A0003 - VA 695-24-107 Addendum 03 Combined Drawing SetPart-3.pdf
PDF 6 MB Posted
- Solicitation number
- 36C25227B0001
About this file
This is a comprehensive set of bid documents for a federal construction project involving the replacement of steam boilers at a Department of Veterans Affairs facility located at 23 Mechanic Street, Springville, New York 14141.
The project (695-24-107, Building 112) encompasses the demolition of existing Boilers 4 and 5 and installation of a new firetube boiler system with associated mechanical, electrical, and plumbing infrastructure. Key deliverables include hydronic piping plans, fuel piping systems, compressed air piping, steam piping with flow meters, boiler equipment with economizer, control panels, and electrical power distribution modifications. The mechanical work involves connections to existing steam headers, installation of inverted bucket steam traps, drip legs, and safety valve assemblies. The electrical scope includes new feeder cables, branch panel modifications (EPH-SB-BLD112-1, EPL-SB-BLD112-2), lighting upgrades with LED fixtures, and lightning protection system enhancements for the new exhaust stack. The documents detail extensive piping support requirements, pipe hanger specifications, and specialized mechanical details for steam system operation. Bid documents were initially issued April 20, 2026 (REV 0) with Addendum 03 effective November 4, 2026 (REV 1). The certification of authorization number is 0023683. The project is not sprinklered. Construction is to occur at the Veterans Affairs facility with coordination required for equipment clearances, tube removal access, and integration with existing building systems including the reverse osmosis storage system and main boiler operating header.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
E
D
C
1"ø CWS1"ø CWS
8621 SF
EAST BOILER ROOM
2 1/2"ø FW
2 1/2"ø FW
TO 112-105-CF-001 AMINE PUMP
TO 112-105-CF-002 SCALE INHIBITOR PUMP
TO 112-105-CF-003 OXYGEN SCAVENGER PUMP
1/2 "ø
C F
1/2 "ø
C F
1/2 "ø
C F
3"ø FW
1" DRAIN LINE FROM
NEW STEAM HEADER
TO SAMPLE
COOLER
3" ø
BB
D
1 1 /2" ø
CB
D
NEW STEAM BOILER
112-105-BLR-005
EXISTING B-4
STEAM BOILER
RISE OR DROP IN PIPE
PIPE UP
PIPE DOWN
POINT OF CONNECTION BETWEEN NEW
AND EXISTING WORK
GATE VALVE
ABBREVIATIONS
VALVE SYMBOLS
PIPING SYMBOLS
PIPE HANGER
Room name
XXX SF
ROOM NAME, NUMBER, AND AREA
GENERAL SYMBOLS:
BBD BOTTOM BLOWDOWN
CBD CONTINUOUS BLOWDOWN
CF CHEMICAL FEEDWATER
CW CITY WATER
FW FEEDWATER
FLOOR DRAIN
23 MECHANIC STREET, SPRINGVILLE, NY 14141
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD "Unauthorized alteration or addition to any plans, specifications or reports bearing a Licensed Professional Engineer's seal is a violation of Section 7209, subdivision 2, of the New York State Education Law".CONSULTANT
321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6"
6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t
BID DOCUMENTS REPLACE BOILERS 4 & 5
5000 W. NATIONAL AVE
MILWAUKEE, WI 53295
695-24-107
2026-04-20
CERTIFICATION OF AUTHORIZATION NUMBER: 0023683
MP106
MECHANICAL BID DEDUCT
HYDRONIC PIPING PLAN - FIRST FL 112
DJU KRL
NOT SPRINKLERED
N
KEYPLAN
20' - 0"20' - 0"20' - 0"
0"
0"
0"
0"
4321E ED DCBAUPUP
AREA OF WORK
1. SEE M-001 FOR M-SERIES NOTES AND LEGENDS.
GENERAL NOTES
SCALE: 3/8" = 1'-0"1 MECHANICAL BID DEDUCTION HYDRONIC PIPING PLAN - FIRST FLOOR LEVEL N
Revision: Date:
REV 0 - BID DOCUMENTS 2026-04-20
REV 1 - ADDENDUM 03 2026-11-04
EXP 11/30/2027 11/4/2026
RISE OR DROP IN PIPE
PIPE UP
PIPE DOWN
POINT OF CONNECTION BETWEEN NEW
AND EXISTING WORK
GATE VALVE
ABBREVIATIONS
VALVE SYMBOLS
PIPING SYMBOLS
SF SQUARE FOOT
PIPE HANGER
Room name
XXX SF
ROOM NAME, NUMBER, AND AREA
GENERAL SYMBOLS:
FOR FUEL OIL RETURN
FOS FUEL OIL SUPPLY
LPG LIQUIFIED PETROLEUM GAS
NG NATURAL GAS
E
D
C
3/4"ø FOR 3/4"ø FOS
1"ø LPG
8621 SF
EAST BOILER ROOM
3" ø
NG
NEW STEAM BOILER
112-105-BLR-005
EXISTING B-4
STEAM BOILER
23 MECHANIC STREET, SPRINGVILLE, NY 14141
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD "Unauthorized alteration or addition to any plans, specifications or reports bearing a Licensed Professional Engineer's seal is a violation of Section 7209, subdivision 2, of the New York State Education Law".CONSULTANT
321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6"
6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t
BID DOCUMENTS REPLACE BOILERS 4 & 5
5000 W. NATIONAL AVE
MILWAUKEE, WI 53295
695-24-107
2026-04-20
CERTIFICATION OF AUTHORIZATION NUMBER: 0023683
MP107
MECHANICAL BID DEDUCT FUEL
PIPING PLAN - FIRST FLOOR LEVEL 112
DJU KRL
NOT SPRINKLERED
N
KEYPLAN
20' - 0"20' - 0"20' - 0"
0"
0"
0"
0"
4321E ED DCBAUPUP
AREA OF WORK
1. SEE M-001 FOR M-SERIES NOTES AND LEGENDS.
GENERAL NOTES
SCALE: 3/8" = 1'-0"1 MECHANICAL BID DEDUCTION FUEL PIPING PLAN - FIRST FLOOR LEVEL N
KEYED NOTES
1 FUEL OIL PIPING TO BE DOUBLE-WALLED TYPE
Revision: Date:
REV 0 - BID DOCUMENTS 2026-04-20
D
C
1"ø CA
3" ø
CA
8621 SF
EAST BOILER ROOM
3" ø
CA
NEW STEAM BOILER
112-105-BLR-005
EXISTING B-4
STEAM BOILER
RISE OR DROP IN PIPE
PIPE UP
PIPE DOWN
POINT OF CONNECTION BETWEEN NEW
AND EXISTING WORK
CA COMPRESSED AIR
ABBREVIATIONS
PIPING SYMBOLS
PIPE HANGER
Room name
XXX SF
ROOM NAME, NUMBER, AND AREA
GENERAL SYMBOLS:
23 MECHANIC STREET, SPRINGVILLE, NY 14141
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD "Unauthorized alteration or addition to any plans, specifications or reports bearing a Licensed Professional Engineer's seal is a violation of Section 7209, subdivision 2, of the New York State Education Law".CONSULTANT
321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6"
6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t
BID DOCUMENTS REPLACE BOILERS 4 & 5
5000 W. NATIONAL AVE
MILWAUKEE, WI 53295
695-24-107
2026-04-20
CERTIFICATION OF AUTHORIZATION NUMBER: 0023683
MP108
MECH BID DEDUCT COMPRESSED
AIR PIPING PLAN - FIRST FLOOR 112
DJU KRL
NOT SPRINKLERED
N
KEYPLAN
20' - 0"20' - 0"20' - 0"
0"
0"
0"
0"
4321E ED DCBAUPUP
AREA OF WORK
1. SEE M-001 FOR M-SERIES NOTES AND LEGENDS.
GENERAL NOTES
SCALE: 3/8" = 1'-0"1 MECHANICAL BID DEDUCTION COMPRESED AIR PIPING PLAN - FIRST FLOOR LEVEL N
KEYED NOTES
1 CONNECT EXISTING SHOP GENERAL COMPRESSED ARI TO BURNER FOR FUEL
ATOMIZATION DURING COLD START AND TIE EXISTING LOW ATOMIZATION MEDIA
PRESSURE SWITCH (LAMPS) FOR SAFETY BOILER SHUTDWON ON LOW AIR PRESSURE
Revision: Date:
REV 0 - BID DOCUMENTS 2026-04-20
D
C
B
M
112-105-FLO-003 1
EAST BOILER ROOM
6" HPS
AREA OF WORK
RISE OR DROP IN PIPE
PIPE UP
PIPE DOWN
POINT OF CONNECTION BETWEEN NEW
AND EXISTING WORK
PIPING SYMBOLS
Room name
XXX SF
ROOM NAME, NUMBER, AND AREA
GENERAL SYMBOLS:
FLOW METERM
HPS HIGH PRESSURE STEAM SUPPLY
ABBREVIATIONS
23 MECHANIC STREET, SPRINGVILLE, NY 14141
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD "Unauthorized alteration or addition to any plans, specifications or reports bearing a Licensed Professional Engineer's seal is a violation of Section 7209, subdivision 2, of the New York State Education Law".CONSULTANT
321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6"
6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t
BID DOCUMENTS REPLACE BOILERS 4 & 5
5000 W. NATIONAL AVE
MILWAUKEE, WI 53295
695-24-107
2026-04-20
CERTIFICATION OF AUTHORIZATION NUMBER: 0023683
MP110
MECHANICAL STEAM PIPING PLAN -
SPS FLOW METER 112
DJU CCW
NOT SPRINKLERED
SCALE: 1/4" = 1'-0"1 MECHANICAL STEAM PIPING PLAN - SPS FLOW METER
KEYED NOTES
1 INSTALL FLOW METER ON EXISTING OVERHEAD, 6" SPS LINE AND PROVIDE MINIMUM
STRAIGHT RUN PIPING OF 10D UPSTREAM AND 5D DOWNSTREAM OF STEAM FLOW
METER, OR GREATER IF REQUIRED BY MANUFACTURER
1. SEE M-001 FOR M-SERIES NOTES AND LEGENDS.
GENERAL NOTES
N
KEYPLAN
20' - 0"20' - 0"20' - 0"
0"
0"
0"
0"
4321E ED DCBAUPUP
Revision: Date:
REV 0 - BID DOCUMENTS 2026-04-20
NEW HPR
EXISTING HPR HEADER
CONNECT TO TOP OF HPR HEADER
TT
PT
PRESSURE
TRANSMITTER
TEMPERATURE
TRANSMITTER
TO METERING SYSTEM
BUILDING INCOMING
MAIN STEAM
NOTE:
MAINTAIN UPSTREAM AND DOWN STREAM DISTANCES RECOMMENDED BY
METER MANUFACTURERS
FLOW METER
INTERFACE WITH
BACNET SYSTEM
DIFFERENTIAL PRESSURE
(DP) CELL STEAM FLOW
MEASUREMENT
SHUTOFF VALVE
1" BY-PASS GATE VALVE (TYP)
PRESSURE GAUGE WITH
GATE VALVE (TYP)
1" BY-PASS GLOBE VALVE (TYP AT
ALL GATE VALVES 6" OR LARGER)
3000 LBS STEEL HALF COUPLING
OR SOCKET WELDED (TYP)
SEE PLANS FOR PIPE SIZES
BUTT WELD (TYP)
GATE VALVE
D
SW
BW
S
BW
S
ELEVATION
FD
3/4" COOLING WATER
1/4" SAMPLE
OUTLET
3/4"
ANTI-SIPHON
VACUUM BREAKER
SAMPLE COOLER
PROVIDE SEPARATE COOLERS FOR BWS AND FWS.
MOUNT BWS COOLER 4' ABOVE FINISHED FLOOR ON
WALL OR COLUMN.
1/2" FROM
EACH BOILER
1/2"
SW
0-83°C
1-5/8" GALVANIZED STRUT
TUBING, TYP
TUBING CLAMP
PERFORATED TUBE TRAY
HANGER ROD
1" GATE VALVE
SCHEDULE 80
STEEL PIPE
INVERTED BUCKET TRAP,
SEE PLANS AND SCHEDULES
DIELECTRIC FITTING WHERE
RETURN IS COPPER PIPESEE DRAWINGS FOR PIPE SIZES
SCHEDULE 80 STEEL PIPE
TO RETURN MAIN
PIPE SIZE SHALL BE
SAME SIZE AS TRAP
BYPASS-INSTALL IN HORIZONTAL
PLANE LEVEL WITH TRAP OR IN
VERTICAL PLANE AND BELOW TRAP
DRIP LEG OR EQUIPMENT
CONNECTION. MAKE THE SAME SIZE
AS THE SUPPLY MAIN OR EQUIPMENT
CONNECTION. SEE NOTE 1
6" M
IN
" M
IN
FLOW
NOTE:
1. ALLDRIP POINTS ON STEAM MAINS SHALL BE PROVIDED WITH A 12"
MINIMUM HIGH DRIP LEG FROM BOTTOM OF STEAM MAIN TO TRAP INLET.
DRIP LEG SHALL HAVE 6" SCALE POCKET BELOW TRAP INLET.
2. PROVIDE BYPASS PIPING.
CAP (TYP)
DRIP RETURN
3/8" TEST
CONNECTION
PIPE TO STEAM
TRAP (TYP)
STEAMLINE (TYP)
DRIP LEG (TYP)
3/4" DRAIN
(ALTERNATE
LOCATIONS), TYP
3/4" MIN
FROM DRIP
CONNECTION
2"
2"
STEAM TRAP ASSEMBLY
STEAM LINE DRIP POCKET
8"x8"x3/8" STEEL PLATE
WELD PLATE TO PIPE
SECURE TO SLAB WITH (4) 1/2" DIA
EXPANSION BOLTS
CONCRETE SLAB
WELD PIPE TO PLATE
4" SCH 40 PIPE
3/8" STEEL PLATE, SIZE TO
MATCH PIPE SUPPORT
NOTES:
1. PROVIDE ANCHORS
ONLY WHERE
SHOWN ON
DRAWINGS.
2. EXTEND SLEEVE
ABOVE FLOOR
WHERE
SPECIFIED.
ELEVATION
PLAN
RISER
FLOOR SLAB
INSULATION
BOLT (TYP)
RISER CLAMP (BOTTOM
CLAMP REQUIRED AT
ANCHOR POINTS ONLY)
PIPE SLEEVE
WHERE SPECIFIED
RISER CLAMP
FIRE-STOPPING MATERIAL
BOLT
RISER CLAMP
PIPE SLEEVE
WHERE SPECIFIED
PIPE
/1 MK202 /1 MK202
/1 MK206
HPR HIGH PRESSURE STEAM RETURN
ABBREVIATIONS
TYP TYPICAL
MAX MAXIMUM
MIN MINIMUM
DIA DIAMETER
23 MECHANIC STREET, SPRINGVILLE, NY 14141
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD "Unauthorized alteration or addition to any plans, specifications or reports bearing a Licensed Professional Engineer's seal is a violation of Section 7209, subdivision 2, of the New York State Education Law".CONSULTANT
321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6"
6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t
BID DOCUMENTS REPLACE BOILERS 4 & 5
5000 W. NATIONAL AVE
MILWAUKEE, WI 53295
695-24-107
2026-04-20
CERTIFICATION OF AUTHORIZATION NUMBER: 0023683
MP501
MECHANICAL PIPING DETAILS
DJU ADL
NOT SPRINKLERED
NTS1 TYPICAL CONDENSATE HEADER CONNECTIONS
NTS2 STEAM METER
NTS3 GATE VALVE BYPASS
NTS4 WATER SAMPLE COOLERS DETAILS
NTS5 TUBING SUPPORTS DETAIL
NTS6 INVERTED BUCKET STEAM TRAP ASSEMBLY
NTS7 STEAMLINE DRIP POCKET AND STEAM TRAP ASSEMBLY
NTS8 PIPE SUPPORT STAND
NTS9 SUPPORT ANCHOR FOR RISERS
1. SEE M-001 FOR M-SERIES NOTES AND LEGENDS.
GENERAL NOTES
Revision: Date:
REV 0 - BID DOCUMENTS 2026-04-20
SIDE VIEW TRAPEZE HANGER FOR UP TO
1000 LB UNIFORM LOAD
ADJUSTABLE CLEVIS HANGER
TYPE 1 - SEE SPECIFICATIONS
ADJUSTABLE CLEVIS HANGER
TYPE 43 - SEE SPECIFICATIONS
WELD
SADDLE
1/2" DIA HANGER RODS
WITH 36" MAX SPACING
ON EACH CHANNEL
1 5/8" 12 GAUGE CHANNEL
OR 2"x2"x1/4" ANGLE
PROVIDE INSULATION SHIELD
& INSERT FOR ALL PIPING
(8" MIN)
INSULATION SHIELD
AT HANGER
PROVIDE HIGH COMPRESSIVE
STRENGTH INSULATION (9
PSF MIN DENSITY) UNDER
INSULATION SHIELD
INSULATION (VAPOR
BARRIER TYPE IS
REQUIRED FOR LOW
TEMPERATURE PIPE)
HANGER ROD
BAND
FRAMING MEMBER
OPTION A OPTION B
BEAM CLAMP
1-5/8" GALVANIZED STRUT
MAXIMUM PIPE/TUBING SUPPORT SPACING
NOM
SIZE IN
THRU
3/4 1 1 1/4
1/2 2 2 1/2 3 4 5 6 8 10 12 14 16 18 20 24
PIPE FT 7 7 7 9 10 11 12 14 16 17 19 22 23 25 27 28 30 32
TUBING
FT 5 FT 6 7 8 8 9 10 12 13 14 16 - - - - - - -
NOTE: FOR TRAPEZE HANGER TAKE SPACING OF SMALLEST SIZE ON TRAPEZE
NOTES:
SEE SPECIFER FOR DETAILED
HANGER REQUIREMENTS 1" MA
X
NOTE:
WHERE USED FOR COPPER TUBE OR PIPE, BRAZE TO FABRICATED STEEL ANCHOR
PIPE ANCHOR SCHEDULE
D P C N S BOLT PATTERN
mm in mm in mm in mm in mm in
13 1/2"
102 4
19 3/4
21/2
11/2
5/8
1/2
3/8 3/8
3/8
1/2
3/8 3/8 1/4
3/4 5/8
5/8
5/8
INSULATE PIPE ONLY FOR STEAM, CONDENSATE
AND HEATING WATER.
STL PIPE OR
COPPER TUBE
NOTE A
ANCHOR BOLTS
N=NUMBER
S=SIZE
DRILL ∅ = S+1/16"
D+3 3/4"
D+1 1/2"
D+1"
D=PIPE OD
D+ P
D+4 3/4"
D+2 1/2"
C5/16"
PIPE ANCHOR SCHEDULE
D L P T E N S BOLT PATTERN
mm
NOTES:
A. INSTALL WALL PLATE FIRST THEN WELD ON
REMAINING ASSEMBLY. ONE WALL PLATE
FOR BOTH CHILLED WATER S.&R. IS
OPTIONAL.
in mm in mm in mm in mm in mm in mm in
7/8
7/8
7/8
7/8
7/8
7/8
6 1/4
6 1/4
6 1/4
6 1/4
13 1/2
13 1/2
13 1/2
13 1/2
13 1/2
13 1/2
13 1/2
13 1/2
13 5/8
10 3/8
25 1
19 3/4
19 3/4
19 3/4
19 3/4
19 3/4
19 3/4
508 20
216 81/2
D+8"
D+4"
P
NOTE A L+8"
L+4"
T
D=PIPE OD
E
T
L+3" L
ANCHOR BOLTS
N=NUMBER S=SIZE
DRILL ∅ = S+1/8"
INSULATE PIPE ONLY FOR STEAM, CONDENSATE & HEATING
WATER.
SAFETY VALVE
OPEN DRAIN (NOTE 3)
CONNECTION TO
PRESSURE VESSEL
OR PIPE
PROVIDE UNION UNLESS
SAFETY VALVE HAS
FLANGED OUTLET
VENT PIPE THROUGH
ROOF SUPPORT AS
INDICATED ON DWGS
(NOTES 1, 2)
PIPE THREADED
INTO ELBOW (SAME
SIZE AS ELBOW)
DRIP PAN ELBOW
(SECTIONAL VIEW)
FLEXIBLE CONNECTOR
3/4" DRAIN TO FLOOR
DRAIN OR OPEN SIGHT
DRAIN (NOTE 4)
1" M
IN
24" MAX
3"
D
ELEVATION
TYPICAL WATER PIPING
REDUCER, IF REQUIRED
3/4" BALL VALVE
ADAPTER TO 3/4"
HOSE
THREAD-PROVIDE
HOSE CAP NUT
1/4" COPPER
TUBING
1/2" x 4"
NIPPLE
AIR VENT
1/2" BALL
VALVE
CIRCULATING WATER PIPING
TYPICAL MANUAL AIR VENT
TYPICAL HOT WATER
PIPING DRAIN VALVE
CONNECTIONS
ELEVATION
THREADED
PIPING
ELEVATION
WELDED
PIPING
NOTES:
1. DRAIN ALL LOW POINTS AS INDICATED ABOVE.
2. WHERE SCALE POCKETS ARE SHOWN ON PIPE RISER DIAGRAMS
AND/OR PLANS LOCATE DRAIN AT BOTTOM OF SCALE
POCKET.
ELEVATION
NOTES:
1. VENT ALL HIGH POINTS INDICATED ABOVE.
2. IF AUTOMATIC AIR VENTS ARE USED, PIPE DISCHARGE TO DRAIN.
MV
OR
AV SADDLE
WELD
1.
2.
3.
4.
5.
NOTES:
UNLESS OTHERWISE SHOWN ON THE DRAWINGS, SIZE THE VENT PIPE SO THAT STEAM IS NOT
BLOWN OUT AT THE VENT PIPE ENTRANCE. UTILIZE THE CALCULATION METHOD CONTAINED IN
ANSI B31.1. POWER PIPING CODE, APPENDIX II. THE VENT PIPE SHOULD GO VERTICAL THRU
THE ROOF WITH NO TURNS OR ANGLES. WHERE REQUIRED THERE SHALL BE NO MORE THEN A
TOTAL OR 180 DEGREES IN DIRECTIONAL CHANGES MADE WITH 45 DEG. ELBOWS.
VENT PIPE SHALL TERMINATE 6' MIN. ABOVE FINISHED ROOF.
DISCHARGE OF DRAIN SHALL BE DIRECTED AWAY FROM PLATFORMS OR OTHER AREAS
WHERE PERSONNEL MAY OCCUPY.
DO NOT CONNECT ANY OTHER DRAIN TO THE DRIP PAN ELBOW DRAIN PIPE.
SEE SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.
/2 MK202
/2 MK206
/1 MK202
/1 MK206
6" SCH 40 PIPE
BASE PLATE
3/8" THICK REINFORCEMENT
PLATE
10" HEADER PIPE
/1 MK202
/1 MK206
DEG DEGREE
ABBREVIATIONS
TYP TYPICAL
MAX MAXIMUM
MIN MINIMUM
DIA DIAMETER
OD OUTER DIAMETER
23 MECHANIC STREET, SPRINGVILLE, NY 14141
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD "Unauthorized alteration or addition to any plans, specifications or reports bearing a Licensed Professional Engineer's seal is a violation of Section 7209, subdivision 2, of the New York State Education Law".CONSULTANT
321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6"
