This document is a set of construction plans (100% Construction Documents) for a lightning protection system installation project at the Clement J. Zablocki Veterans Affairs Medical Center (VAMC) in Milwaukee, Wisconsin. The project, numbered 23-093 with drawing reference 112.E101, involves installing a new lightning protection system on Building 112's roof while demolishing the existing outdated system. The work is dated August 20, 2024, and prepared by Apogee Consulting Group, P.A., serving as the design consultant under VA project number 695-22-106.
The scope of work includes installation of Class 2 lightning conductors fastened with adhesive-type fasteners at 3-foot on-center intervals, placement of air terminals around the roof perimeter at maximum 20-foot intervals (or 50-foot intervals for mid-roof installations), installation of new down conductors along the building facade, and connection to grounding systems at the main distribution panel. Critical requirements mandate that a certified lightning protection installation contractor perform all work in compliance with NFPA 780 and UL96A standards, that lightning protection testing be conducted on existing down conductors prior to installation and after new conductor connections are made, and that down conductors be protected with rigid Schedule 80 PVC to a height of 6 feet from grade. The plans indicate Building 112's upper level is approximately 40 feet above ground, with the specified work area approximately 23-25 feet above grade. The document notes these are construction documents as of November 3, 2026, not final record drawings.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
7 7 7
4 4 4
Engineers Architects
# DEMO KEY NOTES:
# KEY NOTES:
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
NOT FOR
CONSTRUCTION
NOT FOR
CONSTRUCTION
Date Checked Drawn
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
8/
/2
:4 1:
P
M C
:\U se rs \w re ed
\D oc um en ts \E
_2 3-
3-
Q
-V A
M ilw au ke e- In st l L tn g
Pr ot
-W I_
R
_w re ed R
G 8R
E.
rv t
112.E101
BUILDING 112 ROOF, LIGHTNING
PROTECTION PLANS
16 24WSR
INSTALL LIGHTNING
PROTECTION
CLEMENT J. ZABLOCKI VAMC
5000 WEST NATIONAL AVENUE
MILWAUKEE, WI 53295 AUGUST 20, 2024
100% CONSTRUCTION DOCUMENTS
695-22-10623-093
KTK
NORTH
0 105 20
Scale: 1" = 10'-0"1 BUILDING 112, ROOF DEMOLITION PLAN
Scale: 1" = 10'-0"2 BUILDING 112 ROOF LIGHTNING PROTECTION PLAN, NEW WORK
NORTH
0 105 20
1 CLASS 2 LIGHTNING CONDUCTORS FASTENED
USING ADHESIVE TYPE FASTENERS EVERY 3' OC.
2 BOND CONDUCTOR TO EXISTING LADDER FRAME.
3 REUSE EXISTING ROOF PENETRATION AND RUN
NEW DOWN CONDUCTOR ALONG EXTERIOR OF
BUILDING FACADE. DOWN CONDUCTOR SHALL BE
FASTENED TO BUILDING FACADE WITH
FASTENERS DESIGNED FOR BUILDING’S
EXTERIOR MATERIAL. TIE IN NEW LPS
CONDUCTOR TO EXISTING THROUGH ROOF
PENETRATION CONDUCTOR AND NEW DOWN
CONDUCTOR ALONG BUILDING EXTERIOR.
CONTRACTOR SHALL PERFORM A LIGHTNING
PROTECTION TEST ON THE EXISTING DOWN
CONDUCTOR PRIOR TO INSTALLATION, AND ON
THE CONNECTION OF THE NEW CONDUCTOR TO
THE EXISTING CONDUCTOR AFTER INSTALLATION
TO ENSURE PERFORMANCE.
4 RUN NEW DOWN CONDUCTOR ALONG EXTERIOR
OF BUILDING FACADE. DOWN CONDUCTOR SHALL
BE FASTENED TO BUILDING FACADE WITH
FASTENERS DESIGNED FOR BUILDING’S
EXTERIOR MATERIAL.
5 CONNECT LPS CONDUCTOR TO GROUNDING BUS
AT MAIN DISTRIBUTION PANEL.
6 CONNECT LIGHTNING PROTECTION CONDUCTORS
TO EXISTING DOWN CONDUCTORS REUSING
EXISTING ROOF PENETRATION. VERIFY WATER
TIGHT SEAL AND RESEAL AS NECESSARY.
CONTRACTOR SHALL PERFORM A LIGHTNING
PROTECTION TEST ON THE EXISTING DOWN
CONDUCTOR PRIOR TO INSTALLATION, AND ON
THE CONNECTION OF THE NEW CONDUCTOR TO
THE EXISTING CONDUCTOR AFTER INSTALLATION
TO ENSURE PERFORMANCE.
7 DOWN CONDUCTOR TO BE PROTECTED TO A
HEIGHT OF 6’ FROM GRADE WITH RIGID
SCHEDULE 80 PVC ATTACHED TO BUILDING.
PAINT PVC IN A COMPLIMENTARY COLOR TO THE
EXISTING FACADE. PROVIDE PAINT SAMPLES TO
COR TO VERIFY FINAL COLOR DECISION.
8 BUILDING 112 UPPER LEVEL IS APPROXIMATELY
40 FEET ABOVE GROUND.
9 BUILDING 112 IS APPROXIMATELY 23-25 FEET
ABOVE GROUND IN THIS LOCATION.
1 EXISTING LIGHTNING PROTECTION CONDUCTOR
TO BE DEMOLISHED. TYPICAL ALL DASHED LINES
THIS DEMOLITION ROOF PLAN.
2 EXISTING LIGHTNING PROTECTION AIR TERMINAL
TO BE DEMOLISHED. TYPICAL ALL AIR TERMINALS
THIS DEMOLITION ROOF PLAN.
3 EXISTING CONDUCTOR BOND TO BE
DEMOLISHED. TYPICAL ALL CONDUCTOR BONDS
THIS DEMOLITION ROOF PLAN.
A.
B.
C.
D.
E.
F.
G.
H.
I.
J.
K.
L.
LIGHTNING PROTECTION SYSTEM SHALL BE
INSTALLED BY A CERTIFIED LIGHTNING
PROTECTION INSTALLATION CONTRACTOR.
THE FINAL INSTALLATION SHALL MEET NFPA 780
AND UL96A REQUIREMENTS FOR LIGHTNING
PROTECTION SYSTEMS.
ACTUAL JOB SITE CONDITIONS MAY
NECESSITATE SLIGHT ALTERNATIONS OF AIR
TERMINAL AND GROUND LOCATIONS. ANY
ALTERATIONS SHALL BE APPROVED BY THE
COR PRIOR TO THEIR EXECUTION.
AIR TERMINALS SHALL BE PLACED AROUND THE
ROOF PERIMETER OR RIDGE AT 20'-0" MAXIMUM
INTERVALS FOR 10" TO 24" AIR TERMINALS AND
EXTEND A MINIMUM OF 10” ABOVE THE OBJECT
OR AREA IT IS TO PROTECT.
AIR TERMINALS SHALL BE PLACED WITHIN 24"
FROM THE OUTSIDE EDGES OF THE OBJECT TO
BE PROTECTED.
MID-ROOF AIR TERMINALS ON FLAT OR GENTLY
SLOPING ROOFS SHALL BE INSTALLED AT
MAXIMUM 50'-0" INTERVALS.
ALL ROOF PROJECTIONS AND/OR OBJECTS
THAT ARE SUBJECT TO A DIRECT LIGHTNING
STRIKE SHALL BE PROVIDED WITH AIR
TERMINALS UNLESS THEY ARE LOCATED
WITHIN A ZONE OF PROTECTION.
METAL BODIES SITUATED WITHIN 6'-0" OF A
LIGHTNING PROTECTION CONDUCTOR SHALL
BE BONDED TO THE LIGHTNING PROTECTION
SYSTEM. HAND/GUARDRAILS SHALL BE
BONDED EVERY 50 LINEAR FEET AND AT
MINIMUM THE BEGINNING AND END OF THE
RAILING.
ELECTRICAL CONTRACTOR SHALL FOLLOW
SITE LOCK-OUT/TAG-OUT GUIDELINES TO
DEENERGIZE EQUIPMENT AS REQUIRED.
ELECTRICAL CONTRACTOR TO DISPOSE OF
REMOVED ELECTRICAL EQUIPMENT.
DEVICES AND CONDUCTORS INDICATED WITH
HIDDEN/DASHED LINES ARE TO BE REMOVED,
UNLESS NOTED OTHERWISE. SEE ELECTRICAL
SYMBOLS LEGEND ON E-001 FOR REFERENCE.
AIR TERMINALS ARE TO BE MOUNTED TO THE
PARAPET WALL USING ADHESIVE MOUNTS.
CONTRACTOR WILL NOT USE SCREWS OR
ANCHORS INTO WALL TO PREVENT FROST
HEAVE OF HARDWARE AND CRACKING OF
PARAPET.
Docusign Envelope ID: FB232B3D-DB2C-480F-9397-58A7828991F7
8/19/2024
THESE are Construction Documents as of 11/3/26 - not the RECORD Drawings