This document package comprises 100% Construction Documents for the "Replace Boilers 4 & 5" project at the U.S. Department of Veterans Affairs facility located at 5000 W. National Avenue, Milwaukee, Wisconsin 53295. The project, identified as Building 112, Project Number 695-24-107, is issued as of April 6, 2026, and is classified as NOT SPRINKLERED construction.

The project involves the demolition of existing Boilers 4 and 5 and the installation of new Cleaver-Brooks firetube boilers with associated mechanical, electrical, and plumbing systems. Key mechanical components include two new boilers (CBLE-200-600-250ST models rated at 250 PSI and 23,974 lbs estimated operating weight), economizers, steam headers, condensate systems, chemical feed pumps, safety relief valves, and steam traps. Electrical work includes new control panels, feeder cables, lighting fixtures, panel schedules, and a new boiler management system. The construction documents contain detailed P&IDs for steam, combustion air, and process systems; equipment schedules specifying pressures, temperatures, and flow rates; mechanical piping plans for multiple levels; electrical demolition and installation plans; lightning protection details; and comprehensive notes and legends. The project requires coordination with existing building systems, removal of old equipment for scrap value credit to the owner, and compliance with VA construction standards and federal contracting requirements as documented in the accompanying specifications and general notes throughout the drawing set.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

8" HPS

6" HPS

10" HPS

3/4" DR3/4" DR

TRP-44031

EXISTING

BOILER #4

3" HPS 3" HPS

HPS TO MAIN

STEAM HEADER

8" HPS

NC

V-

NC

V-

NC

V-

V-

NC

V-

V-44033

8" HPS

V-

V-

V-

PIT

44001

V-

HPR1"

PI

44001

TRP-44032

EXISTING

BOILER 4

D-641 9 C

112-105-BLR-005

CP-1

V-44034

V-44004

NC

V-44006

V-44007

FE

44005

FIT

44005

FI

44005

FIQ

44005

3"

2 3

4" H

PS

4" H

PS

112-105-FLO-002

KEYED NOTES

1 3/4" THREADED HALF-COUPLING FOR CALORIMETER CONNECTION. LOCATE TO

ALLOW SPACE FOR THREADED PLUG

2 CONNECT EXISTING BOILER 4 TO NEW STEAM HEADER

3 CONNECT EXISTING BOILER 4 3" STEAM ATOMIZATION LINE TO NEW STEAM HEADER

GENERAL NOTES

1. SEE D-001 FOR D-SERIES NOTES AND LEGENDS.

3.

ALL VALVE BODIES AND FITTINGS IN THE BOILER PLANT SHALL BE CAST OR FORGED

STEEL. CAST IRON, DUCTILE IRON, AND BRONZE ARE PROHIBITED, WITH THE

EXCEPTION OF DOMESTIC WATER SERVICES. ALL PRESSURE RELIEF VALVES USED

FOR STEAM SERVICE SHALL BE FORGED STEEL.

2. ALL INSTRUMENTATION TO CONNECT VIA CP-5A, UNLESS OTHERWISE INDICATED.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

23 MECHANIC STREET, SPRINGVILLE, NY 14141

PROCESS - P&ID - STEAM - BOP -

BID DEDUCT

100% CONSTRUCTION

DOCUMENTS

NOT SPRINKLERED

REPLACE BOILERS 4 & 5

5000 W. NATIONAL AVE.

MILWAUKEE, WI 53295

2026-04-06 D-643

695-24-107

BEH DAK

REV A - 35% SCHEMATIC DESIGN DOCUMENTS 2024-07-24

REV B - 65% DESIGN DEVELOPMENT 2024-09-17

REV C - 65% DESIGN DEVELOPMENT 2025-12-30

REV D - 95% CONSTRUCTION DOCUMENTS 2026-03-09

REV E - 100% CONSTRUCTION DOCUMENTS 2026-04-06

GENERAL LINETYPES

CONTINUATION ARROWS

XXXX

XXXX

FLOW ARROW

FLOW DIRECTION

(SINGLE )

FLOW DIRECTION

ANALOG SIGNAL

PIPING PROCESS

DRAWING

POS1 POS2

XXX

AREA BOUNDRY

POINT OF CONNECTION BETWEEN NEW AND

EXISTING WORK

DRAIN

STEAM TRAP- INVERTED BUCKET

PROCESS SYMBOLS

PIPE CAP

LINE WITH PLUG

PROCESS VALVES

VALVES (GENERAL)

GATE VALVE W/ GLOBE VALVE BYPASS

UNION

INSTRUMENT SYMBOLS

FIELD MOUNTED-DISCRETE INSTRUMENT

XXX

XXX

PRIMARY LOCATION ACCESSIBLE TO OPERATOR-SHARED

DISPLAY * = PANEL LEGEND

XXX

XXX *

ABBREVIATIONS

HPS HIGH PRESSURE STEAM

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

AutoCAD SHX Text

%%UPRELIMINARY%%U

AutoCAD SHX Text

%%UNOT%%U FOR CONSTRUCTION

FLUE GAS TO

ATMOSPHERE

TE

53022

TIT

53022

STACK

DAMPER

M

COMBUSTION

AIR INLET

PDS

53007

M

BURNER

PDS

53013

ROTARY AIR

DAMPER

LOCKABLE

(LOCK OPEN)

LOCKABLE

(LOCK OPEN)

CAPS

PAPS

M

BE

53015

INCLUDED WITH BOILER #112-105-BLR-005

BOILER

112-105-BLR-005

AE

53023

AIT

53023

AI

53023

AI

53023

AAL

53023

AAL

53023

0₂ ANALYZER

LFGOLI

TI

53022

TI

53022

TE

53019

TIT

53019

TI

53019

TI

53019

TDI

53019

TDI

53019

ZSO

53021

ZIO

53021

ZIO

53021

OSDPI

ZIC

53020

ZI

53020

ZC

53020

ZI

53020

PDAL

53013

ZIC

53009

ZI

53009

ZC

53009

ZI

53009

BJ

53016

BI

53016

BI

53016

PDAL

53007

IE

53002

IIT

53002

II

53002

II

53002

ISL

53003

IAL

53003

IAL

53003

FDMIS

SC

53001

SI

53001

SI

53001

SIC

53001

ZSO

53010

ZIO

53010

ZAC

53010

53013

PDAL

53007

PDAL

53016

BJA

53010

ZAC

FDDWOPS

V-53008

V-

V-53006

V-53004

V-

V-53012

V-53014

SILENCER

TP

TPTP

TP

TP

PSH

53017

FPI

PAH

53017

PAH

53017

TP

V-53017 V-53018

LOCKABLE

(LOCK OPEN)

CP-1

CP-1 CP-1

CP-1

CP-1

CP-1

CP-1 CP-1 CP-1

CP-1

CP-1

CP-1

CP-1

CP-1

ECONOMIZER

112-105-ECO-001

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

23 MECHANIC STREET, SPRINGVILLE, NY 14141

PROCESS - P&ID - COMBUSTION AIR

- BOILER #5

100% CONSTRUCTION

DOCUMENTS

NOT SPRINKLERED

REPLACE BOILERS 4 & 5

5000 W. NATIONAL AVE.

MILWAUKEE, WI 53295

2026-04-06 D-651

695-24-107

GENERAL NOTES

1 SEE D-001 FOR D-SERIES NOTES AND LEGENDS.

KEYED NOTES

1 LOW-FIRE PROVING SWITCH REQUIRED ON CONTROL DAMPER, REFER TO

BAPSDTM

2 FORCED DRAFT MOTOR INTERLOCK CURRENT RELAYS SHALL BE SET UP ON A

SEPERATE ELECTRICAL ENCLOSURE

BEH DAK

REV A - 35% SCHEMATIC DESIGN DOCUMENTS 2024-07-24

REV B - 65% DESIGN DEVELOPMENT 2024-09-17

REV C - 65% DESIGN DEVELOPMENT 2025-12-30

REV D - 95% CONSTRUCTION DOCUMENTS 2026-03-09

REV E - 100% CONSTRUCTION DOCUMENTS 2026-04-06

GENERAL LINETYPES

CONTINUATION ARROWS

XXXX

XXXX

FLOW ARROW

FLOW DIRECTION

ANALOG SIGNAL

PIPING PROCESS

NETWORK CONNECTION

MOTOR

EQUIPMENT SYMBOLS

FAN

MOTORIZED DAMPER

M

UV FLAME SCANNER

PROCESS SYMBOLS

VENTURI FLOW METER

PROCESS VALVES

VALVES (GENERAL)

BALL VALVE

INSTRUMENT SYMBOLS

FIELD MOUNTED-DISCRETE INSTRUMENT

XXX

XXX

PRIMARY LOCATION ACCESSIBLE TO OPERATOR-SHARED

DISPLAY * = PANEL LEGEND

PRIMARY LOCATION ACCESSIBLE TO OPERATOR-SHARED

DISPLAY * = PANEL LEGEND

XXX

XXX *

XXX

XXX *

ABBREVIATIONS

BAPSDTM BOILER AND ASSOCIATED PLANT SAFETY DEVICE

TESTING MANUAL

CAPS COMBUSTION AIR PRESSURE SWITCH

FDDWOPS FORCED DRAFT DAMPER WIDE OPEN POSITION

SWITCH

FDMIS

FPI FURNACE PRESSURE INTERLOCK

LFGOLI LOW FLUE GAS OXYGEN LEVEL INDICATOR

OSDPI OUTLET STACK DAMPER POSITION INTERLOCK

SWITCH

PAPS PURGE AIRFLOW PROVING SWITCH

TP TEST POINT

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

AutoCAD SHX Text

%%UPRELIMINARY%%U

LC

S

M

M

CORRIDOR

C2

DEMOLISH/REMOVE DEVICE

BUILDING NUMBER

ROOM NUMBER

PHASE CALLOUT#

ROOM NAME AND NUMBER

DEMOLITION

LINE

DRAIN LINE

HIGH PRESSURE STEAM RETURN

GATE VALVE - THREADED/FLANGED

GATE VALVE WITH 3/4" HOSE ADAPTER

CHECK VALVE

ANGLE GLOBE VALVE

BALL VALVE

PRESSURE REGULATING VALVE

PRESSURE SAFETY VALVE

GATE VALVE WITH GLOBE-VALVED BYPASS

PRESSURE REDUCING VALVE (PRV)

WATER LEVEL CONTROLLER

PRESSURE REGULATOR

GLOBE VALVE - THREADED/FLANGED

TOP CONNECTION, 45° OR 90°

BOTTOM CONNECTION, 45° OR 90°

SIDE CONNECTION

CAPPED OUTLET

RISE OR DROP IN PIPE

UNION

PIPE UP

PIPE DOWN

STEAM TRAP - INVERTED BUCKET

POINT OF CONNECTION BETWEEN NEW AND EXISTING WORK

LIMIT OF DEMOLITION

STRAINER

SOLENOID ACTUATED VALVE

FLANGED PIPE CONNECTION

CONNECTIONS:

BLIND FLANGE

NATURAL GAS

PROPERTY BOUNDARY

MOTORIZED CONTROL VALVE

FEED WATER

FUEL OIL RETURN

FUEL OIL SUPPLY

LIQUIFIELD PETROLEUM GAS

LOW PRESSURE STEAM RETURN

SOFTENED WATER

VENT

BOTTOM BLOWDOWN

CHEMICAL FEEDWATER

CITY WATER

CONDENSATE TRANSFER

EQUIPMENT TYPE

BLR = BOILER

TK = TANK

PMP = PUMP

ECO = ECONOMIZER

CF = CHEMICAL FEED

UH = UNIT HEATER

F = FAN

HRV = HEAT RECOVERY VENTILATOR

HEX = HEAT EXCHANGER

CON = CONVECTOR

CU = CONDENSING UNIT

MAU = MAKE UP AIR UNIT

FTR = FINNED TUBE RADIATOR

ITU = INDOOR A/C TERMINAL UNIT

CH = CABINET HEATER

IDENTIFIER NUMBER

HIGH PRESSURE STEAM SUPPLY

LOW PRESSURE STEAM SUPPLY

STEAM TRAP - FLOAT AND THERMOSTATIC

FUEL OIL FILL

REDUCER

CIRCUIT SETTER BALANCE VALVE

GATE VALVE

COMPRESSED AIR

PUMPED CONDENSATE RETURN

VALVE SYMBOLS: PIPING SYMBOLS:

PUMP

EXPANSION JOINT

GUIDE SUPPORT

RH ROLLER-TYPE HANGER

VARIABLE SPRING-TYPE HANGER

TRAPEZE HANGER (PROVIDE U-BOLT PIPE

ATTACHMENT TO TRAPEZE EXCEPT WHERE RH ARE

INDICATED)

FLOOR-SUPPORTED PIPE STAND

SH

TH

PS

2-100-BLR-001

NUMBERING DESIGNATIONS FOR EQUIPMENT:

FLOW METER

GENERAL SYMBOLS:

GENERAL LINETYPES:

ABBREVIATIONS:

FW

FOR

FOS

HPR

LPG

LPR

SW

V

G

BBD

CF

CW

CT

HPS

LPS

FOF

A

AMPERE

AHU AIR HANDLING UNIT

BD BOARD

BMS BUILDING MANAGEMENT SYSTEM

BTU BRITISH THERMAL UNIT

CBD CONTINUOUS BLOWDOWN

CFM CUBIC FEET PER MINUTE

CWR COLD WATER RETURN

CWS COLD WATER SUPPLY

DB DRY BULB

DN DOWN

EA EXHAUST AIR

EAT ENTERING AIR TEMPERATURE

EXH EXHAUST

F&T FLOAT AND THERMOSTATIC

FTR FIN TUBE RADIATOR

FS FLOW SENSOR

FT FEET

GPM GALLONS PER MINUTE

HP HORSEPOWER

HWR HOT WATER RETURN

HWS HOT WATER SUPPLY

HZ HERTZ

IB INVERTED BUCKET

LAT LEAVING AIR TEMPERATURE

MAX MAXIMUM

MBH THOUSAND BTU PER HOUR

MIN MINIMUM

NTS NOT TO SCALE

OA OUTSIDE AIR

PH PHASE

PSIG POUNDS PER SQUARE INCH GAUGE

PTAC PACKAGED TERMINAL AIR CONDITIONER

RA RETURN AIR

RG RETURN GRILL

SA SUPPLY AIR

SD SUPPLY DIFFUSER

SP STATIC PRESSURE

SR SUPPLY REGISTER

TEMP TEMPERATURE

TYP TYPICAL

UH UNIT HEATER

V

VOLT

VAV VARIABLE AIR VOLUME

VFD VARIABLE FREQUENCY DRIVE

W WATT

WB WET BULB

CA COMPRESSED AIR

CA

PCR

23 MECHANIC STREET, SPRINGVILLE, NY 14141

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

100% CONSTRUCTION

DOCUMENTS

REPLACE BOILERS 4 & 5

5000 W. NATIONAL AVE

MILWAUKEE, WI 53295

695-24-107

2026-04-06

PREL

IMIN

ARY

NOT

FOR

CONS

TRUC

TION

M-001

MECHANICAL NOTES AND

LEGENDS 112

DJU KRL

NOT SPRINKLERED

1. DESIGN CONSTRUCTION AND SAFETY SHALL CONFORM TO ALL LOCAL, STATE AND OWNER SPECIFIC CODES, INCLUDING (BUT NOT LIMITED TO) THE INTERNATIONAL BUILDING CODE, AND THE DEPT OF VA STEAM, HEATING HOT WATER, AND OUTSIDE DISTRIBUTION SYSTEMS DESIGN MANUAL.

2. THIS CONTRACT REQUIRES COMPLETE, FINISHED WORKABLE PROJECT OF THE AREAS INDICATED BY THE CONTRACT DOCUMENTS, AND SHALL INCLUDE ALL MATERIALS AND LABOR NECESSARY TO COMPLETE, REGARDLESS OF WHETHER OR NOT ALL WORK OR EACH ITEM IS SPECIFICALLY INDICATED ON ANY OTHER PORTION OF THE

DRAWINGS AND/OR NOTES.

3. WHERE MATERIALS REFERENCED ON DRAWINGS, OR NECESSARY TO COMPLETE THE WORK OF THIS CONTRACT ARE NOT SPECIFIED HEREIN, PROVIDE BEST QUALITY MATERIAL. WHERE MATERIALS ARE INTENDED TO MATCH EXISTING, PROVIDE CLOSEST POSSIBLE MATCH, SUBJECT TO OWNERS APPROVAL. ALL ITEMS AND WORK ON DRAWINGS ARE NEW, UNLESS INDICATED EXISTING. ALL WORK WHICH HAS BEEN DAMAGED SHALL BE REPAIRED TO A “NEW CONDITION”, OR WHERE THE STRUCTURAL

INTEGRITY HAS BEEN AFFECTED, ITEMS SHALL BE REPLACED AT NO COST TO THE OWNER.

4. CONTRACTOR IS RESPONSIBLE TO VERIFY ALL SITE, FIELD AND BUILDING CONDITIONS PRIOR TO COMMENCING WORK. IF THERE ARE ANY DISCREPANCIES BETWEEN DRAWINGS AND FIELD CONDITIONS, NOTIFY THE CONSTRUCTION MANAGER AND ARCHITECT/ENGINEER AND REQUEST CLARIFICATION.

5. DRAWINGS MAY NOT INDICATE ALL DEMOLITION/REMOVALS. CONTRACTOR SHALL REFER TO DRAWINGS, SPECIFICATIONS AND VERIFY FIELD CONDITIONS TO DETERMINE FULL SCOPE AND PARTICULARS OF REMOVALS AS REQUIRED FOR AND COORDINATED WITH THE NEW WORK PRIOR TO BIDDING WORK. VERIFY AND CONFIRM WITH OWNER

WHICH ITEMS ARE TO BE SAVED FOR OWNER ’S USE OR REINSTALLATION BY CONTRACTOR.

6. WHERE CONSTRUCTION OR ITEMS HAVE BEEN INFILLED, REMOVED AND/OR DISTURBED FOR INSTALLATION OF NEW WORK, CAUSING THE EXPOSURE OF UNFINISHED AND/OR DAMAGED SURFACES, RESULTING SURFACES AND INFILLED SURFACES SHALL BE RECONSTRUCTED WITH MATERIALS TO MATCH FINISHED. ALL ABANDONED OPENINGS (I.E., DUCT/PIPE REMOVALS.) AT WALLS, ROOF OR FLOOR TO BE INFILLED SOLID.

7. WORK IS REQUIRED IN VARIOUS PORTIONS OF THE FACILITY TO EXECUTE WORK OF OTHER TRADES (I.E. ELECTRICAL, MECHANICAL). ALTHOUGH NOT NECESSARILY SHOWN ON DRAWINGS, WORK IS REQUIRED IN THESE AREAS CONSISTING OF PLACEMENT OF CEILINGS, WALL, FINISHES, PAVEMENT AND OTHER CONSTRUCTION AS NECESSARY TO

PERFORM WORK AND RESTORE THESE SPACES OR AREAS TO ORIGINAL CONDITIONS.

8. CONTRACTOR SHALL COORDINATE THE WORK WITH EACH TRADE SO THAT THE WORK AND SCHEDULE ARE NOT IMPEDED. SCHEDULE WORK PROGRESS THROUGHOUT THE ENTIRE PROJECT TO PREVENT CONFLICTS AND INTERFERENCES. OBTAIN ALL NECESSARY INFORMATION SUCH AS SIZES, LOCATIONS, TEMPLATES, LAYOUT, DIMENSIONS AND ALL OTHER INFORMATION NECESSARY FOR A PROPER AND WELL COORDINATED INSTALLATION. PRIOR TO INSTALLATION OF ITEMS, VERIFY AND CONFIRM WITH EACH

TRADE EXACT LOCATION OF ALL ITEMS.

9. LABEL ALL PIPING IN ACCORDANCE WITH ASME A13.1, AND AS DESCRIBED IN SPECIFICATION SECTION 09 91 00 - 3.14.

10. INCLUDE FLOW-DIRECTION ARROWS INTEGRAL WITH PIPING SYSTEM SERVICE LETTERING TO ACCOMMODATE BOTH DIRECTIONS OR AS SEPARATE UNIT ON EACH PIPE

LABEL TO INDICATE FLOW DIRECTION PER SPECIFICATION 230553.

11. PIPE LABEL LOCATIONS: LOCATE PIPE LABELS, IN ACCORDANCE WITH SPECIFICATION 230553, WHERE PIPING IS EXPOSED OR ABOVE ACCESSIBLE CEILINGS IN FINISHED

SPACES; MACHINE ROOMS; ACCESSIBLE MAINTENANCE SPACES SUCH AS SHAFTS, TUNNELS, AND PLENUMS; AND EXTERIOR EXPOSED LOCATIONS AS FOLLOWS:

A. NEAR EACH VALVE AND CONTROL DEVICE.

B. NEAR EACH BRANCH CONNECTION, EXCLUDING SHORT TAKEOFFS FOR FIXTURES AND TERMINAL UNITS. WHERE FLOW PATTERN IS NOT OBVIOUS, MARK EACH PIPE

AT BRANCH.

C. NEAR PENETRATIONS AND ON BOTH SIDES OF THROUGH WALLS, FLOORS, CEILINGS, AND INACCESSIBLE ENCLOSURES.

D. AT ACCESS DOORS, MANHOLES, AND SIMILAR ACCESS POINTS THAT PERMIT VIEW OF CONCEALED PIPING.

E. NEAR MAJOR EQUIPMENT ITEMS AND OTHER POINTS OF ORIGINATION AND TERMINATION.

F. SPACED AT MAXIMUM INTERVALS OF 50 FEET ALONG EACH RUN. REDUCE INTERVALS TO 25 FEET IN AREAS OF CONGESTED PIPING AND EQUIPMENT.

12. REFER TO PHASING PLANS.

13. BUY AMERICA ACT MATERIALS TO BE UTILIZED.

THE APPLICABLE MODEL CODES, STANDARDS AND REFERENCES DOCUMENTS PERTINENT TO THE PROJECT ARE AS FOLLOWS:

· NFPA 101 LIFE SAFETY CODE

· ASHRAE STANDARDS

· INTERNATIONAL MECHANICAL CODE

· NFPA 70 NATIONAL ELECTRIC CODE

· OCCUPATIONAL, SAFETY, AND HEALTH ADMINISTRATIONS VA STANDARD APPLICATION GUIDE, AND OTHER GUIDANCE ON THE TECHNICAL INFORMATION LIBRARY

· ASME B31.1 CODE FOR PRESSURE PIPING

GENERAL NOTES:

APPLICABLE CODES:

Revisions: Date:

REV A - 35% SCHEMATIC DESIGN DOCUMENTS 2024-07-24

REV B - 65% DESIGN DEVELOPMENT 2024-09-17

REV C - 65% DESIGN DEVELOPMENT 2025-12-30

REV D - 95% CONSTRCUTION DOCUMENTS 2026-03-09

REV E - 100% CONSTRUCTION DOCUMENTS 2026-04-06

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

23 MECHANIC STREET, SPRINGVILLE, NY 14141

MECHANICAL SCHEDULES 100% CONSTRUCTION

DOCUMENTS

NOT SPRINKLERED

REPLACE BOILERS 4 & 5

5000 W. NATIONAL AVE.

MILWAUKEE, WI 53295

2026-04-06 M-601

695-24-107

BEH CJR

REV A - 35% SCHEMATIC DESIGN DOCUMENTS 2024-07-24

REV B - 65% DESIGN DEVELOPMENT 2024-09-17

REV C - 65% DESIGN DEVELOPMENT 2025-12-30

REV D - 95% CONSTRUCTION DOCUMENTS 2026-03-09

REV E - 100% CONSTRUCTION DOCUMENTS 2026-04-06

CHEMICAL FEED PUMP SCHEDULE

UNIT LOCATION OUTLET SIZE

OUTPUT RANGE

(GPH) PRESSURE (PSI)

ELECTRICAL

BASIS OF DESIGN

V/P/HZ

112-105-CF-001; AMINE PUMP BOILER ROOM 1/4 NPT .002-.25 450 120/1/60 LMI PD71

112-105-CF-002; SCALE INHIBITOR PUMP BOILER ROOM 1/4 NPT .002-.25 450 120/1/60 LMI PD71 112-105-CF-003; SULFITE OXYGEN SCAVENGER PUMP BOILER ROOM 1/4 NPT .002-.25 450 120/1/60 LMI PD71

VORTEX FLOW METER SCHEDULE

UNIT FLUID MEDIUM

SATURATED STEAM

PIPE SIZE (NPS) METER SIZE (NPS)

MAXIMUM PRESSURE

DROP AT FULL FLOW

(PSI)

NOTESMAXIMUM FLOW RATE

(LB/HR)

MINIMUM FLOW RATE

(LB/HR) INLET PRESSURE (PSIG)

112-105-FLO-001 STEAM 20,000 1000 100 8 6 1 -

112-105-FLO-002 STEAM 20,000 1000 100 8 6 1 -

112-103-FLO-003 STEAM 5,000 100 100 6 6 1

SAFETY RELIEF VALVE SCHEDULE

UNIT SERVICE MATERIAL

MASS FLOW SET PRESSURE

NOTES

(LBS/HR) (PSIG)

V-42001 112-105-BLR-005 CAST STEEL 20,000 130 -

V-42002 112-105-BLR-005 CAST STEEL 20,000 135 -

STEAM TRAP SCHEDULE

UNIT LOCATION TYPE CONN. SIZE (IN) OPERATING PRESSURE

(PSIG)

RETURN LINE

(PSIG)

DIFFERENTIAL

PRESSURE (PSIG) BASIS OF DESIGN

TRP-44031 STEAM HEADER IB 1" 100 5 95 ARMSTRONG IB 983

TRP-44032 STEAM HEADER IB 1" 100 5 95 ARMSTRONG IB 983

NOTES:

BOILER UNIT SCHEDULE

UNIT LOCATION

RATINGS FUEL ELECTRICAL ESTIMATED OPERATING

WEIGHT (LBS) BASIS OF DESIGN

HP EFF (%) NOX LEVEL (PPM) LIGHT OIL (GPH) NATURAL GAS (SCFH) V PH HZ

112-105-BLR-005 BOILER ROOM 600 83.8 30 164 23,974 460 3 60 31,571 CLEAVER-BROOKS CBLE-200-600-250ST

GENERAL NOTES

1. SEE M-001 FOR M-SERIES NOTES AND LEGENDS.

ECONOMIZER SCHEDULE

UNIT LOCATION SERVICE

HEAT RECOVERED

(MBH)

FEEDWATER FLOW

(GPM)

FEEDWATER PRESSURE

DROP (PSI)

FEEDWATER TEMPERATURE

IN/OUT (°F) FLUE GAS FLOW (SCFM) FLUE GAS

TEMPERATURE (°F) BASIS OF DESIGN NOTES

112-105-ECO-001 BOILER ROOM BOILER 5 449 41.4 1 227/250 5184 385 CLEAVER-BROOKS CRE-48G -

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

AutoCAD SHX Text

%%UPRELIMINARY%%U

E

D

C

3"ø RO

8"ø HPS

1 1/2"ø HPR

3"ø RO

"ø

H

PS

5"ø PCR

1"ø LPR

12"ø HPS

3"ø FW

FEEDWATER STORAGE TANK

B-5 STEAM BOILERB-4 STEAM BOILER

3"ø RO

6"ø HPS

3"ø HPS

8" ø

HP

S

3" ø

HP

S

12"ø HPS

3" ø

RO

2" ø

CB

D2" ø

BB

D

3" ø

NG

6" ø

NG

1"ø LPG

3" ø

NG

3" ø

CA

1" ø

CA

1"ø CA

3"ø BBD1 1/2"ø HPS3"ø NG

3" ø

RO

3" ø

RO

3" ø

NG

1 1/2"ø HPS

3/4"ø CA

1"ø LPG

3/4"ø CA

3/4"ø CA3/4"ø LPG

1"ø CW

STEAM HEADER

1" ø

CW

4" ø

V

4" ø

V

FOS3/4"ø

FOR3/4"ø

HPR1"ø

3/4"ø CF

3/4 "ø

C F

BYPASS FEEDER

(TO BE REMOVED)

3/4 "ø

F W

2 1/2"ø FW

3"ø FW 1" ø

HP

R

MD201 1

1" ø

CW

S

1"ø CWS 1"ø CWS

1"ø CW 1"ø CW

2" ø

CB

D

2" ø

BB

D

3" ø

HP

S

4" ø

V

4" ø

V

8621 SF

EAST BOILER ROOM

RISE OR DROP IN PIPE

PIPE UP

PIPE DOWN

POINT OF CONNECTION BETWEEN NEW

AND EXISTING WORK

LIMIT OF DEMOLITION

GATE VALVE

BBD BOTTOM BLOWDOWN

CBD CONTINUOUS BLOWDOWN

CF CHEMICAL FEEDWATER

CW CITY WATER

CT CONDENSATE TRANSFER

FW FEEDWATER

FOR FUEL OIL RETURN

FOS FUEL OIL SUPPLY

HPS HIGH PRESSURE STEAM SUPPLY

HPR HIGH PRESSURE STEAM RETURN

LPG LIQUIFIED PETROLEUM GAS

LPS LOW PRESSURE STEAM SUPPLY

LPR LOW PRESSURE STEAM RETUN

ABBREVIATIONS

VALVE SYMBOLS

PIPING SYMBOLS

NG NATURAL GAS

PCR PUMPED CONDENSATE RETURN

RO REVERSE OSMOSIS

Room name

XXX SF

ROOM NAME, NUMBER, AND AREA

GENERAL SYMBOLS:

SF SQUARE FOOT

23 MECHANIC STREET, SPRINGVILLE, NY 14141

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

100% CONSTRUCTION

DOCUMENTS

REPLACE BOILERS 4 & 5

5000 W. NATIONAL AVE

MILWAUKEE, WI 53295

695-24-107

2026-04-06

PREL

IMIN

ARY

NOT

FOR

CONS

TRUC

TION

MD101

MECHANICAL PIPING DEMOLITION

PLAN - FIRST FLOOR 112

DJU KRL

NOT SPRINKLERED

SCALE: 3/8" = 1'-0"1 MECHANICAL PIPING DEMOLITION PLAN - FIRST FLOOR LEVEL

2. CONTRACTOR TO COODINATE WITH VA TO PROVIDE SCRAP VALUE CREDIT TO OWNER

FOR REMOVED EQUIPMENT.

1. SEE M-001 FOR M-SERIES NOTES AND LEGENDS.

GENERAL NOTES

N

N

KEYPLAN

20' - 0"20' - 0"20' - 0"

0"

0"

0"

0"

4321E ED DCBAUPUP

AREA OF WORK

Revisions: Date:

REV A - 35% SCHEMATIC DESIGN DOCUMENTS 2024-07-24

REV B - 65% DESIGN DEVELOPMENT 2024-09-17

REV C - 65% DESIGN DEVELOPMENT 2025-12-30

D

C

MD201 1

3"ø RO

8"ø HPS

1 1/2"ø HPR

3"ø RO

"ø

H

PS

5"ø PCR

1"ø LPR

12"ø HPS

3"ø FW

FEEDWATER STORAGE TANK

B-5 STEAM BOILERB-4 STEAM BOILER

3"ø RO

8" ø

HP

S

3" ø

HP

S

12"ø HPS

3" ø

RO

6" ø

NG

1"ø LPG

3" ø

NG

3" ø

CA

1"ø CA 3" ø

RO

3" ø

RO

1 1/2"ø HPS

3/4"ø CA

1"ø LPG 3/4"ø CA

STEAM HEADER

1" ø

CW

1" ø

HP

R

1"ø CW1"ø CW

1"ø CA 1"ø CA

1"ø CWS1"ø CWS 6" ø

HP

S 3" ø

NG

1" ø

CW

S

3/4"ø CF

6" ø

HP

S

3" ø

NG

4" ø

V

4" ø

V

2" ø

BB

D

2" ø

CB

D

3"ø HPS

1"ø HPR

2 1 /2" ø

FW

8621 SF

EAST BOILER ROOM

RISE OR DROP IN PIPE

PIPE UP

PIPE DOWN

POINT OF CONNECTION BETWEEN NEW

AND EXISTING WORK

LIMIT OF DEMOLITION

GATE VALVE

BBD BOTTOM BLOWDOWN

CBD CONTINUOUS BLOWDOWN

CF CHEMICAL FEEDWATER

CW CITY WATER

CT CONDENSATE TRANSFER

FW FEEDWATER

FOR FUEL OIL RETURN

FOS FUEL OIL SUPPLY

HPS HIGH PRESSURE STEAM SUPPLY

HPR HIGH PRESSURE STEAM RETURN

LPG LIQUIFIED PETROLEUM GAS

LPS LOW PRESSURE STEAM SUPPLY

LPR LOW PRESSURE STEAM RETUN

ABBREVIATIONS

VALVE SYMBOLS

PIPING SYMBOLS

NG NATURAL GAS

PCR PUMPED CONDENSATE RETURN

RO REVERSE OSMOSIS

Room name

XXX SF

ROOM NAME, NUMBER, AND AREA

GENERAL SYMBOLS:

SF SQUARE FOOT

23 MECHANIC STREET, SPRINGVILLE, NY 14141

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

100% CONSTRUCTION

DOCUMENTS

REPLACE BOILERS 4 & 5

5000 W. NATIONAL AVE

MILWAUKEE, WI 53295

695-24-107

2026-04-06

PREL

IMIN

ARY

NOT

FOR

CONS

TRUC

TION

MD105

MECHANICAL PIPING BID DEDUCT

DEMOLITION PLAN - FIRST FLOOR 112

DJU KRL

NOT SPRINKLERED

SCALE: 3/8" = 1'-0"1 MECHANICAL PIPING BID DEDUCTION DEMOLITION PLAN - FIRST FLOOR LEVEL

2. CONTRACTOR TO COODINATE WITH VA TO PROVIDE SCRAP VALUE CREDIT TO OWNER

FOR REMOVED EQUIPMENT.

1. SEE M-001 FOR M-SERIES NOTES AND LEGENDS.

GENERAL NOTES

N

N

KEYPLAN

20' - 0"20' - 0"20' - 0"

0"

0"

0"

0"

4321E ED DCBAUPUP

AREA OF WORK

Revisions: Date:

REV A - 35% SCHEMATIC DESIGN DOCUMENTS 2024-07-24

REV B - 65% DESIGN DEVELOPMENT 2024-09-17

REV C - 65% DESIGN DEVELOPMENT 2025-12-30

D

C

MIDDLE ROOF AREA

REMOVE BOILER EXHAUST STACK

AND SUPPORT FRAMEWORK

REMOVE RELIEF

VALVE VENT PIPES

REMOVE RELIEF

VALVE VENT PIPES

EXISTING CAPPED

ROOF OPENING

EXISTING CAPPED

ROOF OPENING

23 MECHANIC STREET, SPRINGVILLE, NY 14141

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

100% CONSTRUCTION

DOCUMENTS

REPLACE BOILERS 4 & 5

5000 W. NATIONAL AVE

MILWAUKEE, WI 53295

695-24-107

2026-04-06

PREL

IMIN

ARY

NOT

FOR

CONS

TRUC

TION

MD121

MECHANICAL PIPING DEMOLITION

PLAN - ROOF LEVEL 112

DJU KRL

NOT SPRINKLERED

SCALE: 3/8" = 1'-0"1 MECHANICAL PIPING DEMOLITION PLAN - ROOF LEVEL

N

1. SEE M-001 FOR M-SERIES NOTES AND LEGENDS.

GENERAL NOTES

N

KEYPLAN

20' - 0"20' - 0"20' - 0"

0"

0"

0"

0"

4321E ED DCBAUPUP

AREA OF WORK

Revisions: Date:

REV A - 35% SCHEMATIC DESIGN DOCUMENTS 2024-07-24

REV B - 65% DESIGN DEVELOPMENT 2024-09-17

REV C - 65% DESIGN DEVELOPMENT 2025-12-30

D

C

MIDDLE ROOF AREA

REMOVE BOILER EXHAUST STACK

AND SUPPORT FRAMEWORK

REMOVE RELIEF

VALVE VENT PIPES

EXISTING CAPPED

ROOF OPENING

EXISTING CAPPED

ROOF OPENING

23 MECHANIC STREET, SPRINGVILLE, NY 14141

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

100% CONSTRUCTION

DOCUMENTS

REPLACE BOILERS 4 & 5

5000 W. NATIONAL AVE

MILWAUKEE, WI 53295

695-24-107

2026-04-06

PREL

IMIN

ARY

NOT

FOR

CONS

TRUC

TION

MD125

MECHANICAL BID DEDUCT PIPING

DEMOLITION PLAN - ROOF LEVEL 112

DJU KRL

NOT SPRINKLERED

SCALE: 3/8" = 1'-0"1 MECHANICAL BID DEDUCTION PIPING DEMOLITION PLAN - ROOF LEVEL N

1. SEE M-001 FOR M-SERIES NOTES AND LEGENDS.

GENERAL NOTES

N

KEYPLAN

20' - 0"20' - 0"20' - 0"

0"

0"

0"

0"

4321E ED DCBAUPUP

AREA OF WORK

Revisions: Date:

REV A - 35% SCHEMATIC DESIGN DOCUMENTS 2024-07-24

REV B - 65% DESIGN DEVELOPMENT 2024-09-17

REV C - 65% DESIGN DEVELOPMENT 2025-12-30

LIMIT OF DEMOLITION

FW FEEDWATER

FOR FUEL OIL RETURN

FOS FUEL OIL SUPPLY

HPS HIGH PRESSURE STEAM SUPPLY

HPR HIGH PRESSURE STEAM RETURN

LPG LIQUIFIED PETROLEUM GAS

LPS LOW PRESSURE STEAM SUPPLY

LPR LOW PRESSURE STEAM RETUN

ABBREVIATIONS

PIPING SYMBOLS

NG NATURAL GAS

PCR PUMPED CONDENSATE RETURN

RO REVERSE OSMOSIS

RH ROD HANGER PIPE SUPPORT

SH SPRING HANGER PIPE SUPPORT

FIRST FLOOR LEVEL

71' - 0"

E

D

12"ø HPS

5"ø PCR

1"ø LPR3"ø FW

/1 MD101

6"ø HPS

8"ø HPS

3"ø NG

3"ø NG

3/4"ø CA

1"ø LPG

1"ø HPR

EXISTING BOILER B-5

EXISTING STEAM HEADER

BOILER HEADER

AREA

/1 MD105

1"ø HPR

3"ø HPS

3/4"ø FOS

3/4"ø FOR

1" ø

LP

G

3"ø HPS

3/4"ø CF

1" ø

CA

1" ø

CW

3/4 "ø

C W

S

2"ø BBD 2"ø CBD

4" ø

V

4" ø

V

23 MECHANIC STREET, SPRINGVILLE, NY 14141

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

100% CONSTRUCTION

DOCUMENTS

REPLACE BOILERS 4 & 5

5000 W. NATIONAL AVE

MILWAUKEE, WI 53295

695-24-107

2026-04-06

PREL

IMIN

ARY

NOT

FOR

CONS

TRUC

TION

MD201

MECHANICAL DEMOLITION

ELEVATION 112

DJU KRL

NOT SPRINKLERED

1. SEE M-001 FOR M-SERIES NOTES AND LEGENDS.

GENERAL NOTES

SCALE: 1/2" = 1'-0"1 MECHANICAL DEMOLITION ELEVATION

Revisions: Date:

REV A - 35% SCHEMATIC DESIGN DOCUMENTS 2024-07-24

REV B - 65% DESIGN DEVELOPMENT 2024-09-17

REV C - 65% DESIGN DEVELOPMENT 2025-12-30

D

C

1" ø

HP

R

1" ø

HP

R

1"ø HPR

SH SH

RH

0"

8621 SF

EAST BOILER ROOM

8" ø

HP

S

8" ø

HP

S

8" ø

HP

S

22.50°

1" ø

HP

R

SH

SH

NEW STEAM BOILER

112-105-BLR-005

M

M

112-105-FLO-001

112-105-FLO-001

1"ø HPR

RISE OR DROP IN PIPE

PIPE UP

PIPE DOWN

POINT OF CONNECTION BETWEEN NEW

AND EXISTING WORK

GATE VALVE

HPS HIGH PRESSURE STEAM SUPPLY

HPR HIGH PRESSURE STEAM RETURN

LPS LOW PRESSURE STEAM SUPPLY

LPR LOW PRESSURE STEAM RETURN

ABBREVIATIONS

VALVE SYMBOLS

PIPING SYMBOLS

RH ROD HANGER PIPE SUPPORT

SF SQUARE FOOT

PIPE HANGER

SH SPRING HANGER PIPE SUPPORT

Room name

XXX SF

ROOM NAME, NUMBER, AND AREA

GENERAL SYMBOLS:

FLOW METERM

23 MECHANIC STREET, SPRINGVILLE, NY 14141

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

100% CONSTRUCTION

DOCUMENTS

REPLACE BOILERS 4 & 5

5000 W. NATIONAL AVE

MILWAUKEE, WI 53295

695-24-107

2026-04-06

PREL

IMIN

ARY

NOT

FOR

CONS

TRUC

TION

MP101

MECHANICAL STEAM PIPING PLAN -

FIRST FLOOR LEVEL 112

DJU KRL

NOT SPRINKLERED

N

KEYPLAN

20' - 0"20' - 0"20' - 0"

0"

0"

0"

0"

4321E ED DCBAUPUP

AREA OF WORK

SCALE: 3/8" = 1'-0"1 MECHANICAL STEAM PIPING PLAN - FIRST FLOOR LEVEL

1. SEE M-001 FOR M-SERIES NOTES AND LEGENDS.

GENERAL NOTES

N

Revisions: Date:

REV A - 35% SCHEMATIC DESIGN DOCUMENTS 2024-07-24

REV B - 65% DESIGN DEVELOPMENT 2024-09-17

REV C - 65% DESIGN DEVELOPMENT 2025-12-30

REV D - 95% CONSTRCUTION DOCUMENTS 2026-03-09

REV E - 100% CONSTRUCTION DOCUMENTS 2026-04-06

KEYED NOTES

1 PROVIDE MINIMUM STRAIGHT RUN PIPING OF 10D UPSTREAM AND 5D DOWNSTREAM OF

STEAM FLOW METER, OR GREATER IF REQUIRED BY MANUFACTURER

D

C

1"ø CWS 1"ø CWS

1 1/2"ø ROC

8621 SF

EAST BOILER ROOM

2 1/2"ø FW

3"ø FW 3"ø FW

3" ø

BB

D

1 1/2"ø CBD

1" DRAIN LINE FROM

NEW STEAM HEADER

TO SAMPLE

COOLER

1/2 "ø

C F

1/2 "ø

C F

1/2 "ø

C F

TO 112-105-CF-001 AMINE PUMP

TO 112-105-CF-002 SCALE INHIBITOR PUMP

TO 112-105-CF-003 OXYGEN SCAVENGER PUMP

NEW STEAM BOILER

112-105-BLR-005

RISE OR DROP IN PIPE

PIPE UP

PIPE DOWN

POINT OF CONNECTION BETWEEN NEW

AND EXISTING WORK

GATE VALVE

ABBREVIATIONS

VALVE SYMBOLS

PIPING SYMBOLS

PIPE HANGER

Room name

XXX SF

ROOM NAME, NUMBER, AND AREA

GENERAL SYMBOLS:

BBD BOTTOM BLOWDOWN

CBD CONTINUOUS BLOWDOWN

CF CHEMICAL FEEDWATER

CW CITY WATER

FW FEEDWATER

FLOOR DRAIN

23 MECHANIC STREET, SPRINGVILLE, NY 14141

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

100% CONSTRUCTION

DOCUMENTS

REPLACE BOILERS 4 & 5

5000 W. NATIONAL AVE

MILWAUKEE, WI 53295

695-24-107

2026-04-06

PREL

IMIN

ARY

NOT

FOR

CONS

TRUC

TION

MP102

MECHANICAL HYDRONIC PIPING

PLAN - FIRST FLOOR LEVEL 112

DJU KRL

NOT SPRINKLERED

N

KEYPLAN

20' - 0"20' - 0"20' - 0"

0"

0"

0"

0"

4321E ED DCBAUPUP

AREA OF WORK

1. SEE M-001 FOR M-SERIES NOTES AND LEGENDS.

GENERAL NOTES

SCALE: 3/8" = 1'-0"1 MECHANICAL HYDRONIC PIPING PLAN - FIRST FLOOR LEVEL

N

Revisions: Date:

REV A - 35% SCHEMATIC DESIGN DOCUMENTS 2024-07-24

REV B - 65% DESIGN DEVELOPMENT 2024-09-17

REV C - 65% DESIGN DEVELOPMENT 2025-12-30

D

C

3/4"ø FOR 3/4"ø FOS

1"ø LPG

8621 SF

EAST BOILER ROOM

3"ø NG

6" ø

NG

1"ø LPG

3" ø

NG

6"ø NG

NEW STEAM BOILER

112-105-BLR-005

RISE OR DROP IN PIPE

PIPE UP

PIPE DOWN

POINT OF CONNECTION BETWEEN NEW

AND EXISTING WORK

GATE VALVE

ABBREVIATIONS

VALVE SYMBOLS

PIPING SYMBOLS

SF SQUARE FOOT

PIPE HANGER

Room name

XXX SF

ROOM NAME, NUMBER, AND AREA

GENERAL SYMBOLS:

FOR FUEL OIL RETURN

FOS FUEL OIL SUPPLY

LPG LIQUIFIED PETROLEUM GAS

NG NATURAL GAS

23 MECHANIC STREET, SPRINGVILLE, NY 14141

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

100% CONSTRUCTION

DOCUMENTS

REPLACE BOILERS 4 & 5

5000 W. NATIONAL AVE

MILWAUKEE, WI 53295

695-24-107

2026-04-06

PREL

IMIN

ARY

NOT

FOR

CONS

TRUC

TION

MP103

MECHANICAL FUEL PIPING PLAN -

FIRST FLOOR LEVEL 112

DJU KRL

NOT SPRINKLERED

N

KEYPLAN

20' - 0"20' - 0"20' - 0"

0"

0"

0"

0"

4321E ED DCBAUPUP

AREA OF WORK

1. SEE M-001 FOR M-SERIES NOTES AND LEGENDS.

GENERAL NOTES

SCALE: 3/8" = 1'-0"1 MECHANICAL FUEL PIPING PLAN - FIRST FLOOR LEVEL

N

Revisions: Date:

REV A - 35% SCHEMATIC DESIGN DOCUMENTS 2024-07-24

REV B - 65% DESIGN DEVELOPMENT 2024-09-17

REV C - 65% DESIGN DEVELOPMENT 2025-12-30

D

C

1"ø CA

3" ø

CA

8621 SF

EAST BOILER ROOM

3" ø

CA

NEW STEAM BOILER

112-105-BLR-005

RISE OR DROP IN PIPE

PIPE UP

PIPE DOWN

POINT OF CONNECTION BETWEEN NEW

AND EXISTING WORK

CA COMPRESSED AIR

ABBREVIATIONS

PIPING SYMBOLS

PIPE HANGER

Room name

XXX SF

ROOM NAME, NUMBER, AND AREA

GENERAL SYMBOLS:

23 MECHANIC STREET, SPRINGVILLE, NY 14141

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

100% CONSTRUCTION

DOCUMENTS

REPLACE BOILERS 4 & 5

5000 W. NATIONAL AVE

MILWAUKEE, WI 53295

695-24-107

2026-04-06

PREL

IMIN

ARY

NOT

FOR

CONS

TRUC

TION

MP104

MECHANICAL COMPRESSED AIR

PIPING PLAN - FIRST FLOOR LEVEL 112

DJU KRL

NOT SPRINKLERED

N

KEYPLAN

20' - 0"20' - 0"20' - 0"

0"

0"

0"

0"

4321E ED DCBAUPUP

AREA OF WORK

1. SEE M-001 FOR M-SERIES NOTES AND LEGENDS.

GENERAL NOTES

SCALE: 3/8" = 1'-0"1 MECHANICAL COMPRESED AIR PIPING PLAN - FIRST FLOOR LEVEL

N

Revisions: Date:

REV A - 35% SCHEMATIC DESIGN DOCUMENTS 2024-07-24

REV B - 65% DESIGN DEVELOPMENT 2024-09-17

REV C - 65% DESIGN DEVELOPMENT 2025-12-30

REV D - 95% CONSTRCUTION DOCUMENTS 2026-03-09

REV E - 100% CONSTRUCTION DOCUMENTS 2026-04-06

KEYED NOTES

1 CONNECT EXISTING SHOP GENERAL COMPRESSED ARI TO BURNER FOR FUEL

ATOMIZATION DURING COLD START AND TIE EXISTING LOW ATOMIZATION MEDIA

PRESSURE SWITCH (LAMPS) FOR SAFETY BOILER SHUTDWON ON LOW AIR PRESSURE

BACK TO EPH-SB-BLD112-1. CONTRACTOR TO REMOVE ALL CONDUIT AND CABLING

SUPPLYING BOILER 5 CONTROL PANEL BACK TO EPL-SB-BLD112-2

D

C

1" ø

HP

R

1" ø

HP

R

1"ø HPR

SH SH

RH

0"

SH

SH

8621 SF

EAST BOILER ROOM

8"ø HPS

8" ø

HP

S

3"ø HPS

1 1/2"ø HPR

1"ø LPR

5"ø PCR

8" ø

HP

S

12"ø HPS

3" ø

HP

S

1 1/2"ø HPS

6"ø HPS

22.50°

1" ø

HP

R

SHSH

SH

NEW STEAM BOILER

112-105-BLR-005

EXISTING B-4

STEAM BOILER

M

M

112-105-FLO-001

112-105-FLO-001

1"ø HPR

RISE OR DROP IN PIPE

PIPE UP

PIPE DOWN

POINT OF CONNECTION BETWEEN NEW

AND EXISTING WORK

GATE VALVE

HPS HIGH PRESSURE STEAM SUPPLY

HPR HIGH PRESSURE STEAM RETURN

LPS LOW PRESSURE STEAM SUPPLY

LPR LOW PRESSURE STEAM RETURN

ABBREVIATIONS

VALVE SYMBOLS

PIPING SYMBOLS

RH ROD HANGER PIPE SUPPORT

SF SQUARE FOOT

PIPE HANGER

SH SPRING HANGER PIPE SUPPORT

Room name

XXX SF

ROOM NAME, NUMBER, AND AREA

GENERAL SYMBOLS:

FLOW METERM

23 MECHANIC STREET, SPRINGVILLE, NY 14141

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

100% CONSTRUCTION

DOCUMENTS

REPLACE BOILERS 4 & 5

5000 W. NATIONAL AVE

MILWAUKEE, WI 53295

695-24-107

2026-04-06

PREL

IMIN

ARY

NOT

FOR

CONS

TRUC

TION

MP105

MECHANICAL BID DEDUCT STEAM

PIPING PLAN - FIRST FLOOR LEVEL 112

DJU KRL

NOT SPRINKLERED

N

KEYPLAN

20' - 0"20' - 0"20' - 0"

0"

0"

0"

0"

4321E ED DCBAUPUP

AREA OF WORK

SCALE: 3/8" = 1'-0"1 MECHANICAL BID DEDUCTION STEAM PIPING PLAN - FIRST FLOOR LEVEL

1. SEE M-001 FOR M-SERIES NOTES AND LEGENDS.

GENERAL NOTES

N

Revisions: Date:

REV A - 35% SCHEMATIC DESIGN DOCUMENTS 2024-07-24

REV B - 65% DESIGN DEVELOPMENT 2024-09-17

REV C - 65% DESIGN DEVELOPMENT 2025-12-30

REV D - 95% CONSTRCUTION DOCUMENTS 2026-03-09

REV E - 100% CONSTRUCTION DOCUMENTS 2026-04-06

KEYED NOTES

1 PROVIDE MINIMUM STRAIGHT RUN PIPING OF 10D UPSTREAM AND 5D DOWNSTREAM OF

STEAM FLOW METER, OR GREATER IF REQUIRED BY MANUFACTURER

D

C

1"ø CWS1"ø CWS

8621 SF

EAST BOILER ROOM

2 1/2"ø FW

2 1/2"ø FW

TO 112-105-CF-001 AMINE PUMP

TO 112-105-CF-002 SCALE INHIBITOR PUMP

TO 112-105-CF-003 OXYGEN SCAVENGER PUMP

1/2 "ø

C F

1/2 "ø

C F

1/2 "ø

C F

3"ø FW

1" DRAIN LINE FROM

NEW STEAM HEADER

TO SAMPLE

COOLER

3" ø

BB

D

1 1 /2" ø

CB

D

NEW STEAM BOILER

112-105-BLR-005

EXISTING B-4

STEAM BOILER

RISE OR DROP IN PIPE

PIPE UP

PIPE DOWN

POINT OF CONNECTION BETWEEN NEW

AND EXISTING WORK

GATE VALVE

ABBREVIATIONS

VALVE SYMBOLS

PIPING SYMBOLS

PIPE HANGER

Room name

XXX SF

ROOM NAME, NUMBER, AND AREA

GENERAL SYMBOLS:

BBD BOTTOM BLOWDOWN

CBD CONTINUOUS BLOWDOWN

CF CHEMICAL FEEDWATER

CW CITY WATER

FW FEEDWATER

FLOOR DRAIN

23 MECHANIC STREET, SPRINGVILLE, NY 14141

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

100% CONSTRUCTION

DOCUMENTS

REPLACE BOILERS 4 & 5

5000 W. NATIONAL AVE

MILWAUKEE, WI 53295

695-24-107

2026-04-06

PREL

IMIN

ARY

NOT

FOR

CONS

TRUC

TION

MP106

MECHANICAL BID DEDUCT

HYDRONIC PIPING PLAN - FIRST FL 112

DJU KRL

NOT SPRINKLERED

N

KEYPLAN

20' - 0"20' - 0"20' - 0"

0"

0"

0"

0"

4321E ED DCBAUPUP

AREA OF WORK

1. SEE M-001 FOR M-SERIES NOTES AND LEGENDS.

GENERAL NOTES

SCALE: 3/8" = 1'-0"1 MECHANICAL BID DEDUCTION HYDRONIC PIPING PLAN - FIRST FLOOR LEVEL N

Revisions: Date:

REV A - 35% SCHEMATIC DESIGN DOCUMENTS 2024-07-24

REV B - 65% DESIGN DEVELOPMENT 2024-09-17

REV C - 65% DESIGN DEVELOPMENT 2025-12-30

RISE OR DROP IN PIPE

PIPE UP

PIPE DOWN

POINT OF CONNECTION BETWEEN NEW

AND EXISTING WORK

GATE VALVE

ABBREVIATIONS

VALVE SYMBOLS

PIPING SYMBOLS

SF SQUARE FOOT

PIPE HANGER

Room name

XXX SF

ROOM NAME, NUMBER, AND AREA

GENERAL SYMBOLS:

FOR FUEL OIL RETURN

FOS FUEL OIL SUPPLY

LPG LIQUIFIED PETROLEUM GAS

NG NATURAL GAS

E

D

C

3/4"ø FOR 3/4"ø FOS

1"ø LPG

8621 SF

EAST BOILER ROOM

3" ø

NG

NEW STEAM BOILER

112-105-BLR-005

EXISTING B-4

STEAM BOILER

23 MECHANIC STREET, SPRINGVILLE, NY 14141

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

100% CONSTRUCTION

DOCUMENTS

REPLACE BOILERS 4 & 5

5000 W. NATIONAL AVE

MILWAUKEE, WI 53295

695-24-107

2026-04-06

PREL

IMIN

ARY

NOT

FOR

CONS

TRUC

TION

MP107

MECHANICAL BID DEDUCT FUEL

PIPING PLAN - FIRST FLOOR LEVEL 112

DJU KRL

NOT SPRINKLERED

N

KEYPLAN

20' - 0"20' - 0"20' - 0"

0"

0"

0"

0"

4321E ED DCBAUPUP

AREA OF WORK

1. SEE M-001 FOR M-SERIES NOTES AND LEGENDS.

GENERAL NOTES

SCALE: 3/8" = 1'-0"1 MECHANICAL BID DEDUCTION FUEL PIPING PLAN - FIRST FLOOR LEVEL N

Revisions: Date:

REV A - 35% SCHEMATIC DESIGN DOCUMENTS 2024-07-24

REV B - 65% DESIGN DEVELOPMENT 2024-09-17

REV C - 65% DESIGN DEVELOPMENT 2025-12-30

D

C

1"ø CA

3" ø

CA

8621 SF

EAST BOILER ROOM

3" ø

CA

NEW STEAM BOILER

112-105-BLR-005

EXISTING B-4

STEAM BOILER

RISE OR DROP IN PIPE

PIPE UP

PIPE DOWN

POINT OF CONNECTION BETWEEN NEW

AND EXISTING WORK

CA COMPRESSED AIR

ABBREVIATIONS

PIPING SYMBOLS

PIPE HANGER

Room name

XXX SF

ROOM NAME, NUMBER, AND AREA

GENERAL SYMBOLS:

23 MECHANIC STREET, SPRINGVILLE, NY 14141

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

100% CONSTRUCTION

DOCUMENTS

REPLACE BOILERS 4 & 5

5000 W. NATIONAL AVE

MILWAUKEE, WI 53295

695-24-107

2026-04-06

PREL

IMIN

ARY

NOT

FOR

CONS

TRUC

TION

MP108

MECH BID DEDUCT COMPRESSED

AIR PIPING PLAN - FIRST FLOOR 112

DJU KRL

NOT SPRINKLERED

N

KEYPLAN

20' - 0"20' - 0"20' - 0"

0"

0"

0"

0"

4321E ED DCBAUPUP

AREA OF WORK

1. SEE M-001 FOR M-SERIES NOTES AND LEGENDS.

GENERAL NOTES

SCALE: 3/8" = 1'-0"1 MECHANICAL BID DEDUCTION COMPRESED AIR PIPING PLAN - FIRST FLOOR LEVEL N

Revisions: Date:

REV A - 35% SCHEMATIC DESIGN DOCUMENTS 2024-07-24

REV B - 65% DESIGN DEVELOPMENT 2024-09-17

REV C - 65% DESIGN DEVELOPMENT 2025-12-30

REV D - 95% CONSTRCUTION DOCUMENTS 2026-03-09

REV E - 100% CONSTRUCTION DOCUMENTS 2026-04-06

KEYED NOTES

1 CONNECT EXISTING SHOP GENERAL COMPRESSED ARI TO BURNER FOR FUEL

ATOMIZATION DURING COLD START AND TIE EXISTING LOW ATOMIZATION MEDIA

PRESSURE SWITCH (LAMPS) FOR SAFETY BOILER SHUTDWON ON LOW AIR PRESSURE

D

C

B

M

112-105-FLO-003 1

EAST BOILER ROOM

6" HPS

AREA OF WORK

RISE OR DROP IN PIPE

PIPE UP

PIPE DOWN

POINT OF CONNECTION BETWEEN NEW

AND EXISTING WORK

PIPING SYMBOLS

Room name

XXX SF

ROOM NAME, NUMBER, AND AREA

GENERAL SYMBOLS:

FLOW METERM

HPS HIGH PRESSURE STEAM SUPPLY

ABBREVIATIONS

23 MECHANIC STREET, SPRINGVILLE, NY 14141

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

100% CONSTRUCTION

DOCUMENTS

REPLACE BOILERS 4 & 5

5000 W. NATIONAL AVE

MILWAUKEE, WI 53295

695-24-107

2026-04-06

PREL

IMIN

ARY

NOT

FOR

CONS

TRUC

TION

MP110

MECHANICAL STEAM PIPING PLAN -

SPS FLOW METER 112

DJU CCW

NOT SPRINKLERED

SCALE: 1/4" = 1'-0"1 MECHANICAL STEAM PIPING PLAN - SPS FLOW METER

KEYED NOTES

1 INSTALL FLOW METER ON EXISTING OVERHEAD, 6" SPS LINE AND PROVIDE MINIMUM

STRAIGHT RUN PIPING OF 10D UPSTREAM AND 5D DOWNSTREAM OF STEAM FLOW

METER, OR GREATER IF REQUIRED BY MANUFACTURER

Revisions: Date:

REV A - 35% SCHEMATIC DESIGN DOCUMENTS 2024-07-24

REV B - 65% DESIGN DEVELOPMENT 2024-09-17

REV C - 65% DESIGN DEVELOPMENT 2025-12-30

REV D - 95% CONSTRCUTION DOCUMENTS 2026-03-09

REV E - 100% CONSTRUCTION DOCUMENTS 2026-04-06

1. SEE M-001 FOR M-SERIES NOTES AND LEGENDS.

GENERAL NOTES

N

KEYPLAN

20' - 0"20' - 0"20' - 0"

0"

0"

0"

0"

4321E ED DCBAUPUP

NEW HPR

EXISTING HPR

TT

PT

PRESSURE

TRANSMITTER

TEMPERATURE

TRANSMITTER

TO METERING SYSTEM

BUILDING INCOMING

MAIN STEAM

NOTE:

MAINTAIN UPSTREAM AND DOWN STREAM DISTANCES RECOMMENDED BY

METER MANUFACTURERS

FLOW METER

INTERFACE WITH

BACNET SYSTEM

DIFFERENTIAL PRESSURE

(DP) CELL STEAM FLOW

MEASUREMENT

SHUTOFF VALVE

1" BY-PASS GATE VALVE (TYP)

PRESSURE GAUGE WITH

GATE VALVE (TYP)

1" BY-PASS GLOBE VALVE (TYP AT

ALL GATE VALVES 6" OR LARGER)

3000 LBS STEEL HALF COUPLING

OR SOCKET WELDED (TYP)

SEE PLANS FOR PIPE SIZES

BUTT WELD (TYP)

GATE VALVE

D

SW

BW

S

BW

S

ELEVATION

FD

3/4" COOLING WATER

1/4" SAMPLE

OUTLET

3/4"

ANTI-SIPHON

VACUUM BREAKER

SAMPLE COOLER

PROVIDE SEPARATE COOLERS FOR BWS AND FWS.

MOUNT BWS COOLER 4' ABOVE FINISHED FLOOR ON

WALL OR COLUMN.

1/2" FROM

EACH BOILER

1/2"

SW

0-83°C

1-5/8" GALVANIZED STRUT

TUBING, TYP

TUBING CLAMP

PERFORATED TUBE TRAY

HANGER ROD

1" GATE VALVE

SCHEDULE 80

STEEL PIPE

INVERTED BUCKET TRAP,

SEE PLANS AND SCHEDULES

DIELECTRIC FITTING WHERE

RETURN IS COPPER PIPESEE DRAWINGS FOR PIPE SIZES

SCHEDULE 80 STEEL PIPE

TO RETURN MAIN

PIPE SIZE SHALL BE

SAME SIZE AS TRAP

BYPASS-INSTALL IN HORIZONTAL

PLANE LEVEL WITH TRAP OR IN

VERTICAL PLANE AND BELOW TRAP

DRIP LEG OR EQUIPMENT

CONNECTION. MAKE THE SAME SIZE

AS THE SUPPLY MAIN OR EQUIPMENT

CONNECTION. SEE NOTE 1

6" M

IN

" M

IN

FLOW

NOTE:

1. ALLDRIP POINTS ON STEAM MAINS SHALL BE PROVIDED WITH A 12"

MINIMUM HIGH DRIP LEG FROM BOTTOM OF STEAM MAIN TO TRAP INLET.

DRIP LEG SHALL HAVE 6" SCALE POCKET BELOW TRAP INLET.

2. PROVIDE BYPASS PIPING.

CAP (TYP)

DRIP RETURN

3/8" TEST

CONNECTION

PIPE TO STEAM

TRAP (TYP)

STEAMLINE (TYP)

DRIP LEG (TYP)

3/4" DRAIN

(ALTERNATE

LOCATIONS), TYP

3/4" MIN

FROM DRIP

CONNECTION

2"

2"

STEAM TRAP ASSEMBLY

STEAM LINE DRIP POCKET

8"x8"x3/8" STEEL PLATE

WELD PLATE TO PIPE

SECURE TO SLAB WITH (4) 1/2" DIA

EXPANSION BOLTS

CONCRETE SLAB

WELD PIPE TO PLATE

4" SCH 40 PIPE

3/8" STEEL PLATE, SIZE TO

MATCH PIPE SUPPORT

NOTES:

1. PROVIDE ANCHORS

ONLY WHERE

SHOWN ON

DRAWINGS.

2. EXTEND SLEEVE

ABOVE FLOOR

WHERE

SPECIFIED.

ELEVATION

PLAN

RISER

FLOOR SLAB

INSULATION

BOLT (TYP)

RISER CLAMP (BOTTOM

CLAMP REQUIRED AT

ANCHOR POINTS ONLY)

PIPE SLEEVE

WHERE SPECIFIED

RISER CLAMP

FIRE-STOPPING MATERIAL

BOLT

RISER CLAMP

PIPE SLEEVE

WHERE SPECIFIED

PIPE

/1 MK202 /1 MK202

/1 MK206

HPR HIGH PRESSURE STEAM RETURN

ABBREVIATIONS

TYP TYPICAL

MAX MAXIMUM

MIN MINIMUM

DIA DIAMETER

23 MECHANIC STREET, SPRINGVILLE, NY 14141

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

100% CONSTRUCTION

DOCUMENTS

REPLACE BOILERS 4 & 5

5000 W. NATIONAL AVE

MILWAUKEE, WI 53295

695-24-107

2026-04-06

PREL

IMIN

ARY

NOT

FOR

CONS

TRUC

TION

MP501

MECHANICAL PIPING DETAILS

DJU ADL

NOT SPRINKLERED

NTS1 TYPICAL CONDENSATE HEADER CONNECTIONS

NTS2 STEAM METER

NTS3 GATE VALVE BYPASS

NTS4 WATER SAMPLE COOLERS DETAILS

NTS5 TUBING SUPPORTS DETAIL

NTS6 INVERTED BUCKET STEAM TRAP ASSEMBLY

NTS7 STEAMLINE DRIP POCKET AND STEAM TRAP ASSEMBLY

NTS8 PIPE SUPPORT STAND

NTS9 SUPPORT ANCHOR FOR RISERS

1. SEE M-001 FOR M-SERIES NOTES AND LEGENDS.

GENERAL NOTES

Revisions: Date:

REV A - 35% SCHEMATIC DESIGN DOCUMENTS 2024-07-24

REV B - 65% DESIGN DEVELOPMENT 2024-09-17

REV C - 65% DESIGN DEVELOPMENT 2025-12-30

SIDE VIEW TRAPEZE HANGER FOR UP TO

1000 LB UNIFORM LOAD

ADJUSTABLE CLEVIS HANGER

TYPE 1 - SEE SPECIFICATIONS

ADJUSTABLE CLEVIS HANGER

TYPE 43 - SEE SPECIFICATIONS

WELD

SADDLE

1/2" DIA HANGER RODS

WITH 36" MAX SPACING

ON EACH CHANNEL

1 5/8" 12 GAUGE CHANNEL

OR 2"x2"x1/4" ANGLE

PROVIDE INSULATION SHIELD

& INSERT FOR ALL PIPING

(8" MIN)

INSULATION SHIELD

AT HANGER

PROVIDE HIGH COMPRESSIVE

STRENGTH INSULATION (9

PSF MIN DENSITY) UNDER

INSULATION SHIELD

INSULATION (VAPOR

BARRIER TYPE IS

REQUIRED FOR LOW

TEMPERATURE PIPE)

HANGER ROD

BAND

FRAMING MEMBER

OPTION A OPTION B

BEAM CLAMP

1-5/8" GALVANIZED STRUT

MAXIMUM PIPE/TUBING SUPPORT SPACING

NOM

SIZE IN

THRU

3/4 1 1 1/4

1/2 2 2 1/2 3 4 5 6 8 10 12 14 16 18 20 24

PIPE FT 7 7 7 9 10 11 12 14 16 17 19 22 23 25 27 28 30 32

TUBING

FT 5 FT 6 7 8 8 9 10 12 13 14 16 - - - - - - -

NOTE: FOR TRAPEZE HANGER TAKE SPACING OF SMALLEST SIZE ON TRAPEZE

NOTES:

SEE SPECIFER FOR DETAILED

HANGER REQUIREMENTS 1" MA

X

NOTE:

WHERE USED FOR COPPER TUBE OR PIPE, BRAZE TO FABRICATED STEEL ANCHOR

PIPE ANCHOR SCHEDULE

D P C N S BOLT PATTERN

mm in mm in mm in mm in mm in

13 1/2"

102 4

19 3/4

21/2

11/2

5/8

1/2

3/8 3/8

3/8

1/2

3/8 3/8 1/4

3/4 5/8

5/8

5/8

INSULATE PIPE ONLY FOR STEAM, CONDENSATE

AND HEATING WATER.

STL PIPE OR

COPPER TUBE

NOTE A

ANCHOR BOLTS

N=NUMBER

S=SIZE

DRILL ∅ = S+1/16"

D+3 3/4"

D+1 1/2"

D+1"

D=PIPE OD

D+ P

D+4 3/4"

D+2 1/2"

C5/16"

PIPE ANCHOR SCHEDULE

D L P T E N S BOLT PATTERN

mm

NOTES:

A. INSTALL WALL PLATE FIRST THEN WELD ON

REMAINING ASSEMBLY. ONE WALL PLATE

FOR BOTH CHILLED WATER S.&R. IS

OPTIONAL.

in mm in mm in mm in mm in mm in mm in

7/8

7/8

7/8

7/8

7/8

7/8

6 1/4

6 1/4

6 1/4

6 1/4

13 1/2

13 1/2

13 1/2

13 1/2

13 1/2

13 1/2

13 1/2

13 1/2

13 5/8

10 3/8

25 1

19 3/4

19 3/4

19 3/4

19 3/4

19 3/4

19 3/4

508 20

216 81/2

D+8"

D+4"

P

NOTE A L+8"

L+4"

T

D=PIPE OD

E

T

L+3" L

ANCHOR BOLTS

N=NUMBER S=SIZE

DRILL ∅ = S+1/8"

INSULATE PIPE ONLY FOR STEAM, CONDENSATE & HEATING

WATER.

SAFETY VALVE

OPEN DRAIN (NOTE 3)

CONNECTION TO

PRESSURE VESSEL

OR PIPE

PROVIDE UNION UNLESS

SAFETY VALVE HAS

FLANGED OUTLET

VENT PIPE THROUGH

ROOF SUPPORT AS

INDICATED ON DWGS

(NOTES 1, 2)

PIPE THREADED

INTO ELBOW (SAME

SIZE AS ELBOW)

DRIP PAN ELBOW

(SECTIONAL VIEW)

FLEXIBLE CONNECTOR

3/4" DRAIN TO FLOOR

DRAIN OR OPEN SIGHT

DRAIN (NOTE 4)

1" M

IN

24" MAX

3"

D

ELEVATION

TYPICAL WATER PIPING

REDUCER, IF REQUIRED

3/4" BALL VALVE

ADAPTER TO 3/4"

HOSE

THREAD-PROVIDE

HOSE CAP NUT

1/4" COPPER

TUBING

1/2" x 4"

NIPPLE

AIR VENT

1/2" BALL

VALVE

CIRCULATING WATER PIPING

TYPICAL MANUAL AIR VENT

TYPICAL HOT WATER

PIPING DRAIN VALVE

CONNECTIONS

ELEVATION

THREADED

PIPING

ELEVATION

WELDED

PIPING

NOTES:

1. DRAIN ALL LOW POINTS AS INDICATED ABOVE.

2. WHERE SCALE POCKETS ARE SHOWN ON PIPE RISER DIAGRAMS

AND/OR PLANS LOCATE DRAIN AT BOTTOM OF SCALE

POCKET.

ELEVATION

NOTES:

1. VENT ALL HIGH POINTS INDICATED ABOVE.

2. IF AUTOMATIC AIR VENTS ARE USED, PIPE DISCHARGE TO DRAIN.

MV

OR

AV SADDLE

WELD

1.

2.

3.

4.

5.

NOTES:

UNLESS OTHERWISE SHOWN ON THE DRAWINGS, SIZE THE VENT PIPE SO THAT STEAM IS NOT

BLOWN OUT AT THE VENT PIPE ENTRANCE. UTILIZE THE CALCULATION METHOD CONTAINED IN

ANSI B31.1. POWER PIPING CODE, APPENDIX II. THE VENT PIPE SHOULD GO VERTICAL THRU

THE ROOF WITH NO TURNS OR ANGLES. WHERE REQUIRED THERE SHALL BE NO MORE THEN A

TOTAL OR 180 DEGREES IN…