6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t
BID DOCUMENTS REPLACE BOILERS 4 & 5
5000 W. NATIONAL AVE
MILWAUKEE, WI 53295
695-24-107
2026-04-20
CERTIFICATION OF AUTHORIZATION NUMBER: 0023683
MP502
MECHANICAL PIPING DETAILS
DJU ADL
NOT SPRINKLERED
NTS1 PIPE HANGERS
NTS2 SMALL PIPE ANCHORS
NTS3 LARGE PIPE ANCHORS
NTS4 STEAM SAFETY VALVE
NTS5 DRAIN VALVE AND AIR VENT CONNECTIONS
NTS6 PIPE ROLLER SUPPORT
SCALE: 1 1/2" = 1'-0"7 10" PIPE ANCHOR SIDE VIEW
1. SEE M-001 FOR M-SERIES NOTES AND LEGENDS.
GENERAL NOTES
Revision: Date:
REV 0 - BID DOCUMENTS 2026-04-20
8"ø HPS
8"ø HPS
1"ø HPR
3 1/2"ø V
3 1/2"ø V
3/4"ø FOS 3/4"ø FOR
1/2"ø CF 1/2"ø CF
1/2"ø CF
2 1/2"ø FW
1"ø HPR
1"ø CWS
1"ø BBD
1"ø CA
1/2"ø CF 1/2"ø CF 1/2"ø CF
3/4"ø FOS 3/4"ø FOR
1"ø HPR
1"ø CWS
1"ø HPR
3 1/2"ø V 3 1/2"ø V
8"ø HPS 8"ø HPS
3"ø BBD 2 1/2"ø FW
1 1/2"ø CBD
NEW BOILER 5 SHOWN AS
TRANSPARENT FOR CLARITY
23 MECHANIC STREET, SPRINGVILLE, NY 14141
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD "Unauthorized alteration or addition to any plans, specifications or reports bearing a Licensed Professional Engineer's seal is a violation of Section 7209, subdivision 2, of the New York State Education Law".CONSULTANT
321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6"
6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t
BID DOCUMENTS REPLACE BOILERS 4 & 5
5000 W. NATIONAL AVE
MILWAUKEE, WI 53295
695-24-107
2026-04-20
CERTIFICATION OF AUTHORIZATION NUMBER: 0023683
MP901
MECHANICAL PIPING ISOMETRICS
DJU ADL
NOT SPRINKLERED
1. SEE M-001 FOR M-SERIES NOTES AND LEGENDS
GENERAL NOTES
N
KEYPLAN
20' - 0"20' - 0"20' - 0"
0"
0"
0"
0"
4321E ED DCBAUPUP
AREA OF WORK
NTS1 BOILER ROOM ISO 1
NTS2 BOILER ROOM ISO 2
Revision: Date:
REV 0 - BID DOCUMENTS 2026-04-20
1"ø CWS
3/4"ø FOS 3/4"ø FOR
1/2"ø CF 3"ø BBD 1/2"ø CF
2 1/2"ø FW
1"ø LPG
1"ø HPR
1"ø CA
2 1/2"ø FW
3"ø HPS 8"ø HPS
8"ø HPS 1"ø HPR
3 1/2"ø V 3 1/2"ø V
EXISTING BOILER 4 SHOWN AS
TRANSPARENT FOR CLARITY
6"ø HPS
3/4"ø FOS 3/4"ø FOR
1"ø LPG 1"ø HPR
1"ø CA
1/2"ø CF
1/2"ø CF 1/2"ø CF
2 1/2"ø FW
1"ø HPR
3"ø HPS 8"ø HPS
3 1/2"ø V 3 1/2"ø V
3/4"ø CWS
1 1/2"ø CBD 3"ø BBD
2 1/2"ø FW
1"ø HPR 2 1/2"ø FW
NEW BOILER 5 SHOWN AS
TRANSPARENT FOR CLARITY
23 MECHANIC STREET, SPRINGVILLE, NY 14141
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD "Unauthorized alteration or addition to any plans, specifications or reports bearing a Licensed Professional Engineer's seal is a violation of Section 7209, subdivision 2, of the New York State Education Law".CONSULTANT
321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6"
6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t
BID DOCUMENTS REPLACE BOILERS 4 & 5
5000 W. NATIONAL AVE
MILWAUKEE, WI 53295
695-24-107
2026-04-20
CERTIFICATION OF AUTHORIZATION NUMBER: 0023683
MP905
MECHANICAL BID DEDUCT PIPING
ISOMETRICS 112
DJU ADL
NOT SPRINKLERED
1. SEE M-001 FOR M-SERIES NOTES AND LEGENDS
GENERAL NOTES
N
KEYPLAN
20' - 0"20' - 0"20' - 0"
0"
0"
0"
0"
4321E ED DCBAUPUP
AREA OF WORK
NTS1 BOILER ROOM BID DEDUCT ISO 1
NTS2 BOILER ROOM BID DEDUCT ISO 2
Revision: Date:
REV 0 - BID DOCUMENTS 2026-04-20
D
C
NEW B-5 STEAM BOILER
112-105-BLR-005
MK201
MK2022
MK202
5'
- 8
3/ 4"
26' - 7 7/8"
25' - 4 3/4"
5' - 6"
EXISTING ROOF OPENING
NEW FIRETUBE BOILER BASE
NEW FIRETUBE BOILER
EXHAUST STACK
5'
- 1
0 1 /4"
9 1 /2"
ECONOMIZER
112-105-ECO-001
8621 SF
EAST BOILER ROOM
CONTROL PANEL LOCATION
AND CLEARANCE AREA
NEW BOILER CLEARANCE
FRONT DOOR SWING
CLEARANCE
REAR DOOR SWING
CLEARANCE
REAR TUBE REMOVAL
CLEARANCE
VALVE ASSEMBLY
CLEARANCE
STEAM HEADER
ABBREVIATIONS
Room name
XXX SF
ROOM NAME, NUMBER, AND AREA
GENERAL SYMBOLS:
SF SQUARE FOOT
23 MECHANIC STREET, SPRINGVILLE, NY 14141
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD "Unauthorized alteration or addition to any plans, specifications or reports bearing a Licensed Professional Engineer's seal is a violation of Section 7209, subdivision 2, of the New York State Education Law".CONSULTANT
321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6"
6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t
BID DOCUMENTS REPLACE BOILERS 4 & 5
5000 W. NATIONAL AVE
MILWAUKEE, WI 53295
695-24-107
2026-04-20
CERTIFICATION OF AUTHORIZATION NUMBER: 0023683
MK101
MECHANICAL EQUIPMENT PLAN -
FIRST FLOOR LEVEL 112
DJU CCW
NOT SPRINKLERED
SCALE: 3/8" = 1'-0"1 MECHANICAL EQUIPMENT PLAN - FIRST FLOOR LEVEL
N
2. BOILER DIMENSIONS MAY VARY BASED ON MANUFACTURER. CONTRACTOR TO ENSURE
SELECTED BOILER FITS IN THE SPACE AND CONFIGURATION SHOWN ON THE DRAWING
1. SEE M-001 FOR M-SERIES NOTES AND LEGENDS.
GENERAL NOTES
N
KEYPLAN
20' - 0"20' - 0"20' - 0"
0"
0"
0"
0"
4321E ED DCBAUPUP
AREA OF WORK
KEYED NOTES
1 PROVIDE BOILER SAFETY VALVE DRIP PAN ELBOW AT BOILER, ROUTE FULL SIZE
DISCHARGE RISER TO ROOF AND TERMINATE WITH GOOSENECK ABOVE ROOF
2 BOILER SHALL BE SELECTED AND INSTALLED TO ALLOW FULL MAINTENANCE ACCESS
FOR TUBE REMOVAL FROM THE REAR OF THE VESSEL. COORDINATE BOILER
ORIENTATION, CLEARANCES, AND SURROUNDING EQUIPMENT LAYOUT TO
ACCOMMODATE TUBE PULLING WITHOUT OBSTRUCTION
Revision: Date:
REV 0 - BID DOCUMENTS 2026-04-20
D
C
NEW B-5 STEAM
BOILER
112-105-BLR-005
EXISTING B-4 STEAM
BOILER
STEAM HEADER
MK205
NEW FIRETUBE BOILER BASE
NEW FIRETUBE BOILER
EXHAUST STACK
ECONOMIZER
112-105-ECO-001
5' - 6"25' - 4 3/4"
26' - 8 1/8"
MK2062
MK206
EXISTING ROOF OPENING
CONTROL PANEL LOCATION
AND CLEARANCE AREA
FRONT DOOR SWING
CLEARANCE
REAR DOOR SWING
CLEARANCE
REAR TUBE REMOVAL
CLEARANCE
VALVE ASSEMBLY
CLEARANCE
NEW BOILER CLEARANCE
8621 SF
EAST BOILER ROOM
ABBREVIATIONS
Room name
XXX SF
ROOM NAME, NUMBER, AND AREA
GENERAL SYMBOLS:
SF SQUARE FOOT
23 MECHANIC STREET, SPRINGVILLE, NY 14141
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD "Unauthorized alteration or addition to any plans, specifications or reports bearing a Licensed Professional Engineer's seal is a violation of Section 7209, subdivision 2, of the New York State Education Law".CONSULTANT
321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6"
6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t
BID DOCUMENTS REPLACE BOILERS 4 & 5
5000 W. NATIONAL AVE
MILWAUKEE, WI 53295
695-24-107
2026-04-20
CERTIFICATION OF AUTHORIZATION NUMBER: 0023683
MK105
MECHANICAL BID DEDUCT
EQUIPMENT PLAN - FIRST FLOOR 112
DJU CCW
NOT SPRINKLERED
SCALE: 3/8" = 1'-0"1 MECHANICAL BID DEDUCTION EQUIPMENT PLAN - FIRST FLOOR LEVEL
N
2. BOILER DIMENSIONS MAY VARY BASED ON MANUFACTURER. CONTRACTOR TO ENSURE
SELECTED BOILER FITS IN THE SPACE AND CONFIGURATION SHOWN ON THE DRAWING
1. SEE M-001 FOR M-SERIES NOTES AND LEGENDS.
GENERAL NOTES
N
KEYPLAN
20' - 0"20' - 0"20' - 0"
0"
0"
0"
0"
4321E ED DCBAUPUP
AREA OF WORK
KEYED NOTES
1 PROVIDE BOILER SAFETY VALVE DRIP PAN ELBOW AT BOILER, ROUTE FULL SIZE
DISCHARGE RISER TO ROOF AND TERMINATE WITH GOOSENECK ABOVE ROOF
2 BOILER SHALL BE SELECTED AND INSTALLED TO ALLOW FULL MAINTENANCE ACCESS
FOR TUBE REMOVAL FROM THE REAR OF THE VESSEL. COORDINATE BOILER
ORIENTATION, CLEARANCES, AND SURROUNDING EQUIPMENT LAYOUT TO
ACCOMMODATE TUBE PULLING WITHOUT OBSTRUCTION
Revision: Date:
REV 0 - BID DOCUMENTS 2026-04-20
D
C
MIDDLE ROOF AREA
NEW BOILER 5 STACK
RELIEF VENT
EXISTING ROOF OPENINGEXISTING ROOF OPENING
23 MECHANIC STREET, SPRINGVILLE, NY 14141
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD "Unauthorized alteration or addition to any plans, specifications or reports bearing a Licensed Professional Engineer's seal is a violation of Section 7209, subdivision 2, of the New York State Education Law".CONSULTANT
321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6"
