S02. VA RRKW Bid Issue Drawings G-Q Updated.pdf
PDF 15 MB Posted
- Attached to
- Renovate Research K-Wing Federal contract opportunity
- Solicitation number
- 36C25022B0021
About this file
This solicitation is for construction services to renovate the research K-Wing at the Louis Stokes Cleveland VA Medical Center. The contractor shall provide all labor, equipment, supplies and supervision necessary to complete the renovation project, with a period of performance of 496 calendar days from the notice to proceed. The project magnitude is estimated between $10 million to $20 million. The solicitation is for a 100% set-aside for a Service-Disabled Veteran Owned Small Business, and all bidders must be verified in VETBIZ and registered in SAM by the offer due date and award date. Bidders shall insert their price bids in Block 17 of the SF1442 form. The site visit will be conducted on May 12th in accordance with social distancing guidelines, and requests for information must be received by May 12th at 3:30 PM Eastern via email.
View the file
Other files for this federal contract opportunity
Show all 23
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R E G
I STERED ARC
H
I T E C T
MICHAEL
LIPOWSKI
12451
ST
AT
E OF OHIO
Michael Lipowski, License #12451 Expiration Date 12/31/2023
EAST BLVD.
E.
S
T.
EA
ST
B
LV
D
MAGNOLIA DR.
HA
ZE
L
DR
E. 108 ST.
MT. SINAI DR.
MARTIN LUTHER KING DR.
on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot th re e ei gh th s in ch o ne fo ot on e ha lf in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot th re e in ch es o ne fo ot
VA FORM 08-6231, OCT 1978
2 3 4 5 6 7 8 9
A
1 2 3 4 5 6 7 8 9 10
B
C
D
E
F
A B
C D
E F
6"
6"
6"
6"
LOUIS STOKES CLEVELAND VA MEDICAL CENTER
10701 EAST BLVD. CLEVELAND, OH. 44106
PROJECT NO.
DRAWING INDEX
U.S. GOVERNMENT PRINTING OFFICE: 1983-400-285
ARCH JOB NO.:
SITE PLAN
Scale = None
True North
F F & H now IMEG Mechanical & Electrical Engineers 672 East Royalton Road, Broadview Heights, Ohio 44147
Plan North
Perspectus Architecture LLC Architect 1300 East 9th Street, Suite 910 Clleveland, Ohio 44114
Barber & Hoffman, Inc.
Structural Engineer 2217 East 9th Street, Suite 350, Cleveland, Ohio 44115
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
BID ISSUE
FULLY SPRINKLERED
Phase
CLEVELAND, OHIO
Drawing Title
Approved:
Louis Stokes Cleveland
VA Medical Center
U.S. Department of Veterans Affairs
ARCHITECT OF RECORDCONSULTANT
GENERAL
0-G-000 COVER SHEET
0-G-001 REFERENCE INFORMATION
0-G-002 UL DESIGN J201 (FOR REFERENCE ONLY)
0-G-003 PHASING PLANS
1-G-104 PHASE 1 - SECOND FLOOR LIFE SAFETY PLAN
1-G-105 PHASE 1 - PENTHOUSE LIFE SAFETY PLAN
2-G-102 PHASE 2 - BASEMENT LIFE SAFETY PLAN
2-G-103 PHASE 2 - FIRST FLOOR LIFE SAFETY PLAN
ARCHITECTURAL
0-AE-601 PHASES 1 & 2 - DOOR SCHEDULE AND DETAILS
1-AD-104 PHASE 1 - SECOND FLOOR DEMOLITION PLAN
1-AD-105 PHASE 1 - ROOF / PENTHOUSE DEMOLITION PLAN
2-AD-102 PHASE 2 - BASEMENT DEMOLITION PLAN
2-AD-103 PHASE 2 - FIRST FLOOR DEMOLITION PLAN
1-AE-114 PHASE 1 - SECOND FLOOR PLAN
1-AE-115 PHASE 1 - ROOF / PENTHOUSE PLAN
1-AE-116 PHASE 1 - PENTHOUSE ROOF PLAN
2-AE-112 PHASE 2 - BASEMENT PLAN
2-AE-113 PHASE 2 - FIRST FLOOR PLAN
1-AE-122 PHASE 1 - BASEMENT INFECTION CONTROL PLAN
1-AE-123 PHASE 1 - FIRST FLOOR INFECTION CONTROL PLAN
1-AE-124 PHASE 1 - SECOND FLOOR REFLECTED CEILING PLAN
2-AE-122 PHASE 2 - BASEMENT REFLECTED CEILING PLAN
2-AE-123 PHASE 2 - FIRST FLOOR REFLECTED CEILING PLAN
1-AE-201 PHASE 1 - EXTERIOR ELEVATIONS
1-AE-301 BUILDING SECTION & WALL SECTIONS
1-AE-411 PHASE 1 - INTERIOR ELEVATIONS - LABS
1-AE-412 PHASE 1 - INTERIOR ELEVATIONS - LABS
2-AE-413 PHASE 2 - INTERIOR ELEVATIONS - DIALYSIS & ADMINISTRATION
1-AE-501 PHASE 1 - ROOF DETAILS
1-AE-502 PHASE 1 - ROOF DETAILS
1-AE-521 PHASE 1 - CASEWORK AND INTERIOR DETAILS - LABS
2-AE-522 PHASE 2 - MILLWORK AND INTERIOR DETAILS - DIALYSIS & ADMINISTRATION
MECHANICAL
0-M-001 HVAC SYMBOLS AND GENERAL NOTES
0-M-301 MECHANICAL SECTIONS
0-M-501 HVAC DETAILS
0-M-502 HVAC DETAILS
0-M-503 HVAC DETAILS
0-M-601 AC-24 SCHEDULE AND DETAILS
0-M-602 KWING-EF-24 SCHEDULE AND DETAILS
0-M-603 AC-25 SCHEDULE AND DETAILS
0-M-604 HVAC SCHEDULES
0-M-605 HVAC SCHEDULES
0-M-701 TEMPERATURE CONTROLS
0-M-702 TEMPERATURE CONTROLS
0-M-703 TEMPERATURE CONTROLS
0-M-704 TEMPERATURE CONTROLS
0-M-801 BASEMENT HVAC ROOM BALANCE PLAN
0-M-802 FIRST AND SECOND FLOOR HVAC ROOM BALANCE PLANS
1-MD-102 PHASE 1 - BASEMENT HVAC DUCTWORK DEMOLITION PLAN
1-MD-104 PHASE 1 - SECOND FLOOR HVAC DUCTWORK DEMOLITION PLAN
1-MD-105 PHASE 1 - ROOF HVAC DEMOLITION PLAN
1-MD-114 PHASE 1 - SECOND FLOOR HVAC PIPING DEMOLITION PLAN
1-MD-405 PHASE 1 - ENLARGED FAN PENTHOUSE MECHANICAL DEMOLITION PLAN
1-MD-415 PHASE 1 - ENLARGED AIR HANDLING UNIT PENTHOUSE MECH DEMO PLAN
2-MD-102 PHASE 2 - BASEMENT HVAC DUCTWORK DEMOLITION PLAN
2-MD-103 PHASE 2 - FIRST FLOOR HVAC DUCTWORK DEMOLITION PLAN
2-MD-105 PHASE 2 - ROOF HVAC DEMOLITION PLAN
2-MD-112 PHASE 2 - BASEMENT HVAC PIPING DEMOLITION PLAN
2-MD-113 PHASE 2 - FIRST FLOOR HVAC PIPING DEMOLITION PLAN
2-MD-405 PHASE 2 - ENLARGED FAN PENTHOUSE MECHANICAL DEMOLITION PLAN
2-MD-415 PHASE 2 - ENLARGED AIR HANDLING UNIT PENTHOUSE MECH DEMO PLAN
1-MH-102 PHASE 1 - BASEMENT HVAC DUCTWORK PLAN
1-MH-103 PHASE 1 - FIRST FLOOR HVAC DUCTWORK PLAN
1-MH-104 PHASE 1 - SECOND FLOOR HVAC DUCTWORK PLAN
1-MH-105 PHASE 1 - ROOF / PENTHOUSE HVAC PLAN
ELECTRICAL
0-E-001 ELECTRICAL LEGEND AND GENERAL NOTES
0-E-501 ACCESS CONTROL PANEL DETAIL AND GENERAL NOTES
0-E-502 ACCESS-CONTROLLED DOOR DETAILS AND NOTES
0-E-503 FIRE ALARM SYSTEM RISER DIAGRAM AND GENERAL NOTES
0-E-504 TYPICAL FIRE ALARM EQUIPMENT PANEL DETAIL
0-E-505 ELECTRICAL DETAILS
0-E-506 ELECTRICAL DETAILS
0-E-507 ELECTRICAL DETAILS
0-E-601 LIGHTING FIXTURE SCHEDULE AND DETAILS
0-E-602 PANELBOARD SCHEDULES (ESSENTIAL EQUIPMENT)
0-E-603 PANELBOARD SCHEDULES (CRITICAL AND LIFE SAFETY)
0-E-604 PANELBOARD SCHEDULES (NORMAL)
0-E-701 POWER DISTRIBUTION LEGEND AND GENERAL NOTES
0-E-702 DEMOLITION ONE-LINE DIAGRAM
0-E-703 SUBSTATION K ONE-LINE DIAGRAM
0-E-704 PALMSLAB WAREHOUSE SUBSTATION ONE-LINE DIAGRAM
1-ED-104 PHASE 1 - PARTIAL SECOND FLOOR ELECTRICAL DEMOLITION PLAN
1-ED-105 PHASE 1 - PARTIAL ROOF / PENTHOUSE ELECTRICAL DEMOLITION PLAN
2-ED-102 PHASE 2 - PARTIAL BASEMENT LIGHTING DEMOLITION PLAN
2-ED-103 PHASE 2 - PARTIAL FIRST FLOOR ELECTRICAL DEMOLITION PLAN
2-ED-105 PHASE 2 - PARTIAL ROOF / PENTHOUSE ELECTRICAL DEMOLITION PLAN
0-EK-102 PARTIAL BASEMENT ELECTRICAL KEY PLAN
0-EK-103 PARTIAL FIRST FLOOR ELECTRICAL KEY PLAN
0-EK-104 PARTIAL SECOND FLOOR ELECTRICAL KEY PLAN
0-EK-105 PARTIAL THIRD FLOOR ELECTRICAL KEY PLAN
1-EL-104 PHASE 1 - PARTIAL SECOND FLOOR LIGHTING PLAN
1-EL-105 PHASE 1 - PARTIAL ROOF / PENTHOUSE LIGHTING PLAN
2-EL-102 PHASE 2 - PARTIAL BASEMENT LIGHTING PLAN
2-EL-103 PHASE 2 - PARTIAL FIRST FLOOR LIGHTING PLAN
2-EL-105 PHASE 2 - PARTIAL ROOF / PENTHOUSE LIGHTING PLAN
1-EP-104 PHASE 1 - PARTIAL SECOND FLOOR POWER PLAN
1-EP-105 PHASE 1 - PARTIAL ROOF / PENTHOUSE MECH CONN PLAN
2-EP-103 PHASE 2 - PARTIAL FIRST FLOOR POWER PLAN
2-EP-105 PHASE 2 - PARTIAL ROOF / PENTHOUSE MECH CONN PLAN
1-EY-101 PHASE 1 - PARTIAL BASEMENT FIRE ALARM PLAN
1-EY-103 PHASE 1 - PARTIAL SECOND FLOOR FA AND SECURITY PLAN
1-EY-105 PHASE 1&2 - PARTIAL ROOF / PENTHOUSE FA AND SECURITY PLAN
2-EY-103 PHASE 2 - PARTIAL FIRST FLOOR FA AND SECURITY PLAN
PLUMBING
0-P-001 PLUMBING SYMBOLS, SCHEDULES AND NOTES
0-P-501 PLUMBING DETAILS
0-P-901 PHASE 1 - PLUMBING ISOMETRICS
0-P-902 PHASE 2 - PLUMBING ISOMETRIC
1-PD-103 PHASE 1 - FIRST FLOOR PLUMBING DEMOLITION PLAN
1-PD-104 PHASE 1 - SECOND FLOOR PLUMBING DEMOLITION PLAN
1-PD-105 PHASE 1 - ROOF / PENTHOUSE PLUMBING DEMOLITION PLAN
1-PD-114 PHASE 1 - SECOND FLOOR LABORATORY GAS AND VACUUM DEMO PLAN
2-PD-102 PHASE 2 - BASEMENT PLUMBING DEMOLITION PLAN
2-PD-103 PHASE 2 - FIRST FLOOR PLUMBING DEMOLITION PLAN
2-PD-113 PHASE 2 - FIRST FLOOR LABORATORY GAS AND VACUUM DEMOLITION PLAN
1-PL-102 PHASE 1 - BASEMENT PLUMBING PLAN
1-PL-103 PHASE 1 - FIRST FLOOR PLUMBING PLAN
1-PL-104 PHASE 1 - SECOND FLOOR PLUMBING PLAN
1-PL-105 PHASE 1 - ROOF PLUMBING PLAN
2-PL-102 PHASE 2 - BASEMENT PLUMBING PLAN
2-PL-103 PHASE 2 - FIRST FLOOR PLUMBING PLAN
2-PL-104 PHASE 2 - SECOND FLOOR PLUMBING PLAN
2-PL-105 PHASE 2 - ROOF PLUMBING PLAN
1-PG-112 PHASE 1 - BASEMENT LABORATORY GAS AND VACUUM PLAN
1-PG-114 PHASE 1 - SECOND FLOOR LABORATORY GAS AND VACUUM PLAN
2-PG-112 PHASE 2 - BASEMENT MEDICAL GAS AND VACUUM PLAN
2-PG-113 PHASE 2 - FIRST FLOOR MEDICAL GAS AND VACUUM PLAN
TECHNOLOGY
0-T-001 TECHNOLOGY LEGEND AND GENERAL NOTES
0-T-501 TECHNOLOGY DETAILS
0-T-502 TECHNOLOGY RACK DETAILS
0-T-503 TECHNOLOGY GROUNDING DETAIL
0-T-504 TECHNOLOGY RISER DIAGRAM
0-T-505 SMART BUILDING SYSTEM (SBS) RISER DIAGRAM
0-T-506 NURSE CALL SYSTEM RISER DIAGRAMS AND NOTES
0-T-507 HILL-ROM NURSECALL BACK BOX DETAILS
0-TK-103 PARTIAL FIRST FLOOR TECHNOLOGY KEY PLAN
0-TK-104 PARTIAL SECOND FLOOR TECHNOLOGY KEY PLAN
0-TK-105 PARTIAL THIRD FLOOR TECHNOLOGY KEY PLAN
1-TD-104 PHASE 1 - PARTIAL SECOND FLOOR TECHNOLOGY DEMOLITION PLAN
2-TD-103 PHASE 2 - PARTIAL FIRST FLOOR TECHNOLOGY DEMOLITION PLAN
1-T-104 PHASE 1 - PARTIAL SECOND FLOOR TECHNOLOGY PLAN
1-T-105 PHASE 1 - PARTIAL ROOF / PENTHOUSE TECHNOLOGY PLAN
2-T-103 PHASE 2 - PARTIAL FIRST FLOOR TECHNOLOGY PLAN
2-T-105 PHASE 2 - PARTIAL ROOF / PENTHOUSE TECHNOLOGY PLAN
STRUCTURAL
0-S-001 GENERAL NOTES
0-S-002 SPECIAL INSPECTIONS
0-S-101 PHASES 1 & 2 - PARTIAL STRUCTURAL PLANS
0-S-102 PHASES 1 & 2 - PARTIAL STRUCTURAL PLANS
0-S-201 SECTIONS AND TYPICAL DETAILS
EQUIPMENT
1-Q-104 PHASE 1 - SECOND FLOOR EQUIPMENT PLAN
2-Q-103 PHASE 2 - FIRST FLOOR EQUIMENT PLAN
INTERIOR DESIGN
1-AI-104 PHASE 1 - SECOND FLOOR FINISH PLAN AND SCHEDULE
2-AI-103 PHASE 2 - FIRST FLOOR FINISH PLAN AND SCHEDULE
HAZARDOUS MATERIALS ABATEMENT
0-HA-001 STANDARD ASBESTOS ABATEMENT DETAILS
1-HA-104 PHASE 1 - SECOND FLOOR ASBESTOS ABATEMENT PLAN
1-HA-105 PHASE 1 - ROOF / PENTHOUSE ASBESTOS ABATEMENT PLAN
2-HA-103 PHASE 2 - FIRST FLOOR ASBESTOS ABATEMENT PLAN
FIRE PROTECTION
0-FX-001 FIRE PROTECTION LEGEND, DETAILS AND NOTES
1-FX-102 PHASE 1 - BASEMENT FIRE PROTECTION PLAN
1-FX-104 PHASE 1 - SECOND FLOOR FIRE PROTECTION PLAN
1-FX-105 PHASE 1 - ROOF / PENTHOUSE FIRE PROTECTION PLAN
2-FX-103 PHASE 2 - FIRST FLOOR FIRE PROTECTION PLAN
2-FX-105 PHASE 2 - ROOF / PENTHOUSE FIRE PROTECTION PLAN
1-MH-405 PHASE 1 - ENLARGED FAN PENTHOUSE MECHANICAL PLAN
1-MH-415 PHASE 1 - ENLARGED AIR HANDLING UNIT PENTHOUSE MECH PLAN
2-MH-102 PHASE 2 - BASEMENT HVAC DUCTWORK PLAN
2-MH-103 PHASE 2 - FIRST FLOOR HVAC DUCTWORK PLAN
2-MH-105 PHASE 2 - ROOF / PENTHOUSE HVAC PLAN
2-MH-405 PHASE 2 - ENLARGED FAN PENTHOUSE MECHANICAL PLAN
2-MH-415 PHASE 2 - ENLARGED AIR HANDLING UNIT PENTHOUSE MECH PLAN
1-MP-111 PHASE 1 - SUB-BASEMENT HVAC PIPING PLAN
1-MP-112 PHASE 1 - BASEMENT HVAC PIPING PLAN
1-MP-114 PHASE 1 - SECOND FLOOR HVAC PIPING PLAN
2-MP-112 PHASE 2 - BASEMENT HVAC PIPING PLAN
2-MP-113 PHASE 2 - FIRST FLOOR HVAC PIPING PLAN
Stamp
Stephen J. Sebesta & Associates Environmental Health Engineer 30628 Detroit Road, #258, Westlake, Ohio 44145
Consulting Engineers
BARBER & HOFFMAN, INC.
2217 East 9th Street, Suite 350 Cleveland, OH 44115-1257 216-875-0100/ (F) 216-875-0111 barberhoffman.com
672 EAST ROYALTON ROAD
BROADVIEW HTS., OHIO 44147
TEL. (440) 546-9696
FAX: (440) 546-9699
541-20-104
BID ISSUE
1/20/2022
Renovate Research K-Wing
19-119
0-G-000
COVER SHEET Renovate Research K-Wing 541-20-104
1/20/2022 RH DER
FIRST FLOOR KEY PLAN
SECOND FLOOR KEY PLAN
BID ALTERNATE SUMMARY
BID ALTERNATE NO. 1
Acoustical panel ceilings in lieu of perforated metal ceilings
BID ALTERNATE NO. 2
Delete high impact wall covering in locations indicated
BID ALTERNATE NO. 3
Delete ICU sliding doors in locations indicated
BID ALTERNATE NO. 4
Painted metal casework finish in lieu of seamless polymer metal casework finish
Nick Carrozza
REVISIONS: DATE:
BID ISSUE 1/20/2022
Building, wall and detail section mark
Interior/exterior elevation reference
Enlarged plan or detail reference
Column reference grids
Revision reference number
Wall type
Window type
New level line, control point, or datum
New door
Indicates drawing sheet on which plan/detail is shown.
Indicates detail number
Indicates drawing sheet on which elevation is shown
Indicates elevation number
Indicates drawing sheet on which section is shown
Indicates section number
Door number46
XX
A
A2-1
A2-1
A2-1
A
Crown typeXX
Wall finish
A
New Existing
XX
XXX-XX Ceiling Type Ceiling HeightXX'-XX" anchor bolt above air conditioning acoustic(al) acoustical ceiling tile adjacent above finish floor alternate aluminum anodized approximate architect(ural) automatic ab abv a/c acous act adj aff alt alum anod approx arch auto board between building block(ing) bulkhead beam bottom bridging bearing brick basement built-up roofing bd betw bldg blk blkhd bm bot brdg brg brk bsmt bur cfm cg ci cj clg cl clr cll cntr cmu co col conc conn const cont coord corr cs ctr cubic feet per minute corner guard cast iron control joint ceiling closet clear contract limit line counter concrete masonry unit cased opening/clean out column concrete connection construction continuous coordinate corridor course center d dbl deg demo dia dim disp dn dr ds det dwg dwr dw depth double degrees demolition diameter dimension dispenser down door down spout detail drawing drawer drywall each electrical contractor exterior insulation and finish system expansion joint electric elevator/elevation emergency equal equipment exposed structure existing to remain each way electric water cooler exhaust existing expansion exposed exterior ea ec eifs ej elec elev emerg eq equip es etr ew ewc exh exist exp exp'd ext fire alarm face brick fan coil unit face to face floor drain foundation fire extinguisher fire extinguisher cabinet fire hose cabinet finish floor fluorescent fire resistant fa fb fcu f/f fd fdn fe fec fhc fin flr fluor fr ga galv gc gl gr gyp bd gauge galvanized general contractor glass grade gypsum board h hb hc hdbd hdcpd hdwr hdwd hm horiz hpdl hr ht htg htr hvac hw hwh high hose bibb hollow core hardboard handicapped hardware hardwood hollow metal horizontal high pressure decorative laminate hour height heating heater heating, ventilation air conditioning hot water hot water heater id in incl insul int inside diameter inch include (inclusive) insulation interior janitor joist jan jst knock down knock out kd ko l lam lav lb lf lim lt ltg lvr length (long) laminate(d) lavatory pound linear feet (foot) limited light lighting louver marb mas mat max mech memb mfr mh min marble masonry material maximum mechanical membrane manufacturer manhole minimum not applicable not in contract number nominal not to scale n/a nic no nom nts owner overall on center on center above finish floor outside diameter owner furnished owner installed owner furnished contr installed overhead door opposite hand overflow roof drain out to out opening opposite optional o oa oc ocaff od ofoi ofci ohdr oph ovrd o/o op'g opp opt plbg pmld pnl plywd pol pp pr prefin prefab proj psc psf psi pt ptd ptn pvc pvmt plumbing premoulded panel plywood polished push plate pair prefinished prefabricated projection pre-stress concrete pounds per square foot pounds per square inch point painted partition polyvinylchloride pavement qty quantity r ra rad rag rd rec ref reg reinf req'd riser return air radius return air grille roof drain receptacle refrigerator register reinforcement (reinforcing) required solid core schedule smoke detector saddle section sheet similar stand pipe specifications speaker sprinkler single ply roofing square square inch square yard stainless steel/ slop sink standard steel storage structure(al) suspended systems sc sched sd sdl sect sht sim sp spec spkr spklr spr sq sq in sy ss std stl stor struc sucp sys t t/g or t&g tg td tel temp temp'd terr thk thld toc tos tod tom toj top tow typ thread tongue and groove tempered glass trench drain telephose temporary tempered terrazzo thick threshold top of concrete (top of curb) top of steel top of deck top of masonry top of joist top of parapet top of wall typical undercut underground unfinished unlimited unless noted otherwise urinal uc ug unfin unlim uno ur v vert vest vif vendor vertical vestibule verify in field w w/ w/o w/w wc wd wh win wg wt wwf width with without wall to wall water closet wood water heater window wire glass weight welded wire fabric yd yard c c/c cab't cb cem cl contractor center to center cabinet catch basin cement center line fire-retardant treated fire-retardant treated wood feet footing furring fire valve cabinet frt frtwd ft ftg furr fvc misc mo mtd mtg mtl mull miscellaneous masonry opening mounted mounting metal mullion pbd pcf perim pg bd pl plas plam particle board pounds per cubic foot perimeter peg board plate plastic plastic laminate res ret rev rm ro rvs resilient return revised (revision) room rough opening reverse
1. Do not scale drawings. Contractor(s) are to verify site dimensions and conditions prior to work.
2. Construction shall be in accordance with the requirements of the applicable codes including accessibility standards and the requirements of “Americans with Disabilities Act”, "Architectural Barriers Act Accessibility Standards" and "VA Barrier Free Design Standard"
3. Contractor(s) shall visit the site and correlate the requirements of the documents with the existing conditions.
4. Drawings are diagrammatic and since existing conditions, including areas above accessible ceilings may affect new work, the contractor shall coordinate and alter new work to properly fit the existing conditions. The work shall be performed at no extra cost. The contractor shall verify all conditions and dimensions at the job site prior to the start of construction. If discrepancies are found, the architect shall be notified for clarification before commencing with the work.
5. Details not shown are similar in character to those shown. When specific dimensions, details, or design intent cannot be determined, consult the COR before proceeding with the work.
6. Some masonry and lumber dimensions shown on the drawings are nominal dimensions. Contractor(s) shall coordinate actual dimensions with the job conditions.
Report all discrepancies to the COR.
7. Existing conditions shown on this drawing are not guaranteed to be complete. The contractor(s) shall field verify all existing conditions, dimensions, and materials required for the contracted work. Report all discrepancies to the COR prior to fabrication and erection.
8. The term ‘patch to match’ or ‘cutting and patching’ denotes that repair work is necessary to construct a floor, base, wainscot, wall or ceiling to match its adjacent surface, texture, material, finish and color of adjacent existing surfaces.
9. If materials suspected of containing hazardous materials are encountered, DO NOT DISTURB; immediately notify the COR and owner.
10. Where existing partitions or services have been removed, or new services penetrate existing surfaces, the openings shall be patched to match the existing surface finish, texture, and sheen.
11. Where new openings occur in structural bearing wall, contractor is responsible for temporary supports and/or shoring as required for installation of lintels.
12. Where existing doorways are to be filled in, contractor is responsible for field verifying wall widths.
13. The Contractor is responsible for installation of all access doors, access panels and frames, including, but not limited to those specific in the construction documents and furnished by other contractors. All access doors and panel locations to be coordinated and approved by the COR prior to installation. The Contractor is responsible for painting all access panels and access doors. Contractor is responsible for coordinating all paint colors with the COR prior to commencing with the work.
II. Dimensioning
1. Interior partitions are dimensioned to face of gypsum board exclusive of finish material, such as ceramic tile or wood paneling. The contractor shall coordinate finish dimensions with finish schedule when critical to the installation of millwork or equipment.
3' -6
1' -6
Shower valve
Shower head
Receptacle
Push plate
Thermostat
Humidistat
8"
4' -0
Phone jack
Light switch
CTW-1 DCS-1
3'
4"
FM-1 18"x36" FM-2 18"x18"
3'-0"
4'
0"
PTD-1
4' -6
RH-1
1'
6"
SND-1
3'
6"
SDR-1
1'
7"
TTD-1
4'
6"
Fire extinguisher
Cabinet may occur
House Keeping
4'
6"5' -6
3' -0
Mop basin
Service faucet & controls
MBH-1, TYP
US-1
GB-36 3'-0"
6"
2' -1
0"
GB-18 1'-6"
GB-42 3'-6"
2' -1
0" 3'
-4 "1'-0" 3'-6"
3'-4"
Fa ce o f w al l
Fa ce o f w al l
6' -8
Typical accessory items. Some items may not occur in project.
2' -9
"4' -0
4' -0
8" 8"
CONT stud track
CONT stud track
Channel stud REINF as required at wall mounted devices
Midpoint at door opening
CONT channel REINF
Double studs at jamb opening 20 GA MIN, 18 GA at openings over 3'-0"
Door Opening
Door Opening
EXIST STRUC above
GYP BD control joint
Hollow MTL frame
MTL studs coped to fit
TYP MTL studs
UNO
6"
Partition assembly
Door frame
TYP of all frames that occur at room corner locations, UNO
Back to back boxes NOT permitted Stagger Boxes
Joint compound and tape
5/8" GYP BD
MTL studs
Control joint
5/8" Type X GYP BD MTL studs
Control joint, both sides
MAX
1/2"
5/8" Type X GYP BD
TYP of all control joints located in rated wall assemblies
MAX
1/2"
MAX
1/2"
1 13/16"
A
See specifications for sealant type.
All joints 1" wide or more are to be laid up in beads and tooled to profile indicated.
All joints are to be primed before bond breaking rod is installed.
Install bond breaking rod with roller to proper depth. No sharp tools permitted.
1.
2.
3.
4.
Notes:
B C
Wall material varies
07 92 00 - Bond breaker rod
07 92 00 - Sealant
Joint Schedule Dimensions
A B C 3/8" 1/8" 1/4"
1/2" 1/8" 3/8"
5/8" 1/8"
3/4" 1/8"
7/8" 1/8"
1" 1/8"
3/8"
3/8"
3/8"
3/8"
Accoustic insulation
Area Accessible to Public
Construction Area
Seal perimeter (deck, walls, floor) with edge trim and all penetrations to comply with ICRA requirements
Remove portion of existing ceilings and patch @ temporary partitions
Notes:
1. See also 01 00 00 General Requirements.
2. Contractor to frame around existing duct work, pipes, etc. that interfere with temporary partition.
3. Provide "Ball-in-the-wall" pressure monitors at all contractor entrances.
4. See 01 35 26 Safety Requirements for Infection Control requirements regarding pressurization and dust particulate testing.
5. 1 Hour rated partition, UL Design U465
Provide new ceiling, trim, wall angle on public side
Single layer of gypsum wall each side.
1. All partitions are type A1 unless noted otherwise.
2. Refer to the Life Safety Plans for fire barriers, fire partitions, smoke barriers and smoke partitions.
3. Fire resistance rating indicated on the Life Safety Plans shall mean the entire length and height of the partition indicated to be fire rated. All piping, ducts, cabinets, etc. that penetrate partitions shall be installed in a manner that will preserve the fire resistant rating of the partition.
4. Partitions are dimensioned from the face of gypsum board exclusive of finish materials such as porcelain tile or wood paneling. Coordinate finish dimensions with finish schedule.
5. Provide blocking in partitions for wall mounted accessories.
6. Provide water resistant gypsum board at plumbing locations unless cementitious backer board is specified.
7. Metal studs shall be 20 gauge minimum. Maximum height is 15'-0".
Partition heights that exceed 15'-0" shall increase in gauge in accordance with the Steel Stud Manufacturers Association Technical Guide, Latest Edition.
Gypsum board to underside of deck -both sides
Ceiling may occur
Deck
Accoustic insulation
Gypsum board to underside of deck -one side only
Gypsum board to 6" above ceiling - On other side
Mineral wool fire blocking
Deck
Ceiling
Gypsum board to 6" above ceiling -both sides Mineral wool fire blocking
Deck
Ceiling
Gypsum board to underside of ceiling -both Sides
Deck
Ceiling
A
B
C
D
R E G
I STERED ARC
H
I T E C T
MICHAEL
LIPOWSKI
12451
ST
AT
E OF OHIO
Michael Lipowski, License #12451 Expiration Date 12/31/2023
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID ISSUE
FULLY SPRINKLERED
Louis Stokes Cleveland
VA Medical Center
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
Consulting Engineers
BARBER & HOFFMAN, INC.
2217 East 9th Street, Suite 350 Cleveland, OH 44115-1257 216-875-0100/ (F) 216-875-0111 barberhoffman.com CLEVELAND, OHIO
Stamp
672 EAST ROYALTON ROAD
BROADVIEW HTS., OHIO 44147
TEL. (440) 546-9696
FAX: (440) 546-9699
C :\U se rs
\rp ha ns al
\D oc um en ts \V
A R
R
KW
_0
_r ph an sa l@ pe rs pe ct us ar ch
.c om
.rv t
1/
/2
9:
:5
AM
0-G-001
REFERENCE INFORMATION Renovate Research K-Wing 541-20-104
1/20/2022 RH DER
STANDARD SYMBOLSSTANDARD ABBREVIATIONS
GENERAL NOTES
STANDARD MOUNTING HEIGHTS
Scale: 1/4" = 1'-0"0-G-001
TYP GYP BD WALL DETAIL1
Scale: 1 1/2" = 1'-0"0-G-001
TYP FRAME LOCATION2
Scale: 1 1/2" = 1'-0"0-G-001
TYP ELECTRICAL / JUNCTION BOX3
Scale: 1 1/2" = 1'-0"0-G-001
TYP GYP BD CONTROL JOINT4
Scale: 1 1/2" = 1'-0"0-G-001
FIRE RESISTANT CONTROL JOINT5
Scale: 12" = 1'-0"0-G-001
TYP SEALANT DETAIL6
Scale: 3/8" = 1'-0"0-G-001
TEMPORARY PARTITION DETAIL7
PARTITION SCHEDULE
TAG
FRAMING SHEATHING DETAIL
TOP
RATING
STC
SOUND
TEST #
TOTAL
WIDTH REMARKSSIZE TYPE SIDE 1 SIDE 2 TYPE TIME UL #
A1 3 5/8" C 5/8" 5/8" X A 49 SA-870717 4 7/8"
A2 3 5/8" C 5/8" 5/8" X A 1 U465 49 SA-870717 4 7/8"
A6 3 5/8" C 5/8" - X C 4 1/4" A7 3 5/8" C (2) 5/8" (2) 5/8" X A 2 U411 6 1/8" A9 3 5/8" C (2) 1/2" 5/8" X 5 1/4" Existing door infill C6 2 1/2" C 5/8" - X A 3 1/8" D6 1 5/8" C 5/8" - X D 2 1/4" E1 7/8" Hat 5/8" - X C 1 1/2" F6 1 1/2" Hat 5/8" - X C 2 1/8" G1 1 1/2" C-H 1/2" 1" C A 1 3" G2 2 1/2" C-H (2) 1/2" 1" C A 2 U438 3 1/2" R2 7 5/8" cmu A 1 F/S 7 5/8" U1 1 5/8" C 5/8" - A 4 1/4" 2" Rigid INSUL (R11.4 MIN) inboard of MTL studs
PARTITION SCHEDULE GENERAL NOTES
TOP OF WALL LEGEND
Revisions: Date:
G
I STERED ARC
H
I T E C T
MICHAEL
LIPOWSKI
12451
ST
AT
E OF OHIO
Michael Lipowski, License #12451 Expiration Date 12/31/2023
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID ISSUE
FULLY SPRINKLERED
Louis Stokes Cleveland
VA Medical Center
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
Consulting Engineers
BARBER & HOFFMAN, INC.
2217 East 9th Street, Suite 350 Cleveland, OH 44115-1257 216-875-0100/ (F) 216-875-0111 barberhoffman.com CLEVELAND, OHIO
Stamp
672 EAST ROYALTON ROAD
BROADVIEW HTS., OHIO 44147
TEL. (440) 546-9696
FAX: (440) 546-9699
C :\U se rs
\rp ha ns al
\D oc um en ts \V
A R
R
KW
_0
_r ph an sa l@ pe rs pe ct us ar ch
.c om
.rv t
1/
/2
9:
:0
AM
0-G-002
UL DESIGN J201 (FOR REFERENCE ONLY) Renovate Research K-Wing 541-20-104
1/20/2022 RH DERRevisions: Date:
UP
DNDN
UP
UPUP UP
UP
H
G F C B ACC1
10.9
P R O J E C T S C O P E
P R
O J
E C
T
S
O P
O J
E
O
P R O J E C T S C O P E
BF465
BF 473
BF468
BF468A
BF466
BF464A
BF464B
BF464
BF468D
BF468C
BF463
BF442
BF440
BF441
BF431BF430
BF429
BF428
BF477
BF424
BF422BF423
BF421
BF404
BS21
BF450
BF403
BF461
BF462
BF460
BF459
BF427
BF426
BF457
BF-
BF458
BF456
BF454
BF451
BF453
BF455
BF452
BF472
BF471
BF411
BF412
BF348
BF347A
BF346
BF346A
BF345
BS24
BF344
BF343
BF350
BF442A
1F455B
1F455C
10.4
5.2
3.6
2.5
1.2
.1
H
G F C B ACC1
10.9
P R O J E C T S C O P E
P R
O J
E
O
O J
E
O
1F494
1F495
1F491 1F485
1F4881F486
1F492
1F483
1F482
1F481
1F478
1F477
1F476
1F480B 1F480C
1F490A
1F475
1F472
1F474
1F484
1F451
1F451A 1F452
1F
0A
1F454
1F460J
1F460L 1F460F
1F460E1F460M
1F460T
1F460S
1F460P 1F460C
1F460B1F460Q
1F465
1F464
1F462
1F461
1F463
1F466
1F470
1F470A
1S21
1S24
EX Elev
1F455
1F450B
1F487
1F471
1F480D
1F480A
1F493
1F473
1F453
1F456
1F460N
1F460A
1F460R1F455A
1F460D
1F489
1F479
1F493A
1F460K
1F460G 1F460H
1F490
1F490B
1F480E
1F480
1F4601G401
1G402
1F450
1F501
10.4
5.2
3.6
2.5
1.2
1F460U
1F460V
H
G F C B ACC1
10.9
P R O J E C T S C O P E
P R
O J
E
O
O J
E
O
2F4482F442 2F444
2F438
2F440
2F437
2F436
2F435
2F431
2F428
2F424
2F422
2F421 2F417
2F414 2F412
2F411
2F416
2F410
2F423
2F425
2F426
2F427
2F433
2F434
2F441
2F443
2F445
2F446
2F447
2F449
2S21
2S24
2F420B
2F420A
2F430A
2F430C
2F440A 2F440B
2F430
2F430D
2F430B
2F428A
2F415
2F420C
2F420
2E348
2F413
2F432
2F440C
10.4
5.2
3.6
2.5
1.2
.1
H
G F C B AF.1G.9CC1
10.9
P R O J E C T S C O P E
P R
O J
E
O
O J
E
O
3F440
3S21
3F410
3S24
3F411
3F412
10.4
5.2
3.6
2.5
1.2
. 1
H
G F C B ACC1
10.9
P R O J E C T S C O P E
P R
O J
E
O
O J
E
O
BF469
BF467
BF465
BF 473
BF468
BF468A
BF466
BF464A
BF464B
BF464
BF468D
BF468C
BF463
BF442
BF440
BF441
BF431BF430
BF429
BF428
BF477
BF424
BF422BF423
BF421
BF404
BS21
BF450
BF403
BF461
BF462
BF460
BF459
BF427
BF426
BF457
BF-
BF458
BF456
BF454
BF451
BF453
BF455
BF452
BF472
BF471
BF411
BF412
BF348
BF347A
BF346
BF346A
BF345
BS24
BF344
BF343
BF350
BF442A
10.4
5.2
3.6
2.5
1.2
R E G
I STERED ARC
H
I T E C T
MICHAEL
LIPOWSKI
12451
ST
AT
E OF OHIO
Michael Lipowski, License #12451 Expiration Date 12/31/2023
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID ISSUE
FULLY SPRINKLERED
Louis Stokes Cleveland
VA Medical Center
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
Consulting Engineers
BARBER & HOFFMAN, INC.
2217 East 9th Street, Suite 350 Cleveland, OH 44115-1257 216-875-0100/ (F) 216-875-0111 barberhoffman.com CLEVELAND, OHIO
Stamp
672 EAST ROYALTON ROAD
BROADVIEW HTS., OHIO 44147
TEL. (440) 546-9696
FAX: (440) 546-9699
C :\U se rs
\rp ha ns al
\D oc um en ts \V
A R
R
KW
_0
_r ph an sa l@ pe rs pe ct us ar ch
.c om
.rv t
1/
/2
9:
:2
AM
0-G-003
PHASING PLANS Renovate Research K-Wing 541-20-104
1/20/2022 RH DER
Scale: 1" = 20'-0"0-G-003
BASEMENT PLAN - PHASE 22
Scale: 1" = 20'-0"0-G-003
FIRST FLOOR PLAN - PHASE 23
Scale: 1" = 20'-0"0-G-003
SECOND FLOOR PLAN - PHASE 14
Scale: 1" = 20'-0"0-G-003
ROOF / PENTHOUSE PLAN - PHASE 15
Phase Name: Duration in calendar Days from Notice days to Proceed (NTP)
Submision Phase 60 days day 1-60
Phase 1 (2nd Floor) 210 days day 61-270
VA Activation 45 days day 271-316
Phase 2 (1st Floor) 180 days day 317-496
CONSTRUCTION DURATIONS
The following chart describes the amounts of time allotted for each phase. Also included is activation time for the VAMC to transition/move staff and equipment between phases
The project will consist of 2 phases. Certain areas within each phase will need to occur in a certain order and for a specific period of time.
PHASING NOTES
1. Coordinate all Phasing Work and temporary partitions with the entire set of documents and with Owner’s operation of facility.
2. Work to occur during off hours - refer to specifications for approved hours of contractor work.
3. Where work beyond temporary construction partitions occurs; ceilings shall be removed and replaced daily.
4. Project scope line is indicated for general intent only.Contractor will complete all work regardless if is located outside of the project scope area as indicated on any drawing.
Scale: 1" = 20'-0"0-G-003
BASEMENT PLAN - PHASE 11
LIFE SAFETY PLAN LEGEND
1 HR Fire Barrier
2 HR Fire Barrier
1 HR Fire / Smoke Barrier
0 HR Smoke Partition
Hazardous Room
2018 Life Safety Code
Fire Extinguisher
THIS DRAWING SHALL BE PRINTED IN FULL COLOR FOR CLARITY
Exit Sign
- indicates Illumination side and arrow direction
2 HR Fire / Smoke Barrier
BLACK AND WHITE FACSIMILES ARE NOT CONSIDERED PART OF THE
CONSTRUCTION DOCUMENT SET
1. Contractor shall inform COR immediately of any discrepancies in the existing rated wall construction and non-conforming penetrations.
2. Travel distances are from remote point to exit.
3. Interim Life Safety measures may be required. Coordinate interim Life Safety measures with VA COR.
4. Provide firestopping at all penetrations through new and existing fire/smoke rated barriers (walls and floors) to comply with required rating associated with new work. Provide firestopping around 4 penetrations less than 6 square inches, 4 penetrations between 16 and 36 square inches, and 4 penetrations between 36 and 64 square inches through existing fire/smoke rated barriers (walls and floors) to comply with required rating not associated with new work. Larger openings shall be brought to the immediate attention of the COR.
5. Contractor shall provide fire alarm devices in accordance with electrical drawings.
Fire Resistance Rating
1. Fire rating indicated on a wall shall mean the entire length and height of wall to be fire rated.
2. All piping, ducts, cabinets, etc. that penetrate walls shall be installed in a manner that will preserve the fire resistance rating of that wall.
3. Preserve all fire resistance ratings of existing walls, unless noted otherwise.
ExitEX
LIFE SAFETY GENERAL NOTES
FIRE RESISTANCE RATING NOTES
Horizontal ExitHE
CODES, STANDARDS, MANUALS AND GUIDES
2018 NFPA 101 Life Safety Code 2018 International Building Code (IBC) (Only as indicated by specific reference below) 2018 NFPA National Fire Codes (With the exception of NFPA 5000 and NFPA 900) Occupational, Safety and Health Administration (OSHA) Standards VA Seismic Design Requirements, H-18-8 VA Technical Information Library 2019 Accreditation Manual for Hospitals, of the Joint Commission of Accreditation of Hospitals 2019 National Electrical Code (NEC) 2018 International Plumbing Code (IPC) 2019 ASME Code for Pressure Piping 2015 Architectural Barriers Act Accessibility Standards (ABAAS) VA supplement, Barrier Free Design Guide (PG-18-13) 2019 Requirements for Reinforced Concrete, American Concrete Institute & Commentary (ACI 318) 2017 Manual of Steel Construction, American Institute of Steel Construction (AISC) Energy policy Act of 2005 (EPAct) Ventilation for Acceptable Indoor Air Quality – ASHRAE Standard 62.1- 2019 Safety Standard for Refrigeration Systems – ASHRAE Standard 15 – 2019 Roof Code Information:
Weather Protection IBC, Section 1503 Performance Requirements IBC, Section 1504 Internal Fire Classification Class 1 Exterior Fire Classification Class A Basic Wind Speed (Wind Design) IBC, Chapter 16: 120 Mph A. Exposure Category B B. Risk Category IV Surface Roughness B Hail Rating Sh Wind Uplift Design Rating Fm 1-90 ANSI/SPRI Es1 Wind Uplift Pressures Field 40 PSF Perimeter 56 PSF Corners 75 PSF Wind Uplift Design Ratings
Field 1-90 Perimeter 1-120 Corners 1-150
Thermal Insulation (IECC)
1'
T ra ve l D is ta nc e
65' Common Path of Travel
Bu si ne ss
O cc up an cy
H ea lth ca re up an cy
Business Occupancy
Industrial Occupancy
EX FEC
EX
EX
Laboratory 04 Bonomo
2F437
Autoclave 2F438
Laboratory
Papp-Wallace 2F442
Laboratory
2F444
Laboratory 01 Hise
2F448
EX Stair 2S21
Elec 2F449
Passage 2F440
Labs 01-02 Eq Alcove
2F440B
Lab 03 Eq Alcove 2F440A
Office 01 2F447
Office 02 2F446
Office 03 2F445
Office 04 2F443
Office 05 2F441
Laboratory 05 Bonomo
2F436
Lab 04 Eq Alcove 2F430D
Lab 05 Eq Alcove 2F430C
Laboratory
2F435
Passage 2F430
Labs 06-07 Eq Alcove
2F430B
Office 06 2F434
Simulation Center 2F433
Laboratory
Donskey 2F431
Eyewash 2F430A
Passage 2F420C
Office 07 2F427
Office 08 2F426
Office 09 2F425
Office 10 2F423
Laboratory
2F424
IT
2F428A
Nitrogen / Ice
2F428 Labs 08-09 Eq Alcove
2F420B
Labs 09-10 Eq Alcove
2F420A
Laboratory
2F422
Laboratory 10 Pieper
2F421
Equipment 2F417
Equipment 2F415
Lounge 2F411
Office 2E348
Passage 2F410
Hskp 2F412
Womens 2F414
Mens 2F416
EX Stair 2S24
Cold 2F432
Eq Alcove 2F440C
ROOF
ROOF
ROOF
Design Code Occupancy (6.1)
Occupancy Separations (Table 6.1.14.4.1 & 6.1.14.4.3)
Fire Suppression
Construction Type (Existing and New)
Fire Ratings (Table A.8.2.1.2) Exterior Bearing Walls
Interior Bearing Walls
Column/Beams/Girders
Floor-Ceiling Assemblies Roof-Ceiling Assemblies Interior Non-bearing Walls Exterior Non-bearing Walls
Exit Enclosures/Passageways (7.3.1.2.1.3)
Shaft Enclosures (8.6.5)
Exit Access Corridors (38.3.6.1)
Corridor width (38.2.3.2)
Dead End Corridors (38.2.5.2.1)
Hazardous Area Protection (38.3.2.1, 8.7.1.1) High hazard areas (38.3.2.2)
Travel Distances Room remote point to an exit (38.2.6.2 & 38.2.6.3) Common path of travel (38.2.5.3.3, 38.2.5.3.1)
2018 NFPA 101 Life Safety Code Business
2 hours between Business and Healthcare 1 hour between Business and Ambulatory Healthcare 2 hours between Business and Industrial
Fully Sprinklered
Type II (III)
1 hour 1 hour supporting roof only 1 hour 1 hour supporting roof only 1 hour 1 hour supporting roof only 1 hour 1 hour 0 hours 0 hours
1 hour for less than 4 stories 2 hours for 4 stories or more 1 hour for existing if building is fully sprinklered
2 hours for 4 stories or more 1 hour for less than 4 stories
No rating
44" minimum
50' maximum
1 hour; or extinguishing system and smoke partitions 1 hour and extinguishing system
200' maximum, 300' if fully sprinklered 75' maximum, 100' maximum if fully sprinklered
NEW BUSINESS OCCUPANCIES CODE INFORMATION
Existing Concrete Columns:
Minimum 1'-4" x 1'-4" cast reinforced concrete meets requirements of 2HR fire resistance ratings.
Existing Concrete Girders and Beams:
Minimum 8" x 1'-3" cast reinforced concrete meets requirements of 2HR fire resistance ratings.
Existing Shaft Enclosures:
Minimum 8" concrete masonry units meets requirements of 2HR fire resistance ratings.
Existing Concrete Decks:
3.5" Thick cast reinforced concrete meets requirements of 1HR fire resistance rating.
Other existing partitions indicated as fire-resistance rated, are based on VA Cleveland record documents.
EXISTING BUILDING ASSEMBLY INFORMATION (TYPICAL)
R E G
I STERED ARC
H
I T E C T
MICHAEL
LIPOWSKI
12451
ST
AT
E OF OHIO
Michael Lipowski, License #12451 Expiration Date 12/31/2023
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID ISSUE
FULLY SPRINKLERED
Louis Stokes Cleveland
VA Medical Center
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
Consulting Engineers
BARBER & HOFFMAN, INC.
2217 East 9th Street, Suite 350 Cleveland, OH 44115-1257 216-875-0100/ (F) 216-875-0111 barberhoffman.com CLEVELAND, OHIO
Stamp
672 EAST ROYALTON ROAD
BROADVIEW HTS., OHIO 44147
TEL. (440) 546-9696
FAX: (440) 546-9699
C :\U se rs
\rp ha ns al
\D oc um en ts \V
A R
R
KW
_0
_r ph an sa l@ pe rs pe ct us ar ch
.c om
.rv t
1/
/2
9:
:3
AM
1-G-104
PHASE 1 - SECOND FLOOR LIFE SAFETY PLAN Renovate Research K-Wing 541-20-104
1/20/2022 RH DER
Scale: 1/8" = 1'-0"1-G-104
PHASE 1 - SECOND FLOOR LIFE SAFETY PLAN1
SECOND FLOOR SMOKE COMPARTMENT PLAN
LIFE SAFETY PLAN LEGEND
1 HR Fire Barrier
2 HR Fire Barrier
1 HR Fire / Smoke Barrier
0 HR Smoke Partition
Hazardous Room
2018 Life Safety Code
Fire Extinguisher
THIS DRAWING SHALL BE PRINTED IN FULL COLOR FOR CLARITY
Exit Sign
- indicates Illumination side and arrow direction
2 HR Fire / Smoke Barrier
BLACK AND WHITE FACSIMILES ARE NOT CONSIDERED PART OF THE
CONSTRUCTION DOCUMENT SET
1. Contractor shall inform COR immediately of any discrepancies in the existing rated wall construction and non-conforming penetrations.
2. Travel distances are from remote point to exit.
3. Interim Life Safety measures may be required. Coordinate interim Life Safety measures with VA COR.
4. Provide firestopping at all penetrations through new and existing fire/smoke rated barriers (walls and floors) to comply with required rating associated with new work. Provide firestopping around 4 penetrations less than 6 square inches, 4 penetrations between 16 and 36 square inches, and 4 penetrations between 36 and 64 square inches through existing fire/smoke rated barriers (walls and floors) to comply with required rating not associated with new work. Larger openings shall be brought to the immediate attention of the COR.
5. Contractor shall provide fire alarm devices in accordance with electrical drawings.
Fire Resistance Rating
1. Fire rating indicated on a wall shall mean the entire length and height of wall to be fire rated.
2. All piping, ducts, cabinets, etc. that penetrate walls shall be installed in a manner that will preserve the fire resistance rating of that wall.
3. Preserve all fire resistance ratings of existing walls, unless noted otherwise.
ExitEX
LIFE SAFETY GENERAL NOTES
FIRE RESISTANCE RATING NOTES
Horizontal ExitHE
CODES, STANDARDS, MANUALS AND GUIDES
2018 NFPA 101 Life Safety Code 2018 International Building Code (IBC) (Only as indicated by specific reference below) 2018 NFPA National Fire Codes (With the exception of NFPA 5000 and NFPA 900) Occupational, Safety and Health Administration (OSHA) Standards VA Seismic Design Requirements, H-18-8 VA Technical Information Library 2019 Accreditation Manual for Hospitals, of the Joint Commission of Accreditation of Hospitals 2019 National Electrical Code (NEC) 2018 International Plumbing Code (IPC) 2019 ASME Code for Pressure Piping 2015 Architectural Barriers Act Accessibility Standards (ABAAS) VA supplement, Barrier Free Design Guide (PG-18-13) 2019 Requirements for Reinforced Concrete, American Concrete Institute & Commentary (ACI 318) 2017 Manual of Steel Construction, American Institute of Steel Construction (AISC) Energy policy Act of 2005 (EPAct) Ventilation for Acceptable Indoor Air Quality – ASHRAE Standard 62.1- 2019 Safety Standard for Refrigeration Systems – ASHRAE Standard 15 – 2019 Roof Code Information:
Weather Protection IBC, Section 1503 Performance Requirements IBC, Section 1504 Internal Fire Classification Class 1 Exterior Fire Classification Class A Basic Wind Speed (Wind Design) IBC, Chapter 16: 120 Mph A. Exposure Category B B. Risk Category IV Surface Roughness B Hail Rating Sh Wind Uplift Design Rating Fm 1-90 ANSI/SPRI Es1 Wind Uplift Pressures Field 40 PSF Perimeter 56 PSF Corners 75 PSF Wind Uplift Design Ratings
Field 1-90 Perimeter 1-120 Corners 1-150
Thermal Insulation (IECC)
Ex Mechanical
Room 3F440
Stair 21 3S21
Ex Mechanical
Room 3F410
Stair 24 3S24
Mechanical Penthouse
3F411
FMS Room 3F412
EX
EX
R E G
I STERED ARC
H
I T E C T
MICHAEL
LIPOWSKI
12451
ST
AT
E OF OHIO
Michael Lipowski, License #12451 Expiration Date 12/31/2023
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID ISSUE
FULLY SPRINKLERED
Louis Stokes Cleveland
VA Medical Center
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
Consulting Engineers
BARBER & HOFFMAN, INC.
2217 East 9th Street, Suite 350 Cleveland, OH 44115-1257 216-875-0100/ (F) 216-875-0111 barberhoffman.com CLEVELAND, OHIO
Stamp
672 EAST ROYALTON ROAD
BROADVIEW HTS., OHIO 44147
TEL. (440) 546-9696
FAX: (440) 546-9699
C :\U se rs
\rp ha ns al
\D oc um en ts \V
A R
R
KW
_0
_r ph an sa l@ pe rs pe ct us ar ch
.c om
.rv t
1/
/2
9:
:4
AM
1-G-105
PHASE 1 - PENTHOUSE LIFE SAFETY PLAN Renovate Research K-Wing 541-20-104
1/20/2022 RH DER
Scale: 1/8" = 1'-0"1-G-105
PHASE 1 - PENTHOUSE LIFE SAFETY PLAN1
H ea lth up an cy Bu si up an cy Bu si up an cy Am bu la to ry up an cy
EX FEC
EX FEC
EX FEC
EX FEC
EX FEC
EX FEC
EX FEC
EX FEC
Outline of required 2hr floor and floor/ceiling assemblies separating First Floor Healthcare area from Basement Business area. Refer to drawing 2-AE-122 for additional information
Existing connector floor above.
(UL Design N706)
Haz Waste 1F455B
HVAC
1F455C
Quarantine
BF465
Necrospy
BF463
Animal Ward
BF461
Procedure
BF468D
Corridor
BF472
Procedure
BF464A
Vest
BF464
Procedure
BF464B
Procedure
BF468C
Animal Reception
BF466
Security
BF468A
Elec
BF468
Entry
BF 473
Lab Offices
BF442
Office
BF442A
Molecular Biology
Lab
BF440
Work
BF441
Exit Passage
BF404
Ex Stair
BS21
Shop
BF450
Exit Passage
BF403
Specimen
BF431
Refrigerator
BF430
Corridor
BF421
Viewing
BF422
Office
BF426
Tlt
BF423
Haz
BF424
Shower
BF428
Evs
BF429
Autopsy
BF427
Animal Ward
BF460
Animal Ward
BF462
Food
BF459
Mach Rm
BF457
Corridor
BF471
Elec Vault
BF458
Animal Ward
BF455
Animal Ward
BF453
Animal Ward
BF456
Animal Ward
BF454
Animal Ward
BF452
Animal Ward
BF451
Storage
BF348
Sterilizer
BF347A
Bedding / Food
BF346
Cage Assembly
BF346A
Bottle Washer
BF345
Corridor
BF350
Cage Storage
BF343
Cage Wash
BF344
Equipment
BF412
Equipment
BF411
Work in BF472 and BF473 to occur after hours. Corridor and exits to remain usable by building occupants during normal business hours.
LIFE SAFETY PLAN LEGEND
1 HR Fire Barrier
2 HR Fire Barrier
1 HR Fire / Smoke Barrier
0 HR Smoke Partition
Hazardous Room
2018 Life Safety Code
Fire Extinguisher
THIS DRAWING SHALL BE PRINTED IN FULL COLOR FOR CLARITY
Exit Sign
- indicates Illumination side and arrow direction
2 HR Fire / Smoke Barrier
BLACK AND WHITE FACSIMILES ARE NOT CONSIDERED PART OF THE
CONSTRUCTION DOCUMENT SET
1. Contractor shall inform COR immediately of any discrepancies in the existing rated wall construction and non-conforming penetrations.
2. Travel distances are from remote point to exit.
3. Interim Life Safety measures may be required. Coordinate interim Life Safety measures with VA COR.
4. Provide firestopping at all penetrations through new and existing fire/smoke rated barriers (walls and floors) to comply with required rating associated with new work. Provide firestopping around 4 penetrations less than 6 square inches, 4 penetrations between 16 and 36 square inches, and 4 penetrations between 36 and 64 square inches through existing fire/smoke rated barriers (walls and floors) to comply with required rating not associated with new work. Larger openings shall be brought to the immediate attention of the COR.
5. Contractor shall provide fire alarm devices in accordance with electrical drawings.
Fire Resistance Rating
1. Fire rating indicated on a wall shall mean the entire length and height of wall to be fire rated.
2. All piping, ducts, cabinets, etc. that penetrate walls shall be installed in a manner that will preserve the fire resistance rating of that wall.
3. Preserve all fire resistance ratings of existing walls, unless noted otherwise.
ExitEX
LIFE SAFETY GENERAL NOTES
FIRE RESISTANCE RATING NOTES
Horizontal ExitHE
2 Hour rated floor / ceiling assembly above (UL Design J201)
2 Hour rated floor above
Existing wall X1* - 6" cmu, grouted 100% solid (deck to deck) 5.6" equivalent thickness > 2hrs
Existing wall X2* - 8" cmu, grouted 100% solid (deck to deck) 7.6" equivalent thickness > 2hrs
Existing wall X3* - 8" cmu (deck to deck) 4" cmu, grouted 100% solid (deck to deck) 4"+3.6"=7.6" equivalent thickness > 2hrs
*NOTE: Existing masonry walls provide continuity to 2 Hour First Floor rating assemblies.
R E G
I STERED ARC
H
I T E C T
MICHAEL
LIPOWSKI
12451
ST
AT
E OF OHIO
Michael Lipowski, License #12451 Expiration Date 12/31/2023
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID ISSUE
FULLY SPRINKLERED
Louis Stokes Cleveland
VA Medical Center
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
Consulting Engineers
BARBER & HOFFMAN, INC.
2217 East 9th Street, Suite 350 Cleveland, OH 44115-1257 216-875-0100/ (F) 216-875-0111 barberhoffman.com CLEVELAND, OHIO
Stamp
672 EAST ROYALTON ROAD
BROADVIEW HTS., OHIO 44147
TEL. (440) 546-9696
FAX: (440) 546-9699
C :\U se rs
\rp ha ns al
\D oc um en ts \V
A R
R
KW
_0
_r ph an sa l@ pe rs pe ct us ar ch
.c om
.rv t
1/
/2
9:
:2
AM
2-G-102
PHASE 2 - BASEMENT LIFE SAFETY PLAN Renovate Research K-Wing 541-20-104
1/20/2022 RH DER
Scale: 1/8" = 1'-0"2-G-102
PHASE 2 - BASEMENT LIFE SAFETY PLAN1
DNDN
UP
Design Code Occupancies:
Occupancy Separations (18.1.3.4) (Table 6.1.14.4.1 & 6.1.14.4.3)
Fire Suppression (18.3.5.1)
Construction Type - Existing (Table 18.1.6.1)
Fire Ratings (Table A.8.2.1.2) Exterior Bearing Walls
Interior Bearing Walls
Column/Beams/Girders
Floor-Ceiling Assemblies Roof-Ceiling Assemblies Interior Non-bearing Walls Exterior Non-bearing Walls
Exit Enclosures/Passageways (7.3.1.2.1.3)
Shaft Enclosures (8.6.5)
Exit Access Corridors (18.3.6.2)
Corridor width (18.2.3.4)
Dead End Corridors (18.2.5.2)
Smoke Compartments (18.3.7.1.3)
Smoke Barriers (18.3.7.3)
Suite Non-sleeping (18.2.5.7.3.2 A&B) Sleeping (18.2.5.7.2.3 C) Sleeping means of egress (18.2.5.7.2.2 B) Non-sleeping means of egress (18.2.5.7.3.1 B) Walls (18.2.5.7.1.2 & 18.3.6.2)
Healthcare Hazardous Area Protection (18.3.2.1) Boiler and fuel-fired heater rooms Central/bulk laundries larger than 100sf Paint shops less than severe hazard Physical plant maintenance shops Soiled linen rooms exceeding 64 gal Trash Rooms exceeding 64 gal Storage Rooms exceeding 100sf and storing combustibles Storage Rooms larger than 50sf (18.3.2.1.3.2) Labs with non-severe hazard materials (18.3.2.1.3.2) Labs with severe hazard materials (18.3.2.2)
Travel Distances Room remote point to an exit (18.2.6.2.1) Sleeping room remote point to exit access door (18.2.6.2.3) Sleeping suite remote point to exit access door
(18.2.5.7.2.4 A) Sleeping suite remote point to exit (18.2.5.7.2.4 B) Non-sleeping suite remote point to exit access door
(18.2.5.7.3.3 A) Non-sleeping suite remote point to exit (18.2.5.7.3.3 B) Room remote point to smoke barrier (18.3.7.1.5) Common path of travel (18.2.5.3)
See 1-G-104 for New Business Occupancy Code Information
2018 NFPA 101 Life Safety Code Healthcare (Dialysis), Business (Research)
2 hours between Healthcare and Ambulatory Care 2 hours between Healthcare and Business 1 hour between Ambulatory and Business
Fully Sprinklered
Type II (III) 3 stories permitted
1 hour 1 hour supporting roof only 1 hour 1 hour supporting roof only 1 hour 1 hour supporting roof only 1 hour 1 hour 0 hours 0 hours
1 hour for less than 4 stories 2 hours for 4 stories or more 1 hour for existing if building is fully sprinklered
2 hours for 4 stories or more 1 hour for less than 4 stories
0 hour smoke partitions
96" minimum 44" minimum in non-inpatient areas
30' maximum
22,500 SF maximum
1 hour
12,500 sf maximum, 15,000 sf with smoke detection 7,500 sf maximum, 10,000 sf with direct supervision and smoke detection 2 over 1000 sf 2 over 2500 sf 0 hour smoke partitions
1 hour 1 hour 1 hour 1 hour 1 hour 1 hour 1 hour 1 hour 0 hour smoke partitions 0 hour smoke partitions
NFPA 45
200' maximum 50' maximum
100' maximum 200' maximum
100' maximum 200' maximum 200' maximum 100' maximum
NEW HEALTHCARE OCCUPANCIES CODE INFORMATION
LIFE SAFETY PLAN LEGEND
1 HR Fire Barrier
2 HR Fire Barrier
1 HR Fire / Smoke Barrier
0 HR Smoke Partition
Hazardous Room
2018 Life Safety Code
Fire Extinguisher
THIS DRAWING SHALL BE PRINTED IN FULL COLOR FOR CLARITY
Exit Sign
- indicates Illumination side and arrow direction
2 HR Fire / Smoke Barrier
BLACK AND WHITE FACSIMILES ARE NOT CONSIDERED PART OF THE
CONSTRUCTION DOCUMENT SET
1. Contractor shall inform COR immediately of any discrepancies in the existing rated wall construction and non-conforming penetrations.
2. Travel distances are from remote point to exit.
3. Interim Life Safety measures may be required. Coordinate interim Life Safety measures with VA COR.
4. Provide firestopping at all penetrations through new and existing fire/smoke rated barriers (walls and floors) to comply with required rating associated with new work. Provide firestopping around 4 penetrations less than 6 square inches, 4 penetrations between 16 and 36 square inches, and 4 penetrations between 36 and 64 square inches through existing fire/smoke rated barriers (walls and floors) to comply with required rating not associated with new work. Larger openings shall be brought to the immediate attention of the COR.
5. Contractor shall provide fire alarm devices in accordance with electrical drawings.
Fire Resistance Rating
1. Fire rating indicated on a wall shall mean the entire length and height of wall to be fire rated.
2. All piping, ducts, cabinets, etc. that penetrate walls shall be installed in a manner that will preserve the fire resistance rating of that wall.
3. Preserve all fire resistance ratings of existing walls, unless noted otherwise.
ExitEX
LIFE SAFETY GENERAL NOTES
FIRE RESISTANCE RATING NOTES
Horizontal ExitHE
CODES, STANDARDS, MANUALS AND GUIDES
2018 NFPA 101 Life Safety Code 2018 International Building Code (IBC) (Only as indicated by specific reference below) 2018 NFPA National Fire Codes (With the exception of NFPA…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .