S02 - ATT B- Drawing Set Part-2 (1).pdf
PDF 11 MB Posted
- Solicitation number
- 36C25227B0001
About this file
This document package comprises 100% Construction Documents for the "Replace Boilers 4 & 5" project at the U.S. Department of Veterans Affairs facility located at 5000 W. National Avenue, Milwaukee, Wisconsin 53295. The project, identified as Building 112, Project Number 695-24-107, is issued as of April 6, 2026, and is classified as NOT SPRINKLERED construction.
The project involves the demolition of existing Boilers 4 and 5 and the installation of new Cleaver-Brooks firetube boilers with associated mechanical, electrical, and plumbing systems. Key mechanical components include two new boilers (CBLE-200-600-250ST models rated at 250 PSI and 23,974 lbs estimated operating weight), economizers, steam headers, condensate systems, chemical feed pumps, safety relief valves, and steam traps. Electrical work includes new control panels, feeder cables, lighting fixtures, panel schedules, and a new boiler management system. The construction documents contain detailed P&IDs for steam, combustion air, and process systems; equipment schedules specifying pressures, temperatures, and flow rates; mechanical piping plans for multiple levels; electrical demolition and installation plans; lightning protection details; and comprehensive notes and legends. The project requires coordination with existing building systems, removal of old equipment for scrap value credit to the owner, and compliance with VA construction standards and federal contracting requirements as documented in the accompanying specifications and general notes throughout the drawing set.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| S02 - ATT G - Wage Determination.pdf | ||
| S02 - ATT F - MAP.pdf | ||
| S02 - ATT C - Specifications.pdf | ||
| S02 - ATT E - VAAR 852.219-75_REQUIRED.pdf | ||
| SOLICITATION-DESCRIPTION.docx | DOCX document | |
| S02 - ATT A - Drawing Set Part-1.pdf | ||
| S02 - ATT D - JnA Boiler Controls.FE.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
8" HPS
6" HPS
10" HPS
3/4" DR3/4" DR
TRP-44031
EXISTING
BOILER #4
3" HPS 3" HPS
HPS TO MAIN
STEAM HEADER
8" HPS
NC
V-
NC
V-
NC
V-
V-
NC
V-
V-44033
8" HPS
V-
V-
V-
PIT
44001
V-
HPR1"
PI
44001
TRP-44032
EXISTING
BOILER 4
D-641 9 C
112-105-BLR-005
CP-1
V-44034
V-44004
NC
V-44006
V-44007
FE
44005
FIT
44005
FI
44005
FIQ
44005
3"
2 3
4" H
PS
4" H
PS
112-105-FLO-002
KEYED NOTES
1 3/4" THREADED HALF-COUPLING FOR CALORIMETER CONNECTION. LOCATE TO
ALLOW SPACE FOR THREADED PLUG
2 CONNECT EXISTING BOILER 4 TO NEW STEAM HEADER
3 CONNECT EXISTING BOILER 4 3" STEAM ATOMIZATION LINE TO NEW STEAM HEADER
GENERAL NOTES
1. SEE D-001 FOR D-SERIES NOTES AND LEGENDS.
3.
ALL VALVE BODIES AND FITTINGS IN THE BOILER PLANT SHALL BE CAST OR FORGED
STEEL. CAST IRON, DUCTILE IRON, AND BRONZE ARE PROHIBITED, WITH THE
EXCEPTION OF DOMESTIC WATER SERVICES. ALL PRESSURE RELIEF VALVES USED
FOR STEAM SERVICE SHALL BE FORGED STEEL.
2. ALL INSTRUMENTATION TO CONNECT VIA CP-5A, UNLESS OTHERWISE INDICATED.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
23 MECHANIC STREET, SPRINGVILLE, NY 14141
PROCESS - P&ID - STEAM - BOP -
BID DEDUCT
100% CONSTRUCTION
DOCUMENTS
NOT SPRINKLERED
REPLACE BOILERS 4 & 5
5000 W. NATIONAL AVE.
MILWAUKEE, WI 53295
2026-04-06 D-643
695-24-107
BEH DAK
REV A - 35% SCHEMATIC DESIGN DOCUMENTS 2024-07-24
REV B - 65% DESIGN DEVELOPMENT 2024-09-17
REV C - 65% DESIGN DEVELOPMENT 2025-12-30
REV D - 95% CONSTRUCTION DOCUMENTS 2026-03-09
REV E - 100% CONSTRUCTION DOCUMENTS 2026-04-06
GENERAL LINETYPES
CONTINUATION ARROWS
XXXX
XXXX
FLOW ARROW
FLOW DIRECTION
(SINGLE )
FLOW DIRECTION
ANALOG SIGNAL
PIPING PROCESS
DRAWING
POS1 POS2
XXX
AREA BOUNDRY
POINT OF CONNECTION BETWEEN NEW AND
EXISTING WORK
DRAIN
STEAM TRAP- INVERTED BUCKET
PROCESS SYMBOLS
PIPE CAP
LINE WITH PLUG
PROCESS VALVES
VALVES (GENERAL)
GATE VALVE W/ GLOBE VALVE BYPASS
UNION
INSTRUMENT SYMBOLS
FIELD MOUNTED-DISCRETE INSTRUMENT
XXX
XXX
PRIMARY LOCATION ACCESSIBLE TO OPERATOR-SHARED
DISPLAY * = PANEL LEGEND
XXX
XXX *
ABBREVIATIONS
HPS HIGH PRESSURE STEAM
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
AutoCAD SHX Text
%%UPRELIMINARY%%U
AutoCAD SHX Text
%%UNOT%%U FOR CONSTRUCTION
FLUE GAS TO
ATMOSPHERE
TE
53022
TIT
53022
STACK
DAMPER
M
COMBUSTION
AIR INLET
PDS
53007
M
BURNER
PDS
53013
ROTARY AIR
DAMPER
LOCKABLE
(LOCK OPEN)
LOCKABLE
(LOCK OPEN)
CAPS
PAPS
M
BE
53015
INCLUDED WITH BOILER #112-105-BLR-005
BOILER
112-105-BLR-005
AE
53023
AIT
53023
AI
53023
AI
53023
AAL
53023
AAL
53023
0₂ ANALYZER
LFGOLI
TI
53022
TI
53022
TE
53019
TIT
53019
TI
53019
TI
53019
TDI
53019
TDI
53019
ZSO
53021
ZIO
53021
ZIO
53021
OSDPI
ZIC
53020
ZI
53020
ZC
53020
ZI
53020
PDAL
53013
ZIC
53009
ZI
53009
ZC
53009
ZI
53009
BJ
53016
BI
53016
BI
53016
PDAL
53007
IE
53002
IIT
53002
II
53002
II
53002
ISL
53003
IAL
53003
IAL
53003
FDMIS
SC
53001
SI
53001
SI
53001
SIC
53001
ZSO
53010
ZIO
53010
ZAC
53010
53013
PDAL
53007
PDAL
53016
BJA
53010
ZAC
FDDWOPS
V-53008
V-
V-53006
V-53004
V-
V-53012
V-53014
SILENCER
TP
TPTP
TP
TP
PSH
53017
FPI
PAH
53017
PAH
53017
TP
V-53017 V-53018
LOCKABLE
(LOCK OPEN)
CP-1
CP-1 CP-1
CP-1
CP-1
CP-1
CP-1 CP-1 CP-1
CP-1
CP-1
CP-1
CP-1
CP-1
ECONOMIZER
112-105-ECO-001
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
23 MECHANIC STREET, SPRINGVILLE, NY 14141
PROCESS - P&ID - COMBUSTION AIR
- BOILER #5
100% CONSTRUCTION
DOCUMENTS
NOT SPRINKLERED
REPLACE BOILERS 4 & 5
5000 W. NATIONAL AVE.
MILWAUKEE, WI 53295
2026-04-06 D-651
695-24-107
GENERAL NOTES
1 SEE D-001 FOR D-SERIES NOTES AND LEGENDS.
KEYED NOTES
1 LOW-FIRE PROVING SWITCH REQUIRED ON CONTROL DAMPER, REFER TO
BAPSDTM
2 FORCED DRAFT MOTOR INTERLOCK CURRENT RELAYS SHALL BE SET UP ON A
SEPERATE ELECTRICAL ENCLOSURE
BEH DAK
REV A - 35% SCHEMATIC DESIGN DOCUMENTS 2024-07-24
REV B - 65% DESIGN DEVELOPMENT 2024-09-17
REV C - 65% DESIGN DEVELOPMENT 2025-12-30
REV D - 95% CONSTRUCTION DOCUMENTS 2026-03-09
REV E - 100% CONSTRUCTION DOCUMENTS 2026-04-06
GENERAL LINETYPES
CONTINUATION ARROWS
XXXX
XXXX
FLOW ARROW
FLOW DIRECTION
ANALOG SIGNAL
PIPING PROCESS
NETWORK CONNECTION
MOTOR
EQUIPMENT SYMBOLS
FAN
MOTORIZED DAMPER
M
UV FLAME SCANNER
PROCESS SYMBOLS
VENTURI FLOW METER
PROCESS VALVES
VALVES (GENERAL)
BALL VALVE
INSTRUMENT SYMBOLS
FIELD MOUNTED-DISCRETE INSTRUMENT
XXX
XXX
PRIMARY LOCATION ACCESSIBLE TO OPERATOR-SHARED
DISPLAY * = PANEL LEGEND
PRIMARY LOCATION ACCESSIBLE TO OPERATOR-SHARED
DISPLAY * = PANEL LEGEND
XXX
XXX *
XXX
XXX *
ABBREVIATIONS
BAPSDTM BOILER AND ASSOCIATED PLANT SAFETY DEVICE
TESTING MANUAL
CAPS COMBUSTION AIR PRESSURE SWITCH
FDDWOPS FORCED DRAFT DAMPER WIDE OPEN POSITION
SWITCH
FDMIS
FPI FURNACE PRESSURE INTERLOCK
LFGOLI LOW FLUE GAS OXYGEN LEVEL INDICATOR
OSDPI OUTLET STACK DAMPER POSITION INTERLOCK
SWITCH
PAPS PURGE AIRFLOW PROVING SWITCH
TP TEST POINT
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
AutoCAD SHX Text
%%UPRELIMINARY%%U
LC
S
M
M
CORRIDOR
C2
DEMOLISH/REMOVE DEVICE
BUILDING NUMBER
ROOM NUMBER
PHASE CALLOUT#
ROOM NAME AND NUMBER
DEMOLITION
LINE
DRAIN LINE
HIGH PRESSURE STEAM RETURN
GATE VALVE - THREADED/FLANGED
GATE VALVE WITH 3/4" HOSE ADAPTER
CHECK VALVE
ANGLE GLOBE VALVE
BALL VALVE
PRESSURE REGULATING VALVE
PRESSURE SAFETY VALVE
GATE VALVE WITH GLOBE-VALVED BYPASS
PRESSURE REDUCING VALVE (PRV)
WATER LEVEL CONTROLLER
PRESSURE REGULATOR
GLOBE VALVE - THREADED/FLANGED
TOP CONNECTION, 45° OR 90°
BOTTOM CONNECTION, 45° OR 90°
SIDE CONNECTION
CAPPED OUTLET
RISE OR DROP IN PIPE
UNION
PIPE UP
PIPE DOWN
STEAM TRAP - INVERTED BUCKET
POINT OF CONNECTION BETWEEN NEW AND EXISTING WORK
LIMIT OF DEMOLITION
STRAINER
SOLENOID ACTUATED VALVE
FLANGED PIPE CONNECTION
CONNECTIONS:
BLIND FLANGE
NATURAL GAS
PROPERTY BOUNDARY
MOTORIZED CONTROL VALVE
FEED WATER
FUEL OIL RETURN
FUEL OIL SUPPLY
LIQUIFIELD PETROLEUM GAS
LOW PRESSURE STEAM RETURN
SOFTENED WATER
VENT
BOTTOM BLOWDOWN
CHEMICAL FEEDWATER
CITY WATER
CONDENSATE TRANSFER
EQUIPMENT TYPE
BLR = BOILER
TK = TANK
PMP = PUMP
ECO = ECONOMIZER
CF = CHEMICAL FEED
UH = UNIT HEATER
F = FAN
HRV = HEAT RECOVERY VENTILATOR
HEX = HEAT EXCHANGER
CON = CONVECTOR
CU = CONDENSING UNIT
MAU = MAKE UP AIR UNIT
FTR = FINNED TUBE RADIATOR
ITU = INDOOR A/C TERMINAL UNIT
CH = CABINET HEATER
IDENTIFIER NUMBER
HIGH PRESSURE STEAM SUPPLY
LOW PRESSURE STEAM SUPPLY
STEAM TRAP - FLOAT AND THERMOSTATIC
FUEL OIL FILL
REDUCER
CIRCUIT SETTER BALANCE VALVE
GATE VALVE
COMPRESSED AIR
PUMPED CONDENSATE RETURN
VALVE SYMBOLS: PIPING SYMBOLS:
PUMP
EXPANSION JOINT
GUIDE SUPPORT
RH ROLLER-TYPE HANGER
VARIABLE SPRING-TYPE HANGER
TRAPEZE HANGER (PROVIDE U-BOLT PIPE
ATTACHMENT TO TRAPEZE EXCEPT WHERE RH ARE
INDICATED)
FLOOR-SUPPORTED PIPE STAND
SH
TH
PS
2-100-BLR-001
NUMBERING DESIGNATIONS FOR EQUIPMENT:
FLOW METER
GENERAL SYMBOLS:
GENERAL LINETYPES:
ABBREVIATIONS:
FW
FOR
FOS
HPR
LPG
LPR
SW
V
G
BBD
CF
CW
CT
HPS
LPS
FOF
A
AMPERE
AHU AIR HANDLING UNIT
BD BOARD
BMS BUILDING MANAGEMENT SYSTEM
BTU BRITISH THERMAL UNIT
CBD CONTINUOUS BLOWDOWN
CFM CUBIC FEET PER MINUTE
CWR COLD WATER RETURN
CWS COLD WATER SUPPLY
DB DRY BULB
DN DOWN
EA EXHAUST AIR
EAT ENTERING AIR TEMPERATURE
EXH EXHAUST
F&T FLOAT AND THERMOSTATIC
FTR FIN TUBE RADIATOR
FS FLOW SENSOR
FT FEET
GPM GALLONS PER MINUTE
HP HORSEPOWER
HWR HOT WATER RETURN
HWS HOT WATER SUPPLY
HZ HERTZ
IB INVERTED BUCKET
LAT LEAVING AIR TEMPERATURE
MAX MAXIMUM
MBH THOUSAND BTU PER HOUR
MIN MINIMUM
NTS NOT TO SCALE
OA OUTSIDE AIR
PH PHASE
PSIG POUNDS PER SQUARE INCH GAUGE
PTAC PACKAGED TERMINAL AIR CONDITIONER
RA RETURN AIR
RG RETURN GRILL
SA SUPPLY AIR
SD SUPPLY DIFFUSER
SP STATIC PRESSURE
SR SUPPLY REGISTER
TEMP TEMPERATURE
TYP TYPICAL
UH UNIT HEATER
V
VOLT
VAV VARIABLE AIR VOLUME
VFD VARIABLE FREQUENCY DRIVE
W WATT
WB WET BULB
CA COMPRESSED AIR
CA
PCR
23 MECHANIC STREET, SPRINGVILLE, NY 14141
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6"
6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t
100% CONSTRUCTION
DOCUMENTS
REPLACE BOILERS 4 & 5
5000 W. NATIONAL AVE
MILWAUKEE, WI 53295
695-24-107
2026-04-06
PREL
IMIN
ARY
NOT
FOR
CONS
TRUC
TION
M-001
MECHANICAL NOTES AND
LEGENDS 112
DJU KRL
NOT SPRINKLERED
1. DESIGN CONSTRUCTION AND SAFETY SHALL CONFORM TO ALL LOCAL, STATE AND OWNER SPECIFIC CODES, INCLUDING (BUT NOT LIMITED TO) THE INTERNATIONAL BUILDING CODE, AND THE DEPT OF VA STEAM, HEATING HOT WATER, AND OUTSIDE DISTRIBUTION SYSTEMS DESIGN MANUAL.
2. THIS CONTRACT REQUIRES COMPLETE, FINISHED WORKABLE PROJECT OF THE AREAS INDICATED BY THE CONTRACT DOCUMENTS, AND SHALL INCLUDE ALL MATERIALS AND LABOR NECESSARY TO COMPLETE, REGARDLESS OF WHETHER OR NOT ALL WORK OR EACH ITEM IS SPECIFICALLY INDICATED ON ANY OTHER PORTION OF THE
DRAWINGS AND/OR NOTES.
3. WHERE MATERIALS REFERENCED ON DRAWINGS, OR NECESSARY TO COMPLETE THE WORK OF THIS CONTRACT ARE NOT SPECIFIED HEREIN, PROVIDE BEST QUALITY MATERIAL. WHERE MATERIALS ARE INTENDED TO MATCH EXISTING, PROVIDE CLOSEST POSSIBLE MATCH, SUBJECT TO OWNERS APPROVAL. ALL ITEMS AND WORK ON DRAWINGS ARE NEW, UNLESS INDICATED EXISTING. ALL WORK WHICH HAS BEEN DAMAGED SHALL BE REPAIRED TO A “NEW CONDITION”, OR WHERE THE STRUCTURAL
INTEGRITY HAS BEEN AFFECTED, ITEMS SHALL BE REPLACED AT NO COST TO THE OWNER.
4. CONTRACTOR IS RESPONSIBLE TO VERIFY ALL SITE, FIELD AND BUILDING CONDITIONS PRIOR TO COMMENCING WORK. IF THERE ARE ANY DISCREPANCIES BETWEEN DRAWINGS AND FIELD CONDITIONS, NOTIFY THE CONSTRUCTION MANAGER AND ARCHITECT/ENGINEER AND REQUEST CLARIFICATION.
5. DRAWINGS MAY NOT INDICATE ALL DEMOLITION/REMOVALS. CONTRACTOR SHALL REFER TO DRAWINGS, SPECIFICATIONS AND VERIFY FIELD CONDITIONS TO DETERMINE FULL SCOPE AND PARTICULARS OF REMOVALS AS REQUIRED FOR AND COORDINATED WITH THE NEW WORK PRIOR TO BIDDING WORK. VERIFY AND CONFIRM WITH OWNER
WHICH ITEMS ARE TO BE SAVED FOR OWNER ’S USE OR REINSTALLATION BY CONTRACTOR.
6. WHERE CONSTRUCTION OR ITEMS HAVE BEEN INFILLED, REMOVED AND/OR DISTURBED FOR INSTALLATION OF NEW WORK, CAUSING THE EXPOSURE OF UNFINISHED AND/OR DAMAGED SURFACES, RESULTING SURFACES AND INFILLED SURFACES SHALL BE RECONSTRUCTED WITH MATERIALS TO MATCH FINISHED. ALL ABANDONED OPENINGS (I.E., DUCT/PIPE REMOVALS.) AT WALLS, ROOF OR FLOOR TO BE INFILLED SOLID.
7. WORK IS REQUIRED IN VARIOUS PORTIONS OF THE FACILITY TO EXECUTE WORK OF OTHER TRADES (I.E. ELECTRICAL, MECHANICAL). ALTHOUGH NOT NECESSARILY SHOWN ON DRAWINGS, WORK IS REQUIRED IN THESE AREAS CONSISTING OF PLACEMENT OF CEILINGS, WALL, FINISHES, PAVEMENT AND OTHER CONSTRUCTION AS NECESSARY TO
PERFORM WORK AND RESTORE THESE SPACES OR AREAS TO ORIGINAL CONDITIONS.
8. CONTRACTOR SHALL COORDINATE THE WORK WITH EACH TRADE SO THAT THE WORK AND SCHEDULE ARE NOT IMPEDED. SCHEDULE WORK PROGRESS THROUGHOUT THE ENTIRE PROJECT TO PREVENT CONFLICTS AND INTERFERENCES. OBTAIN ALL NECESSARY INFORMATION SUCH AS SIZES, LOCATIONS, TEMPLATES, LAYOUT, DIMENSIONS AND ALL OTHER INFORMATION NECESSARY FOR A PROPER AND WELL COORDINATED INSTALLATION. PRIOR TO INSTALLATION OF ITEMS, VERIFY AND CONFIRM WITH EACH
TRADE EXACT LOCATION OF ALL ITEMS.
9. LABEL ALL PIPING IN ACCORDANCE WITH ASME A13.1, AND AS DESCRIBED IN SPECIFICATION SECTION 09 91 00 - 3.14.
10. INCLUDE FLOW-DIRECTION ARROWS INTEGRAL WITH PIPING SYSTEM SERVICE LETTERING TO ACCOMMODATE BOTH DIRECTIONS OR AS SEPARATE UNIT ON EACH PIPE
LABEL TO INDICATE FLOW DIRECTION PER SPECIFICATION 230553.
11. PIPE LABEL LOCATIONS: LOCATE PIPE LABELS, IN ACCORDANCE WITH SPECIFICATION 230553, WHERE PIPING IS EXPOSED OR ABOVE ACCESSIBLE CEILINGS IN FINISHED
SPACES; MACHINE ROOMS; ACCESSIBLE MAINTENANCE SPACES SUCH AS SHAFTS, TUNNELS, AND PLENUMS; AND EXTERIOR EXPOSED LOCATIONS AS FOLLOWS:
A. NEAR EACH VALVE AND CONTROL DEVICE.
B. NEAR EACH BRANCH CONNECTION, EXCLUDING SHORT TAKEOFFS FOR FIXTURES AND TERMINAL UNITS. WHERE FLOW PATTERN IS NOT OBVIOUS, MARK EACH PIPE
AT BRANCH.
C. NEAR PENETRATIONS AND ON BOTH SIDES OF THROUGH WALLS, FLOORS, CEILINGS, AND INACCESSIBLE ENCLOSURES.
D. AT ACCESS DOORS, MANHOLES, AND SIMILAR ACCESS POINTS THAT PERMIT VIEW OF CONCEALED PIPING.
E. NEAR MAJOR EQUIPMENT ITEMS AND OTHER POINTS OF ORIGINATION AND TERMINATION.
F. SPACED AT MAXIMUM INTERVALS OF 50 FEET ALONG EACH RUN. REDUCE INTERVALS TO 25 FEET IN AREAS OF CONGESTED PIPING AND EQUIPMENT.
12. REFER TO PHASING PLANS.
13. BUY AMERICA ACT MATERIALS TO BE UTILIZED.
THE APPLICABLE MODEL CODES, STANDARDS AND REFERENCES DOCUMENTS PERTINENT TO THE PROJECT ARE AS FOLLOWS:
· NFPA 101 LIFE SAFETY CODE
· ASHRAE STANDARDS
· INTERNATIONAL MECHANICAL CODE
· NFPA 70 NATIONAL ELECTRIC CODE
· OCCUPATIONAL, SAFETY, AND HEALTH ADMINISTRATIONS VA STANDARD APPLICATION GUIDE, AND OTHER GUIDANCE ON THE TECHNICAL INFORMATION LIBRARY
· ASME B31.1 CODE FOR PRESSURE PIPING
GENERAL NOTES:
APPLICABLE CODES:
Revisions: Date:
REV A - 35% SCHEMATIC DESIGN DOCUMENTS 2024-07-24
REV B - 65% DESIGN DEVELOPMENT 2024-09-17
REV C - 65% DESIGN DEVELOPMENT 2025-12-30
REV D - 95% CONSTRCUTION DOCUMENTS 2026-03-09
REV E - 100% CONSTRUCTION DOCUMENTS 2026-04-06
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
23 MECHANIC STREET, SPRINGVILLE, NY 14141
MECHANICAL SCHEDULES 100% CONSTRUCTION
DOCUMENTS
NOT SPRINKLERED
REPLACE BOILERS 4 & 5
5000 W. NATIONAL AVE.
MILWAUKEE, WI 53295
2026-04-06 M-601
695-24-107
BEH CJR
REV A - 35% SCHEMATIC DESIGN DOCUMENTS 2024-07-24
REV B - 65% DESIGN DEVELOPMENT 2024-09-17
REV C - 65% DESIGN DEVELOPMENT 2025-12-30
REV D - 95% CONSTRUCTION DOCUMENTS 2026-03-09
REV E - 100% CONSTRUCTION DOCUMENTS 2026-04-06
CHEMICAL FEED PUMP SCHEDULE
UNIT LOCATION OUTLET SIZE
OUTPUT RANGE
(GPH) PRESSURE (PSI)
ELECTRICAL
BASIS OF DESIGN
V/P/HZ
112-105-CF-001; AMINE PUMP BOILER ROOM 1/4 NPT .002-.25 450 120/1/60 LMI PD71
112-105-CF-002; SCALE INHIBITOR PUMP BOILER ROOM 1/4 NPT .002-.25 450 120/1/60 LMI PD71 112-105-CF-003; SULFITE OXYGEN SCAVENGER PUMP BOILER ROOM 1/4 NPT .002-.25 450 120/1/60 LMI PD71
VORTEX FLOW METER SCHEDULE
UNIT FLUID MEDIUM
SATURATED STEAM
PIPE SIZE (NPS) METER SIZE (NPS)
MAXIMUM PRESSURE
DROP AT FULL FLOW
(PSI)
NOTESMAXIMUM FLOW RATE
(LB/HR)
MINIMUM FLOW RATE
(LB/HR) INLET PRESSURE (PSIG)
112-105-FLO-001 STEAM 20,000 1000 100 8 6 1 -
112-105-FLO-002 STEAM 20,000 1000 100 8 6 1 -
112-103-FLO-003 STEAM 5,000 100 100 6 6 1
SAFETY RELIEF VALVE SCHEDULE
UNIT SERVICE MATERIAL
MASS FLOW SET PRESSURE
NOTES
(LBS/HR) (PSIG)
V-42001 112-105-BLR-005 CAST STEEL 20,000 130 -
V-42002 112-105-BLR-005 CAST STEEL 20,000 135 -
STEAM TRAP SCHEDULE
UNIT LOCATION TYPE CONN. SIZE (IN) OPERATING PRESSURE
(PSIG)
RETURN LINE
(PSIG)
DIFFERENTIAL
PRESSURE (PSIG) BASIS OF DESIGN
TRP-44031 STEAM HEADER IB 1" 100 5 95 ARMSTRONG IB 983
TRP-44032 STEAM HEADER IB 1" 100 5 95 ARMSTRONG IB 983
NOTES:
BOILER UNIT SCHEDULE
UNIT LOCATION
RATINGS FUEL ELECTRICAL ESTIMATED OPERATING
WEIGHT (LBS) BASIS OF DESIGN
HP EFF (%) NOX LEVEL (PPM) LIGHT OIL (GPH) NATURAL GAS (SCFH) V PH HZ
112-105-BLR-005 BOILER ROOM 600 83.8 30 164 23,974 460 3 60 31,571 CLEAVER-BROOKS CBLE-200-600-250ST
GENERAL NOTES
1. SEE M-001 FOR M-SERIES NOTES AND LEGENDS.
ECONOMIZER SCHEDULE
UNIT LOCATION SERVICE
HEAT RECOVERED
(MBH)
FEEDWATER FLOW
(GPM)
FEEDWATER PRESSURE
DROP (PSI)
FEEDWATER TEMPERATURE
IN/OUT (°F) FLUE GAS FLOW (SCFM) FLUE GAS
TEMPERATURE (°F) BASIS OF DESIGN NOTES
112-105-ECO-001 BOILER ROOM BOILER 5 449 41.4 1 227/250 5184 385 CLEAVER-BROOKS CRE-48G -
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
AutoCAD SHX Text
%%UPRELIMINARY%%U
E
D
C
3"ø RO
8"ø HPS
1 1/2"ø HPR
3"ø RO
"ø
H
PS
5"ø PCR
1"ø LPR
12"ø HPS
3"ø FW
FEEDWATER STORAGE TANK
B-5 STEAM BOILERB-4 STEAM BOILER
3"ø RO
6"ø HPS
3"ø HPS
8" ø
HP
S
3" ø
HP
S
12"ø HPS
3" ø
RO
2" ø
CB
D2" ø
BB
D
3" ø
NG
6" ø
NG
1"ø LPG
3" ø
NG
3" ø
CA
1" ø
CA
1"ø CA
3"ø BBD1 1/2"ø HPS3"ø NG
3" ø
RO
3" ø
RO
3" ø
NG
1 1/2"ø HPS
3/4"ø CA
1"ø LPG
3/4"ø CA
3/4"ø CA3/4"ø LPG
1"ø CW
STEAM HEADER
1" ø
CW
4" ø
V
4" ø
V
FOS3/4"ø
FOR3/4"ø
HPR1"ø
3/4"ø CF
3/4 "ø
C F
BYPASS FEEDER
(TO BE REMOVED)
3/4 "ø
F W
2 1/2"ø FW
3"ø FW 1" ø
HP
R
MD201 1
1" ø
CW
S
1"ø CWS 1"ø CWS
1"ø CW 1"ø CW
2" ø
CB
D
2" ø
BB
D
3" ø
HP
S
4" ø
V
4" ø
V
8621 SF
EAST BOILER ROOM
RISE OR DROP IN PIPE
PIPE UP
PIPE DOWN
POINT OF CONNECTION BETWEEN NEW
AND EXISTING WORK
LIMIT OF DEMOLITION
GATE VALVE
BBD BOTTOM BLOWDOWN
CBD CONTINUOUS BLOWDOWN
CF CHEMICAL FEEDWATER
CW CITY WATER
CT CONDENSATE TRANSFER
FW FEEDWATER
FOR FUEL OIL RETURN
FOS FUEL OIL SUPPLY
HPS HIGH PRESSURE STEAM SUPPLY
HPR HIGH PRESSURE STEAM RETURN
LPG LIQUIFIED PETROLEUM GAS
LPS LOW PRESSURE STEAM SUPPLY
LPR LOW PRESSURE STEAM RETUN
ABBREVIATIONS
VALVE SYMBOLS
PIPING SYMBOLS
NG NATURAL GAS
PCR PUMPED CONDENSATE RETURN
RO REVERSE OSMOSIS
Room name
XXX SF
ROOM NAME, NUMBER, AND AREA
GENERAL SYMBOLS:
SF SQUARE FOOT
23 MECHANIC STREET, SPRINGVILLE, NY 14141
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6"
6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t
100% CONSTRUCTION
DOCUMENTS
REPLACE BOILERS 4 & 5
5000 W. NATIONAL AVE
MILWAUKEE, WI 53295
695-24-107
2026-04-06
PREL
IMIN
ARY
NOT
FOR
CONS
TRUC
TION
MD101
MECHANICAL PIPING DEMOLITION
PLAN - FIRST FLOOR 112
DJU KRL
NOT SPRINKLERED
SCALE: 3/8" = 1'-0"1 MECHANICAL PIPING DEMOLITION PLAN - FIRST FLOOR LEVEL
2. CONTRACTOR TO COODINATE WITH VA TO PROVIDE SCRAP VALUE CREDIT TO OWNER
FOR REMOVED EQUIPMENT.
1. SEE M-001 FOR M-SERIES NOTES AND LEGENDS.
GENERAL NOTES
N
N
KEYPLAN
20' - 0"20' - 0"20' - 0"
0"
0"
0"
0"
4321E ED DCBAUPUP
AREA OF WORK
Revisions: Date:
REV A - 35% SCHEMATIC DESIGN DOCUMENTS 2024-07-24
REV B - 65% DESIGN DEVELOPMENT 2024-09-17
REV C - 65% DESIGN DEVELOPMENT 2025-12-30
D
C
MD201 1
3"ø RO
8"ø HPS
1 1/2"ø HPR
3"ø RO
"ø
H
PS
5"ø PCR
1"ø LPR
12"ø HPS
3"ø FW
FEEDWATER STORAGE TANK
B-5 STEAM BOILERB-4 STEAM BOILER
3"ø RO
8" ø
HP
S
3" ø
HP
S
12"ø HPS
3" ø
RO
6" ø
NG
1"ø LPG
3" ø
NG
3" ø
CA
1"ø CA 3" ø
RO
3" ø
RO
1 1/2"ø HPS
3/4"ø CA
1"ø LPG 3/4"ø CA
STEAM HEADER
1" ø
CW
1" ø
HP
R
1"ø CW1"ø CW
1"ø CA 1"ø CA
1"ø CWS1"ø CWS 6" ø
HP
S 3" ø
NG
1" ø
CW
S
3/4"ø CF
6" ø
HP
S
3" ø
NG
4" ø
V
4" ø
V
2" ø
BB
D
2" ø
CB
D
3"ø HPS
1"ø HPR
2 1 /2" ø
FW
8621 SF
EAST BOILER ROOM
RISE OR DROP IN PIPE
PIPE UP
PIPE DOWN
POINT OF CONNECTION BETWEEN NEW
AND EXISTING WORK
LIMIT OF DEMOLITION
GATE VALVE
BBD BOTTOM BLOWDOWN
CBD CONTINUOUS BLOWDOWN
CF CHEMICAL FEEDWATER
CW CITY WATER
CT CONDENSATE TRANSFER
FW FEEDWATER
FOR FUEL OIL RETURN
FOS FUEL OIL SUPPLY
HPS HIGH PRESSURE STEAM SUPPLY
HPR HIGH PRESSURE STEAM RETURN
LPG LIQUIFIED PETROLEUM GAS
LPS LOW PRESSURE STEAM SUPPLY
LPR LOW PRESSURE STEAM RETUN
ABBREVIATIONS
VALVE SYMBOLS
PIPING SYMBOLS
NG NATURAL GAS
PCR PUMPED CONDENSATE RETURN
RO REVERSE OSMOSIS
Room name
XXX SF
ROOM NAME, NUMBER, AND AREA
GENERAL SYMBOLS:
SF SQUARE FOOT
23 MECHANIC STREET, SPRINGVILLE, NY 14141
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6"
6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t
100% CONSTRUCTION
DOCUMENTS
REPLACE BOILERS 4 & 5
5000 W. NATIONAL AVE
MILWAUKEE, WI 53295
695-24-107
2026-04-06
PREL
IMIN
ARY
NOT
FOR
CONS
TRUC
TION
MD105
MECHANICAL PIPING BID DEDUCT
DEMOLITION PLAN - FIRST FLOOR 112
DJU KRL
NOT SPRINKLERED
SCALE: 3/8" = 1'-0"1 MECHANICAL PIPING BID DEDUCTION DEMOLITION PLAN - FIRST FLOOR LEVEL
2. CONTRACTOR TO COODINATE WITH VA TO PROVIDE SCRAP VALUE CREDIT TO OWNER
FOR REMOVED EQUIPMENT.
1. SEE M-001 FOR M-SERIES NOTES AND LEGENDS.
GENERAL NOTES
N
N
KEYPLAN
20' - 0"20' - 0"20' - 0"
0"
0"
0"
0"
4321E ED DCBAUPUP
AREA OF WORK
Revisions: Date:
REV A - 35% SCHEMATIC DESIGN DOCUMENTS 2024-07-24
REV B - 65% DESIGN DEVELOPMENT 2024-09-17
REV C - 65% DESIGN DEVELOPMENT 2025-12-30
D
C
MIDDLE ROOF AREA
REMOVE BOILER EXHAUST STACK
AND SUPPORT FRAMEWORK
REMOVE RELIEF
VALVE VENT PIPES
REMOVE RELIEF
VALVE VENT PIPES
EXISTING CAPPED
ROOF OPENING
EXISTING CAPPED
ROOF OPENING
23 MECHANIC STREET, SPRINGVILLE, NY 14141
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6"
6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t
100% CONSTRUCTION
DOCUMENTS
REPLACE BOILERS 4 & 5
5000 W. NATIONAL AVE
MILWAUKEE, WI 53295
695-24-107
2026-04-06
PREL
IMIN
ARY
NOT
FOR
CONS
TRUC
TION
MD121
MECHANICAL PIPING DEMOLITION
PLAN - ROOF LEVEL 112
DJU KRL
NOT SPRINKLERED
SCALE: 3/8" = 1'-0"1 MECHANICAL PIPING DEMOLITION PLAN - ROOF LEVEL
N
1. SEE M-001 FOR M-SERIES NOTES AND LEGENDS.
GENERAL NOTES
N
KEYPLAN
20' - 0"20' - 0"20' - 0"
0"
0"
0"
0"
4321E ED DCBAUPUP
AREA OF WORK
Revisions: Date:
REV A - 35% SCHEMATIC DESIGN DOCUMENTS 2024-07-24
REV B - 65% DESIGN DEVELOPMENT 2024-09-17
REV C - 65% DESIGN DEVELOPMENT 2025-12-30
D
C
MIDDLE ROOF AREA
REMOVE BOILER EXHAUST STACK
AND SUPPORT FRAMEWORK
REMOVE RELIEF
VALVE VENT PIPES
EXISTING CAPPED
ROOF OPENING
EXISTING CAPPED
ROOF OPENING
23 MECHANIC STREET, SPRINGVILLE, NY 14141
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6"
6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t
100% CONSTRUCTION
DOCUMENTS
REPLACE BOILERS 4 & 5
5000 W. NATIONAL AVE
MILWAUKEE, WI 53295
695-24-107
2026-04-06
PREL
IMIN
ARY
NOT
FOR
CONS
TRUC
TION
MD125
MECHANICAL BID DEDUCT PIPING
DEMOLITION PLAN - ROOF LEVEL 112
DJU KRL
NOT SPRINKLERED
SCALE: 3/8" = 1'-0"1 MECHANICAL BID DEDUCTION PIPING DEMOLITION PLAN - ROOF LEVEL N
1. SEE M-001 FOR M-SERIES NOTES AND LEGENDS.
GENERAL NOTES
N
KEYPLAN
20' - 0"20' - 0"20' - 0"
0"
0"
0"
0"
4321E ED DCBAUPUP
AREA OF WORK
Revisions: Date:
REV A - 35% SCHEMATIC DESIGN DOCUMENTS 2024-07-24
REV B - 65% DESIGN DEVELOPMENT 2024-09-17
REV C - 65% DESIGN DEVELOPMENT 2025-12-30
LIMIT OF DEMOLITION
FW FEEDWATER
FOR FUEL OIL RETURN
FOS FUEL OIL SUPPLY
HPS HIGH PRESSURE STEAM SUPPLY
HPR HIGH PRESSURE STEAM RETURN
LPG LIQUIFIED PETROLEUM GAS
LPS LOW PRESSURE STEAM SUPPLY
LPR LOW PRESSURE STEAM RETUN
ABBREVIATIONS
PIPING SYMBOLS
NG NATURAL GAS
PCR PUMPED CONDENSATE RETURN
RO REVERSE OSMOSIS
RH ROD HANGER PIPE SUPPORT
SH SPRING HANGER PIPE SUPPORT
FIRST FLOOR LEVEL
71' - 0"
E
D
12"ø HPS
5"ø PCR
1"ø LPR3"ø FW
/1 MD101
6"ø HPS
8"ø HPS
3"ø NG
3"ø NG
3/4"ø CA
1"ø LPG
1"ø HPR
EXISTING BOILER B-5
EXISTING STEAM HEADER
BOILER HEADER
AREA
/1 MD105
1"ø HPR
3"ø HPS
3/4"ø FOS
3/4"ø FOR
1" ø
LP
G
3"ø HPS
3/4"ø CF
1" ø
CA
1" ø
CW
3/4 "ø
C W
S
2"ø BBD 2"ø CBD
4" ø
V
4" ø
V
23 MECHANIC STREET, SPRINGVILLE, NY 14141
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6"
6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t
100% CONSTRUCTION
DOCUMENTS
REPLACE BOILERS 4 & 5
5000 W. NATIONAL AVE
MILWAUKEE, WI 53295
695-24-107
2026-04-06
PREL
IMIN
ARY
NOT
FOR
CONS
TRUC
TION
MD201
MECHANICAL DEMOLITION
ELEVATION 112
DJU KRL
NOT SPRINKLERED
1. SEE M-001 FOR M-SERIES NOTES AND LEGENDS.
GENERAL NOTES
SCALE: 1/2" = 1'-0"1 MECHANICAL DEMOLITION ELEVATION
Revisions: Date:
REV A - 35% SCHEMATIC DESIGN DOCUMENTS 2024-07-24
REV B - 65% DESIGN DEVELOPMENT 2024-09-17
REV C - 65% DESIGN DEVELOPMENT 2025-12-30
D
C
1" ø
HP
R
1" ø
HP
R
1"ø HPR
SH SH
RH
0"
8621 SF
EAST BOILER ROOM
8" ø
HP
S
8" ø
HP
S
8" ø
HP
S
22.50°
1" ø
HP
R
SH
SH
NEW STEAM BOILER
112-105-BLR-005
M
M
112-105-FLO-001
112-105-FLO-001
1"ø HPR
RISE OR DROP IN PIPE
PIPE UP
PIPE DOWN
POINT OF CONNECTION BETWEEN NEW
AND EXISTING WORK
GATE VALVE
HPS HIGH PRESSURE STEAM SUPPLY
HPR HIGH PRESSURE STEAM RETURN
LPS LOW PRESSURE STEAM SUPPLY
LPR LOW PRESSURE STEAM RETURN
ABBREVIATIONS
VALVE SYMBOLS
PIPING SYMBOLS
RH ROD HANGER PIPE SUPPORT
SF SQUARE FOOT
PIPE HANGER
SH SPRING HANGER PIPE SUPPORT
Room name
XXX SF
ROOM NAME, NUMBER, AND AREA
GENERAL SYMBOLS:
FLOW METERM
23 MECHANIC STREET, SPRINGVILLE, NY 14141
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6"
6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t
100% CONSTRUCTION
DOCUMENTS
REPLACE BOILERS 4 & 5
5000 W. NATIONAL AVE
MILWAUKEE, WI 53295
695-24-107
2026-04-06
PREL
IMIN
ARY
NOT
FOR
CONS
TRUC
TION
MP101
MECHANICAL STEAM PIPING PLAN -
FIRST FLOOR LEVEL 112
DJU KRL
NOT SPRINKLERED
N
KEYPLAN
20' - 0"20' - 0"20' - 0"
0"
0"
0"
0"
4321E ED DCBAUPUP
AREA OF WORK
SCALE: 3/8" = 1'-0"1 MECHANICAL STEAM PIPING PLAN - FIRST FLOOR LEVEL
1. SEE M-001 FOR M-SERIES NOTES AND LEGENDS.
GENERAL NOTES
N
Revisions: Date:
REV A - 35% SCHEMATIC DESIGN DOCUMENTS 2024-07-24
REV B - 65% DESIGN DEVELOPMENT 2024-09-17
REV C - 65% DESIGN DEVELOPMENT 2025-12-30
REV D - 95% CONSTRCUTION DOCUMENTS 2026-03-09
REV E - 100% CONSTRUCTION DOCUMENTS 2026-04-06
KEYED NOTES
1 PROVIDE MINIMUM STRAIGHT RUN PIPING OF 10D UPSTREAM AND 5D DOWNSTREAM OF
STEAM FLOW METER, OR GREATER IF REQUIRED BY MANUFACTURER
D
C
1"ø CWS 1"ø CWS
1 1/2"ø ROC
8621 SF
EAST BOILER ROOM
2 1/2"ø FW
3"ø FW 3"ø FW
3" ø
BB
D
1 1/2"ø CBD
1" DRAIN LINE FROM
NEW STEAM HEADER
TO SAMPLE
COOLER
1/2 "ø
C F
1/2 "ø
C F
1/2 "ø
C F
TO 112-105-CF-001 AMINE PUMP
TO 112-105-CF-002 SCALE INHIBITOR PUMP
TO 112-105-CF-003 OXYGEN SCAVENGER PUMP
NEW STEAM BOILER
112-105-BLR-005
RISE OR DROP IN PIPE
PIPE UP
PIPE DOWN
POINT OF CONNECTION BETWEEN NEW
AND EXISTING WORK
GATE VALVE
ABBREVIATIONS
VALVE SYMBOLS
PIPING SYMBOLS
PIPE HANGER
Room name
XXX SF
ROOM NAME, NUMBER, AND AREA
GENERAL SYMBOLS:
BBD BOTTOM BLOWDOWN
CBD CONTINUOUS BLOWDOWN
CF CHEMICAL FEEDWATER
CW CITY WATER
FW FEEDWATER
FLOOR DRAIN
23 MECHANIC STREET, SPRINGVILLE, NY 14141
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6"
6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t
100% CONSTRUCTION
DOCUMENTS
REPLACE BOILERS 4 & 5
5000 W. NATIONAL AVE
MILWAUKEE, WI 53295
695-24-107
2026-04-06
PREL
IMIN
ARY
NOT
FOR
CONS
TRUC
TION
MP102
MECHANICAL HYDRONIC PIPING
PLAN - FIRST FLOOR LEVEL 112
DJU KRL
NOT SPRINKLERED
N
KEYPLAN
20' - 0"20' - 0"20' - 0"
0"
0"
0"
0"