6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t
BID DOCUMENTS REPLACE BOILERS 4 & 5
5000 W. NATIONAL AVE
MILWAUKEE, WI 53295
695-24-107
2026-04-20
CERTIFICATION OF AUTHORIZATION NUMBER: 0023683
MK121
MECHANICAL EQUIPMENT PLAN -
ROOF LEVEL 112
DJU CCW
NOT SPRINKLERED
N
SCALE: 3/8" = 1'-0"1 MECHANICAL EQUIPMENT PLAN - ROOF LEVEL
1. SEE M-001 FOR M-SERIES NOTES AND LEGENDS.
GENERAL NOTES
N
KEYPLAN
20' - 0"20' - 0"20' - 0"
0"
0"
0"
0"
4321E ED DCBAUPUP
AREA OF WORK
Revision: Date:
REV 0 - BID DOCUMENTS 2026-04-20
FIRST FLOOR LEVEL
71' - 0"
LOWER ROOF LEVEL
83' - 0"
MID ROOF LEVEL
94' - 9"
/1 MK101
CONTROL
PANEL
EXISTING REVERSE
OSMOSIS STORAGE
NEW STEAM BOILER
112-105-BLR-005
BOILER EXHAUST STACK
IN-LINE BOILER ECONOMIZER
112-105-ECO-001
NEW STEAM HEADER
TRP-44031 TRP-44032
23 MECHANIC STREET, SPRINGVILLE, NY 14141
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD "Unauthorized alteration or addition to any plans, specifications or reports bearing a Licensed Professional Engineer's seal is a violation of Section 7209, subdivision 2, of the New York State Education Law".CONSULTANT
321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6"
6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t
BID DOCUMENTS REPLACE BOILERS 4 & 5
5000 W. NATIONAL AVE
MILWAUKEE, WI 53295
695-24-107
2026-04-20
CERTIFICATION OF AUTHORIZATION NUMBER: 0023683
MK201
MECHANICAL EQUIPMENT
ELEVATIONS 112
DJU ADL
NOT SPRINKLERED
SCALE: 3/8" = 1'-0"1 MECHANICAL EQUIPMENT ELEVATION LOOKING NORTH
1. SEE M-001 FOR M-SERIES NOTES AND LEGENDS.
GENERAL NOTES
Revision: Date:
REV 0 - BID DOCUMENTS 2026-04-20
MID ROOF LEVEL
94' - 9"
ED
/1 MK101
CONTROL
PANEL
NEW STEAM BOILER
112-105-BLR-005 STEAM HEADER
BOILER 5 ECONOMIZER
112-105-ECO-001
24" DIA STACK
0"
SAFETY VALVE
V-42002
SAFETY VALVE
V-42001
MP502
MP501
10" DIAMETER STEAM HEADER
NEW STEAM
BOILER 5 HPS
HPS TO MAIN HEADER
DRIP LEG
TYP
UNUSED HPS LINES FOR
FUTURE USE
STEAM
HEADER HPR
1" DIA HPR
INVERTED BUCKET STEAM TRAP ASSEMBLY
TYP (2) PLACES
TRP-44031 TRP-44032
MP501
PIPE SUPPORT STAND
SEE /7 MP502
TYP TYPICAL
ABBREVIATIONS
HPS HIGH PRESSURE STEAM SUPPLY
ROLLER SUPPORT STAND
TYP (2) PLACES
/8 MP501SEE ROLLER SUPPORT STAND
TYP (2) PLACES SEE /8 MP501
/1 MK101
ROLLER,
TYP (2) PLACES
/6 MP502SEE
23 MECHANIC STREET, SPRINGVILLE, NY 14141
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD "Unauthorized alteration or addition to any plans, specifications or reports bearing a Licensed Professional Engineer's seal is a violation of Section 7209, subdivision 2, of the New York State Education Law".CONSULTANT
321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6"
6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t
BID DOCUMENTS REPLACE BOILERS 4 & 5
5000 W. NATIONAL AVE
MILWAUKEE, WI 53295
695-24-107
2026-04-20
CERTIFICATION OF AUTHORIZATION NUMBER: 0023683
MK202
MECHANICAL EQUIPMENT
ELEVATIONS 112
DJU ADL
NOT SPRINKLERED
SCALE: 3/8" = 1'-0"2 EQUIPMENT ELEVATION LOOKING WEST
SCALE: 1 1/2" = 1'-0"1 NEW STEAM HEADER
1. SEE M-001 FOR M-SERIES NOTES AND LEGENDS.
GENERAL NOTES
Revision: Date:
REV 0 - BID DOCUMENTS 2026-04-20
LOWER ROOF LEVEL
83' - 0"
MID ROOF LEVEL
94' - 9"
/1 MK105
EXISTING ECONOMIZER
CONTROL
PANEL
EXISTING REVERSE
OSMOSIS STORAGE
NEW STEAM BOILER
112-105-BLR-005
EXISTING B-4
STEAM BOILER
CONTROL
PANEL
BOILER EXHAUST STACK
IN-LINE BOILER ECONOMIZER
112-105-ECO-001
NEW STEAM HEADER
1" DIA HPR
TRP-44032
23 MECHANIC STREET, SPRINGVILLE, NY 14141
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD "Unauthorized alteration or addition to any plans, specifications or reports bearing a Licensed Professional Engineer's seal is a violation of Section 7209, subdivision 2, of the New York State Education Law".CONSULTANT
321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6"
6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t
BID DOCUMENTS REPLACE BOILERS 4 & 5
5000 W. NATIONAL AVE
MILWAUKEE, WI 53295
695-24-107
2026-04-20
CERTIFICATION OF AUTHORIZATION NUMBER: 0023683
MK205
MECHANICAL BID DEDUCT
EQUIPMENT ELEVATIONS 112
DJU ADL
NOT SPRINKLERED
SCALE: 3/8" = 1'-0"1 MECHANICAL EQUIPMENT BID DEDUCTION ELEVATION LOOKING NORTH
1. SEE M-001 FOR M-SERIES NOTES AND LEGENDS.
GENERAL NOTES
Revision: Date:
REV 0 - BID DOCUMENTS 2026-04-20
MID ROOF LEVEL
94' - 9"
E
D
CONTROL
PANEL
/1 MK105
STEAM HEADER
BOILER 5 ECONOMIZER
112-105-EOC-001
24" DIA STACK
EXISTING BOILER 4 ECONOMIZER
NEW STEAM BOILER
112-105-BLR-005
SAFETY VALVE
V-42002
SAFETY VALVE
V-42001
MP502
MP501
10" DIAMETER STEAM
HEADER
NEW STEAM
BOILER 5 HPS
HPS TO MAIN HEADER
DRIP LEG
TYP
EXISTING BOILER
4 HPS
EXISTING BOILER 4
ATOMIZED STEAM
STEAM
HEADER HPR
1" DIA HPR
INVERTED BUCKET STEAM TRAP ASSEMBLY
TYP (2) PLACES
TRP-44031 TRP-44032
MP501
ROLLER SUPPORT STAND
TYP (2) PLACES
/8 MP501SEE ROLLER SUPPORT STAND
TYP (2) PLACES SEE /8 MP501
/1 MK105
ROLLER,
TYP (2) PLACES
/6 MP502SEE
PIPE SUPPORT STAND, TYP
SEE /7 MP502
TYP TYPICAL
ABBREVIATIONS
HPS HIGH PRESSURE STEAM SUPPLY
23 MECHANIC STREET, SPRINGVILLE, NY 14141
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD "Unauthorized alteration or addition to any plans, specifications or reports bearing a Licensed Professional Engineer's seal is a violation of Section 7209, subdivision 2, of the New York State Education Law".CONSULTANT
321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6"
6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t
BID DOCUMENTS REPLACE BOILERS 4 & 5
5000 W. NATIONAL AVE
MILWAUKEE, WI 53295
695-24-107
2026-04-20
CERTIFICATION OF AUTHORIZATION NUMBER: 0023683
MK206
MECHANICAL BID DEDUCT
EQUIPMENT ELEVATIONS 112
DJU ADL
NOT SPRINKLERED
SCALE: 3/8" = 1'-0"2 EQUIPMENT ELEVATION LOOKING WEST
SCALE: 1 1/2" = 1'-0"1 NEW STEAM HEADER
1. SEE M-001 FOR M-SERIES NOTES AND LEGENDS.
GENERAL NOTES
Revision: Date:
REV 0 - BID DOCUMENTS 2026-04-20
G
M
SPD
250kA
NC
N E
S
P
X
T
PB
VFD
GFCI
WP
J
CORRIDOR
C2
SWITCH, SINGLE BREAK
MOLDED CASE CIRCUIT BREAKER
GENERATOR, POWER
PANELBOARD CABINET, SURFACE MOUNTED
RECEPTACLE, DUPLEX
RECEPTACLE, DUPLEX ON EMERGENCY POWER
RECEPTACLE, DUPLEX WITH GROUND FAULT
CIRCUIT INTERRUPTER
RECEPTACLE, QUADRAPLEX
RECEPTACLE, SINGLE
ELECTRICAL SYMBOLS:
TRANSFORMER
WYE CONNECTION
GROUND
TRANSFORMER, PLAN
BRANCH CIRCUIT HOMERUN. LINES INDICATE
NUMBER OF CIRCUITS, NEUTRAL, AND SWITCH
LEG CONDUCTORS. ONE SEPARATE GREEN
GROUNDING CONDUCTOR SHALL BE PROVIDED
FOR EACH HOMERUN; NOT SHOWN
PULL BOX/JUNCTION BOX
DISCONNECT SWITCH, FUSED
DISCONNECT SWITCH, UNFUSED
STARTER, COMBINATION WITH DISCONNECT SWITCH
STARTER OR MOTOR CONTROLLER
CONDUIT TERMINATED 6" [152mm] AFF
IN STANDARD BOX FOR EXTENSION TO
EQUIPMENT AS DIRECTED.
CONDUIT TERMINATED W/COUPLING
(FLUSH W/FINISHED FLOOR) FOR
EXTENSION TO EQUIPMENT AS DIRECTED.
VARIABLE FREQUENCY DRIVE
SWITCH (# SUBSCRIPT AS INDICATED BELOW):
BLANK = SINGLE POLE 2 = DOUBLE POLE
3 = THREE-WAY 4 = FOUR-WAY
D = DIMMER DS = DOOR SWITCH
F = FUSED K = KEY OPERATED
LV = LOW VOLTAGE LM = LOW VOLTAGE MASTER
M = MOTOR SNAP MP = MOTOR SNAP WITH PILOT
LIGHT MO= OCCUPANCY SENSOR P = WITH PILOT LIGHT
PB= PUSH BUTTON STATION RC= REMOTE CONTROL
T = TIMER OPERATED WP= WEATHER PROOF
X = EXPLOSION PROOF
LIGHTING SYMBOLS:
LIGHT FIXTURE, CEILING MOUNTED
A = FIXTURE ID
B = PANEL & CIRCUIT NUMBER
EXIT SIGN, WALL MOUNTED WITH DIRECTIONAL ARROWS AND FACES AS SHOWN
EXIT SIGN, CEILING MOUNTED WITH DIRECTIONAL ARROWS AND FACES AS SHOWN
CURRENT TRANSFORMER
DEMOLISH/REMOVE
ROOM NAME AND NUMBER
PHASE CALLOUT#
ATS
JUNCTION BOX
RECEPTACLE, SPECIAL PURPOSE
A = 120V, 20A, 1 PHASE, 2-POLE, 3W, NEMA 5-20R.
B = 208V, 20A, 1 PHASE, 2-POLE, 3W, NEMA 6-20R.
C = 120V, 30A, 1 PHASE, 2-POLE, 3W, NEMA 5-30R.
D = 208V, 30A, 1 PHASE, 2-POLE, 3W, NEMA 6-30R.
E = 208V, 60A, 1 PHASE, 3-POLE, 4W, NEMA 14-60R.
F = 208V, 30A, 3 PHASE, 3-POLE 4W, NEMA 15-30R.
G = 208V, 50A, 3 PHASE, 3 POLE, 4W, NEMA 15-30R.
H = 208V, 60A, 3 PHASE, 3 POLE, 4W, NEMA 15-60R.
WEATHERPROOF RECEPTACLE
ELECTRICAL ABBREVIATIONS:
1P SINGLE POLE
1PH SINGLE PHASE
2/C TWO-CONDUCTOR
3/C THREE-CONDUCTOR
3PH THREE-PHASE
4/C FOUR-CONDUCTOR
4W FOUR-WIRE
A/E ARCHITECT/ENGINEER
AC ALTERNATING CURRENT OR ARMORED CABLE
ATS AUTOMATIC TRANSFER SWITCH
BRKR BREAKER
CKT CIRCUIT
CKT BRKR CIRCUIT BREAKER
DISC DISCONNECT
DISTR DISTRIBUTION
DISTR PNL DISTRIBUTION PANEL
EXIST EXISTING
GND GROUND
SPD SURGE PROTECTIVE DEVICE
XFMR TRANSFORMER
DELTA CONNECTION
LIGHTNING PROTECTION SYMBOLS:
AIR TERMINAL
DOWN CONDUCTOR
LIGHTNING PROTECTION CONDUCTOR
POINT OF CONNECTION BETWEEN NEW
AND EXISTING WORK
LIMIT OF DEMOLITION
LUMINAIRES, DEMOLISHED
LUMINAIRES, NEW
METER
UTILITY
SURGE PROTECTIVE DEVICE (SPD)
DUAL PURPOSE DOCKING
STATION - SINGLE CONNECTION
DUAL PURPOSE DOCKING
STATION - DUAL CONNECTION
AUTOMATIC TRANSFER SWITCH - DUAL BYPASS
ELECTRICAL LOAD
ELECTRICAL SYMBOLS CONT:
MOTOR
X = HORSE POWER RATINGX
CABLE
ELECTRICAL SYMBOLS - SINGLE LINE DIAGRAM:
EXTENTS OF DETAIL
DEMOLITION/REMOVAL
FENCE LINE
GROUND
LINE
GENERAL LINETYPES:
CONDUIT SYMBOLS:
GENERAL SYMBOLS:
EN
GND
GND
CONDUIT UP
CONDUIT DOWN
VERTICAL RISER
AT
DC
UTIL
LIGHTING FIXTURE SCHEDULE
MARK DESCRIPTION
LAMPS
LENS FINISH MOUNTING BASIS OF DESIGN NOTES
TYPE VOLTS WATTS
A01 LED LINEAR FIXTURE, 48", 9000LM, 3500K, MIN 80 CRI LED UNIVERSAL
(120-277V) 70.7 WIDE FROSTED
ACRYLIC WHITE SUSPENDED/
PENDENT
LITHONIA LIGHTING - CLX L48 9000LM
SEF SBLW WDL WD MVOLT GZ10 LUGR
35K 80CRI WH
23 MECHANIC STREET, SPRINGVILLE, NY 14141
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD "Unauthorized alteration or addition to any plans, specifications or reports bearing a Licensed Professional Engineer's seal is a violation of Section 7209, subdivision 2, of the New York State Education Law".CONSULTANT
321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6"
6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t
BID DOCUMENTS REPLACE BOILERS 4 & 5
5000 W. NATIONAL AVE
MILWAUKEE, WI 53295
695-24-107
2026-04-20
CERTIFICATION OF AUTHORIZATION NUMBER: 0023683
E-001
ELECTRICAL NOTES AND LEGENDS
AMC KRL
NOT SPRINKLERED
1. EACH BRANCH CIRCUIT HOMERUN SHALL HAVE NO MORE THAN THREE CIRCUITS. EACH BRANCH
CIRCUIT HOMERUN SHALL HAVE A SEPARATE GREEN INSULATED EQUIPMENT GROUNDING
CONDUCTOR.
2. MULTI-GANG BACKBOXES FOR DIFFERENT VOLTAGES AND TYPES OF EMERGENCY AND NORMAL
BRANCH WIRING DEVICES SHALL HAVE DIVIDERS BETWEEN DEVICES.
3. COORDINATE ALL SHUTDOWNS AND INTERRUPTIONS OF SERVICE WITH THE COR IN ACCORDANCE
WITH THE SPECIFICATION REQUIREMENTS.
4. ALL CONDUIT TO BE LABELED AT EACH END TO IDENTIFY TERMINATION LOCATIONS.
5. ALL SPARE CONDUIT SHALL CONTAIN A PULL STRING TO FACILITATE FUTURE USE.
6. THE CONTRACTOR IS TO PROVIDE EXCAVATION/TRENCHING PLANS TO THE VA COR FOR APPROVAL
PRIOR TO STARTING ANY EXCAVATION OR TRENCHING WORK.
7. CONTRACTOR TO LABEL ALL EQUIPMENT, CONDUIT, JUNCTION BOXES, AND PULL BOXES IN
ACCORDANCE WITH VA COR PROVIDED DIRECTION..
8. REFER TO GC101 THROUGH GC103, GC601 FOR PHASING DETAILS.
1. FOR EXISTING EQUIPMENT, SUCH AS LIGHTING FIXTURES, WIRING DEVICES, AND CONDUITS, SHOWN
ON PLANS TO BE REMOVED, COMPLETELY REMOVE CONDUIT AND WIRING TO THE SOURCE (OVER
CURRENT PROTECTIVE DEVICE, AND DISCONNECT).
2. DISCONNECT ALL ABANDONED WIRING OF ALL TYPES AT THE OVERCURRENT PROTECTIVE DEVICE.
COMPLETELY REMOVE ALL ABANDONED WIRING.
3. MAINTAIN AND RESTORE, IF INTERRUPTED, ALL CONDUITS AND CONDUCTORS PASSING THROUGH
RENOVATED AREAS AND SERVICING UNDISTURBED AREAS.
