RFP D-5 QASP_3-18-2024.xlsx

XLSX spreadsheet 12 KB Posted

Attached to
Transportation Security Administration Checkpoint Integrated Logistics Support (ILS) Services
Solicitation number
70T04024R7672N001
Issued by

About this file

This document is an attachment to a Request for Proposal (RFP) for Transportation Security Administration (TSA) Checkpoint Maintenance Services. The attachment, titled "ATTACHMENT 5 - QASP CONTRACT/ SOW SECTION", outlines the performance requirements, standards, and surveillance methods for various aspects of the contract, including preventive maintenance, radiation surveys, contractor logistics support (CLS) services, and the TSA Service Response Center (TSRC) operations.

The key details include performance standards and acceptable quality limits for preventive maintenance, radiation surveys, CLS services (e.g., Ao, parts availability, FST response time, depot turnaround time), and TSRC operations (e.g., call answer times, ticket status updates, email response times, service request dispatching). The document also specifies the method of surveillance and the monitoring performed by the Contracting Officer's Representative (COR) or the TSA Metrics Team.

View the file

Other files

File Type Posted
ILS Checkpoint Draft RFP amendment 4 track changes.docx DOCX document
Attachment F3 Price Evaluation Template - Amendment 4.xlsx XLSX spreadsheet
ILS Checkpoint Draft RFP amendment 4 clean.docx DOCX document
Checkpoint Maintenance RFP_Amendment 04_SF30.pdf PDF
ILS Checkpoint Draft RFP amendment 3 track changes.docx DOCX document
Checkpoint Maintenance RFP_Amendment 03_SF30.pdf PDF
Attachment F3 Price Evaluation Template - Amendment 3.xlsx XLSX spreadsheet
ILS Checkpoint Draft RFP amendment 3 clean.docx DOCX document
ILS Checkpoint Draft RFP amendment 2 track changes.docx DOCX document
DID APM-ILS-025_Special Reporting Requirements - Amendment 2.doc DOC document
Checkpoint Maintenance RFP_Amendment 02_SF30.pdf PDF
ILS Checkpoint Draft RFP amendment 2 clean.docx DOCX document
Attachment F3 Price Evaluation Template - Amendment 2.xlsx XLSX spreadsheet
TSA Checkpoint Maint Questions Amendment 2.pdf PDF
Attachment F-2 Past Performance Data - Amendment 2.docx DOCX document
ILS Checkpoint Draft RFP amendment 1 track changes.docx DOCX document
DID APM-ILS-028_Semiannual Vetting and Certification Status 5-7-2024.pdf PDF
ILS Checkpoint Draft RFP amendment 1 clean.docx DOCX document
TSA Checkpoint Maint Questions and Answers - Amendment 1.pdf PDF
Attachment F-2 Past Performance Data - Amendment 1.docx DOCX document
CDRL A030 Parts Obsolescence Management Plan 5.6.2024.pdf PDF
Checkpoint Maintenance RFP_Amendment 01_SF30 - Copy.pdf PDF
Attachment F3 Price Evaluation Template - Amendment 1.xlsx XLSX spreadsheet
DID APM-ILS-007B_Meeting Minutes 5-7-2024 (1).pdf PDF
Q and A template.xlsx XLSX spreadsheet
Wage Determination_1 of 5.zip ZIP file
Wage Determination_4 of 5.zip ZIP file
Wage Determination_5 of 5.zip ZIP file
Wage Determination_3 of 5.zip ZIP file
Wage Determination_2 of 5.zip ZIP file
Attachment F-5 Labor Categories Descriptions and Minimum Qualifications (004).docx DOCX document
Attachment F-2 Past Performance Data.docx DOCX document
D-8 Persec Documentation.zip ZIP file
D-11 DHS Form 200-2-ROS.pdf PDF
RFP CDRLS 3-6-2024.zip ZIP file
RFP DIDs.zip ZIP file
RFP D-3 TSE Metrics Terms and Definitions and RMA Metrics.docx DOCX document
Attachment F-4 Subcontracting Plan Template.docx DOCX document
D-4 Media Sanitation TSA Form.doc DOC document
D-6 DD Form 1149 - Requisition and Invoive Shipping Document.pdf PDF
RFP Attachment D13 H_H_H - RTM 5May21.pdf PDF
RFP D-1 Fed Airport Listing and Airport Operational Hours.xlsx XLSX spreadsheet
RFP 70T04024R7672N001.pdf PDF
D-9 TSA Region Map.pdf PDF
RFP Part F- Attachment TSE Inventory List.xlsx XLSX spreadsheet
RFP Attachment D7 - TSA ILS SLA Performance Metrics.rtf RTF text file
RFP Attachment D-12 Cybersecurity and Enterprise Architecture Policy 2-8.docx DOCX document
Attachment F1 Price Evaluation Template.xlsx XLSX spreadsheet
RFP D-3a Data Dictionary.xlsx XLSX spreadsheet
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

ATTACHMENT 5 - QASP
CONTRACT/
SOW SECTIONPERFORMANCE REQUIREMENTPERFORMANCE STANDARD ACCEPTABLE QUALITY LIMITMETHOD OF SURVEILLANCECOMPLIANCE WITH PERFORMANCE STANDARD/ AQLOTHER COMMENTSMONITORING PERFORMED BYDATES
Section C.8.1Preventive maintenance (PM) is performed in accordance with OEM recommended schedulesMonthly PM: once per month with minimum of 6 calendar days between PMs

Every other month PM: Maximum of 61 days between PMs Quarterly PM: Maximum of 90 days between PMs Semi-Annual PM: Maximum of 182 days between PMs

Annual PM: Maximum of 364 days between PMs100% Inspection of Monthly PM completionCOR
Section C.8.2Perform and record radiation surveys on each applicable unit at least once every twelve (12) months, after any maintenance that affects the radiation shielding or x-ray production components, after system relocation, and after any incident that may have damaged the system such that unintended radiation emission could occur100% of Radiation Surveys Completed on time with surveys submitted to Gov within required timeframes100% Inspection of Monthly RLS completionCOR
Section C.8.10.1The Contractor shall provide CLS services for fielded TSE to meet or exceed requirements98.0% or higher Ao for each 'airport-equipment type' combination; critical (P1) and non-critical (P2) relevant maintenance actions only; Monthly100% inspection of Ao in A004COR
Section 8.10.2The Contractor shall develop a supply chain to support CLS services that meet or exceed requirementsParts Availability Time equals or is less than 18.0 hours; critical maintenance actions only (P1); Monthly Average nationwide100% inspection of monthly PAT in A004TSA Metrics Team
Section C.8.10.3The Contractor shall develop a staffing plan to support CLS services that meet or exceed requirementsFST response time is 3.0 hours or less for CAT X airports and 5.0 hours or less for all Categories combined; critical maintenance actions only (P1); Monthly Average nationwide100% inspection of monthly response time in A004TSA Metrics Team
Section C.8.10.4The Contractor shall develop a depot maintenance plan to support CLS services that meet or exceed requirementsDepot Turnaround Time equals or is less than 360.0 hours; Monthly Average nationwide100% inspection monthly of DTAT in A004TSA Metrics Team
Section C.8.10.5The Contractor shall develop a depot maintenance plan to support CLS services that meet or exceed requirements95.0% or more of Non-critical maintenance actions (P2) will be completed within 720.0 hours of opening; National average100% inspection of non-critical work order completion in A004TSA Metrics Team
Section C.8.12.2The TSRC telephone line capacity shall be capable of handling the volume of incoming calls so that no calls will encounter a busy signal95.0% of all calls shall be answered by a person within 30 seconds, and 98.0% of all calls shall be answered by a person within 60 seconds100% inspection monthly of A021COR
Section C.8.12.2The TSRC shall follow up on ticket status with the originatorProvide status updates on open tickets every 8 hours; follow up with MSP DCF every 24 hours if status not provided by MSP DCFConfirmation of daily reports distributionCOR
Section C.8.12.2The TSRC shall respond to emails from TSARespond in 15 minutes or less100% inspection monthly of A004TSA Metrics Team
Section C.8.12.2The TSRC shall dispatch each TSA maintenance service requestTickets dispatched within 15 minutes (0.25 hours)100% inspection monthly of A004TSA Metrics Team

File details come from the government source that posted it. Updated .