This document is a set of construction plans (100% Construction Documents) for a lightning protection system installation project at the Clement J. Zablocki Veterans Affairs Medical Center (VAMC) in Milwaukee, Wisconsin. The project, numbered 23-093 with drawing reference 112.E101, involves installing a new lightning protection system on Building 112's roof while demolishing the existing outdated system. The work is dated August 20, 2024, and prepared by Apogee Consulting Group, P.A., serving as the design consultant under VA project number 695-22-106.

The scope of work includes installation of Class 2 lightning conductors fastened with adhesive-type fasteners at 3-foot on-center intervals, placement of air terminals around the roof perimeter at maximum 20-foot intervals (or 50-foot intervals for mid-roof installations), installation of new down conductors along the building facade, and connection to grounding systems at the main distribution panel. Critical requirements mandate that a certified lightning protection installation contractor perform all work in compliance with NFPA 780 and UL96A standards, that lightning protection testing be conducted on existing down conductors prior to installation and after new conductor connections are made, and that down conductors be protected with rigid Schedule 80 PVC to a height of 6 feet from grade. The plans indicate Building 112's upper level is approximately 40 feet above ground, with the specified work area approximately 23-25 feet above grade. The document notes these are construction documents as of November 3, 2026, not final record drawings.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

7 7 7

4 4 4

Engineers Architects

# DEMO KEY NOTES:

# KEY NOTES:

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

NOT FOR

CONSTRUCTION

NOT FOR

CONSTRUCTION

Date Checked Drawn

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

8/

/2

:4 1:

P

M C

:\U se rs \w re ed

\D oc um en ts \E

_2 3-

3-

Q

-V A

M ilw au ke e- In st l L tn g

Pr ot

-W I_

R

_w re ed R

G 8R

E.

rv t

112.E101

BUILDING 112 ROOF, LIGHTNING

PROTECTION PLANS

16 24WSR

INSTALL LIGHTNING

PROTECTION

CLEMENT J. ZABLOCKI VAMC

5000 WEST NATIONAL AVENUE

MILWAUKEE, WI 53295 AUGUST 20, 2024

100% CONSTRUCTION DOCUMENTS

695-22-10623-093

KTK

NORTH

0 105 20

Scale: 1" = 10'-0"1 BUILDING 112, ROOF DEMOLITION PLAN

Scale: 1" = 10'-0"2 BUILDING 112 ROOF LIGHTNING PROTECTION PLAN, NEW WORK

NORTH

0 105 20

1 CLASS 2 LIGHTNING CONDUCTORS FASTENED

USING ADHESIVE TYPE FASTENERS EVERY 3' OC.

2 BOND CONDUCTOR TO EXISTING LADDER FRAME.

3 REUSE EXISTING ROOF PENETRATION AND RUN

NEW DOWN CONDUCTOR ALONG EXTERIOR OF

BUILDING FACADE. DOWN CONDUCTOR SHALL BE

FASTENED TO BUILDING FACADE WITH

FASTENERS DESIGNED FOR BUILDING’S

EXTERIOR MATERIAL. TIE IN NEW LPS

CONDUCTOR TO EXISTING THROUGH ROOF

PENETRATION CONDUCTOR AND NEW DOWN

CONDUCTOR ALONG BUILDING EXTERIOR.

CONTRACTOR SHALL PERFORM A LIGHTNING

PROTECTION TEST ON THE EXISTING DOWN

CONDUCTOR PRIOR TO INSTALLATION, AND ON

THE CONNECTION OF THE NEW CONDUCTOR TO

THE EXISTING CONDUCTOR AFTER INSTALLATION

TO ENSURE PERFORMANCE.

4 RUN NEW DOWN CONDUCTOR ALONG EXTERIOR

OF BUILDING FACADE. DOWN CONDUCTOR SHALL

BE FASTENED TO BUILDING FACADE WITH

FASTENERS DESIGNED FOR BUILDING’S

EXTERIOR MATERIAL.

5 CONNECT LPS CONDUCTOR TO GROUNDING BUS

AT MAIN DISTRIBUTION PANEL.

6 CONNECT LIGHTNING PROTECTION CONDUCTORS

TO EXISTING DOWN CONDUCTORS REUSING

EXISTING ROOF PENETRATION. VERIFY WATER

TIGHT SEAL AND RESEAL AS NECESSARY.

CONTRACTOR SHALL PERFORM A LIGHTNING

PROTECTION TEST ON THE EXISTING DOWN

CONDUCTOR PRIOR TO INSTALLATION, AND ON

THE CONNECTION OF THE NEW CONDUCTOR TO

THE EXISTING CONDUCTOR AFTER INSTALLATION

TO ENSURE PERFORMANCE.