GENERAL ELECTRICAL NOTES:
GENERAL ELECTRICAL NOTES - DEMOLITION:
T
Revision: Date:
REV 0 - BID DOCUMENTS 2026-04-20
REV 1 - ADDENDUM 03 2026-11-04
EXP 09/30/2029
11/5/2026
PB PB
EPH-SB-BLD112-1
R1A
ATS-N/E-BLD112-1
T/PL-SB-BLD112-1
EPL-Q-BLD112-1
EPL-Q-BLD112
EPH-Q-BLD112-1
1 2
BOILER 4
BOILER 5
DH-SB-BLD112-1
ATS-LS-BLD112-1
EDH-SB-BLD112-2
EDH-SB-BLD112-1
ELH-SB-BLD112-1
EPL-SB-BLD112-1
E
D
C
B
A
MAINTENANCE ROOM
374 SF
IT ROOM
62 SF
ELECTRICAL ROOM
119 SF
GENERATOR ROOM
363 SF
LOCKER ROOM
79 SF
TOILET ROOM
72 SF
OFFICE
125 SF
STAFF LOUNGE
186 SF
(1) 1-1/2" RMC CONDUIT - 4 #8 AWG, 1 #10 AWG GND
EXISTING MCC-2
T
T
T
T
BOILER 4
CONTROL
PANEL
5 5
ELS-SB-BLD112-1 ELS-SB-BLD112
EPL-SB-BLD112
EPL-SB-BLD112-2
EXISTING COMMUNICATIONS CONDUIT
TO MAIN BOP CONTROL PANEL
1 1
EXISTING EF-1 DISCONNECT
BOILER 5
CONTROL
PANEL
4TYP
8621 SF
EAST BOILER ROOM
6 6
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
EXISTINGEXISTING
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
PANELBOARD CABINET, SURFACE MOUNTED
RECEPTACLE, DUPLEX
ELECTRICAL SYMBOLS:
STARTER, COMBINATION WITH DISCONNECT SWITCH
LUMINAIRES, DEMOLISHED
LIGHTING SYMBOLS:
PB PULLBOX/JUNCTION BOX
T TRANSFORMER, PLAN
SF SQUARE FOOT
ABBREVIATIONS
Room name
XXX SF
ROOM NAME, NUMBER, AND AREA
GENERAL SYMBOLS:
23 MECHANIC STREET, SPRINGVILLE, NY 14141
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD "Unauthorized alteration or addition to any plans, specifications or reports bearing a Licensed Professional Engineer's seal is a violation of Section 7209, subdivision 2, of the New York State Education Law".CONSULTANT
321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6"
6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t
BID DOCUMENTS REPLACE BOILERS 4 & 5
5000 W. NATIONAL AVE
MILWAUKEE, WI 53295
695-24-107
2026-04-20
CERTIFICATION OF AUTHORIZATION NUMBER: 0023683
ED101
ELECTRICAL DEMOLITION PLAN -
FIRST FLOOR LEVEL 112
AMC CGR
NOT SPRINKLERED
SCALE: 1/4" = 1'-0"1 ELECTRICAL DEMOLITION PLAN - FIRST FLOOR LEVEL
3. FIXTURE LOCATIONS AND COUNTS ARE APPROXIMATIONS. CONTRACTOR TO FIELD
VERIFY ACTUAL LOCATIONS AND COUNTS.
2. SEE EP601 SINGLE LINE DRAWING FOR ADDITIONAL INFORMATION.
1. SEE E-001 FOR E-SERIES NOTES AND LEGENDS.
GENERAL NOTES
KEYED NOTES
1 CONTRACTOR TO REMOVE ALL CONDUIT AND CABLING SUPPLYING BOILER 4
BACK TO EPH-Q-BLD112-1. CONTRACTOR TO REMOVE ALL CONDUIT AND CABLING
SUPPLYING BOILER 4 CONTROL PANEL BACK TO EPL-Q-BLD112-1
2 CONTRACTOR TO REMOVE ALL CONDUIT AND CABLING SUPPLYING BOILER 5
BACK TO EPH-SB-BLD112-1. CONTRACTOR TO REMOVE ALL CONDUIT AND CABLING
SUPPLYING BOILER 5 CONTROL PANEL BACK TO EPL-SB-BLD112-2
3 CONTRACTOR TO RELOCATE AND RE-FEED RO CONTROL PANEL TO SUPPORT
CONSTRUCTION ACTIVITIES. REROUTE NEW POWER CONDUIT AND WIRING AS SHOWN
ON EP101 & EP201
4 CONTRACTOR TO DISCONNECT EXISTING LIGHT FIXTURES.
WIRE AND CONDUIT TO REMAIN FOR RECONNECTION TO NEW LED FIXTURES. SEE
EL101
5 CONTRACTOR TO PULL BACK EXISTING COMMUNICATIONS CABLE FROM MAIN BOP
CONTROL PANEL TO PULL BOX ABOVE EXISTING CONTROL PANEL. COIL CABLE IN PULL
BOX FOR RECONNECTION TO NEW CONTROL PANEL. CONDUIT BETWEEN EXISTING
CONTROL PANEL AND PULL BOX TO BE DEMOLISHED
6 GENERAL CONTRACTOR SHALL TURN OVER CONTROL PANEL TO VA FOR SALVAGE.
COORDINATE WITH THE COR
BACK TO EPH-Q-BLD112-1. CONTRACTOR TO REMOVE ALL CONDUIT AND CABLING
SUPPLYING BOILER 4 CONTROL PANEL BACK TO EPL-Q-BLD112-2
N
N
KEYPLAN
20' - 0"20' - 0"20' - 0"
0"
0"
0"
0"
4321E ED DCBAUPUP
AREA OF WORK
Revision: Date:
REV 0 - BID DOCUMENTS 2026-04-20
REV 1 - ADDENDUM 03 2026-11-04
E
D
C
B
A
EPH-SB-BLD112-1
R1A
ATS-N/E-BLD112-1
T/PL-SB-BLD112-1
EPL-Q-BLD112-1
EPL-Q-BLD112
EPH-Q-BLD112-1
BOILER 4
BOILER 5
DH-SB-BLD112-1
ATS-LS-BLD112-1
EDH-SB-BLD112-2
EDH-SB-BLD112-1
ELH-SB-BLD112-1
EPL-SB-BLD112-1
MAINTENANCE ROOM
374 SF
IT ROOM
62 SF
ELECTRICAL ROOM
119 SF
GENERATOR ROOM
363 SF
LOCKER ROOM
79 SF
TOILET ROOM
72 SF
OFFICE
125 SF
STAFF LOUNGE
186 SF
(1) 1-1/2" RMC CONDUIT - 4 #8 AWG, 1 #10 AWG GND
EXISTING MCC-2
TYP
T
T
T
T
ELS-SB-BLD112-1 ELS-SB-BLD112
EPL-SB-BLD112
EPL-SB-BLD112-2
EXISTING COMMUNICATIONS CONDUIT
TO MAIN BOP CONTROL PANEL
EXISTING EF-1 DISCONNECT
BOILER 5
CONTROL
PANEL
8621 SF
EAST BOILER ROOM
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
EXISTINGEXISTING
EXISTING
PANELBOARD CABINET, SURFACE MOUNTED
RECEPTACLE, DUPLEX
ELECTRICAL SYMBOLS:
STARTER, COMBINATION WITH DISCONNECT SWITCH
LUMINAIRES, DEMOLISHED
LIGHTING SYMBOLS:
PB PULLBOX/JUNCTION BOX
T TRANSFORMER, PLAN
SF SQUARE FOOT
ABBREVIATIONS
Room name
XXX SF
ROOM NAME, NUMBER, AND AREA
GENERAL SYMBOLS:
23 MECHANIC STREET, SPRINGVILLE, NY 14141
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD "Unauthorized alteration or addition to any plans, specifications or reports bearing a Licensed Professional Engineer's seal is a violation of Section 7209, subdivision 2, of the New York State Education Law".CONSULTANT
321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6"
6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t
BID DOCUMENTS REPLACE BOILERS 4 & 5
5000 W. NATIONAL AVE
MILWAUKEE, WI 53295
695-24-107
2026-04-20
CERTIFICATION OF AUTHORIZATION NUMBER: 0023683
ED105
ELECTRICAL BID DEDUCT DEMO
PLAN - FIRST FLOOR LEVEL 112
AMC CGR
NOT SPRINKLERED
SCALE: 1/4" = 1'-0"1 ELECTRICAL BID DEDUCTION DEMOLITION PLAN - FIRST FLOOR LEVEL N
N
KEYPLAN
20' - 0"20' - 0"20' - 0"
0"
0"
0"
0"
4321E ED DCBAUPUP
AREA OF WORK
KEYED NOTES
1 CONTRACTOR TO REMOVE ALL CONDUIT AND CABLING SUPPLYING BOILER 5
BACK TO EPH-SB-BLD112-1. CONTRACTOR TO REMOVE ALL CONDUIT AND CABLING
SUPPLYING BOILER 5 CONTROL PANEL BACK TO EPL-SB-BLD112-1
2 CONTRACTOR TO RELOCATE AND RE-FEED RO CONTROL PANEL TO SUPPORT
CONSTRUCTION ACTIVITIES. REROUTE NEW POWER CONDUIT AND WIRING AS SHOWN
ON EP101 & EP201
3 CONTRACTOR TO DISCONNECT EXISTING LIGHT FIXTURES.
WIRE AND CONDUIT TO REMAIN FOR RECONNECTION TO NEW LED FIXTURES. SEE
EL101
4 CONTRACTOR TO PULL BACK EXISTING COMMUNICATIONS CABLE FROM MAIN BOP
CONTROL PANEL TO PULL BOX ABOVE EXISTING CONTROL PANEL. COIL CABLE IN PULL
BOX FOR RECONNECTION TO NEW CONTROL PANEL. CONDUIT BETWEEN EXISTING
CONTROL PANEL AND PULL BOX TO BE DEMOLISHED
5 GENERAL CONTRACTOR SHALL TURN OVER CONTROL PANEL TO VA FOR SALVAGE.
COORDINATE WITH THE COR
BACK TO EPH-Q-BLD112-1. CONTRACTOR TO REMOVE ALL CONDUIT AND CABLING
SUPPLYING BOILER 4 CONTROL PANEL BACK TO EPL-Q-BLD112-2
3. FIXTURE LOCATIONS AND COUNTS ARE APPROXIMATIONS. CONTRACTOR TO FIELD
VERIFY ACTUAL LOCATIONS AND COUNTS.
2. SEE EP605 SINGLE LINE DRAWING FOR ADDITIONAL INFORMATION.
1. SEE E-001 FOR E-SERIES NOTES AND LEGENDS.
GENERAL NOTES
Revision: Date:
REV 0 - BID DOCUMENTS 2026-04-20
REV 1 - ADDENDUM 03 2026-11-04
CBL
S
P
XFMR-112
750kVA
CBL-3(4-600 KCMIL, 3/0 AWG GND, 4" C)
SPD
250kA
CBL
S
P
XFMR-112
15kVA
CBL
SPD
250kA
MCB-ELS-SB-BLD112-1
60A MCB
M
S
P
EPL-SB-BLD112
40A 30A
EPL-SB-BLD112-2
EPH-SB-BLD112-1
400A
SHORT CIRCUIT 16260
CB-112-BASEMENT
AIR COMP 1
60A
CB-112-BASEMENT
AIR COMP 2
60A
CBL
BOILER 5 CP
AIR COMP 1 AIR COMP 2
CB-EPH-SB-BLD112-1
400A
LSI
CB-112S VAULT PLN
100A
CBL
S VAULT PNL
CBLCBL CBL
ELH-SB-BLD112-1
CB-112-N VAULT PNL
100A
CBL
CB-SPARE
40A
CB-SPARE
15A
CB-PORTABLE BOILER DISCONNECT
200A
LSI
CB-ELH-SB-BLD112-1
100A
N VAULT PNL
S
P
EPL-Q-BLD112
40A 30A
EPL-Q-BLD112-1
EPH-Q-BLD112-1
600A
SHORT CIRCUIT 16415
CBL-2(4-350 KCMIL,
1 AWG GND, 4" C)
BOILER 4 CP
CB-EPH-Q-BLD112-1
600A
65KA LSI
CBL-4-3/0 AWG, 6 AWG GND, 2"
PORTABLE BOILER DISCONNECT
200A
EDH-SB-BLD-112-2
1200A 480/277 65 kAIC
SHORT CIRCUIT 16459
NC
CBL-3(4-600KCMIL, 3/0 AWG GND, 4"C)
M
NC
CBL-3(4-600 KCMIL, 3/0 AWG GND, 4" C)
CB-SPD
60A
CB-ATS-LS-BLD112-1
45A
CB-EDH-SB-BLD112-2
1200A
65KA LSI
DH-SB-BLD112-1
1200A 65 kAIC
SHORT CIRCUIT18472
MCB-DH-SB-BLD112-1
1200A
LSIG
BUS-XFMR-5-PRI
CBL-3-8 AWG, 10 AWG GND, 1" C
CB-ELS-SB-BLD112-1
45A
CBL-3-8 AWG, 10 AWG GND, 1" C
100A DUAL PUPOSE
DOCKING STATION
MALE CAMLOCK CONNECTION
PORTABLE GENERATOR
CB-EDH-SB-BLD112-2
1200A
LSIG
CBL-3-8 AWG, 10 AWG GND, 1" C
1200A DUAL PUPOSE
DOCKING STATION
MALE CAMLOCK CONNECTION
FOR PORTABLE GENERATOR
FEMALE CAMLOCK CONNECTION
FOR 1200A LOADBANK
BUS-GEN-BLD112
GEN-BLD112
600KW/750KVA
NO NEUTRAL GROUND
BOND AT GENERATOR
N E N E
ATS-LS-BLD112-1
400A
ELS-SB-BLD112-1
60A MCB
CB-SPD
30A
BOILER 4 FAN
BOILER 5 FAN
MCB-ELS-SB-BLD112-2
1200A MCB
LSI
ATS-N/E-BLD112-1
1200A
3-POLE
DUAL OPERATOR
BYPASS ISOLATION
CLOSED TRANSITION
AUTOMATIC TRANSFER SWITCH
UTIL
CBL 3-#4AWG,
#8AWG GND, 1-1/2" C
CBL-3(4-600 KCMIL, 3/0 AWG GND, 4" C)
20A
CBL 2-#12AWG,
#12AWG GND, 3/4" C
CBL
20A
20A
CBL 3-#12 AWG,
#12AWG GND, 3/4" C
MCC-2
G
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
23 MECHANIC STREET, SPRINGVILLE, NY 14141
ELECTRICAL DEMOLITION SINGLE
LINE DIAGRAM
BID DOCUMENTS
NOT SPRINKLERED
REPLACE BOILERS 4 & 5
5000 W. NATIONAL AVE.
MILWAUKEE, WI 53295
2026-04-20
ED601
695-24-107
CGR CCW
DEMOLITION
GENERAL NOTES
1. SEE E-001 FOR E-SERIES NOTES AND LEGENDS.
REV 0 - BID DOCUMENTS 2026-04-20
"Unauthorized alteration or addition to any plans, specifications or reports bearing a Licensed Professional Engineer's seal is a violation of Section 7209, subdivision 2, of the New York State Education Law".
CERTIFICATE OF AUTHORIZATION NUMBER: 0023683
REV 1 - ADDENDUM 03 2026-11-04
GENERAL LINETYPES
EXISTING
ABBREVIATIONS
MOLDED CASE CIRCUIT BREAKER
ELECTRICAL SYMBOLS
CABLE
GROUND
1PH SINGLE-PHASE
1P SINGLE POLE
2/C TWO-CONDUCTOR
3/C THREE-CONDUCTOR
3PH THREE-PHASE
4/C FOUR-CONDUCTOR
4W FOUR-WIRE
A/E ARCHITECT/ENGINEER
AC ALTERNATING CURRENT OR
ARMORED CABLE
ATS AUTOMATIC TRANSFER SWITCH
BRKR BREAKER
CKT CIRCUIT
CKT BRKR CIRCUIT BREAKER
DISC DISCONNECT
DISTR DISTRIBUTION
DISTR PNL DISTRIBUTION PANEL
EXIST EXISTING
SPD SURGE PROTECTIVE DEVICE
XFMR TRANSFORMER
MOTOR
X = HORSE POWER RATING
G
M
S
P
UTIL
GENERATOR
METER
CURRENT TRANSFORMER
TRANSFORMER
UTILITY
DISCONNECT SWITCH - FUSED
X
SPD
250kA
NC
N E
DUAL PURPOSE DOCKING
STATION - SINGLE CONNECTION
DUAL PURPOSE DOCKING
STATION - DUAL CONNECTION
SURGE PROTECTIVE DEVICE (SPD)
AUTOMATIC TRANSFER SWITCH -
DUAL BYPASS
ELECTRICAL LOAD
LIMIT OF DEMOLITION
EXP 09/30/2029
11/5/2026
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
P
XFMR-112
750kVA
CBL-3(4-600 KCMIL, 3/0 AWG GND, 4" C)
SPD
250kA
CBL
S
P
XFMR-112
15kVA
CBL
SPD
250kA
MCB-ELS-SB-BLD112-1
60A MCB
M
S
P
EPL-SB-BLD112
40A 30A
EPL-SB-BLD112-2
EPH-SB-BLD112-1
400A
SHORT CIRCUIT 16260
CB-112-BASEMENT
AIR COMP 1
60A
CB-112-BASEMENT
AIR COMP 2
60A
CBL
BOILER 5 CP
AIR COMP 1 AIR COMP 2
CB-EPH-SB-BLD112-1
400A
LSI
CB-112S VAULT PLN
100A
CBL
S VAULT PNL
CBLCBL CBL
ELH-SB-BLD112-1
CB-112-N VAULT PNL
100A
CBL
CB-SPARE
40A
CB-SPARE
15A
CB-PORTABLE BOILER DISCONNECT
200A
LSI
CB-ELH-SB-BLD112-1
100A
N VAULT PNL
S
P
EPL-Q-BLD112
40A 30A
EPL-Q-BLD112-1
EPH-Q-BLD112-1
600A
SHORT CIRCUIT 16415
CBL-2(4-350 KCMIL,
1 AWG GND, 4" C)
BOILER 4 CP
CB-EPH-Q-BLD112-1
600A
65KA LSI
CBL-4-3/0 AWG, 6 AWG GND, 2"
PORTABLE BOILER DISCONNECT
200A
EDH-SB-BLD-112-2
1200A 480/277 65 kAIC
SHORT CIRCUIT 16459
NC
CBL-3(4-600KCMIL, 3/0 AWG GND,…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .