This document is a set of 100% construction drawings for the replacement of Boilers 4 and 5 at the Clement J. Zablocki Veterans Affairs Medical Center (VAMC) in Milwaukee, Wisconsin. The project is located at 5000 West National Avenue, Milwaukee, WI 53295.

The construction documents include architectural and mechanical drawings organized into multiple phases. Phase 1 involves mobilization, including establishment of a contractor laydown area and installation of temporary fencing. Phase 2 encompasses demolition of existing Boilers 4 and 5, including removal of metal panels (to be salvaged for reuse), boilers, and boiler stacks, with coordination of lockout/tagout procedures and provisions to maintain weather-tight conditions. Phase 3 covers installation and commissioning of the new boiler, installation of a steam header, reconnection of Boiler 4 piping, infill of the 2-hour exterior wall, installation of a new roll-up door and security gate, and a 30-day monitoring period before final turnover. The drawings include detailed civil site plans showing drainage, fencing, and gate details; architectural demolition and construction plans for first-floor and roof levels; and comprehensive process and instrumentation diagrams (P&IDs) for fuel oil, natural gas, feedwater, and steam systems for the new Boiler #5 (Model 112-105-BLR-005, a 600 HP firetube boiler rated for 250 PSI designed pressure with 30 PPM NOx emissions capability). The contractor must coordinate all work with the VA Boiler Plant Supervisor, maintain 24/7 access to emergency boiler connections, and comply with all specified technical requirements outlined in the detailed drawings and specifications.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N

DRAWING INDEX

DRAWING NUMBER DRAWING TITLE DRAWING NUMBER DRAWING TITLE

GENERAL MP102 MECHANICAL HYDRONIC PIPING PLAN - FIRST FLOOR LEVEL

GI001 TITLE SHEET AND DRAWING INDEX MP103 MECHANICAL FUEL PIPING PLAN - FIRST FLOOR LEVEL GC101 GENERAL PHASING PLAN - PHASE 1 MP104 MECHANICAL COMPRESSED AIR PIPING PLAN - FIRST FLOOR LEVEL GC102 GENERAL PHASING PLAN - PHASE 2 MP105 MECHANICAL BID DEDUCT STEAM PIPING PLAN - FIRST FLOOR LEVEL GC103 GENERAL PHASING PLAN - PHASE 3 MP106 MECHANICAL BID DEDUCT HYDRONIC PIPING PLAN - FIRST FL GC105 GENERAL BID DEDUCT PHASING PLAN - PHASE 2 MP107 MECHANICAL BID DEDUCT FUEL PIPING PLAN - FIRST FLOOR LEVEL GC106 GENERLA BID DEDUCT PHASING PLAN - PHASE 3 MP108 MECH BID DEDUCT COMPRESSED AIR PIPING PLAN - FIRST FLOOR

CIVIL MP110 MECHANICAL STEAM PIPING PLAN - SPS FLOW METER

CS101 CIVIL SITE PLAN MP501 MECHANICAL PIPING DETAILS

CS501 CIVIL SITE DETAILS MP502 MECHANICAL PIPING DETAILS

ARCHITECTURAL MK101 MECHANICAL EQUIPMENT PLAN - FIRST FLOOR LEVEL

A-001 ARCHITECTURAL NOTES AND LEGENDS MK105 MECHANICAL BID DEDUCT EQUIPMENT PLAN - FIRST FLOOR AD101 ARCHITECTURAL DEMOLITION PLAN - FIRST FLOOR LEVEL MK121 MECHANICAL EQUIPMENT PLAN - ROOF LEVEL AD105 ARCHITECTURAL BID DEDUCT DEMO PLAN - FIRST FLOOR LEVEL MK201 MECHANICAL EQUIPMENT ELEVATIONS AD121 ARCHITECTURAL DEMOLITION PLAN - ROOF LEVEL MK202 MECHANICAL EQUIPMENT ELEVATIONS AD125 ARCHITECTURAL BID DEDUCTION DEMOLITION PLAN - ROOF LEVEL MK205 MECHANICAL BID DEDUCT EQUIPMENT ELEVATIONS AD201 ARCHITECTURAL DEMOLITION EXTERIOR ELEVATION - NORTH MK206 MECHANICAL BID DEDUCT EQUIPMENT ELEVATIONS

AD205 ARCHITECTURAL BID DEDUCT DEMO EXT ELEVATION - NORTH ELECTRICAL

AD301 ARCHITECTURAL DEMOLITION BUILDING SECTION E-001 ELECTRICAL NOTES AND LEGENDS AD305 ARCHITECTURAL BID DEDUCT DEMOLITION BUILDING SECTION ED101 ELECTRICAL DEMOLITION PLAN - FIRST FLOOR LEVEL AE101 ARCHITECTURAL PLAN - FIRST FLOOR LEVEL ED105 ELECTRICAL BID DEDUCT DEMO PLAN - FIRST FLOOR LEVEL AE105 ARCHITECTURAL BID DEDUCT PLAN - FIRST FLOOR LEVEL ED601 ELECTRICAL DEMOLITION SINGLE LINE DIAGRAM AE121 ARCHITECTURAL PLAN - ROOF LEVEL ED605 ELECTRICAL DEMOLITION BID DEDUCT SINGLE LINE DIAGRAM AE125 ARCHITECTURAL BID DEDUCT PLAN - ROOF LEVEL EL101 ELECTRICAL LIGHTING PLAN - FIRST FLOOR LEVEL AE201 ARCHITECTURAL EXTERIOR ELEVATION - NORTH EP101 ELECTRICAL PLAN - FIRST FLOOR LEVEL AE205 ARCHITECTURAL BID DEDUCT EXTERIOR ELEVATION - NORTH EP105 ELECTRICAL BID DEDUCT PLAN - FIRST FLOOR LEVEL

AE301 ARCHITECTURAL BUILDING SECTION EP201 ELECTRICAL POWER ELEVATIONS

AE305 ARCHITECTURAL BID DEDUCT BUILDING SECTION EP205 ELECTRICAL POWER BID DEDUCT ELEVATIONS

AE501 ARCHITECTURAL DETAILS EP601 ELECTRICAL SINGLE LINE DIAGRAM

AE502 ARCHITECTURAL DETAILS EP602 ELECTRICAL PANEL SCHEDULES

PROCESS EP605 ELECTRICAL BID DEDUCT SINGLE LINE DIAGRAM

D-001 PROCESS - NOTES AND LEGENDS EP606 ELECTRICAL BID DEDUCT PANEL SCHEDULES

D-611 PROCESS - P&ID FUEL OIL - BOILER #5 EG121 ELECTRICAL LIGHTNING PROTECTION PLAN - ROOF LEVEL D-621 PROCESS - P&ID NATURAL GAS - BOILER #5 EG125 ELECTRICAL BID DEDUCT LIGHTNING PROTECT. PLAN - ROOF D-631 PROCESS - P&ID - FEEDWATER BOILER #5 EG501 ELECTRICAL LIGHTNING PROTECTION DETAILS

D-641 PROCESS - P&ID - STEAM BOILER #5

D-642 PROCESS - P&ID - STEAM - BOP BASE BID

D-643 PROCESS - P&ID - STEAM - BOP - BID DEDUCT

D-651 PROCESS-P&ID-COMBUSTION AIR-BOILER #5

MECHANICAL

M-001 MECHANICAL NOTES AND LEGENDS

M-601 MECHANICAL SCHEDULES

MD101 MECHANICAL PIPING DEMOLITION PLAN - FIRST FLOOR

MD105 MECHANICAL PIPING BID DEDUCT DEMOLITION PLAN - FIRST FLOOR

MD121 MECHANICAL PIPING DEMOLITION PLAN - ROOF LEVEL

MD125 MECHANICAL BID DEDUCT PIPING DEMOLITION PLAN - ROOF LEVEL

MD201 MECHANICAL DEMOLITION ELEVATION

MP101 MECHANICAL STEAM PIPING PLAN - FIRST FLOOR LEVEL

23 MECHANIC STREET, SPRINGVILLE, NY 14141

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

100% CONSTRUCTION

DOCUMENTS

REPLACE BOILERS 4 & 5

5000 W. NATIONAL AVE

MILWAUKEE, WI 53295

695-24-107

2026-04-06

PREL

IMIN

ARY

NOT

FOR

CONS

TRUC

TION

GI001

TITLE SHEET AND DRAWING

INDEX 112

ANL KRL

NOT SPRINKLERED

DD###

DD###

X

DD###

X

1'-0" = 1'-0"

DETAIL TITLEX

1 / DD###

DD###

X

DD###

X

NORTH ARROWVIEW TITLE

BUILDING/WALL SECTION CUT

EXTERIOR ELEVATION

DETAIL SECTION CUT

DETAIL CALLOUT

DRAWING SYMBOLS

INTERIOR ELEVATION

DETAIL NUMBER

DETAIL IDENTIFIER

DETAIL TITLE NUMBER /

SHEET REF NUMBER

SECTION IDENTIFIER

SHEET REF NUMBER

DETAIL

IDENTIFIER

SHEET REF

NUMBER

DETAIL SECTION IDENTIFIER

VIEWING

DIRECTION

TRUE NORTH

PLAN NORTH

VIEWING

DIRECTION

SHEET REF NUMBER

SHEET REF NUMBER

CLEMENT J. ZABLOCKI VAMC

REPLACE BOILERS 4 & 5

5000 WEST NATIONAL AVE

MILWAUKEE, WI 53295

PROJECT LOCATION

WEST NATIONAL AVE

NORTH WASHINGTON DRIVE

BR

EW

ER

S

BL

VD

HI

NE

S

BL

VD

Revisions: Date:

REV A - 35% SCHEMATIC DESIGN DOCUMENTS 2024-07-24

REV B - 65% DESIGN DEVELOPMENT 2024-09-17

REV C - 65% DESIGN DEVELOPMENT 2025-12-30

REV D - 95% CONSTRUCTION DOCUMENTS 2026-03-09

REV E - 100% CONSTRUCTION DOCUMENTS 2026-04-06

NRF

T45

TEMPORARY FENCE BASE STAND

16"x36" SAND BAG EACH STAND

BOTTOM OF FENCE 1" ABOVE GRADE

GALVANIZED CHAIN LINK FENCING

WITH PRIVACY COVERAGE

1 3/8" POST

6'- 0"

M

IN

IM

UM

PHASE NOTE SYMBOL

GENERAL SYMBOLS:

x

TEMPORARY FENCE

AREA OF WORK

TREE

STORAGE TANKS

1 2

23 MECHANIC STREET, SPRINGVILLE, NY 14141

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

100% CONSTRUCTION

DOCUMENTS

REPLACE BOILERS 4 & 5

5000 W. NATIONAL AVE

MILWAUKEE, WI 53295

695-24-107

2026-04-06

PREL

IMIN

ARY

NOT

FOR

CONS

TRUC

TION

GC101

GENERAL PHASING PLAN - PHASE

1 112

IAR ADL

NOT SPRINKLERED

N

PHASE 1 NOTES - MOBILIZATION

1 ESTABLISH CONTRACTOR LAYDOWN AREA. COORDINATE AREA WITH COR/VA

2 INSTALL 6' HIGH CHAINLINK WITH PRIVACY SCREEN FENCING AROUND WORK AREAS TO

RESIST 1 50LB HORIZONTAL FORCE ALONG TOP OF BOTTOM

3 CONTRACTOR TO AVOID HANK AARON STATE TRAIL RIGHT-OF-WAY

4 CONTRACTOR TO MAINTAIN 24/7 ACCESS TO EMERGENCY BOILER CONNECTIONS

THROUGHOUT CONSTRUCTION

SCALE: NTS1 GENERAL PHASING PLAN - PHASE 1

SCALE: 3/4" = 1'-0"2 TEMPORARY FENCING DETAIL

Revisions: Date:

REV A - 35% SCHEMATIC DESIGN DOCUMENTS 2024-07-24

REV B - 65% DESIGN DEVELOPMENT 2024-09-17

REV C - 65% DESIGN DEVELOPMENT 2025-12-30

E

D

C

20' - 0" 20' - 0" 20' - 0"

0"

0"

32 32

1 1

4 4

B-4 STEAM BOILER B-5 STEAM BOILER

8622 SF

EAST BOILER ROOM

Room name

ROOM NAME AND NUMBER

PHASE NOTE SYMBOL1

GENERAL SYMBOLS:

23 MECHANIC STREET, SPRINGVILLE, NY 14141

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

100% CONSTRUCTION

DOCUMENTS

REPLACE BOILERS 4 & 5

5000 W. NATIONAL AVE

MILWAUKEE, WI 53295

695-24-107

2026-04-06

PREL

IMIN

ARY

NOT

FOR

CONS

TRUC

TION

GC102

GENERAL PHASING PLAN -

PHASE 2 112

IAR NGB

NOT SPRINKLERED

SCALE: 3/8" = 1'-0"1 GENERAL PHASING PLAN - PHASE 2

N

N

KEYPLAN

20' - 0"20' - 0"20' - 0"

0"

0"

0"

0"

4321E ED DCBAUPUP

AREA OF WORK

PHASE 2 NOTES - DEMOLITION OF EXISTING

BOILERS 4 AND 5

1 REMOVE METAL PANEL. SALVAGE FOR REUSE

2 REMOVE BOILERS 4 & 5. REFER TO MD101 FOR MECHANICAL EQUIPMENT DEMOLITION

3 CONTRACTOR TO COORDINATE LOCKOUT/TAGOUT OF THE STEAM SYSTEM WITH THE

COR AND VA BOILER PLANT SUPERVISOR BEFORE STARTING DEMOLITION

4 COVER HOLES ON ROOF. BUILDING NEEDS TO BE WEATHER PROOF. SEE AD121

Revisions: Date:

REV A - 35% SCHEMATIC DESIGN DOCUMENTS 2024-07-24

REV B - 65% DESIGN DEVELOPMENT 2024-09-17

REV C - 65% DESIGN DEVELOPMENT 2025-12-30

D

C

0"

0"

20' - 0" 20' - 0" 20' - 0"

8622 SF

EAST BOILER ROOM

Room name

ROOM NAME AND NUMBER

PHASE NOTE SYMBOL1

GENERAL SYMBOLS:

23 MECHANIC STREET, SPRINGVILLE, NY 14141

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

100% CONSTRUCTION

DOCUMENTS

REPLACE BOILERS 4 & 5

5000 W. NATIONAL AVE

MILWAUKEE, WI 53295

695-24-107

2026-04-06

PREL

IMIN

ARY

NOT

FOR

CONS

TRUC

TION

GC103

GENERAL PHASING PLAN -

PHASE 3 112

IAR NGB

NOT SPRINKLERED

SCALE: 3/8" = 1'-0"1 GENERAL PHASING PLAN - PHASE 3

N

N

KEYPLAN

20' - 0"20' - 0"20' - 0"

0"

0"

0"

0"

4321E ED DCBAUPUP

AREA OF WORK

PHASE 3 NOTES - INSTALL AND

COMMISSION OF NEW BOILER

1 INSTALL NEW BOILER AND EQUIPMENT

2 COMMISSION NEW BOILER

3 INFILL OF THE 2 HOUR EXTERIOR FIREWALL

Revisions: Date:

REV A - 35% SCHEMATIC DESIGN DOCUMENTS 2024-07-24

REV B - 65% DESIGN DEVELOPMENT 2024-09-17

REV C - 65% DESIGN DEVELOPMENT 2025-12-30

D

C

20' - 0" 20' - 0" 20' - 0"

0"

0"

Room name

ROOM NAME AND NUMBER

PHASE NOTE SYMBOL1

GENERAL SYMBOLS:

23 MECHANIC STREET, SPRINGVILLE, NY 14141

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

100% CONSTRUCTION

DOCUMENTS

REPLACE BOILERS 4 & 5

5000 W. NATIONAL AVE

MILWAUKEE, WI 53295

695-24-107

2026-04-06

PREL

IMIN

ARY

NOT

FOR

CONS

TRUC

TION

GC105

GENERAL BID DEDUCT PHASING

PLAN - PHASE 2 112

IAR NGB

NOT SPRINKLERED

SCALE: 3/8" = 1'-0"1 GENERAL BID DEDUCTION PHASING PLAN - PHASE 2

N

N

KEYPLAN

20' - 0"20' - 0"20' - 0"

0"

0"

0"

0"

4321E ED DCBAUPUP

AREA OF WORK

PHASE 2 NOTES - DEMOLITION OF EXISTING

BOILER 5

1 REMOVE METAL PANEL. SALVAGE FOR REUSE

2 REMOVE BOILER 5. REFER TO MD101 FOR MECHANICAL EQUIPMENT DEMOLITION

3 CONTRACTOR TO COORDINATE LOCKOUT/TAGOUT OF THE STEAM SYSTEM WITH THE

COR AND VA BOILER PLANT SUPERVISOR BEFORE STARTING DEMOLITION

4 COVER HOLES ON ROOF. BUILDING NEEDS TO BE WEATHER PROOF. SEE AD121

Revisions: Date:

REV A - 35% SCHEMATIC DESIGN DOCUMENTS 2024-07-24

REV B - 65% DESIGN DEVELOPMENT 2024-09-17

REV C - 65% DESIGN DEVELOPMENT 2025-12-30

D

C

0"

0"

20' - 0" 20' - 0" 20' - 0"

Room name

ROOM NAME AND NUMBER

PHASE NOTE SYMBOL1

GENERAL SYMBOLS:

23 MECHANIC STREET, SPRINGVILLE, NY 14141

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

100% CONSTRUCTION

DOCUMENTS

REPLACE BOILERS 4 & 5

5000 W. NATIONAL AVE

MILWAUKEE, WI 53295

695-24-107

2026-04-06

PREL

IMIN

ARY

NOT

FOR

CONS

TRUC

TION

GC106

GENERAL BID DEDUCT PHASING

PLAN - PHASE 3 112

IAR NGB

NOT SPRINKLERED

SCALE: 3/8" = 1'-0"1 GENERAL DEDUCTION PHASING PLAN - PHASE 3

N

N

KEYPLAN

20' - 0"20' - 0"20' - 0"

0"

0"

0"

0"

4321E ED DCBAUPUP

AREA OF WORK

PHASE 3 NOTES - INSTALL AND

COMMISSION OF NEW BOILER

1 INSTALL NEW BOILER AND EQUIPMENT

2 INSTALL STEAM HEADER

3 RECONNECT BOILER 4 PIPING TO HEADER

4 INFILL OF THE 2 HOUR EXTERIOR WALL

5 INSTALLATION OF NEW ROLL UP DOOR & SECURITY GATE

6 COMMISSIONING OF NEW BOILER

7 PERFORMING 30 DAY MONITORING PERIOD BEFORE FINAL TURNOVER TO VA

Revisions: Date:

REV A - 35% SCHEMATIC DESIGN DOCUMENTS 2024-07-24

REV B - 65% DESIGN DEVELOPMENT 2024-09-17

REV C - 65% DESIGN DEVELOPMENT 2025-12-30

D

C

B

A

2A1A

1B

20' - 0" REF 20' - 0" REF 20' - 0" REF

0"

0"

0"

0"

17' - 0"

EXISTING

CATCH BASIN

0"

22' - 2"

BUILDING 12

CS501

CS501

MATCH FINISHED

FLOOR ELEV +/- 71'-0"

MATCH FINISHED

FLOOR ELEV +/- 71'-0"

MIN 1% SLOPE

MIN 1% SLOPE

MATCH FINISHED

FLOOR ELEV +/- 71'-0"

MATCH FINISHED

FLOOR ELEV +/- 71'-0"

ELEV ELEVATION

MIN MINIMUM

REF REFERENCE

ABBREVIATIONS:

SCALE: 1" = 10'-0"1 CIVIL SITE PLAN

23 MECHANIC STREET, SPRINGVILLE, NY 14141

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

100% CONSTRUCTION

DOCUMENTS

REPLACE BOILERS 4 & 5

5000 W. NATIONAL AVE

MILWAUKEE, WI 53295

695-24-107

2026-04-06

PREL

IMIN

ARY

NOT

FOR

CONS

TRUC

TION

CS101

CIVIL SITE PLAN

JRF KRL

NOT SPRINKLERED

N

KEYPLAN

20' - 0"20' - 0"20' - 0"

0"

0"

0"

0"

4321E ED DCBAUPUP

AREA OF WORK

2. TOPOGRAPHIC COUNTOUR LINES ARE APPROXIMATE AND TO BE FIELD VERIFIED.

1. CONTRACTOR TO CONFIRM ELEVATIONS AND SUBMIT PLAN WITH GRADES PRIOR TO

STARTING WORK.

GENERAL NOTES

KEYED NOTES

1 NEW CONCRETE SLAB, SEE DETAIL 2 / CS501

2 APPROXIMATE LOCATION OF BOILER STACK FOUNDATION BELOW GRADE THAT MAY

STILL EXIST

3 SWALE TO EXISTING CATCH BASIN

4 GRADE TO EXISTING DRAIN

5 BLEND CUT TO EXISTING SLOPE AND SWAKE TO EXISTING CATCH BASIN

6 LOW POINT TO DRAIN TO SWALE. DO NOT PUT A CONTROL JOINT OR CRACK JOINT

HERE. USE A PARABOLLIC SWALE

7 PROTECT EXISTING TREE FROM DAMAGE

8 CHAIN LINK FENCE, SEE DETAIL 3 / CS501

9 PROVIDE GATE, SEE DETAIL 4 / CS501

N

Revisions: Date:

REV A - 35% SCHEMATIC DESIGN DOCUMENTS 2024-07-24

REV B - 65% DESIGN DEVELOPMENT 2024-09-17

REV C - 65% DESIGN DEVELOPMENT 2025-12-30

OPERATOR PAD

DIA DIAMETER

MIN MINIMUM

ABBREVIATIONS:

#6 BARS @ 8" OC

EACH WAY

9 MIL POLY

VAPOR RETARDER

9"

COMPACTED STRUCTURAL

FILL SUBBASE

COMPACTED AND PROOF

ROLLED SUBBASE

1'

- 0

/1 CS101

NEW EXISTING

6" EMBEDMENT

EXISTING SLAB

1/2" DIA A36 x 18" LONG SMOOTH DOWEL AT

18" OC GREASE AND WRAP ONE END

SEE DETAIL FOR SLAB THICKNESS

AND REINFORCEMENT

1/2" WIDE JOINT

MATERIAL WITH SEALANT

SLAB SUBBASE

DRILL AND GROUT

EXISTING FOUNDATION

/1 CS101

15'-0" MINIMUM

2" "C"

2" 2" "D" 2" 2" 2" "E"

2" x 4" ALUMINUM

SQUARE TUBE

6" x 2" BOLT ON 180° HINGE

CHAIN LINK FABRIC

HINGE POST SIZE

AND HEIGHT TBD

2" x 2" ALUMINUM SQUARE

TUBE CAPPED VERTICAL

GATE FRAMING TYP

1" ALUMINUM SOLID

SQUARE GUSSETS

GRADE

AMERICAN

ULTRA LATCH

DROP ROD

6" B

EL

OW

G

RA

DE

6'

- 0

PLAN VIEW

ELEVATION VIEW TYP SIDE VIEW GATE SECTION

"I" "G

2" x 4" ALUMINUM

SQUARE TUBE

HORIZONTAL GATE

FRAMING TYP

CHAIN LINK FABRIC

3/16" DIA CABLE

TRUSSING

1" ALUMINUM SOLID

SQUARE GUSSETS

/1 CS101

TOP RAIL OR TENSION WIRE

BRACE RAIL

CORNER, END,

OR PULL POST

TUSS ROD

(3/8" MIN DIA)

TIE WIRES OR

CLIPS TYP

LINE POST

GREEN VINYL COATED CHAIN-LINK

(9 GAGE, 2" MESH)

BOTTOM OF FENCE

LINE POST

TENSION WIRE

TIE WIRES OR

HOG RINGS TYP

6" SLAB ON GRADE

HOG RINGS TYP

CONCRETE BASE

10" DIA

MIN

10'-0" MAXIMUM

LINE POSTS TO BE EQUALLY SPACED

10'-0" MAXIMUM

4'- 0"

6"

16" MINIMUM DIA

6"

4'- 0"

M

IN

IM

UM

6"

.2"

/1 CS101

. 6'- 0"

SCALE: 1" = 1'-0"1 TYP CONCRETE TRUCK SLAB ON GRADE DETAIL

SCALE: 1" = 1'-0"2 TYP SLAB ON GRADE TIE-IN DETAIL

23 MECHANIC STREET, SPRINGVILLE, NY 14141

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

100% CONSTRUCTION

DOCUMENTS

REPLACE BOILERS 4 & 5

5000 W. NATIONAL AVE

MILWAUKEE, WI 53295

695-24-107

2026-04-06

PREL

IMIN

ARY

NOT

FOR

CONS

TRUC

TION

CS501

CIVIL SITE DETAILS

JRF KRL

NOT SPRINKLERED

1. CONTRACTOR TO CONFIRM ELEVATIONS AND SUBMIT PLAN WITH GRADES PRIOR TO

STARTING WORK.

GENERAL NOTES

SCALE: NTS3 TYP SECURITY FENCE

SCALE: NTS4 TYP SWING GATE

Revisions: Date:

REV A - 35% SCHEMATIC DESIGN DOCUMENTS 2024-07-24

REV B - 65% DESIGN DEVELOPMENT 2024-09-17

REV C - 65% DESIGN DEVELOPMENT 2025-12-30

1i

101 DOOR OPENING IDENTIFIER

WINDOW IDENTIFIER

CEILING GRID

LIGHT FIXTURE, CEILING MOUNTED, LETTER INDICATES TYPE

SUPPLY AIR

RETURN AIR

A

Room name

1i

Name Elevation

ROOM NAME AND NUMBER

WALL ID SYMBOL

KEYED NOTE SYMBOL

ELEVATION SYMBOL

AREA BOUNDARY

23 MECHANIC STREET, SPRINGVILLE, NY 14141

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

100% CONSTRUCTION

DOCUMENTS

REPLACE BOILERS 4 & 5

5000 W. NATIONAL AVE

MILWAUKEE, WI 53295

695-24-107

2026-04-06

PREL

IMIN

ARY

NOT

FOR

CONS

TRUC

TION

A-001

ARCHITECTURAL NOTES AND

LEGENDS 112

JRF KRL

NOT SPRINKLERED

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

17.

18.

19.

20.

21.

22.

23.

THE CONTRACTOR SHALL COORDINATE ALL WORK ASSOCIATED WITH THIS PROJECT WITH

THE SUB-CONTRACTORS, TO PROVIDE A COMPLETE AND FINISHED PROJECT.

THIS FACILITY IS OCCUPIED. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL METHODS

AND MEANS OF CONSTRUCTION AND SHALL BE RESPONSIBLE TO THE VA COR FOR

PROVIDING A SAFE WORK ENVIRONMENT DURING THE CONSTRUCTION PERIOD. EVERY

EFFORT SHALL BE MADE BY THE CONTRACTOR TO PROTECT THE OCCUPANTS FROM THE

HAZARDS OF CONSTRUCTION.

ALL MATERIALS SHALL BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S

WRITTEN INSTRUCTIONS AND RECOMMENDATIONS.

DIMENSIONS AND DETAILS ARE BASED ON THE BEST AVAILABLE INFORMATION AND THE

CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING FIELD DIMENSIONS BEFORE

ORDERING MATERIALS AND PREFABRICATED ITEMS.

ALL WORK SHALL BE PERFORMED IN THE BEST AND MOST PROFESSIONAL MANNER BY

CONTRACTORS SKILLED IN THEIR RESPECTIVE TRADES.

THE CONTRACTOR SHALL BE RESPONSIBLE FOR INSPECTING AND CORRECTING HIS OWN

WORKMANSHIP TO THE EXTENT THAT SATISFIES THE VA COR.

THE CONTRACTOR SHALL COORDINATE THE SELECTION OF ALL COMPONENT COLORS,

MODEL NUMBERS, AND SIZES. OF ALL BUILDING ELEMENTS WITH THE VA COR BEFORE

ORDERING MATERIALS.

ALL WORKMANSHIP AND MATERIALS, UNLESS OTHERWISE REQUIRED BY PROJECT

SPECIFICATIONS SHALL BE GUARANTEED FOR A PERIOD OF ONE YEAR FROM THE DATE OF

BENEFICIAL OCCUPANCY.

THE CONTRACTOR SHALL VISIT THE SITE PRIOR TO BID TO VERIFY FIELD CONDITIONS, NO

ADDITIONAL PAYMENT WILL BE MADE FOR FAILURE TO ACCOUNT FOR OBSERVABLE

CONDITIONS.

THE CONTRACTOR SHALL MAKE EVERY EFFORT TO PREVENT THE SPREAD OF DUST,

SMOKE , AND FUMES. THROUGHOUT THE BUILDING AND NEIGHBORHOOD. PROTECT ALL AIR

INTAKES WITH CHARCOAL FILTERS FOR ROOF APPLICATIONS.

THE CONTRACTOR SHALL PROVIDE ALL TEMPORARY SERVICES INCLUDING, ADEQUATE

LIGHTING, WATER, TOILETS, POWER, AND HEAT. AS REQUIRED FOR WORKMAN, MATERIAL

INSTALLATION, AND WORK PROTECTION. OR AS DISCUSSED AND ALLOWED BY THE VA COR.

THE CONTRACTOR SHALL PROVIDE THE VA COR A COMPLETE MAINTENANCE &

OPERATIONAL INSTRUCTIONS IN BOTH WRITTEN AND VERBAL FORM FOR ALL CONTRACTOR

PROVIDED EQUIPMENT.

THE CONTRACTOR SHALL REVIEW ALL CONSTRUCTION DOCUMENTS AND NOTIFY THE VA

COR OF ANY INACCURACIES OR DISCREPANCIES IN THE DOCUMENTS AND IN FIELD

CONDITIONS SHOWN ON THE DRAWINGS IN A TIMELY MANNER.

THE CONTRACTOR SHALL PERFORM ALL WORK IN STRICT ACCORDANCE WITH ALL

APPLICABLE CODES, RULES, REGULATIONS AND ORDINANCES INCLUDING, BUT NOT LIMITED

TO, THE INTERNATIONAL ENERGY CONSERVATION CODE, THE INTERNATIONAL BUILDING

CODE, AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI), NATIONAL FIRE PROTECTION

ASSOCIATION (NFPA) AND OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA).

THE CONTRACTOR SHALL BE AWARE THAT THE FACILITY HAS THE POTENTIAL OF HAVING

OTHER CONSTRUCTION PROJECTS GOING ON AT THE SAME TIME. COORDINATE WITH VA

COR.

ALL WOOD BLOCKING SHALL BE PRESSURE TREATED AND FIRE RETARDANT WITH STAMP

SHOWN.

CONTRACTOR TO REVIEW AND LOCATE ALL DUMPSTER LOCATIONS WITH VA COR PRIOR TO

START OF WORK. COORDINATE DUMPSTER LOCATION WITH VA COR. ANY DUMPSTER WITHIN

20 FEET OF A BUILDING WILL REMAIN COVERED WHEN NOT IN USE. CONTRACTOR SHALL

USE TEMPORARY MARKINGS AND SIGNAGE TO INDICATE DUMPSTER PLACEMENT.

CONTRACTOR TO PROVIDE FIRE PREVENTION PLAN TO VA COR FOR REVIEW AND

APPROVAL.

DIMENSIONS FOR METAL STUD WALLS ARE FROM CENTERLINE TO CENTERLINE OF WALLS

UNLESS OTHERWISE NOTED.

DIMENSIONS FOR MASONRY WALLS ARE FROM FACE OF MASONRY TO FACE OF MASONRY.

DIMENSIONS TO EXISTING EXTERIOR WALLS ARE TO EXISTING ROUGH SURFACE.

DIMENSIONS FOR DOORS AND VISION PANELS IN MASONRY WALLS ARE FROM FACE OF

MASONRY TO CLEAR MASONRY OPENING UNLESS OTHERWISE NOTED.

DIMENSIONS FOR DOORS IN METAL STUD WALLS ARE FROM CENTERLINE OF WALL TO

CENTERLINE OF DOOR.

GENERAL NOTES: GENERAL SYMBOLS:

ARCHITECTURAL SYMBOLS:

ACT ACOUSTICAL CEILING TILE

AFF ABOVE FINISH FLOOR

APPROX APPROXIMATE

BLD BUILDING

CL CENTERLINE

CLR CLEAR

CONC CONCRETE

CONT CONTINUOUS

CONTR CONTRACTOR

EXIST EXISTING

EXT EXTERIOR, EXTINGUISHER

FIN FINISH

GL GLASS

GLZ GLAZING

GWB GYPSUM WALL BOARD

HM HOLLOW METAL

HP HIGH POINT

HR HOUR

INSUL INSULATION

INT INTERIOR

LF LINEAR FEET

LP LOW POINT

LVT LUXURY VINYL TILE

MAT MATERIAL

MIN MINIMUM

MTL METAL

NOM NOMINAL

OC ON CENTER

OPP OPPOSITE

OPNG OPENING

PT PAINT

PTD PAINTED

QTY QUANTITY

RB RESILIENT BASE

RCP REFLECTED CEILING PLAN

REF REFERENCE

RM ROOM

SF SQUARE FEET

SIM SIMILIAR

SPEC SPECIFICATION

TBD TO BE DETERMINED

TME TO MATCH EXISTING

TRTD TREATED

TYP TYPICAL

W/ WITH

W/O WITHOUT

ABBREVIATIONS:

Revisions: Date:

REV A - 35% SCHEMATIC DESIGN DOCUMENTS 2024-07-24

REV B - 65% DESIGN DEVELOPMENT 2024-09-17

REV C - 65% DESIGN DEVELOPMENT 2025-12-30

D

C

20' - 0" REF 20' - 0" REF 20' - 0" REF

0" R

EF

0"

R

EF

AD201

12' - 7 1/2" 3' - 8 1/4"

AD301

11' - 0"

8622 SF

EAST BOILER ROOM

Room name

XXX SF

ROOM NAME, NUMBER, AND AREA

GENERAL SYMBOLS:

REF REFERENCE

SF SQUARE FOOT

ABBREVIATIONS:

23 MECHANIC STREET, SPRINGVILLE, NY 14141

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

100% CONSTRUCTION

DOCUMENTS

REPLACE BOILERS 4 & 5

5000 W. NATIONAL AVE

MILWAUKEE, WI 53295

695-24-107

2026-04-06

PREL

IMIN

ARY

NOT

FOR

CONS

TRUC

TION

AD101

ARCHITECTURAL DEMOLITION

PLAN - FIRST FLOOR LEVEL 112

ANL CCW

NOT SPRINKLERED

SCALE: 3/8" = 1'-0"1 ARCHITECTURAL DEMOLITION PLAN - FIRST FLOOR LEVEL

3. ALL REMOVALS TO BE COORDINATED WITH MECHANICAL AND ELECTRICAL DRAWINGS.

2. BUILDING MUST BE WEATHER TIGHT AND SECURE DURING NON-WORKING HOURS.

CONTRACTOR TO PROVIDE TEMPORARY INFILL PANELS AS REQUIRED

1. SEE A-001 FOR A-SERIES NOTES AND LEGENDS.

GENERAL NOTES

KEYED NOTES

1 EXTERIOR, METAL WALL PANEL AND FRAMING TO BE REMOVED. REFER TO AD-301 FOR

ADDITIONAL INFORMATION

2 EXTERIOR, METAL WALL PANEL AND FRAMING TO BE CAREFULLY REMOVED &

SALVAGED FOR LATER REINSTALLATION. REFER TO AD-301 FOR ADDITIONAL

INFORMATION

N

N

KEYPLAN

20' - 0"20' - 0"20' - 0"

0"

0"

0"

0"

4321E ED DCBAUPUP

AREA OF WORK

Revisions: Date:

REV A - 35% SCHEMATIC DESIGN DOCUMENTS 2024-07-24

REV B - 65% DESIGN DEVELOPMENT 2024-09-17

REV C - 65% DESIGN DEVELOPMENT 2025-12-30

D

C

AD201

AD301

20' - 0" REF 20' - 0" REF 20' - 0" REF

0" R

EF

0"

R

EF

AD205

AD305

12' - 7 1/2" 3' - 8 1/4"

8622 SF

EAST BOILER ROOM

Room name

XXX SF

ROOM NAME, NUMBER, AND AREA

GENERAL SYMBOLS:

REF REFERENCE

SF SQUARE FOOT

ABBREVIATIONS:

23 MECHANIC STREET, SPRINGVILLE, NY 14141

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

100% CONSTRUCTION

DOCUMENTS

REPLACE BOILERS 4 & 5

5000 W. NATIONAL AVE

MILWAUKEE, WI 53295

695-24-107

2026-04-06

PREL

IMIN

ARY

NOT

FOR

CONS

TRUC

TION

AD105

ARCHITECTURAL BID DEDUCT

DEMO PLAN - FIRST FLOOR LEVEL 112

ANL CCW

NOT SPRINKLERED

SCALE: 3/8" = 1'-0"1 ARCHITECTURAL BID DEDUCTION DEMOLITION PLAN - FIRST FLOOR LEVEL

3. ALL REMOVALS TO BE COORDINATED WITH MECHANICAL AND ELECTRICAL DRAWINGS.

2. BUILDING MUST BE WEATHER TIGHT AND SECURE DURING NON-WORKING HOURS.

CONTRACTOR TO PROVIDE TEMPORARY INFILL PANELS AS REQUIRED

1. SEE A-001 FOR A-SERIES NOTES AND LEGENDS.

GENERAL NOTES

N

N

KEYPLAN

20' - 0"20' - 0"20' - 0"

0"

0"

0"

0"

4321E ED DCBAUPUP

AREA OF WORK

KEYED NOTES

1 EXTERIOR, METAL WALL PANEL AND FRAMING TO BE REMOVED. REFER TO AD-305 FOR

ADDITIONAL INFORMATION.

Revisions: Date:

REV A - 35% SCHEMATIC DESIGN DOCUMENTS 2024-07-24

REV B - 65% DESIGN DEVELOPMENT 2024-09-17

REV C - 65% DESIGN DEVELOPMENT 2025-12-30

D

C

MIDDLE ROOF AREA

20' - 0" REF 20' - 0" REF 20' - 0" REF

0" R

EF

0"

R

EF

EXISTING ROOF OPENINGEXISTING ROOF OPENINGEXISTING ROOF OPENING 3

REF REFERENCE

ABBREVIATIONS:

EXISTING BOILER 5 STACK

OPENING TO BE CAPPED

EXISTING ROOF OPENING

TO BE REACTIVATED FOR

NEW BOILER 5 STACK

23 MECHANIC STREET, SPRINGVILLE, NY 14141

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

100% CONSTRUCTION

DOCUMENTS

REPLACE BOILERS 4 & 5

5000 W. NATIONAL AVE

MILWAUKEE, WI 53295

695-24-107

2026-04-06

PREL

IMIN

ARY

NOT

FOR

CONS

TRUC

TION

AD121

ARCHITECTURAL DEMOLITION

PLAN - ROOF LEVEL 112

JRF KRL

NOT SPRINKLERED

2. ALL REMOVALS TO BE COORDINATED WITH MECHANICAL AND ELECTRICAL DRAWINGS.

1. SEE A-001 FOR A-SERIES NOTES AND LEGENDS.

GENERAL NOTES

SCALE: 3/8" = 1'-0"1 ARCHITECTURAL DEMOLITION PLAN - ROOF LEVEL

N

N

KEYPLAN

20' - 0"20' - 0"20' - 0"

0"

0"

0"

0"

4321E ED DCBAUPUP

AREA OF WORK

KEYED NOTES

1 REMOVE BOILER STACK IN ITS ENTIRETY

2 BUILDING MUST BE WEATHER TIGHT AND SECURE DURING NON-WORKING HOURS.

CONTRACTOR TO PROVIDE TEMPORARY CURB COVERS OR ROOF PATCHES

3 REMOVE SHEET METAL CAP AND FLASHING TO REACTIVATE EXISTING CURBED ROOF

OPENING

Revisions: Date:

REV A - 35% SCHEMATIC DESIGN DOCUMENTS 2024-07-24

REV B - 65% DESIGN DEVELOPMENT 2024-09-17

REV C - 65% DESIGN DEVELOPMENT 2025-12-30

REV D - 95% CONSTRUCTION DOCUMENTS 2026-03-09

SCALE: NTS2 EXISTING ROOF CONDITIONS

D

C

MIDDLE ROOF AREA

20' - 0" REF 20' - 0" REF 20' - 0" REF

0" R

EF

0"

R

EF

EXISTING ROOF OPENINGEXISTING ROOF OPENING 3

REF REFERENCE

ABBREVIATIONS:

EXISTING BOILER 5 STACK

OPENING TO BE CAPPED

EXISTING ROOF OPENING

TO BE REACTIVATED FOR

NEW BOILER 5 STACK

23 MECHANIC STREET, SPRINGVILLE, NY 14141

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

100% CONSTRUCTION

DOCUMENTS

REPLACE BOILERS 4 & 5

5000 W. NATIONAL AVE

MILWAUKEE, WI 53295

695-24-107

2026-04-06

PREL

IMIN

ARY

NOT

FOR

CONS

TRUC

TION

AD125

ARCHITECTURAL BID DEDUCTION

DEMOLITION PLAN - ROOF LEVEL 112

JRF KRL

NOT SPRINKLERED

2. ALL REMOVALS TO BE COORDINATED WITH MECHANICAL AND ELECTRICAL DRAWINGS.

1. SEE A-001 FOR A-SERIES NOTES AND LEGENDS.

GENERAL NOTES

SCALE: 3/8" = 1'-0"1 ARCHITECTURAL BID DEDUCTION DEMOLITION PLAN - ROOF LEVEL

N

N

KEYPLAN

20' - 0"20' - 0"20' - 0"

0"

0"

0"

0"

4321E ED DCBAUPUP

AREA OF WORK

KEYED NOTES

1 REMOVE BOILER STACK IN ITS ENTIRETY

2 BUILDING MUST BE WEATHER TIGHT AND SECURE DURING NON-WORKING HOURS.

CONTRACTOR TO PROVIDE TEMPORARY CURB COVERS OR ROOF PATCHES

3 REMOVE SHEET METAL CAP AND FLASHING TO REACTIVATE EXISTING CURBED ROOF

OPENING

SCALE: NTS2 EXISTING ROOF CONDITIONS

Revisions: Date:

REV A - 35% SCHEMATIC DESIGN DOCUMENTS 2024-07-24

REV B - 65% DESIGN DEVELOPMENT 2024-09-17

REV C - 65% DESIGN DEVELOPMENT 2025-12-30

FIRST FLOOR LEVEL

71' - 0"

4 3 2 1

MID ROOF LEVEL

94' - 9"

UPPER ROOF LEVEL

109' - 0"

/1 AD101

9"

2 4

3 3

20' - 0" REF20' - 0" REF20' - 0" REF

12' - 7 1/2" 10' - 11 3/8"

6"

APPROXIMATE GRADE

23 MECHANIC STREET, SPRINGVILLE, NY 14141

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

100% CONSTRUCTION

DOCUMENTS

REPLACE BOILERS 4 & 5

5000 W. NATIONAL AVE

MILWAUKEE, WI 53295

695-24-107

2026-04-06

PREL

IMIN

ARY

NOT

FOR

CONS

TRUC

TION

AD201

ARCHITECTURAL DEMOLITION

EXTERIOR ELEVATION - NORTH 112

ANL ADL

NOT SPRINKLERED

SCALE: 3/8" = 1'-0"1 ARCHITECTURAL DEMOLITION EXTERIOR ELEVATION - NORTH

1. SEE A-001 FOR A-SERIES NOTES AND LEGENDS.

GENERAL NOTES

KEYED NOTES

1 CUT AND REMOVE WALL PANELS CORRESPONDING TO REMOVEABLE FRAMING

SECTION. CONTRACTOR TO VERIFY ALL DIMENSIONS IN FIELD PRIOR TO DEMOLITION

2 REMOVE AND SALVAGE EXISTING WALL PANELS

3 REMOVE BOILER STACK AND SUPPORT FRAMING

4 BUILDING MUST BE WEATHER TIGHT AND SECURE DURING NON-WORKING HOURS.

CONTRACTOR TO PROVIDE TEMPORARY INFILL PANELS

Revisions: Date:

REV A - 35% SCHEMATIC DESIGN DOCUMENTS 2024-07-24

REV B - 65% DESIGN DEVELOPMENT 2024-09-17

REV C - 65% DESIGN DEVELOPMENT 2025-12-30

4 3 2 1

MID ROOF LEVEL

94' - 9"

UPPER ROOF LEVEL

109' - 0"

/1 AD105

1 3

12' - 7 1/2"

20' - 0" REF20' - 0" REF20' - 0" REF

6"

APPROXIMATE GRADE

23 MECHANIC STREET, SPRINGVILLE, NY 14141

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

100% CONSTRUCTION

DOCUMENTS

REPLACE BOILERS 4 & 5

5000 W. NATIONAL AVE

MILWAUKEE, WI 53295

695-24-107

2026-04-06

PREL

IMIN

ARY

NOT

FOR

CONS

TRUC

TION

AD205

ARCHITECTURAL BID DEDUCT

DEMO EXT ELEVATION - NORTH 112

ANL ADL

NOT SPRINKLERED

SCALE: 3/8" = 1'-0"1 ARCHITECTURAL BID DEDUCTION DEMOLITION EXTERIOR ELEVATION - NORTH

1. SEE A-001 FOR A-SERIES NOTES AND LEGENDS.

GENERAL NOTES

KEYED NOTES

1 REMOVE AND SALVAGE EXISTING WALL PANELS

2 REMOVE BOILER STACK AND SUPPORT FRAMING

3 BUILDING MUST BE WEATHER TIGHT AND SECURE DURING NON-WORKING HOURS.

CONTRACTOR TO PROVIDE TEMPORARY INFILL PANELS

Revisions: Date:

REV A - 35% SCHEMATIC DESIGN DOCUMENTS 2024-07-24

REV B - 65% DESIGN DEVELOPMENT 2024-09-17

REV C - 65% DESIGN DEVELOPMENT 2025-12-30

MID ROOF LEVEL

94' - 9"

/1 AD101

1 1

2 2

C8x11.5 (E)

L2 1/

2x 2 1

/2x 5/1

6 ( E)

L2 1/2x2 1/2x5/16 (E) L2 1/

2x 2 1

/2x 5/1

6 ( E)

C8 x1

1.5 (E

C8 x1 1.5

(E

C8x11.5 (E)

C8x11.5 (E)

C8 x1

1.5 (E

C8 x1

1.5 (E

W 8x

(E

W 8x

(E

W10x21 (E)

L3x3x1/4 (E)L3x3x1/4 (E)

L3x3x1/4 (E) L3x3x1/4 (E)

20' - 0" REF 20' - 0" REF 20' - 0" REF

C8 x1

1.5 (E

C8x11.5 (E)

C8 x1

1.5 (E

L3x3x1/4 (E) L3x3x1/4 (E)

L2 1/2x2 1/2x5/16 (E)

W 8x

(E

L2

1/ 2x

2 1 /2x

5/1 6 (

E)

C8x11.5 (E) C8x11.5 (E)

L2 1/2x2 1/2x5/16 (E)

L2 1/

2x 2 1

/2x 5/1

6 ( E)

L3x3x1/4 (E)

C8 x1

1.5 (E

L2 1/2x2 1/2x5/16 (E)L2 1/2x2 1/2x5/16 (E)

W10x25 (E)

C8x11.5 (E)

L2 1/2x2 1/2x5/16 (E)

C8x11.5 (E)C8x11.5 (E)

L2 1/2x2 1/2x5/16 (E) L2 1/2x2 1/2x5/16 (E)

C8 x1

1.5 (E

C8x11.5 (E)

C8 x1

1.5 (E

C8 x1

1.5 (E

C8 x1

1.5 (E

C8x11.5 (E) C8x11.5 (E) C8x11.5 (E)

L3x3x1/4 (E)L3x3x1/4 (E)

L3x3x1/4 (E) L3x3x1/4 (E)

C8 x1

1.5 (E

W10x21 (E)

3 3

2 3 23

C8 x1

1.5 (E

C8 x1

1.5 (E

C8 x1

1.5 (E

C8 x1

1.5 (E

L3x3x1/4 (E)

W 8x

(E

TOS TOP OF STAIR

ABBREVIATIONS:

23 MECHANIC STREET, SPRINGVILLE, NY 14141

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

100% CONSTRUCTION

DOCUMENTS

REPLACE BOILERS 4 & 5

5000 W. NATIONAL AVE

MILWAUKEE, WI 53295

695-24-107

2026-04-06

PREL

IMIN

ARY

NOT

FOR

CONS

TRUC

TION

AD301

ARCHITECTURAL DEMOLITION

BUILDING SECTION 112

ANL ADL

NOT SPRINKLERED

2. CONTRACTOR TO SALVAGE ALL REMOVED FRAMING FOR LATER REINSTALLATION.

1. SEE A-001 FOR A-SERIES NOTES AND LEGENDS.

GENERAL NOTES

SCALE: 3/8" = 1'-0"1 ARCHITECTURAL DEMOLITION BUILDING SECTION

KEYED NOTES

1 4X4X3/8" L UNBOLTED FROM SLAB

2 UNBOLT CONNECTIONS AT ENDS OF 8" C-CHANNEL FRAMING

3 REMOVE EXISITING STEEL

Revisions: Date:

REV A - 35% SCHEMATIC DESIGN DOCUMENTS 2024-07-24

REV B - 65% DESIGN DEVELOPMENT 2024-09-17

REV C - 65% DESIGN DEVELOPMENT 2025-12-30

MID ROOF LEVEL

94' - 9"

/1 AD105

2 2

20' - 0" REF 20' - 0" REF 20' - 0" REF

C8 x1

1.5 (E

C8 x1 1.5

(E

C8x11.5 (E)

C8x11.5 (E)

C8 x1

1.5 (E

C8x11.5 (E) W10x21 (E)

C8 x1

1.5 (E

C8 x1

1.5 (E

C8 x1

1.5 (E

L3x3x1/4 (E) L3x3x1/4 (E)L3x3x1/4 (E) L3x3x1/4 (E) L3x3x1/4 (E) L3x3x1/4 (E)

L3x3x1/4 (E)L3x3x1/4 (E) L3x3x1/4 (E)L3x3x1/4 (E)L3x3x1/4 (E)L3x3x1/4 (E)

W10x25 (E) W10x21 (E)

L2 1/2x2 1/2x5/16 (E) L2 1/2x2 1/2x5/16 (E)C8 x1

1.5 (E

L2 1/2x2 1/2x5/16 (E) L2 1/2x2 1/2x5/16 (E)C8 x1

1.5 (E

C8x11.5 (E) C8x11.5 (E)

W 8x

(E

W 8x

(E

W 8x

(E

W 8x

(E

L2 1/

2x 2 1

/2x 5/1

6 ( E)

L2 1/2x2 1/2x5/16 (E)

L2 1/2x2 1/2x5/16 (E)

L2 1/

2x 2 1

/2x 5/1

6 ( E)

L2 1/2x2 1/2x5/16 (E)

L2 1/

2x 2 1

/2x 5/1

6 ( E)

L2 1/2x2 1/2x5/16 (E) L2

1/ 2x

2 1 /2x

5/1 6 (

E)

C8 x1

1.5 (E

C8 x1

1.5

C8 x1

1.5 (E

C8x11.5

(E

C8 x1

1.5 (E

C8x11.5 (E)C8x11.5 (E) C8x11.5 (E) C8x11.5 (E) C8x11.5 (E) C8x11.5 (E)C8x11.5 (E)

C8 x1

1.5 (E

C8 x1

1.5 (E

C8 x1

1.5 (E

C8 x1 1.5

(E

TOS TOP OF STAIR

ABBREVIATIONS:

23 MECHANIC STREET, SPRINGVILLE, NY 14141

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

100% CONSTRUCTION

DOCUMENTS

REPLACE BOILERS 4 & 5

5000 W. NATIONAL AVE

MILWAUKEE, WI 53295

695-24-107

2026-04-06

PREL

IMIN

ARY

NOT

FOR

CONS

TRUC

TION

AD305

ARCHITECTURAL BID DEDUCT

DEMOLITION BUILDING SECTION 112

ANL ADL

NOT SPRINKLERED

2. CONTRACTOR TO SALVAGE ALL REMOVED FRAMING FOR LATER REINSTALLATION.

1. SEE A-001 FOR A-SERIES NOTES AND LEGENDS.

GENERAL NOTES

SCALE: 3/8" = 1'-0"1 ARCHITECTURAL BID DEDUCTION DEMOLITION BUILDING SECTION

KEYED NOTES

1 4X4X3/8" L UNBOLTED FROM SLAB

2 REMOVE EXISITING STEEL

Revisions: Date:

REV A - 35% SCHEMATIC DESIGN DOCUMENTS 2024-07-24

REV B - 65% DESIGN DEVELOPMENT 2024-09-17

REV C - 65% DESIGN DEVELOPMENT 2025-12-30

D

C

20' - 0" REF 20' - 0" REF 20' - 0" REF

0" R

EF

0"

R

EF

AE501

AE301

AE201

NEW PLATFORM (BY

BOILER MANUFACTURER)

8622 SF

EAST BOILER ROOM

AE502

Room name

XXX SF

ROOM NAME, NUMBER, AND AREA

GENERAL SYMBOLS:

REF REFERENCE

SF SQUARE FOOT

ABBREVIATIONS:

23 MECHANIC STREET, SPRINGVILLE, NY 14141

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

100% CONSTRUCTION

DOCUMENTS

REPLACE BOILERS 4 & 5

5000 W. NATIONAL AVE

MILWAUKEE, WI 53295

695-24-107

2026-04-06

PREL

IMIN

ARY

NOT

FOR

CONS

TRUC

TION

AE101

ARCHITECTURAL PLAN - FIRST

FLOOR LEVEL 112

JRF KRL

NOT SPRINKLERED

1. SEE A-001 FOR A-SERIES NOTES AND LEGENDS.

GENERAL NOTES

SCALE: 3/8" = 1'-0"1 ARCHITECTURAL PLAN - FIRST FLOOR LEVEL

N

N

KEYPLAN

20' - 0"20' - 0"20' - 0"

0"

0"

0"

0"

4321E ED DCBAUPUP

AREA OF WORK

KEYED NOTES

1 REINSTALL SALVAGED PANEL & FRAMING MEMBERS

2 CONTRACTOR TO INSTALL NEW INSULATED ROLLING SERVICE DOOR AND SECURITY

GRATE

Revisions: Date:

REV A - 35% SCHEMATIC DESIGN DOCUMENTS 2024-07-24

REV B - 65% DESIGN DEVELOPMENT 2024-09-17

REV C - 65% DESIGN DEVELOPMENT 2025-12-30

D

C

20' - 0" REF 20' - 0" REF 20' - 0" REF

0" R

EF

0"

R

EF

AE205

8622 SF

EAST BOILER ROOM

NEW PLATFORM (BY

BOILER MANUFACTURER)

AE502

Room name

XXX SF

ROOM NAME, NUMBER, AND AREA

GENERAL SYMBOLS:

REF REFERENCE

SF SQUARE FOOT

ABBREVIATIONS:

23 MECHANIC STREET, SPRINGVILLE, NY 14141

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

100% CONSTRUCTION

DOCUMENTS

REPLACE BOILERS 4 & 5

5000 W. NATIONAL AVE

MILWAUKEE, WI 53295

695-24-107

2026-04-06

PREL

IMIN

ARY

NOT

FOR

CONS

TRUC

TION

AE105

ARCHITECTURAL BID DEDUCT

PLAN - FIRST FLOOR LEVEL 112

JRF KRL

NOT SPRINKLERED

1. SEE A-001 FOR A-SERIES NOTES AND LEGENDS.

GENERAL NOTES

SCALE: 3/8" = 1'-0"1 ARCHITECTURAL BID DEDUCTION PLAN - FIRST FLOOR LEVEL

N

N

KEYPLAN

20' - 0"20' - 0"20' - 0"

0"

0"

0"

0"

4321E ED DCBAUPUP

AREA OF WORK

KEYED NOTES

1 CONTRACTOR TO INSTALL NEW INSULATED ROLLING SERVICE DOOR AND SECURITY

GRATE

Revisions: Date:

REV A - 35% SCHEMATIC DESIGN DOCUMENTS 2024-07-24

REV B - 65% DESIGN DEVELOPMENT 2024-09-17

REV C - 65% DESIGN DEVELOPMENT 2025-12-30

D

C

MIDDLE ROOF AREA

20' - 0" REF 20' - 0" REF 20' - 0" REF

0" R

EF

0"

R

EF

EXISTING ROOF OPENING EXISTING CAPPED

ROOF OPENING

BOILER STACK GUY WIRE

ANCHOR LOCATION, TYP

AE501

AE1212

AE501

REF REFERENCE

TYP TYPICAL

ABBREVIATIONS:

EXISTING BOILER 5 STACK

OPENING TO BE CAPPED

EXISTING ROOF OPENING

TO BE REACTIVATED FOR

NEW BOILER 5 STACK

/1 AE121

23 MECHANIC STREET, SPRINGVILLE, NY 14141

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

100% CONSTRUCTION

DOCUMENTS

REPLACE BOILERS 4 & 5

5000 W. NATIONAL AVE

MILWAUKEE, WI 53295

695-24-107

2026-04-06

PREL

IMIN

ARY

NOT

FOR

CONS

TRUC

TION

AE121

ARCHITECTURAL PLAN - ROOF

LEVEL 112

JRF KRL

NOT SPRINKLERED

2. ALL REMOVALS TO BE COORDINATED WITH MECHANICAL AND ELECTRICAL DRAWINGS.

1. SEE A-001 FOR A-SERIES NOTES AND LEGENDS.

GENERAL NOTES

SCALE: 3/8" = 1'-0"1 ARCHITECTURAL PLAN - ROOF LEVEL

N

N

KEYPLAN

20' - 0"20' - 0"20' - 0"

0"

0"

0"

0"

4321E ED DCBAUPUP

AREA OF WORK

KEYED NOTES

1 INSTALL NEW ROOF STACK. REFER TO DETAIL 1/AE-501

2 CONTRACTOR TO PATCH AND REPAIR EXISTING ROOF MEMBRANE AND MECHANICAL

CURB FOLLOWING ALL EQUIPMENT REMOVALS

3 CONTRACTOR TO INSTALL GUY WIRE ANCHORS FOR NEW BOILER STACK. REFER TO

DETAIL 10/AE-501

Revisions: Date:

REV A - 35% SCHEMATIC DESIGN DOCUMENTS 2024-07-24

REV B - 65% DESIGN DEVELOPMENT 2024-09-17

REV C - 65% DESIGN DEVELOPMENT 2025-12-30

REV D - 95% CONSTRUCTION DOCUMENTS 2026-03-09

SCALE: NTS2 EXISTING ROOF CONDITIONS

REF REFERENCE

TYP TYPICAL

ABBREVIATIONS:

E

D

C

MIDDLE ROOF AREA

20' - 0" REF 20' - 0" REF 20' - 0" REF

0" R

EF

0"

R

EF

EXISTING ROOF OPENINGEXISTING ROOF OPENING

BOILER STACK GUY WIRE

ANCHOR LOCATION, TYP

AE501

AE1212

AE501

EXISTING BOILER 5 STACK

OPENING TO BE CAPPED

EXISTING ROOF OPENING

TO BE REACTIVATED FOR

NEW BOILER 5 STACK

/1 AE125

23 MECHANIC STREET, SPRINGVILLE, NY 14141

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

100% CONSTRUCTION

DOCUMENTS

REPLACE BOILERS 4 & 5

5000 W. NATIONAL AVE

MILWAUKEE, WI 53295

695-24-107

2026-04-06

PREL

IMIN

ARY

NOT

FOR

CONS

TRUC

TION

AE125

ARCHITECTURAL BID DEDUCT

PLAN - ROOF LEVEL 112

JRF KRL

NOT SPRINKLERED

2. ALL REMOVALS TO BE COORDINATED WITH MECHANICAL AND ELECTRICAL DRAWINGS.

1. SEE A-001 FOR A-SERIES NOTES AND LEGENDS.

GENERAL NOTES

N

N

KEYPLAN

20' - 0"20' - 0"20' - 0"

0"

0"

0"

0"

4321E ED DCBAUPUP

AREA OF WORK

KEYED NOTES

1 INSTALL NEW ROOF STACK. REFER TO DETAIL 1/AE-501

2 CONTRACTOR TO PATCH AND REPAIR EXISTING ROOF MEMBRANE AND MECHANICAL

CURB FOLLOWING ALL EQUIPMENT REMOVALS

3 CONTRACTOR TO INSTALL GUY WIRE ANCHORS FOR NEW BOILER STACK. REFER TO

DETAIL 10/AE-501

SCALE: 3/8" = 1'-0"1 ARCHITECTURAL BID DEDUCTION PLAN - ROOF LEVEL

SCALE: NTS2 EXISTING ROOF CONDITIONS

Revisions: Date:

REV A - 35% SCHEMATIC DESIGN DOCUMENTS 2024-07-24

REV B - 65% DESIGN DEVELOPMENT 2024-09-17

REV C - 65% DESIGN DEVELOPMENT 2025-12-30

4 3 2 1

MID ROOF LEVEL

94' - 9"

UPPER ROOF LEVEL

109' - 0"

11' - 0"

/1 AE101

2'

- 6

" GUY WIRE

ATTACHMENT BAND

3"

6"

12' - 7 1/2"

20' - 0" REF20' - 0" REF20' - 0" REF

9"

APPROXIMATE GRADE

23 MECHANIC STREET, SPRINGVILLE, NY 14141

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

100% CONSTRUCTION

DOCUMENTS

REPLACE BOILERS 4 & 5

5000 W. NATIONAL AVE

MILWAUKEE, WI 53295

695-24-107

2026-04-06

PREL

IMIN

ARY

NOT

FOR

CONS

TRUC

TION

AE201

ARCHITECTURAL EXTERIOR

ELEVATION - NORTH 112

ANL ADL

NOT SPRINKLERED

SCALE: 3/8" = 1'-0"1 ARCHITECTURAL EXTERIOR ELEVATION - NORTH

1. SEE A-001 FOR A-SERIES NOTES AND LEGENDS.

GENERAL NOTES

KEYED NOTES

1 REPLACE SALVALGED WALL PANEL. CONTRACTROR TO REPAIR OR REPLACE ANY

COMPONENTS DAMAGED DURING REMOVAL PROCESS

2 CONTRACTOR TO INSTALL NEW INSULATED ROLLING SERVICE DOOR AND SECURITY

GRATE

Revisions: Date:

REV A - 35% SCHEMATIC DESIGN DOCUMENTS 2024-07-24

REV B - 65% DESIGN DEVELOPMENT 2024-09-17

REV C - 65% DESIGN DEVELOPMENT 2025-12-30

4 3 2 1

MID ROOF LEVEL

94' - 9"

UPPER ROOF LEVEL

109' - 0"

/1 AE105

GUY WIRE

ATTACHMENT BAND

0" 2'

- 6

6"

12' - 7 1/2"

APPROXIMATE GRADE

23 MECHANIC STREET, SPRINGVILLE, NY 14141

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

100% CONSTRUCTION

DOCUMENTS

REPLACE BOILERS 4 & 5

5000 W. NATIONAL AVE

MILWAUKEE, WI 53295

695-24-107

2026-04-06

PREL

IMIN

ARY

NOT

FOR

CONS

TRUC

TION

AE205

ARCHITECTURAL BID DEDUCT

EXTERIOR ELEVATION - NORTH 112

ANL ADL

NOT SPRINKLERED

SCALE: 3/8" = 1'-0"1 ARCHITECTURAL BID DEDUCTION EXTERIOR ELEVATION - NORTH

1. SEE A-001 FOR A-SERIES NOTES AND LEGENDS.

GENERAL NOTES

KEYED NOTES

1 CONTRACTOR TO INSTALL NEW INSULATED ROLLING SERVICE DOOR AND SECURITY

GRATE

Revisions: Date:

REV A - 35% SCHEMATIC DESIGN DOCUMENTS 2024-07-24

REV B - 65% DESIGN DEVELOPMENT 2024-09-17

REV C - 65% DESIGN DEVELOPMENT 2025-12-30

AE301

/1 AE101

W10x21 (E)

20' - 0" REF 20' - 0" REF 20' - 0" REF

L3x3x1/4 (E)L3x3x1/4 (E)

C8 x1

1.5

C8x11.5

L2 1/

2x 2 1

/2x 5/1

6 ( E)

C8x11.5 (E) C8x11.5 (E)

L2 1/2x2 1/2x5/16 (E)

C8x11.5 (E)

C8 x1

1.5 (E

C8 x1

1.5 (E

C8x11.5 (E)

L2 1/

2x 2 1

/2x 5/1

6 ( E)

L3x3x1/4 (E)L3x3x1/4 (E)

C8 x1

1.5 (E

C8 x1

1.5 (E

L2 1/2x2 1/2x5/16 (E)

L2 1/2x2 1/2x5/16 (E)L2 1/2x2 1/2x5/16 (E)

W10x25 (E)

C8 x1

1.5 (E

L2 1/

2x 2 1

/2x 5/1

6 ( E)

L2 1/2x2 1/2x5/16 (E) L2 1/

2x 2 1

/2x 5/1

6 ( E)

L2 1/2x2 1/2x5/16 (E)C8 x1

1.5

C8x11.5 (E) C8x11.5 (E)

C8 x1

1.5 (E

C8 x1

1.5 (E

L3x3x1/4 (E)

L3x3x1/4 (E) L3x3x1/4 (E)

L3x3x1/4 (E)

C8x11.5 (E) C8x11.5 (E)C8x11.5 (E)

C8 x1

1.5 (E

C8 x1 1.5

(E

C8 x1

1.5 (E

C8 x1

1.5 (E

C8x11.5 (E)C8x11.5 (E)

W 8x

(E

W 8x

(E

W 8x

(E

W 8x

(E

L2 1/2x2 1/2x5/16 (E) L2 1/2x2 1/2x5/16 (E)

C8 x1

1.5 (E

W10x21 (E)

AE301

FIRST FLOOR LEVEL

71' - 0"

E

AE501

AE501

AE501

/3 AE301

TOS TOP OF STAIR

ABBREVIATIONS:

AE502

2'-4"

3'- 6"

1'-2 1/8"

3'-8 1/8"

5"

BENT STEEL PLATE JAMB

TO STRUCTURAL

FRAMING

OVERHEAD DOOR

OVERHEAD DOOR

ASSEMBLY

/3 AE301

OVERHEAD COILING

DOOR & GRILL TO BE

INSTALLED AS PER THE

MANUFACTURER'S

SPECIFICATIONS

/1 AE305

23 MECHANIC STREET, SPRINGVILLE, NY 14141

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

100% CONSTRUCTION

DOCUMENTS

REPLACE BOILERS 4 & 5

5000 W. NATIONAL AVE

MILWAUKEE, WI 53295

695-24-107

2026-04-06

PREL

IMIN

ARY

NOT

FOR

CONS

TRUC

TION

AE301

ARCHITECTURAL BUILDING

SECTION 112

ANL ADL

NOT SPRINKLERED

2. CONTRACTOR TO SALVAGE ALL REMOVED FRAMING FOR LATER REINSTALLATION.

1. SEE A-001 FOR A-SERIES NOTES AND LEGENDS.

GENERAL NOTES

SCALE: 3/8" = 1'-0"3 ARCHITECTURAL BUILDING SECTION

KEYED NOTES

1 4X4X3/8" L BOLTED TO SLAB

2 REINSTALL BOLTED CONNECTIONS AT ENDS OF 8" C-CHANNEL FRAMING

SCALE: 3/4" = 1'-0"1 WALL PANEL SECTION

Revisions: Date:

REV A - 35% SCHEMATIC DESIGN DOCUMENTS 2024-07-24

REV B - 65% DESIGN DEVELOPMENT 2024-09-17

REV C - 65% DESIGN…