7 DOWN CONDUCTOR TO BE PROTECTED TO A

HEIGHT OF 6’ FROM GRADE WITH RIGID

SCHEDULE 80 PVC ATTACHED TO BUILDING.

PAINT PVC IN A COMPLIMENTARY COLOR TO THE

EXISTING FACADE. PROVIDE PAINT SAMPLES TO

COR TO VERIFY FINAL COLOR DECISION.

8 BUILDING 112 UPPER LEVEL IS APPROXIMATELY

40 FEET ABOVE GROUND.

9 BUILDING 112 IS APPROXIMATELY 23-25 FEET

ABOVE GROUND IN THIS LOCATION.

1 EXISTING LIGHTNING PROTECTION CONDUCTOR

TO BE DEMOLISHED. TYPICAL ALL DASHED LINES

THIS DEMOLITION ROOF PLAN.

2 EXISTING LIGHTNING PROTECTION AIR TERMINAL

TO BE DEMOLISHED. TYPICAL ALL AIR TERMINALS

THIS DEMOLITION ROOF PLAN.

3 EXISTING CONDUCTOR BOND TO BE

DEMOLISHED. TYPICAL ALL CONDUCTOR BONDS

THIS DEMOLITION ROOF PLAN.

A.

B.

C.

D.

E.

F.

G.

H.

I.

J.

K.

L.

LIGHTNING PROTECTION SYSTEM SHALL BE

INSTALLED BY A CERTIFIED LIGHTNING

PROTECTION INSTALLATION CONTRACTOR.

THE FINAL INSTALLATION SHALL MEET NFPA 780

AND UL96A REQUIREMENTS FOR LIGHTNING

PROTECTION SYSTEMS.

ACTUAL JOB SITE CONDITIONS MAY

NECESSITATE SLIGHT ALTERNATIONS OF AIR

TERMINAL AND GROUND LOCATIONS. ANY

ALTERATIONS SHALL BE APPROVED BY THE

COR PRIOR TO THEIR EXECUTION.

AIR TERMINALS SHALL BE PLACED AROUND THE

ROOF PERIMETER OR RIDGE AT 20'-0" MAXIMUM

INTERVALS FOR 10" TO 24" AIR TERMINALS AND

EXTEND A MINIMUM OF 10” ABOVE THE OBJECT

OR AREA IT IS TO PROTECT.

AIR TERMINALS SHALL BE PLACED WITHIN 24"

FROM THE OUTSIDE EDGES OF THE OBJECT TO

BE PROTECTED.

MID-ROOF AIR TERMINALS ON FLAT OR GENTLY

SLOPING ROOFS SHALL BE INSTALLED AT

MAXIMUM 50'-0" INTERVALS.

ALL ROOF PROJECTIONS AND/OR OBJECTS

THAT ARE SUBJECT TO A DIRECT LIGHTNING

STRIKE SHALL BE PROVIDED WITH AIR

TERMINALS UNLESS THEY ARE LOCATED

WITHIN A ZONE OF PROTECTION.

METAL BODIES SITUATED WITHIN 6'-0" OF A

LIGHTNING PROTECTION CONDUCTOR SHALL

BE BONDED TO THE LIGHTNING PROTECTION

SYSTEM. HAND/GUARDRAILS SHALL BE

BONDED EVERY 50 LINEAR FEET AND AT

MINIMUM THE BEGINNING AND END OF THE

RAILING.

ELECTRICAL CONTRACTOR SHALL FOLLOW

SITE LOCK-OUT/TAG-OUT GUIDELINES TO

DEENERGIZE EQUIPMENT AS REQUIRED.

ELECTRICAL CONTRACTOR TO DISPOSE OF

REMOVED ELECTRICAL EQUIPMENT.

DEVICES AND CONDUCTORS INDICATED WITH

HIDDEN/DASHED LINES ARE TO BE REMOVED,

UNLESS NOTED OTHERWISE. SEE ELECTRICAL

SYMBOLS LEGEND ON E-001 FOR REFERENCE.

AIR TERMINALS ARE TO BE MOUNTED TO THE

PARAPET WALL USING ADHESIVE MOUNTS.

CONTRACTOR WILL NOT USE SCREWS OR

ANCHORS INTO WALL TO PREVENT FROST

HEAVE OF HARDWARE AND CRACKING OF

PARAPET.

Docusign Envelope ID: FB232B3D-DB2C-480F-9397-58A7828991F7

8/19/2024

THESE are Construction Documents as of 11/3/26 - not the RECORD Drawings

File details come from the government source that posted it. Updated .