4321E ED DCBAUPUP
AREA OF WORK
1. SEE M-001 FOR M-SERIES NOTES AND LEGENDS.
GENERAL NOTES
SCALE: 3/8" = 1'-0"1 MECHANICAL HYDRONIC PIPING PLAN - FIRST FLOOR LEVEL
N
Revisions: Date:
REV A - 35% SCHEMATIC DESIGN DOCUMENTS 2024-07-24
REV B - 65% DESIGN DEVELOPMENT 2024-09-17
REV C - 65% DESIGN DEVELOPMENT 2025-12-30
D
C
3/4"ø FOR 3/4"ø FOS
1"ø LPG
8621 SF
EAST BOILER ROOM
3"ø NG
6" ø
NG
1"ø LPG
3" ø
NG
6"ø NG
NEW STEAM BOILER
112-105-BLR-005
RISE OR DROP IN PIPE
PIPE UP
PIPE DOWN
POINT OF CONNECTION BETWEEN NEW
AND EXISTING WORK
GATE VALVE
ABBREVIATIONS
VALVE SYMBOLS
PIPING SYMBOLS
SF SQUARE FOOT
PIPE HANGER
Room name
XXX SF
ROOM NAME, NUMBER, AND AREA
GENERAL SYMBOLS:
FOR FUEL OIL RETURN
FOS FUEL OIL SUPPLY
LPG LIQUIFIED PETROLEUM GAS
NG NATURAL GAS
23 MECHANIC STREET, SPRINGVILLE, NY 14141
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6"
6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t
100% CONSTRUCTION
DOCUMENTS
REPLACE BOILERS 4 & 5
5000 W. NATIONAL AVE
MILWAUKEE, WI 53295
695-24-107
2026-04-06
PREL
IMIN
ARY
NOT
FOR
CONS
TRUC
TION
MP103
MECHANICAL FUEL PIPING PLAN -
FIRST FLOOR LEVEL 112
DJU KRL
NOT SPRINKLERED
N
KEYPLAN
20' - 0"20' - 0"20' - 0"
0"
0"
0"
0"
4321E ED DCBAUPUP
AREA OF WORK
1. SEE M-001 FOR M-SERIES NOTES AND LEGENDS.
GENERAL NOTES
SCALE: 3/8" = 1'-0"1 MECHANICAL FUEL PIPING PLAN - FIRST FLOOR LEVEL
N
Revisions: Date:
REV A - 35% SCHEMATIC DESIGN DOCUMENTS 2024-07-24
REV B - 65% DESIGN DEVELOPMENT 2024-09-17
REV C - 65% DESIGN DEVELOPMENT 2025-12-30
D
C
1"ø CA
3" ø
CA
8621 SF
EAST BOILER ROOM
3" ø
CA
NEW STEAM BOILER
112-105-BLR-005
RISE OR DROP IN PIPE
PIPE UP
PIPE DOWN
POINT OF CONNECTION BETWEEN NEW
AND EXISTING WORK
CA COMPRESSED AIR
ABBREVIATIONS
PIPING SYMBOLS
PIPE HANGER
Room name
XXX SF
ROOM NAME, NUMBER, AND AREA
GENERAL SYMBOLS:
23 MECHANIC STREET, SPRINGVILLE, NY 14141
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6"
6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t
100% CONSTRUCTION
DOCUMENTS
REPLACE BOILERS 4 & 5
5000 W. NATIONAL AVE
MILWAUKEE, WI 53295
695-24-107
2026-04-06
PREL
IMIN
ARY
NOT
FOR
CONS
TRUC
TION
MP104
MECHANICAL COMPRESSED AIR
PIPING PLAN - FIRST FLOOR LEVEL 112
DJU KRL
NOT SPRINKLERED
N
KEYPLAN
20' - 0"20' - 0"20' - 0"
0"
0"
0"
0"
4321E ED DCBAUPUP
AREA OF WORK
1. SEE M-001 FOR M-SERIES NOTES AND LEGENDS.
GENERAL NOTES
SCALE: 3/8" = 1'-0"1 MECHANICAL COMPRESED AIR PIPING PLAN - FIRST FLOOR LEVEL
N
Revisions: Date:
REV A - 35% SCHEMATIC DESIGN DOCUMENTS 2024-07-24
REV B - 65% DESIGN DEVELOPMENT 2024-09-17
REV C - 65% DESIGN DEVELOPMENT 2025-12-30
REV D - 95% CONSTRCUTION DOCUMENTS 2026-03-09
REV E - 100% CONSTRUCTION DOCUMENTS 2026-04-06
KEYED NOTES
1 CONNECT EXISTING SHOP GENERAL COMPRESSED ARI TO BURNER FOR FUEL
ATOMIZATION DURING COLD START AND TIE EXISTING LOW ATOMIZATION MEDIA
PRESSURE SWITCH (LAMPS) FOR SAFETY BOILER SHUTDWON ON LOW AIR PRESSURE
BACK TO EPH-SB-BLD112-1. CONTRACTOR TO REMOVE ALL CONDUIT AND CABLING
SUPPLYING BOILER 5 CONTROL PANEL BACK TO EPL-SB-BLD112-2
D
C
1" ø
HP
R
1" ø
HP
R
1"ø HPR
SH SH
RH
0"
SH
SH
8621 SF
EAST BOILER ROOM
8"ø HPS
8" ø
HP
S
3"ø HPS
1 1/2"ø HPR
1"ø LPR
5"ø PCR
8" ø
HP
S
12"ø HPS
3" ø
HP
S
1 1/2"ø HPS
6"ø HPS
22.50°
1" ø
HP
R
SHSH
SH
NEW STEAM BOILER
112-105-BLR-005
EXISTING B-4
STEAM BOILER
M
M
112-105-FLO-001
112-105-FLO-001
1"ø HPR
RISE OR DROP IN PIPE
PIPE UP
PIPE DOWN
POINT OF CONNECTION BETWEEN NEW
AND EXISTING WORK
GATE VALVE
HPS HIGH PRESSURE STEAM SUPPLY
HPR HIGH PRESSURE STEAM RETURN
LPS LOW PRESSURE STEAM SUPPLY
LPR LOW PRESSURE STEAM RETURN
ABBREVIATIONS
VALVE SYMBOLS
PIPING SYMBOLS
RH ROD HANGER PIPE SUPPORT
SF SQUARE FOOT
PIPE HANGER
SH SPRING HANGER PIPE SUPPORT
Room name
XXX SF
ROOM NAME, NUMBER, AND AREA
GENERAL SYMBOLS:
FLOW METERM
23 MECHANIC STREET, SPRINGVILLE, NY 14141
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6"
6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t
100% CONSTRUCTION
DOCUMENTS
REPLACE BOILERS 4 & 5
5000 W. NATIONAL AVE
MILWAUKEE, WI 53295
695-24-107
2026-04-06
PREL
IMIN
ARY
NOT
FOR
CONS
TRUC
TION
MP105
MECHANICAL BID DEDUCT STEAM
PIPING PLAN - FIRST FLOOR LEVEL 112
DJU KRL
NOT SPRINKLERED
N
KEYPLAN
20' - 0"20' - 0"20' - 0"
0"
0"
0"
0"
4321E ED DCBAUPUP
AREA OF WORK
SCALE: 3/8" = 1'-0"1 MECHANICAL BID DEDUCTION STEAM PIPING PLAN - FIRST FLOOR LEVEL
1. SEE M-001 FOR M-SERIES NOTES AND LEGENDS.
GENERAL NOTES
N
Revisions: Date:
REV A - 35% SCHEMATIC DESIGN DOCUMENTS 2024-07-24
REV B - 65% DESIGN DEVELOPMENT 2024-09-17
REV C - 65% DESIGN DEVELOPMENT 2025-12-30
REV D - 95% CONSTRCUTION DOCUMENTS 2026-03-09
REV E - 100% CONSTRUCTION DOCUMENTS 2026-04-06
KEYED NOTES
1 PROVIDE MINIMUM STRAIGHT RUN PIPING OF 10D UPSTREAM AND 5D DOWNSTREAM OF
STEAM FLOW METER, OR GREATER IF REQUIRED BY MANUFACTURER
D
C
1"ø CWS1"ø CWS
8621 SF
EAST BOILER ROOM
2 1/2"ø FW
2 1/2"ø FW
TO 112-105-CF-001 AMINE PUMP
TO 112-105-CF-002 SCALE INHIBITOR PUMP
TO 112-105-CF-003 OXYGEN SCAVENGER PUMP
1/2 "ø
C F
1/2 "ø
C F
1/2 "ø
C F
3"ø FW
1" DRAIN LINE FROM
NEW STEAM HEADER
TO SAMPLE
COOLER
3" ø
BB
D
1 1 /2" ø
CB
D
NEW STEAM BOILER
112-105-BLR-005
EXISTING B-4
STEAM BOILER
RISE OR DROP IN PIPE
PIPE UP
PIPE DOWN
POINT OF CONNECTION BETWEEN NEW
AND EXISTING WORK
GATE VALVE
ABBREVIATIONS
VALVE SYMBOLS
PIPING SYMBOLS
PIPE HANGER
Room name
XXX SF
ROOM NAME, NUMBER, AND AREA
GENERAL SYMBOLS:
BBD BOTTOM BLOWDOWN
CBD CONTINUOUS BLOWDOWN
CF CHEMICAL FEEDWATER
CW CITY WATER
FW FEEDWATER
FLOOR DRAIN
23 MECHANIC STREET, SPRINGVILLE, NY 14141
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6"
6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t
100% CONSTRUCTION
DOCUMENTS
REPLACE BOILERS 4 & 5
5000 W. NATIONAL AVE
MILWAUKEE, WI 53295
695-24-107
2026-04-06
PREL
IMIN
ARY
NOT
FOR
CONS
TRUC
TION
MP106
MECHANICAL BID DEDUCT
HYDRONIC PIPING PLAN - FIRST FL 112
DJU KRL
NOT SPRINKLERED
N
KEYPLAN
20' - 0"20' - 0"20' - 0"
0"
0"
0"
0"
