIFICATIONS FOR REQUIREMENTS. ADDITIONALLY, PROVIDE PROGRAMMING TRAINING FOR 4 VA TOMAH ELECTRONICS TECHNICIANS. THESE 4 VA TOMAH ELECTRONICS TECHNICIANS AT THE END OF TRAINING SHALL BE ABLE TO ALTER THE FIRE ALARM PROGRAM TO ADD, DELETE, MODIFY, CORRECT, FIRE ALARM NODES AND DEVICES SEEN FOR THE OVERALL CAMPUS AND EVERY INDIVIDUAL BUILDING INCLUDED IN THE NEW FIRE ALARM SYSTEM AT THE TOMAH VAMC. ALL TRAINING SHALL INCLUDE FORMAL PLANS (SUBMITTED FOR APPROVAL), A SYLLABUS, A COURSE OUTLINE, ALL PAPER FOR THE COURSE IN 3-RING BINDERS, SAMPLE TUTORIALS, AND A HELP CONTACT NAME, PHONE NUMBER AND EMAIL ADDRESS FOR FUTURE QUESTIONS.
AutoCAD SHX Text NOTE: PROVIDE A $5,000.00 CONTINGENCY FOR SPRINKLER PIPE REPAIRS FOR THE FOLLOWING BUILDINGS: B400, B401, B402, B403, B404, B406, B407, B408, B415, B416, B25, B36, AND B40.
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
AutoCAD SHX Text
VA FORM 08-6231, OCT 1978
P-UE P-UE
P-UE
B
B
P- U
E
P-UE
FD011
JMD
FIRE ALARM
SITE PLAN NORTHWEST
DEMOLITION
HFB
1 1/50" = 1'-0"
PARTIAL SITE PLAN
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
PROJECT LEADER:
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
D
C
B
A
97 8654321
Tomah, Wisconsin
676-22-110 Office of Facilities
Management
APRIL 21, 2026
CONSULTANTS:
500 E VETERANS ST
TOMAH, WI 54660
MEDICAL CENTER
VETERANS AFFAIRS
UPGRADE FIRE ALARM
SYSTEM DESIGN
1021 N. Superior Ave, Unit 11 Tomah, Wisconsin 54660
FINAL BID DOCUMENTSNORTH
AutoCAD SHX Text
B404 PIV
AutoCAD SHX Text
B403 PIV
AutoCAD SHX Text
B402 PIV
AutoCAD SHX Text
B424 PIV
AutoCAD SHX Text
BLDG T70
AutoCAD SHX Text
BLDG 52
AutoCAD SHX Text
BLDG NO. T296
AutoCAD SHX Text
BLDG NO. T295
AutoCAD SHX Text
BLDG T290
AutoCAD SHX Text
BLDG 403
AutoCAD SHX Text
BLDG 415
AutoCAD SHX Text
BLDG 423
AutoCAD SHX Text
BLDG. 451
AutoCAD SHX Text
BLDG. 445
AutoCAD SHX Text
BLDG 421
AutoCAD SHX Text
BLDG 404
AutoCAD SHX Text
BLDG 424
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
FD140
AutoCAD SHX Text
AutoCAD SHX Text
FD154
AutoCAD SHX Text
AutoCAD SHX Text
FD154
AutoCAD SHX Text
AutoCAD SHX Text
FD114
AutoCAD SHX Text
AutoCAD SHX Text
FD145
AutoCAD SHX Text
AutoCAD SHX Text
FD118
AutoCAD SHX Text
AutoCAD SHX Text
FD146
AutoCAD SHX Text
KEYED NOTES
AutoCAD SHX Text FIRE ALARM CONTRACTOR SHALL DISCONNECT AND REMOVE EXISTING TAMPER SWITCH FA DEVICE. REMOVE WIRING, FITTINGS, SUPPORTS, AND SYSTEM JUNCTION BOXES. WIRING TO BE REMOVED TO SOURCE. EXISTING FIRE ALARM. FIRE ALARM CONTRACTOR TO COORDINATE AND PROVIDE GUIDANCE TO THE CIVIL CONTRACTOR WHO SHALL REMOVE THE BURIED CONDUIT, CABLES, AND THE EXISTING METHOD USED TO HOUSE FIRE ALARM WIRING FROM TAMPER SWITCH TO INSIDE BUILDING COMPLETE. FIRE ALARM CONTRACTOR TO DEMOLISH ALL FIRE ALARM CONDUIT WITHIN EACH CRAWL SPACE FROM THE FOUNDATION WALL TO THE FACP FOR THIS TAMPER SWITCH, INCLUDING ALL SUPPORTS. THE FIRE ALARM CONTRACTOR SHALL HIRE THE TOMAH VAMC BUILDING AUTOMATION SYSTEM (BAS) CONTRACTOR TO DISCONNECT THE CONNECTION BETWEEN THE FIRE ALARM SYSTEM AND BAS.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
%%UGENERAL FIRE ALARM SITE WORK NOTES:
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text NOTE: WHEN ACCESS DRIVE IS REQUIRED TO BE CLOSED FOR CONSTRUCTION ACTIVITY THE CONTRACTOR SHALL PROVIDE A WRITTEN REQUEST FOR THE SHUTDOWN 2 WEEKS (10 WORKING DAYS) PRIOR TO EVENT. INCLUDE IN THE REQUEST A DETAILED PROCEDURE, MATERIALS OR EQUIPMENT USED, VEHICLES INCLUDED, NUMBER OF STAFF WORKING ON THE PROCEDURE AND THE EXPECTED DURATION OF SHUTDOWN (5 WORKING DAYS MAXIMUM ALLOWED).. THE CONTRACTOR SHALL ALSO PROVIDE PROPER STATE OF WISCONSIN DOT AND MUTCD TRAFFIC WARNING SIGNS AND PROTECTION. TRAFFIC WARNING SIGNS FOR CONTROLLING AND REDIRECTING PEDESTRIAN AND VEHICLE TRAFFIC ARE REQUIRED FOR THE ENTIRE DURATION OF THE SHUTDOWN.
AutoCAD SHX Text
1. ALL WORK TO CONFORM TO STATE AND LOCAL REGULATIONS. ALL WORK TO CONFORM TO STATE AND LOCAL REGULATIONS. 2. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS IN THE FIELD PRIOR TO THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS IN THE FIELD PRIOR TO STARTING CONSTRUCTION AND SHALL BE RESPONSIBLE FOR ALL FIELD DIMENSIONS. IF ANY DISCREPANCIES ARE FOUND IN THESE PLANS FROM THE ACTUAL FIELD CONDITIONS, THE CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY. 3. THE GENERAL CONTRACTOR MUST CONTRACT WITH A PRIVATE UTILITY THE GENERAL CONTRACTOR MUST CONTRACT WITH A PRIVATE UTILITY LOCATOR CONTRACTOR TO FIND AND LOCATE ALL BURIED UTILITIES BEFORE AND EXCAVATION OR DIRECTIONAL BORING TAKES PLACE. 4. TAKE PARTICULAR CARE WHEN EXCAVATING IN AND AROUND EXISTING UTILITY TAKE PARTICULAR CARE WHEN EXCAVATING IN AND AROUND EXISTING UTILITY LINES AND EQUIPMENT. VERIFY COVER REQUIREMENTS BY GENERAL CONTRACTORS PRIVATE UTILITY LOCATOR CONTRACTOR AND/OR UTILITY COMPANIES SO AS NOT TO CAUSE DAMAGE. 5. PROVIDE POSITIVE DRAINAGE WITHOUT PONDING, IN ALL AREAS. AFTER PROVIDE POSITIVE DRAINAGE WITHOUT PONDING, IN ALL AREAS. AFTER INSTALLATION, CONTRACTOR TO TEST FOR, AND CORRECT, IF ANY, 'BIRD BATH' CONDITIONS. 6. REPLACEMENT PAVEMENT SHALL MATCH EXISTING PAVEMENT ELEVATIONS REPLACEMENT PAVEMENT SHALL MATCH EXISTING PAVEMENT ELEVATIONS WITHOUT CAUSING PONDING ISSUES. 7. COORDINATE REQUIRED EARTHWORK WITH THE GC. FIRE ALARM CONTRACTOR COORDINATE REQUIRED EARTHWORK WITH THE GC. FIRE ALARM CONTRACTOR TO DEFINE AND LOCATE THE REQUIRED FIRE ALARM CONDUIT ROUTE, PROVIDE THE INFORMATION TO THE CIVIL CONTRACTOR FOR INSTALLATION. 8. THE CIVIL CONTRACTOR SHALL PROVIDE THE RED CONDUIT. THE CIVIL THE CIVIL CONTRACTOR SHALL PROVIDE THE RED CONDUIT. THE CIVIL DRAWINGS STATE 2" DIAMETER. NO FIRE ALARM CONDUIT MAY BE INSTALLED IN THE EARTH LESS THAN THAN 1" DIAMETER. COORDINATE WITH THE CIVIL CONTRACTOR FOR MATERIALS NEEDED FOR BURYING CONDUIT REQUIRED BY THE FIRE ALARM DEVICES FOR SIGNALS AND POWER OF THOSE DEVICES. 9. VERIFY AND COORDINATE WITH THE CIVIL CONTRACTOR FOR COVER VERIFY AND COORDINATE WITH THE CIVIL CONTRACTOR FOR COVER REQUIREMENTS MEETING MINIMUM AND INDUSTRY STANDARD DEPTHS, COVER, BEDDING, TRACING AND RESTORATION. 10. THE CIVIL CONTRACTOR SHALL PROTECT ALL EXISTING STORM WATER INLETS THE CIVIL CONTRACTOR SHALL PROTECT ALL EXISTING STORM WATER INLETS WITH GEOTEXTILE FABRIC. THE FIRE ALARM CONTRACTOR WILL ENSURE AND VERIFY THESE ARE DONE AND MAINTAINED. REPORT ISSUES TO THE PROJECT CCR IMMEDIATELY. SEE DETAILS. 11. ALL RESTORATION FOR LAWN, SIDEWALK, ROADWAYS, AND ALL EXTERIOR ALL RESTORATION FOR LAWN, SIDEWALK, ROADWAYS, AND ALL EXTERIOR FEATURES SHALL BE COMPLETED WITHIN 15 WORKING DAYS FROM THE VA TOMAH ACCEPTED END OF THE WORK, UNLESS OTHERWISE DESCRIBED OR NOTED IN THESE DOCUMENTS. COOPERATE AND OTHERWISE WORK WITH THE ALL CONTRACTORS TO QUICKLY FINISH OPEN TRENCHES, AND QUICKLY COMPLETE CONTRACTORS DUTIES.
AutoCAD SHX Text NOTE: THE GENERAL CONTRACTOR SHALL DIRECTLY HIRE A SPECIALIZED DEWATERING CONTRACTOR. THE GC AND DEWATERING CONTRACTOR SHALL BE RESPONSIBLE FOR ALL DEWATERING DURING CONSTRUCTION. SEE SPECIFICATION SECTION 312319 FOR ADDITIONAL INFORMATION. PREVIOUS SITE EVALUATION REPORTS HAVE NOTED THE GROUND WATER IN AND AROUND THE TOMAH VAMC CAMPUS SITE AS HIGH AS 3' TO 4' BELOW GRADE. ALL PENETRATIONS IN THE GROUNDWATER REQUIRE DEWATERING. PREVIOUS EVALUATION REPORTS RECOMMEND REMOVING GROUNDWATER FROM EXCAVATIONS WITH CONVENTIONAL PUMPS. THE DEWATERING CONTRACTOR MUST DEVELOP A DEWATERING PLAN FOR SUBMISSION AND REVIEW BY THE AE AND VA. GROUNDWATER REMOVAL SHALL BE PERFORMED BY THE DEWATERING CONTRACTOR. REVIEW ALL SPECIFICATIONS IN THE CONSTRUCTION DOCUMENTS FOR DEWATERING REQUIREMENTS BEYOND THOSE LISTED HERE.
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
AC AC
BI
TU
M
IN
O U
S
PA
TH
B
B
B
B
B
O
XY
G
EN
FD012
JMD
FIRE ALARM
SITE PLAN NORTHEAST
DEMOLITION
HFB
1 1/50" = 1'-0"
PARTIAL SITE PLAN
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
PROJECT LEADER:
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
D
C
B
A
97 8654321
Tomah, Wisconsin
676-22-110 Office of Facilities
Management
APRIL 21, 2026
CONSULTANTS:
500 E VETERANS ST
TOMAH, WI 54660
MEDICAL CENTER
VETERANS AFFAIRS
UPGRADE FIRE ALARM
SYSTEM DESIGN
1021 N. Superior Ave, Unit 11 Tomah, Wisconsin 54660
FINAL BID DOCUMENTSNORTH
AutoCAD SHX Text H
AutoCAD SHX Text
B411 PIV
AutoCAD SHX Text
B452/B455 PIV
AutoCAD SHX Text
BLDG 411
AutoCAD SHX Text
BLDG 400
AutoCAD SHX Text
BLDG 407
AutoCAD SHX Text
BLDG 448
AutoCAD SHX Text
BLDG 447
AutoCAD SHX Text
BLDG 408
AutoCAD SHX Text
BLDG 410
AutoCAD SHX Text
BLDG 409
AutoCAD SHX Text
BLDG 412
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
FD136
AutoCAD SHX Text
AutoCAD SHX Text
FD139
AutoCAD SHX Text
AutoCAD SHX Text
FD138
AutoCAD SHX Text
AutoCAD SHX Text
FD137
AutoCAD SHX Text
AutoCAD SHX Text
FD128
AutoCAD SHX Text
AutoCAD SHX Text
FD101
AutoCAD SHX Text
AutoCAD SHX Text
FD132
AutoCAD SHX Text
B412 PIV
AutoCAD SHX Text
AutoCAD SHX Text
B409 PIV
AutoCAD SHX Text
AutoCAD SHX Text
B410 PIV
AutoCAD SHX Text
AutoCAD SHX Text
B408 PIV
AutoCAD SHX Text
AutoCAD SHX Text
B407 PIV
AutoCAD SHX Text
AutoCAD SHX Text
B400 PIV
AutoCAD SHX Text
AutoCAD SHX Text
B405 PIV
AutoCAD SHX Text
AutoCAD SHX Text
B406 PIV
AutoCAD SHX Text
AutoCAD SHX Text
BLDG 406
AutoCAD SHX Text
BLDG 455
AutoCAD SHX Text
BLDG 452
AutoCAD SHX Text
BLDG 405
AutoCAD SHX Text
BLDG 425
AutoCAD SHX Text
AutoCAD SHX Text
FD146
AutoCAD SHX Text
AutoCAD SHX Text
FD124
AutoCAD SHX Text
AutoCAD SHX Text
FD144
AutoCAD SHX Text
AutoCAD SHX Text
FD155
AutoCAD SHX Text
AutoCAD SHX Text
FD122
AutoCAD SHX Text
KEYED NOTES
AutoCAD SHX Text FIRE ALARM CONTRACTOR SHALL DISCONNECT AND REMOVE EXISTING TAMPER SWITCH FA DEVICE. REMOVE WIRING, FITTINGS, SUPPORTS, AND SYSTEM JUNCTION BOXES. WIRING TO BE REMOVED TO SOURCE. EXISTING FIRE ALARM. FIRE ALARM CONTRACTOR TO COORDINATE AND PROVIDE GUIDANCE TO THE CIVIL CONTRACTOR WHO SHALL REMOVE THE BURIED CONDUIT, CABLES, AND THE EXISTING METHOD USED TO HOUSE FIRE ALARM WIRING FROM TAMPER SWITCH TO INSIDE BUILDING COMPLETE. FIRE ALARM CONTRACTOR TO DEMOLISH ALL FIRE ALARM CONDUIT WITHIN EACH CRAWL SPACE FROM THE FOUNDATION WALL TO THE FACP FOR THIS TAMPER SWITCH, INCLUDING ALL SUPPORTS. FIRE ALARM CONTRACTOR TO DEMOLISH ALL FIRE ALARM CONDUIT WITHIN BUILDING FROM THE FOUNDATION WALL TO THE FACP FOR THIS TAMPER SWITCH, INCLUDING ALL SUPPORTS. THE FIRE ALARM CONTRACTOR SHALL HIRE THE TOMAH VAMC BUILDING AUTOMATION SYSTEM (BAS) CONTRACTOR TO DISCONNECT THE CONNECTION BETWEEN THE FIRE ALARM SYSTEM AND BAS.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
%%UGENERAL FIRE ALARM SITE WORK NOTES:
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text NOTE: WHEN ACCESS DRIVE IS REQUIRED TO BE CLOSED FOR CONSTRUCTION ACTIVITY THE CONTRACTOR SHALL PROVIDE A WRITTEN REQUEST FOR THE SHUTDOWN 2 WEEKS (10 WORKING DAYS) PRIOR TO EVENT. INCLUDE IN THE REQUEST A DETAILED PROCEDURE, MATERIALS OR EQUIPMENT USED, VEHICLES INCLUDED, NUMBER OF STAFF WORKING ON THE PROCEDURE AND THE EXPECTED DURATION OF SHUTDOWN (5 WORKING DAYS MAXIMUM ALLOWED).. THE CONTRACTOR SHALL ALSO PROVIDE PROPER STATE OF WISCONSIN DOT AND MUTCD TRAFFIC WARNING SIGNS AND PROTECTION. TRAFFIC WARNING SIGNS FOR CONTROLLING AND REDIRECTING PEDESTRIAN AND VEHICLE TRAFFIC ARE REQUIRED FOR THE ENTIRE DURATION OF THE SHUTDOWN.
AutoCAD SHX Text
1. ALL WORK TO CONFORM TO STATE AND LOCAL REGULATIONS. ALL WORK TO CONFORM TO STATE AND LOCAL REGULATIONS. 2. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS IN THE FIELD PRIOR TO THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS IN THE FIELD PRIOR TO STARTING CONSTRUCTION AND SHALL BE RESPONSIBLE FOR ALL FIELD DIMENSIONS. IF ANY DISCREPANCIES ARE FOUND IN THESE PLANS FROM THE ACTUAL FIELD CONDITIONS, THE CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY. 3. THE GENERAL CONTRACTOR MUST CONTRACT WITH A PRIVATE UTILITY THE GENERAL CONTRACTOR MUST CONTRACT WITH A PRIVATE UTILITY LOCATOR CONTRACTOR TO FIND AND LOCATE ALL BURIED UTILITIES BEFORE AND EXCAVATION OR DIRECTIONAL BORING TAKES PLACE. 4. TAKE PARTICULAR CARE WHEN EXCAVATING IN AND AROUND EXISTING UTILITY TAKE PARTICULAR CARE WHEN EXCAVATING IN AND AROUND EXISTING UTILITY LINES AND EQUIPMENT. VERIFY COVER REQUIREMENTS BY GENERAL CONTRACTORS PRIVATE UTILITY LOCATOR CONTRACTOR AND/OR UTILITY COMPANIES SO AS NOT TO CAUSE DAMAGE. 5. PROVIDE POSITIVE DRAINAGE WITHOUT PONDING, IN ALL AREAS. AFTER PROVIDE POSITIVE DRAINAGE WITHOUT PONDING, IN ALL AREAS. AFTER INSTALLATION, CONTRACTOR TO TEST FOR, AND CORRECT, IF ANY, 'BIRD BATH' CONDITIONS. 6. REPLACEMENT PAVEMENT SHALL MATCH EXISTING PAVEMENT ELEVATIONS REPLACEMENT PAVEMENT SHALL MATCH EXISTING PAVEMENT ELEVATIONS WITHOUT CAUSING PONDING ISSUES. 7. COORDINATE REQUIRED EARTHWORK WITH THE GC. FIRE ALARM CONTRACTOR COORDINATE REQUIRED EARTHWORK WITH THE GC. FIRE ALARM CONTRACTOR TO DEFINE AND LOCATE THE REQUIRED FIRE ALARM CONDUIT ROUTE, PROVIDE THE INFORMATION TO THE CIVIL CONTRACTOR FOR INSTALLATION. 8. THE CIVIL CONTRACTOR SHALL PROVIDE THE RED CONDUIT. THE CIVIL THE CIVIL CONTRACTOR SHALL PROVIDE THE RED CONDUIT. THE CIVIL DRAWINGS STATE 2" DIAMETER. NO FIRE ALARM CONDUIT MAY BE INSTALLED IN THE EARTH LESS THAN THAN 1" DIAMETER. COORDINATE WITH THE CIVIL CONTRACTOR FOR MATERIALS NEEDED FOR BURYING CONDUIT REQUIRED BY THE FIRE ALARM DEVICES FOR SIGNALS AND POWER OF THOSE DEVICES. 9. VERIFY AND COORDINATE WITH THE CIVIL CONTRACTOR FOR COVER VERIFY AND COORDINATE WITH THE CIVIL CONTRACTOR FOR COVER REQUIREMENTS MEETING MINIMUM AND INDUSTRY STANDARD DEPTHS, COVER, BEDDING, TRACING AND RESTORATION. 10. THE CIVIL CONTRACTOR SHALL PROTECT ALL EXISTING STORM WATER INLETS THE CIVIL CONTRACTOR SHALL PROTECT ALL EXISTING STORM WATER INLETS WITH GEOTEXTILE FABRIC. THE FIRE ALARM CONTRACTOR WILL ENSURE AND VERIFY THESE ARE DONE AND MAINTAINED. REPORT ISSUES TO THE PROJECT CCR IMMEDIATELY. SEE DETAILS. 11. ALL RESTORATION FOR LAWN, SIDEWALK, ROADWAYS, AND ALL EXTERIOR ALL RESTORATION FOR LAWN, SIDEWALK, ROADWAYS, AND ALL EXTERIOR FEATURES SHALL BE COMPLETED WITHIN 15 WORKING DAYS FROM THE VA TOMAH ACCEPTED END OF THE WORK, UNLESS OTHERWISE DESCRIBED OR NOTED IN THESE DOCUMENTS. COOPERATE AND OTHERWISE WORK WITH THE ALL CONTRACTORS TO QUICKLY FINISH OPEN TRENCHES, AND QUICKLY COMPLETE CONTRACTORS DUTIES.
AutoCAD SHX Text NOTE: THE GENERAL CONTRACTOR SHALL DIRECTLY HIRE A SPECIALIZED DEWATERING CONTRACTOR. THE GC AND DEWATERING CONTRACTOR SHALL BE RESPONSIBLE FOR ALL DEWATERING DURING CONSTRUCTION. SEE SPECIFICATION SECTION 312319 FOR ADDITIONAL INFORMATION. PREVIOUS SITE EVALUATION REPORTS HAVE NOTED THE GROUND WATER IN AND AROUND THE TOMAH VAMC CAMPUS SITE AS HIGH AS 3' TO 4' BELOW GRADE. ALL PENETRATIONS IN THE GROUNDWATER REQUIRE DEWATERING. PREVIOUS EVALUATION REPORTS RECOMMEND REMOVING GROUNDWATER FROM EXCAVATIONS WITH CONVENTIONAL PUMPS. THE DEWATERING CONTRACTOR MUST DEVELOP A DEWATERING PLAN FOR SUBMISSION AND REVIEW BY THE AE AND VA. GROUNDWATER REMOVAL SHALL BE PERFORMED BY THE DEWATERING CONTRACTOR. REVIEW ALL SPECIFICATIONS IN THE CONSTRUCTION DOCUMENTS FOR DEWATERING REQUIREMENTS BEYOND THOSE LISTED HERE.
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
P-UE P-UE
P-UE
B
B
O
XY
G
EN
P-
P-UE
P-U
E P-U
E P-U
E P-U
E P-U
E P-U
E P-U
E P-U
E P-U
E P-U
E P-U
E P-U
E
P- U
E P-
U E
P- U
E
P-U E
P- U
E P-
U E
P- U
E P-
U E
P- U
E P-
U E
P-UE
FD013
JMD
FIRE ALARM
SITE PLAN SOUTHWEST
DEMOLITION
HFB
1 1/50" = 1'-0"
PARTIAL SITE PLAN
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
PROJECT LEADER:
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
D
C
B
A
97 8654321
Tomah, Wisconsin
676-22-110 Office of Facilities
Management
APRIL 21, 2026
CONSULTANTS:
500 E VETERANS ST
TOMAH, WI 54660
MEDICAL CENTER
VETERANS AFFAIRS
UPGRADE FIRE ALARM
SYSTEM DESIGN
1021 N. Superior Ave, Unit 11 Tomah, Wisconsin 54660
FINAL BID DOCUMENTSNORTH
AutoCAD SHX Text
B401 PIV
AutoCAD SHX Text
B23 PIV
AutoCAD SHX Text
AutoCAD SHX Text
BLDG 260
AutoCAD SHX Text
BLDG. 402
AutoCAD SHX Text
BLDG 416
AutoCAD SHX Text
BLDG 406
AutoCAD SHX Text
BLDG 36
AutoCAD SHX Text
BLDG 40
AutoCAD SHX Text
BLDG T270
AutoCAD SHX Text
BLDG 32
AutoCAD SHX Text
BLDG 401
AutoCAD SHX Text
BLDG 425
AutoCAD SHX Text
BLDG 446
AutoCAD SHX Text
OXYGEN STORAGE
AutoCAD SHX Text
BLDG. 451
AutoCAD SHX Text
BLDG NO. 23
AutoCAD SHX Text
BLDG NO. 25
AutoCAD SHX Text
BLDG NO. 15
AutoCAD SHX Text
BLDG NO. 18
AutoCAD SHX Text
BLDG NO. T240
AutoCAD SHX Text
BLDG NO. 240A
AutoCAD SHX Text
BLDG NO. 5
AutoCAD SHX Text
BLDG NO. 6
AutoCAD SHX Text
BLDG. 449
AutoCAD SHX Text
BLDG 450
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
FD150
AutoCAD SHX Text
AutoCAD SHX Text
FD153
AutoCAD SHX Text
AutoCAD SHX Text
FD148
AutoCAD SHX Text
AutoCAD SHX Text
FD151
AutoCAD SHX Text
AutoCAD SHX Text
FD149
AutoCAD SHX Text
AutoCAD SHX Text
FD150
AutoCAD SHX Text
AutoCAD SHX Text
FD143
AutoCAD SHX Text
AutoCAD SHX Text
FD153
AutoCAD SHX Text
AutoCAD SHX Text
FD153
AutoCAD SHX Text
AutoCAD SHX Text
FD141
AutoCAD SHX Text
AutoCAD SHX Text
FD110
AutoCAD SHX Text
AutoCAD SHX Text
FD146
AutoCAD SHX Text
AutoCAD SHX Text
FD106
AutoCAD SHX Text
AutoCAD SHX Text
FD142
AutoCAD SHX Text
AutoCAD SHX Text
FD124
AutoCAD SHX Text
B416 PIV
AutoCAD SHX Text
AutoCAD SHX Text
FD148
AutoCAD SHX Text
AutoCAD SHX Text
B32 PIV
AutoCAD SHX Text
AutoCAD SHX Text
B402 PIV
AutoCAD SHX Text
AutoCAD SHX Text
KEYED NOTES
AutoCAD SHX Text FIRE ALARM CONTRACTOR SHALL DISCONNECT AND REMOVE EXISTING TAMPER SWITCH FA DEVICE. REMOVE WIRING, FITTINGS, SUPPORTS, AND SYSTEM JUNCTION BOXES. WIRING TO BE REMOVED TO SOURCE. EXISTING FIRE ALARM. FIRE ALARM CONTRACTOR TO COORDINATE AND PROVIDE GUIDANCE TO THE CIVIL CONTRACTOR WHO SHALL REMOVE THE BURIED CONDUIT, CABLES, AND THE EXISTING METHOD USED TO HOUSE FIRE ALARM WIRING FROM TAMPER SWITCH TO INSIDE BUILDING COMPLETE. FIRE ALARM CONTRACTOR TO DEMOLISH ALL FIRE ALARM CONDUIT WITHIN EACH CRAWL SPACE FROM THE FOUNDATION WALL TO THE FACP FOR THIS TAMPER SWITCH, INCLUDING ALL SUPPORTS. FIRE ALARM CONTRACTOR TO DEMOLISH ALL FIRE ALARM CONDUIT WITHIN BUILDING FROM THE FOUNDATION WALL TO THE FACP FOR THIS TAMPER SWITCH, INCLUDING ALL SUPPORTS. THE FIRE ALARM CONTRACTOR SHALL HIRE THE TOMAH VAMC BUILDING AUTOMATION SYSTEM (BAS) CONTRACTOR TO DISCONNECT THE CONNECTION BETWEEN THE FIRE ALARM SYSTEM AND BAS.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
%%UGENERAL FIRE ALARM SITE WORK NOTES:
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
B406 PIV
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
B15 PIV
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text NOTE: WHEN ACCESS DRIVE IS REQUIRED TO BE CLOSED FOR CONSTRUCTION ACTIVITY THE CONTRACTOR SHALL PROVIDE A WRITTEN REQUEST FOR THE SHUTDOWN 2 WEEKS (10 WORKING DAYS) PRIOR TO EVENT. INCLUDE IN THE REQUEST A DETAILED PROCEDURE, MATERIALS OR EQUIPMENT USED, VEHICLES INCLUDED, NUMBER OF STAFF WORKING ON THE PROCEDURE AND THE EXPECTED DURATION OF SHUTDOWN (5 WORKING DAYS MAXIMUM ALLOWED).. THE CONTRACTOR SHALL ALSO PROVIDE PROPER STATE OF WISCONSIN DOT AND MUTCD TRAFFIC WARNING SIGNS AND PROTECTION. TRAFFIC WARNING SIGNS FOR CONTROLLING AND REDIRECTING PEDESTRIAN AND VEHICLE TRAFFIC ARE REQUIRED FOR THE ENTIRE DURATION OF THE SHUTDOWN.
AutoCAD SHX Text
1. ALL WORK TO CONFORM TO STATE AND LOCAL REGULATIONS. ALL WORK TO CONFORM TO STATE AND LOCAL REGULATIONS. 2. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS IN THE FIELD PRIOR TO THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS IN THE FIELD PRIOR TO STARTING CONSTRUCTION AND SHALL BE RESPONSIBLE FOR ALL FIELD DIMENSIONS. IF ANY DISCREPANCIES ARE FOUND IN THESE PLANS FROM THE ACTUAL FIELD CONDITIONS, THE CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY. 3. THE GENERAL CONTRACTOR MUST CONTRACT WITH A PRIVATE UTILITY THE GENERAL CONTRACTOR MUST CONTRACT WITH A PRIVATE UTILITY LOCATOR CONTRACTOR TO FIND AND LOCATE ALL BURIED UTILITIES BEFORE AND EXCAVATION OR DIRECTIONAL BORING TAKES PLACE. 4. TAKE PARTICULAR CARE WHEN EXCAVATING IN AND AROUND EXISTING UTILITY TAKE PARTICULAR CARE WHEN EXCAVATING IN AND AROUND EXISTING UTILITY LINES AND EQUIPMENT. VERIFY COVER REQUIREMENTS BY GENERAL CONTRACTORS PRIVATE UTILITY LOCATOR CONTRACTOR AND/OR UTILITY COMPANIES SO AS NOT TO CAUSE DAMAGE. 5. PROVIDE POSITIVE DRAINAGE WITHOUT PONDING, IN ALL AREAS. AFTER PROVIDE POSITIVE DRAINAGE WITHOUT PONDING, IN ALL AREAS. AFTER INSTALLATION, CONTRACTOR TO TEST FOR, AND CORRECT, IF ANY, 'BIRD BATH' CONDITIONS. 6. REPLACEMENT PAVEMENT SHALL MATCH EXISTING PAVEMENT ELEVATIONS REPLACEMENT PAVEMENT SHALL MATCH EXISTING PAVEMENT ELEVATIONS WITHOUT CAUSING PONDING ISSUES. 7. COORDINATE REQUIRED EARTHWORK WITH THE GC. FIRE ALARM CONTRACTOR COORDINATE REQUIRED EARTHWORK WITH THE GC. FIRE ALARM CONTRACTOR TO DEFINE AND LOCATE THE REQUIRED FIRE ALARM CONDUIT ROUTE, PROVIDE THE INFORMATION TO THE CIVIL CONTRACTOR FOR INSTALLATION. 8. THE CIVIL CONTRACTOR SHALL PROVIDE THE RED CONDUIT. THE CIVIL THE CIVIL CONTRACTOR SHALL PROVIDE THE RED CONDUIT. THE CIVIL DRAWINGS STATE 2" DIAMETER. NO FIRE ALARM CONDUIT MAY BE INSTALLED IN THE EARTH LESS THAN THAN 1" DIAMETER. COORDINATE WITH THE CIVIL CONTRACTOR FOR MATERIALS NEEDED FOR BURYING CONDUIT REQUIRED BY THE FIRE ALARM DEVICES FOR SIGNALS AND POWER OF THOSE DEVICES. 9. VERIFY AND COORDINATE WITH THE CIVIL CONTRACTOR FOR COVER VERIFY AND COORDINATE WITH THE CIVIL CONTRACTOR FOR COVER REQUIREMENTS MEETING MINIMUM AND INDUSTRY STANDARD DEPTHS, COVER, BEDDING, TRACING AND RESTORATION. 10. THE CIVIL CONTRACTOR SHALL PROTECT ALL EXISTING STORM WATER INLETS THE CIVIL CONTRACTOR SHALL PROTECT ALL EXISTING STORM WATER INLETS WITH GEOTEXTILE FABRIC. THE FIRE ALARM CONTRACTOR WILL ENSURE AND VERIFY THESE ARE DONE AND MAINTAINED. REPORT ISSUES TO THE PROJECT CCR IMMEDIATELY. SEE DETAILS. 11. ALL RESTORATION FOR LAWN, SIDEWALK, ROADWAYS, AND ALL EXTERIOR ALL RESTORATION FOR LAWN, SIDEWALK, ROADWAYS, AND ALL EXTERIOR FEATURES SHALL BE COMPLETED WITHIN 15 WORKING DAYS FROM THE VA TOMAH ACCEPTED END OF THE WORK, UNLESS OTHERWISE DESCRIBED OR NOTED IN THESE DOCUMENTS. COOPERATE AND OTHERWISE WORK WITH THE ALL CONTRACTORS TO QUICKLY FINISH OPEN TRENCHES, AND QUICKLY COMPLETE CONTRACTORS DUTIES.
AutoCAD SHX Text NOTE: THE GENERAL CONTRACTOR SHALL DIRECTLY HIRE A SPECIALIZED DEWATERING CONTRACTOR. THE GC AND DEWATERING CONTRACTOR SHALL BE RESPONSIBLE FOR ALL DEWATERING DURING CONSTRUCTION. SEE SPECIFICATION SECTION 312319 FOR ADDITIONAL INFORMATION. PREVIOUS SITE EVALUATION REPORTS HAVE NOTED THE GROUND WATER IN AND AROUND THE TOMAH VAMC CAMPUS SITE AS HIGH AS 3' TO 4' BELOW GRADE. ALL PENETRATIONS IN THE GROUNDWATER REQUIRE DEWATERING. PREVIOUS EVALUATION REPORTS RECOMMEND REMOVING GROUNDWATER FROM EXCAVATIONS WITH CONVENTIONAL PUMPS. THE DEWATERING CONTRACTOR MUST DEVELOP A DEWATERING PLAN FOR SUBMISSION AND REVIEW BY THE AE AND VA. GROUNDWATER REMOVAL SHALL BE PERFORMED BY THE DEWATERING CONTRACTOR. REVIEW ALL SPECIFICATIONS IN THE CONSTRUCTION DOCUMENTS FOR DEWATERING REQUIREMENTS BEYOND THOSE LISTED HERE.
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
2.
FD014
JMD
FIRE ALARM
SITE PLAN SOUTHEAST
DEMOLITION
HFB
1 1/64" = 1'-0"
PARTIAL SITE PLAN
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
PROJECT LEADER:
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
D
C
B
A
97 8654321
Tomah, Wisconsin
676-22-110 Office of Facilities
Management
APRIL 21, 2026
CONSULTANTS:
500 E VETERANS ST
TOMAH, WI 54660
MEDICAL CENTER
VETERANS AFFAIRS
UPGRADE FIRE ALARM
SYSTEM DESIGN
1021 N. Superior Ave, Unit 11 Tomah, Wisconsin 54660
FINAL BID DOCUMENTSNORTH
AutoCAD SHX Text
BLDG NO. 1
AutoCAD SHX Text
BLDG NO. 2
AutoCAD SHX Text
BLDG NO. T223
AutoCAD SHX Text
BLDG NO. 3
AutoCAD SHX Text
BLDG NO. 12
AutoCAD SHX Text
BLDG NO. 4
AutoCAD SHX Text
BLDG NO. 10
AutoCAD SHX Text
BLDG NO. 427
AutoCAD SHX Text
BLDG NO. T212
AutoCAD SHX Text
BLDG NO. 215
AutoCAD SHX Text
AutoCAD SHX Text
FD147
AutoCAD SHX Text
AutoCAD SHX Text
FD147
AutoCAD SHX Text
AutoCAD SHX Text
FD153
AutoCAD SHX Text
AutoCAD SHX Text
FD149
AutoCAD SHX Text
AutoCAD SHX Text
FD148
AutoCAD SHX Text
AutoCAD SHX Text
FD148
AutoCAD SHX Text
AutoCAD SHX Text
FD153
AutoCAD SHX Text
%%UGENERAL FIRE ALARM SITE WORK NOTES:
AutoCAD SHX Text NOTE: SEE THE REFERENCED SHEETS NOTED FOR DEMOLITION WORK IN THESE BUILDINGS. THERE IS NO SITE WORK FOR DEMOLITION ASSOCIATED WITH ANY BUILDING ON THIS DRAWING.
AutoCAD SHX Text NOTE: WHEN ACCESS DRIVE IS REQUIRED TO BE CLOSED FOR CONSTRUCTION ACTIVITY THE CONTRACTOR SHALL PROVIDE A WRITTEN REQUEST FOR THE SHUTDOWN 2 WEEKS (10 WORKING DAYS) PRIOR TO EVENT. INCLUDE IN THE REQUEST A DETAILED PROCEDURE, MATERIALS OR EQUIPMENT USED, VEHICLES INCLUDED, NUMBER OF STAFF WORKING ON THE PROCEDURE AND THE EXPECTED DURATION OF SHUTDOWN (5 WORKING DAYS MAXIMUM ALLOWED).. THE CONTRACTOR SHALL ALSO PROVIDE PROPER STATE OF WISCONSIN DOT AND MUTCD TRAFFIC WARNING SIGNS AND PROTECTION. TRAFFIC WARNING SIGNS FOR CONTROLLING AND REDIRECTING PEDESTRIAN AND VEHICLE TRAFFIC ARE REQUIRED FOR THE ENTIRE DURATION OF THE SHUTDOWN.
AutoCAD SHX Text
1. ALL WORK TO CONFORM TO STATE AND LOCAL REGULATIONS. ALL WORK TO CONFORM TO STATE AND LOCAL REGULATIONS. 2. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS IN THE FIELD PRIOR TO THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS IN THE FIELD PRIOR TO STARTING CONSTRUCTION AND SHALL BE RESPONSIBLE FOR ALL FIELD DIMENSIONS. IF ANY DISCREPANCIES ARE FOUND IN THESE PLANS FROM THE ACTUAL FIELD CONDITIONS, THE CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY. 3. THE GENERAL CONTRACTOR MUST CONTRACT WITH A PRIVATE UTILITY THE GENERAL CONTRACTOR MUST CONTRACT WITH A PRIVATE UTILITY LOCATOR CONTRACTOR TO FIND AND LOCATE ALL BURIED UTILITIES BEFORE AND EXCAVATION OR DIRECTIONAL BORING TAKES PLACE. 4. TAKE PARTICULAR CARE WHEN EXCAVATING IN AND AROUND EXISTING UTILITY TAKE PARTICULAR CARE WHEN EXCAVATING IN AND AROUND EXISTING UTILITY LINES AND EQUIPMENT. VERIFY COVER REQUIREMENTS BY GENERAL CONTRACTORS PRIVATE UTILITY LOCATOR CONTRACTOR AND/OR UTILITY COMPANIES SO AS NOT TO CAUSE DAMAGE. 5. PROVIDE POSITIVE DRAINAGE WITHOUT PONDING, IN ALL AREAS. AFTER PROVIDE POSITIVE DRAINAGE WITHOUT PONDING, IN ALL AREAS. AFTER INSTALLATION, CONTRACTOR TO TEST FOR, AND CORRECT, IF ANY, 'BIRD BATH' CONDITIONS. 6. REPLACEMENT PAVEMENT SHALL MATCH EXISTING PAVEMENT ELEVATIONS REPLACEMENT PAVEMENT SHALL MATCH EXISTING PAVEMENT ELEVATIONS WITHOUT CAUSING PONDING ISSUES. 7. COORDINATE REQUIRED EARTHWORK WITH THE GC. FIRE ALARM CONTRACTOR COORDINATE REQUIRED EARTHWORK WITH THE GC. FIRE ALARM CONTRACTOR TO DEFINE AND LOCATE THE REQUIRED FIRE ALARM CONDUIT ROUTE, PROVIDE THE INFORMATION TO THE CIVIL CONTRACTOR FOR INSTALLATION. 8. THE CIVIL CONTRACTOR SHALL PROVIDE THE RED CONDUIT. THE CIVIL THE CIVIL CONTRACTOR SHALL PROVIDE THE RED CONDUIT. THE CIVIL DRAWINGS STATE 2" DIAMETER. NO FIRE ALARM CONDUIT MAY BE INSTALLED IN THE EARTH LESS THAN THAN 1" DIAMETER.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .