S02. Safety.pdf

PDF 101 KB Posted

Attached to
Renovate Research K-Wing Federal contract opportunity
Solicitation number
36C25022B0021
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10

About this file

This document provides details for a federal construction contract opportunity with the Department of Veterans Affairs. The solicitation is for the renovation of Research K-Wing at the Louis Stokes Cleveland VA Medical Center, with a project magnitude between $10-20 million. Interested parties must visit the site and submit bids by the May 12th deadline. The work includes all labor, equipment, and supervision to complete the project according to provided drawings and specifications, and will have a period of performance of 496 calendar days from notice to proceed. This opportunity is a 100% set-aside for Service-Disabled Veteran Owned Small Businesses, who must be verified in VETBIZ and registered in SAM by the offer due date and time of award to be eligible.

View the file

Other files for this federal contract opportunity

Other files attached to Renovate Research K-Wing, newest first.
File Type Posted
S02. Calculation of Self-Performed and Sub-Contracted Work.docx DOCX document
S02. Sole Source - Hill-Rom Nurse Call_Redacted.pdf PDF
S02. Sole Source - Corbin Russwin Locking Cylinders_Redacted.pdf PDF
S02. VHA Supplemental Contract Requirements for Combatting COVID-19 Updated 12-14-2021.docx DOCX document
S02. Final Specs Vol 2 of 2.pdf PDF
S02. RFI Form.pdf PDF
S02. Bid Opening Instructions.pdf PDF
S02. Sole Source - Lenel_Redacted.pdf PDF
S02. VA RRKW Bid Issue Drawings FP-M Updated.pdf PDF
S02. VAMC Health Requirements.pdf PDF
S02. Brand Name or Equal Spreadsheet.pdf PDF
S02. Brand Name or Equal Memo.pdf PDF
S02. Sole Source - Tridium Niagra N4_Redacted.pdf PDF
S02. VA RRKW Bid Issue Drawings E-T Updated.pdf PDF
S02. VA RRKW Bid Issue Drawings G-Q Updated.pdf PDF
S02. Final Drawings.pdf PDF
S02. Final Specs Vol 1 of 2.pdf PDF
S02. Notice-Safety Compliance Requirement.pdf PDF
S02. Sole Source - Notifier Fire Alarm_Redacted.pdf PDF
S02. VA RRKW Bid Issue Specification Vol 2 of 2 Updated.pdf PDF
S02. Wage Determination.pdf PDF
S02. Solicitation 36C25022B0021.pdf PDF
S02. VA RRKW Bid Issue Specification Vol 1 of 2 Updated.pdf PDF
Show all 23

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NOTICE-SAFETY COMPLIANCE REQUIREMENT

Safety or Environmental Violations and Experience Modification Rate All Bidders/Offerors shall submit the following information pertaining to their past Safety and

Environmental record: (The information as outlined below shall be submitted at the time the sealed bid or request for proposal is submitted. For sealed bids, information shall be submitted in a separate sealed envelope identified by the solicitation number, company name, and identified as

“Safety Compliance Information”)

1. VIOLATION INFORMATION: The information shall contain, at a minimum, a certification that the bidder/offeror has no more than three (3) serious, or one (1) repeat or one (1) willful OSHA or any EPA violation(s) in the past three years.

2. EXPERIENCE MODIFICATION RATE: All Bidders/Offerors shall submit information regarding their current Experience Modification Rate (EMR) equal to or less than 1.0. This information shall be obtained from the bidder’s/offeror’s insurance company and be furnished on the insurance carrier’s letterhead.

Self-insured contractors or other contractors that cannot provide their EMR rating on insurance letterhead must obtain a rating from the National Council on Compensation Insurance, Inc. (NCCI) by completing/submitting form ERM-6 and providing the rating on letterhead from NCCI. Note: Self-insured contractors or other contractors that cannot provide EMR rating on insurance letterhead from the states or territories of CA, DE, MI, NJ, ND, OH, PA, WA, WY, and PR shall obtain their EMR rating from their state run worker’s compensation insurance rating bureau.

DETERMINATION OF NON-RESPONSIVE--

All bids/offers in response to this solicitation will be reviewed for responsiveness to the solicitation.

Failure to provide documentation as outlined above, at date and time set for bid opening or receipt of proposal, may deem the bid/proposal Non-Responsive.

Post award, this requirement is applicable to all subcontracting tiers, and prospective prime contractors will be responsible for determining the suitability of their prospective subcontractors. Information concerning any subcontractors will be provided to the Contracting Officer, in the same form and format as outlined above, prior to the prospective subcontractors commencing work under any resulting contract.

File details come from the government source that posted it. Updated .