4321E ED DCBAUPUP
AREA OF WORK
1. SEE M-001 FOR M-SERIES NOTES AND LEGENDS.
GENERAL NOTES
SCALE: 3/8" = 1'-0"1 MECHANICAL BID DEDUCTION HYDRONIC PIPING PLAN - FIRST FLOOR LEVEL N
Revisions: Date:
REV A - 35% SCHEMATIC DESIGN DOCUMENTS 2024-07-24
REV B - 65% DESIGN DEVELOPMENT 2024-09-17
REV C - 65% DESIGN DEVELOPMENT 2025-12-30
RISE OR DROP IN PIPE
PIPE UP
PIPE DOWN
POINT OF CONNECTION BETWEEN NEW
AND EXISTING WORK
GATE VALVE
ABBREVIATIONS
VALVE SYMBOLS
PIPING SYMBOLS
SF SQUARE FOOT
PIPE HANGER
Room name
XXX SF
ROOM NAME, NUMBER, AND AREA
GENERAL SYMBOLS:
FOR FUEL OIL RETURN
FOS FUEL OIL SUPPLY
LPG LIQUIFIED PETROLEUM GAS
NG NATURAL GAS
E
D
C
3/4"ø FOR 3/4"ø FOS
1"ø LPG
8621 SF
EAST BOILER ROOM
3" ø
NG
NEW STEAM BOILER
112-105-BLR-005
EXISTING B-4
STEAM BOILER
23 MECHANIC STREET, SPRINGVILLE, NY 14141
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6"
6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t
100% CONSTRUCTION
DOCUMENTS
REPLACE BOILERS 4 & 5
5000 W. NATIONAL AVE
MILWAUKEE, WI 53295
695-24-107
2026-04-06
PREL
IMIN
ARY
NOT
FOR
CONS
TRUC
TION
MP107
MECHANICAL BID DEDUCT FUEL
PIPING PLAN - FIRST FLOOR LEVEL 112
DJU KRL
NOT SPRINKLERED
N
KEYPLAN
20' - 0"20' - 0"20' - 0"
0"
0"
0"
0"
4321E ED DCBAUPUP
AREA OF WORK
1. SEE M-001 FOR M-SERIES NOTES AND LEGENDS.
GENERAL NOTES
SCALE: 3/8" = 1'-0"1 MECHANICAL BID DEDUCTION FUEL PIPING PLAN - FIRST FLOOR LEVEL N
Revisions: Date:
REV A - 35% SCHEMATIC DESIGN DOCUMENTS 2024-07-24
REV B - 65% DESIGN DEVELOPMENT 2024-09-17
REV C - 65% DESIGN DEVELOPMENT 2025-12-30
D
C
1"ø CA
3" ø
CA
8621 SF
EAST BOILER ROOM
3" ø
CA
NEW STEAM BOILER
112-105-BLR-005
EXISTING B-4
STEAM BOILER
RISE OR DROP IN PIPE
PIPE UP
PIPE DOWN
POINT OF CONNECTION BETWEEN NEW
AND EXISTING WORK
CA COMPRESSED AIR
ABBREVIATIONS
PIPING SYMBOLS
PIPE HANGER
Room name
XXX SF
ROOM NAME, NUMBER, AND AREA
GENERAL SYMBOLS:
23 MECHANIC STREET, SPRINGVILLE, NY 14141
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6"
6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t
100% CONSTRUCTION
DOCUMENTS
REPLACE BOILERS 4 & 5
5000 W. NATIONAL AVE
MILWAUKEE, WI 53295
695-24-107
2026-04-06
PREL
IMIN
ARY
NOT
FOR
CONS
TRUC
TION
MP108
MECH BID DEDUCT COMPRESSED
AIR PIPING PLAN - FIRST FLOOR 112
DJU KRL
NOT SPRINKLERED
N
KEYPLAN
20' - 0"20' - 0"20' - 0"
0"
0"
0"
0"
4321E ED DCBAUPUP
AREA OF WORK
1. SEE M-001 FOR M-SERIES NOTES AND LEGENDS.
GENERAL NOTES
SCALE: 3/8" = 1'-0"1 MECHANICAL BID DEDUCTION COMPRESED AIR PIPING PLAN - FIRST FLOOR LEVEL N
Revisions: Date:
REV A - 35% SCHEMATIC DESIGN DOCUMENTS 2024-07-24
REV B - 65% DESIGN DEVELOPMENT 2024-09-17
REV C - 65% DESIGN DEVELOPMENT 2025-12-30
REV D - 95% CONSTRCUTION DOCUMENTS 2026-03-09
REV E - 100% CONSTRUCTION DOCUMENTS 2026-04-06
KEYED NOTES
1 CONNECT EXISTING SHOP GENERAL COMPRESSED ARI TO BURNER FOR FUEL
ATOMIZATION DURING COLD START AND TIE EXISTING LOW ATOMIZATION MEDIA
PRESSURE SWITCH (LAMPS) FOR SAFETY BOILER SHUTDWON ON LOW AIR PRESSURE
D
C
B
M
112-105-FLO-003 1
EAST BOILER ROOM
6" HPS
AREA OF WORK
RISE OR DROP IN PIPE
PIPE UP
PIPE DOWN
POINT OF CONNECTION BETWEEN NEW
AND EXISTING WORK
PIPING SYMBOLS
Room name
XXX SF
ROOM NAME, NUMBER, AND AREA
GENERAL SYMBOLS:
FLOW METERM
HPS HIGH PRESSURE STEAM SUPPLY
ABBREVIATIONS
23 MECHANIC STREET, SPRINGVILLE, NY 14141
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6"
6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t
100% CONSTRUCTION
DOCUMENTS
REPLACE BOILERS 4 & 5
5000 W. NATIONAL AVE
MILWAUKEE, WI 53295
695-24-107
2026-04-06
PREL
IMIN
ARY
NOT
FOR
CONS
TRUC
TION
MP110
MECHANICAL STEAM PIPING PLAN -
SPS FLOW METER 112
DJU CCW
NOT SPRINKLERED
SCALE: 1/4" = 1'-0"1 MECHANICAL STEAM PIPING PLAN - SPS FLOW METER
KEYED NOTES
1 INSTALL FLOW METER ON EXISTING OVERHEAD, 6" SPS LINE AND PROVIDE MINIMUM
STRAIGHT RUN PIPING OF 10D UPSTREAM AND 5D DOWNSTREAM OF STEAM FLOW
METER, OR GREATER IF REQUIRED BY MANUFACTURER
Revisions: Date:
REV A - 35% SCHEMATIC DESIGN DOCUMENTS 2024-07-24
REV B - 65% DESIGN DEVELOPMENT 2024-09-17
REV C - 65% DESIGN DEVELOPMENT 2025-12-30
REV D - 95% CONSTRCUTION DOCUMENTS 2026-03-09
REV E - 100% CONSTRUCTION DOCUMENTS 2026-04-06
1. SEE M-001 FOR M-SERIES NOTES AND LEGENDS.
GENERAL NOTES
N
KEYPLAN
20' - 0"20' - 0"20' - 0"
0"
0"
0"
0"
4321E ED DCBAUPUP
NEW HPR
EXISTING HPR
TT
PT
PRESSURE
TRANSMITTER
TEMPERATURE
TRANSMITTER
TO METERING SYSTEM
BUILDING INCOMING
MAIN STEAM
NOTE:
MAINTAIN UPSTREAM AND DOWN STREAM DISTANCES RECOMMENDED BY
METER MANUFACTURERS
FLOW METER
INTERFACE WITH
BACNET SYSTEM
DIFFERENTIAL PRESSURE
(DP) CELL STEAM FLOW
MEASUREMENT
SHUTOFF VALVE
1" BY-PASS GATE VALVE (TYP)
PRESSURE GAUGE WITH
GATE VALVE (TYP)
1" BY-PASS GLOBE VALVE (TYP AT
ALL GATE VALVES 6" OR LARGER)
3000 LBS STEEL HALF COUPLING
OR SOCKET WELDED (TYP)
SEE PLANS FOR PIPE SIZES
BUTT WELD (TYP)
GATE VALVE
D
SW
BW
S
BW
S
ELEVATION
FD
3/4" COOLING WATER
1/4" SAMPLE
OUTLET
3/4"
ANTI-SIPHON
VACUUM BREAKER
SAMPLE COOLER
PROVIDE SEPARATE COOLERS FOR BWS AND FWS.
MOUNT BWS COOLER 4' ABOVE FINISHED FLOOR ON
WALL OR COLUMN.
1/2" FROM
EACH BOILER
1/2"
SW
0-83°C
1-5/8" GALVANIZED STRUT
TUBING, TYP
TUBING CLAMP
PERFORATED TUBE TRAY
HANGER ROD
1" GATE VALVE
SCHEDULE 80
STEEL PIPE
INVERTED BUCKET TRAP,
SEE PLANS AND SCHEDULES
DIELECTRIC FITTING WHERE
RETURN IS COPPER PIPESEE DRAWINGS FOR PIPE SIZES
SCHEDULE 80 STEEL PIPE
TO RETURN MAIN
PIPE SIZE SHALL BE
SAME SIZE AS TRAP
BYPASS-INSTALL IN HORIZONTAL
PLANE LEVEL WITH TRAP OR IN
VERTICAL PLANE AND BELOW TRAP
DRIP LEG OR EQUIPMENT
CONNECTION. MAKE THE SAME SIZE
AS THE SUPPLY MAIN OR EQUIPMENT
CONNECTION. SEE NOTE 1
6" M
IN
" M
IN
FLOW
NOTE:
1. ALLDRIP POINTS ON STEAM MAINS SHALL BE PROVIDED WITH A 12"
MINIMUM HIGH DRIP LEG FROM BOTTOM OF STEAM MAIN TO TRAP INLET.
DRIP LEG SHALL HAVE 6" SCALE POCKET BELOW TRAP INLET.
2. PROVIDE BYPASS PIPING.
CAP (TYP)
DRIP RETURN
3/8" TEST
CONNECTION
PIPE TO STEAM
TRAP (TYP)
STEAMLINE (TYP)
DRIP LEG (TYP)
3/4" DRAIN
(ALTERNATE
LOCATIONS), TYP
3/4" MIN
FROM DRIP
CONNECTION
2"
2"
STEAM TRAP ASSEMBLY
STEAM LINE DRIP POCKET
8"x8"x3/8" STEEL PLATE
WELD PLATE TO PIPE
SECURE TO SLAB WITH (4) 1/2" DIA
EXPANSION BOLTS
CONCRETE SLAB
WELD PIPE TO PLATE
4" SCH 40 PIPE
3/8" STEEL PLATE, SIZE TO
MATCH PIPE SUPPORT
NOTES:
1. PROVIDE ANCHORS
ONLY WHERE
SHOWN ON
DRAWINGS.
2. EXTEND SLEEVE
ABOVE FLOOR
WHERE
SPECIFIED.
ELEVATION
PLAN
RISER
FLOOR SLAB
INSULATION
BOLT (TYP)
RISER CLAMP (BOTTOM
CLAMP REQUIRED AT
ANCHOR POINTS ONLY)
PIPE SLEEVE
WHERE SPECIFIED
RISER CLAMP
FIRE-STOPPING MATERIAL
BOLT
RISER CLAMP
PIPE SLEEVE
WHERE SPECIFIED
PIPE
/1 MK202 /1 MK202
/1 MK206
HPR HIGH PRESSURE STEAM RETURN
ABBREVIATIONS
TYP TYPICAL
MAX MAXIMUM
MIN MINIMUM
DIA DIAMETER
23 MECHANIC STREET, SPRINGVILLE, NY 14141
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6"
6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t
100% CONSTRUCTION
DOCUMENTS
REPLACE BOILERS 4 & 5
5000 W. NATIONAL AVE
MILWAUKEE, WI 53295
695-24-107
2026-04-06
PREL
IMIN
ARY
NOT
FOR
CONS
TRUC
TION
MP501
MECHANICAL PIPING DETAILS
DJU ADL
NOT SPRINKLERED
NTS1 TYPICAL CONDENSATE HEADER CONNECTIONS
NTS2 STEAM METER
NTS3 GATE VALVE BYPASS
NTS4 WATER SAMPLE COOLERS DETAILS
NTS5 TUBING SUPPORTS DETAIL
NTS6 INVERTED BUCKET STEAM TRAP ASSEMBLY
NTS7 STEAMLINE DRIP POCKET AND STEAM TRAP ASSEMBLY
NTS8 PIPE SUPPORT STAND
NTS9 SUPPORT ANCHOR FOR RISERS
1. SEE M-001 FOR M-SERIES NOTES AND LEGENDS.
GENERAL NOTES
Revisions: Date:
REV A - 35% SCHEMATIC DESIGN DOCUMENTS 2024-07-24
REV B - 65% DESIGN DEVELOPMENT 2024-09-17
REV C - 65% DESIGN DEVELOPMENT 2025-12-30
SIDE VIEW TRAPEZE HANGER FOR UP TO
1000 LB UNIFORM LOAD
ADJUSTABLE CLEVIS HANGER
TYPE 1 - SEE SPECIFICATIONS
ADJUSTABLE CLEVIS HANGER
TYPE 43 - SEE SPECIFICATIONS
WELD
SADDLE
1/2" DIA HANGER RODS
WITH 36" MAX SPACING
ON EACH CHANNEL
1 5/8" 12 GAUGE CHANNEL
OR 2"x2"x1/4" ANGLE
PROVIDE INSULATION SHIELD
& INSERT FOR ALL PIPING
(8" MIN)
INSULATION SHIELD
AT HANGER
PROVIDE HIGH COMPRESSIVE
STRENGTH INSULATION (9
PSF MIN DENSITY) UNDER
INSULATION SHIELD
INSULATION (VAPOR
BARRIER TYPE IS
REQUIRED FOR LOW
TEMPERATURE PIPE)
HANGER ROD
BAND
FRAMING MEMBER
OPTION A OPTION B
BEAM CLAMP
1-5/8" GALVANIZED STRUT
MAXIMUM PIPE/TUBING SUPPORT SPACING
NOM
SIZE IN
THRU
3/4 1 1 1/4
1/2 2 2 1/2 3 4 5 6 8 10 12 14 16 18 20 24
PIPE FT 7 7 7 9 10 11 12 14 16 17 19 22 23 25 27 28 30 32
TUBING
FT 5 FT 6 7 8 8 9 10 12 13 14 16 - - - - - - -
NOTE: FOR TRAPEZE HANGER TAKE SPACING OF SMALLEST SIZE ON TRAPEZE
NOTES:
SEE SPECIFER FOR DETAILED
HANGER REQUIREMENTS 1" MA
X
NOTE:
WHERE USED FOR COPPER TUBE OR PIPE, BRAZE TO FABRICATED STEEL ANCHOR
PIPE ANCHOR SCHEDULE
D P C N S BOLT PATTERN
mm in mm in mm in mm in mm in
13 1/2"
102 4
19 3/4
21/2
11/2
5/8
1/2
3/8 3/8
3/8
1/2
3/8 3/8 1/4
3/4 5/8
5/8
5/8
INSULATE PIPE ONLY FOR STEAM, CONDENSATE
AND HEATING WATER.
STL PIPE OR
COPPER TUBE
NOTE A
ANCHOR BOLTS
N=NUMBER
S=SIZE
DRILL ∅ = S+1/16"
D+3 3/4"
D+1 1/2"
D+1"
D=PIPE OD
D+ P
D+4 3/4"
D+2 1/2"
C5/16"
PIPE ANCHOR SCHEDULE
D L P T E N S BOLT PATTERN
mm
NOTES:
A. INSTALL WALL PLATE FIRST THEN WELD ON
REMAINING ASSEMBLY. ONE WALL PLATE
FOR BOTH CHILLED WATER S.&R. IS
OPTIONAL.
in mm in mm in mm in mm in mm in mm in
7/8
7/8
7/8
7/8
7/8
7/8
6 1/4
6 1/4
6 1/4
6 1/4
13 1/2
13 1/2
13 1/2
13 1/2
13 1/2
13 1/2
13 1/2
13 1/2
13 5/8
10 3/8
25 1
19 3/4
19 3/4
19 3/4
19 3/4
19 3/4
19 3/4
508 20
216 81/2
D+8"
D+4"
P
NOTE A L+8"
L+4"
T
D=PIPE OD
E
T
L+3" L
ANCHOR BOLTS
N=NUMBER S=SIZE
DRILL ∅ = S+1/8"
INSULATE PIPE ONLY FOR STEAM, CONDENSATE & HEATING
WATER.
SAFETY VALVE
OPEN DRAIN (NOTE 3)
CONNECTION TO
PRESSURE VESSEL
OR PIPE
PROVIDE UNION UNLESS
SAFETY VALVE HAS
FLANGED OUTLET
VENT PIPE THROUGH
ROOF SUPPORT AS
INDICATED ON DWGS
(NOTES 1, 2)
PIPE THREADED
INTO ELBOW (SAME
SIZE AS ELBOW)
DRIP PAN ELBOW
(SECTIONAL VIEW)
FLEXIBLE CONNECTOR
3/4" DRAIN TO FLOOR
DRAIN OR OPEN SIGHT
DRAIN (NOTE 4)
1" M
IN
24" MAX
3"
D
ELEVATION
TYPICAL WATER PIPING
REDUCER, IF REQUIRED
3/4" BALL VALVE
ADAPTER TO 3/4"
HOSE
THREAD-PROVIDE
HOSE CAP NUT
1/4" COPPER
TUBING
1/2" x 4"
NIPPLE
AIR VENT
1/2" BALL
VALVE
CIRCULATING WATER PIPING
TYPICAL MANUAL AIR VENT
TYPICAL HOT WATER
PIPING DRAIN VALVE
CONNECTIONS
ELEVATION
THREADED
PIPING
ELEVATION
WELDED
PIPING
NOTES:
1. DRAIN ALL LOW POINTS AS INDICATED ABOVE.
2. WHERE SCALE POCKETS ARE SHOWN ON PIPE RISER DIAGRAMS
AND/OR PLANS LOCATE DRAIN AT BOTTOM OF SCALE
POCKET.
ELEVATION
NOTES:
1. VENT ALL HIGH POINTS INDICATED ABOVE.
2. IF AUTOMATIC AIR VENTS ARE USED, PIPE DISCHARGE TO DRAIN.
MV
OR
AV SADDLE
WELD
1.
2.
3.
4.
5.
NOTES:
UNLESS OTHERWISE SHOWN ON THE DRAWINGS, SIZE THE VENT PIPE SO THAT STEAM IS NOT
BLOWN OUT AT THE VENT PIPE ENTRANCE. UTILIZE THE CALCULATION METHOD CONTAINED IN
ANSI B31.1. POWER PIPING CODE, APPENDIX II. THE VENT PIPE SHOULD GO VERTICAL THRU
THE ROOF WITH NO TURNS OR ANGLES. WHERE REQUIRED THERE SHALL BE NO MORE THEN A
TOTAL OR 180 DEGREES IN…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .