This document is a Contract Data Requirements List (CDRL) for a Parts Obsolescence Management Plan (POMP) related to a federal contract opportunity. The CDRL outlines the requirements for the contractor to submit an initial POMP 60 days after contract award, with annual updates as required. The POMP shall be submitted electronically in a Microsoft Office compatible format to the Contracting Officer, Contracting Officer's Representative, and designated recipients.
The related federal contract opportunity is for Transportation Security Administration (TSA) Checkpoint Maintenance Services. This is a commercial item solicitation issued as a Request for Proposal (RFP) with a proposal due date of June 4, 2024. Historical maintenance data, equipment listings, and performance data are available upon request. All questions must be submitted by April 24, 2024, and the solicitation will only be available on the Sam.gov website.
View the file
Other files
Show all 49
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OMB Control No. 2120-0595 (DD Form 1423-1) FAA Template No. 59
(6/98)
CONTRACT DATA REQUIREMENTS LIST (CDRL) Page 1 of 1
A. Contract Line Item No.
TBD
B. Exhibit
A
C. Category (Check appropriate one)
TDP TM Other
D. System/Item
TSE ILS Services
E. Contract/PR No.
TBD
F. Contractor
1. Data Item No.
A030
2. Title of Data Item
Parts Obsolescence Management Plan (POMP)
3. Subtitle
N/A
4. Authority
APM-ILS-030
5. Contract Reference
PWS Paragraph C.8.6.1
6. Requiring Office
APM
7. DD 250 Req’d 8. APP Code 9. Distribution Statement Required 10. Frequency 11. As of Date (AOD)
LT A A ONE/R 0
12. Date of First
Submission
See Block 14
13. Date of Subsequent
Submission
ASREQ
15. Distribution
See Block 14
14. REMARKS: a. b. c. Final Copies
Block 12
The initial POMP shall be submitted to the Government 60 days post award.
If a submittal is disapproved, the data item shall be revised and re-submitted within 15 working DARC.
Once approved by the COR, proposed changes shall be submitted 20 working days prior to required implementation date.
The POMP shall be reviewed and updated annually if necessary to reflect up-to-date information and plans depicting the current maintenance activities and implementation.
Block 13
If the POMP is updated, the revised data item shall be submitted within 20 working days from end of review.
Block 15
The POMP shall be submitted in electronic format compatible with Microsoft
Office Suite in accordance with paragraph C.2.4 of the PWS. CDRL submittal will be sent to the CO, COR, and the COR designated recipients as directed. The
CDRL shall be delivered with a cover letter signed by the Contractor’s authorized approving official.
Addressee Copies Reg. Repro
CO
COR
16. Total 2
G. Prepared By: H. Date I. Approved By J. Date
APM
17. Price Group
18. Estimated Total Price
OMB Control No. 2120-0595 (DD Form 1423-1) FAA Template No. 59 (reverse) (6/98)
INSTRUCTIONS FOR COMPLETING FAA Template No. 59 (6/98)
A. Contract Line Item No. Contract Line Item Number (CLIN) associated with this Contract Data Requirements List (CDRL).
B. Exhibit. Exhibit identifier for this CDRL item.
C. Category. TDP, TM, or Other.
D. System/Item. System, item, project designator or name, or title of services being acquired that the data will support.
E. Contract/PR No. Procurement Instrument Identification Number (PIIN) (i.e., the contract number, the Purchase Request (PR) number, the screening Information Request (SIR) number, or other appropriate designator.
F. Contractor. Contractor’s name.
G. Prepared by. Preparer’s organization responsible for preparing the CDRL.
H. Date. Date the form was prepared.
I. Approved by. Office responsible for approving the CDRL. The approving official’s signature appears on the last page of exhibit.
J. Date. The date the CDRL was approved.
1. Data Item No. The 4-character Exhibit Line Item Number (ELIN). The first position consists of the exhibit identifier and the remaining positions are assigned sequentially.
2. Title of Data Item. The title of the Data Item Description (DID) cited in item 4.
3. Subtitle. Further identification of the data item to supplement the title, if required.
4. Authority (Data Acquisition Document No.) DID identification number where detailed preparation instructions are provided.
5. Contract Reference. The specific paragraph number of the applicable contractual document that contains the tasking that generates a requirement for the data item. Normally, this will be a Statement of Work (SOW) paragraph.
6. Requiring Office. The technical office having responsibility for ensuring the technical adequacy of the data.
7. DD 250 Required.
8. APP Code. Identification, by entry of an “A,” of a requirement for advance written approval prior to final distribution of an item of data. An “A” in this item indicates that one or more draft submittals are required. Item 14 will show length of turn-around time for the contractor to resubmit the data after
Government approval/disapproval has been issued.
9. Distribution Statement Required.
10. Frequency. The frequency of data submittal. Entries in this item are explained in Table 1. If the data is of a recurring type, it is to be submitted at the end of the reporting period established in this item unless otherwise indicated in item 14.
Table 1. Data Submittal Frequency Codes
CODE FREQUENCY CODE FREQUENCY
ANNLY Annually ASGEN As generated ASREQ As required BI-MO Every two months
BI-WE Every two weeks CP/RQ Change pages as required
DAILY Daily DFDEL Deferred delivery
MTHLY Monthly ONE/R One time with revisions
OTIME One time (does not include draft submissions QRTLY Quarterly R/ASR Revisions as required SEMIA Every six months
WEKLY Weekly “N”TIME Multiple separate submittals (2time, 3time, etc.)
See Item #14 Requirement is described in item #14. Used in lieu of other codes where such are inadequate to define requirement, or used in addition to other codes requiring amplification in item #14.
11. As of Date. Date for cutting off collection of the data. If the data is to be submitted multiple times, a numeral will be entered to indicate the number of calendar days prior to the end of the reporting period, established in item 10, that data collection will be cut off. For example, “15” would place the “as of date” for the data at 15 days before the end of the month, quarter, or year, depending upon the frequency established in item 10; a “0 or blank” would place the “as of” date at the end of each month, quarter, etc.
12. Date of First Submission. Due date for initial data submission. This is normally the postage date or date the data is delivered to the Contracting Officer or keyed to a specific event or milestone, using a code from Table 2.
Table 2. Data Submission Codes
Code Definition Code Definition
ASGEN As generated ASREQ As required
DFDEL Deferred delivery “N”DAC Days after contract award “N”DACM Days after contract modification “N”DARP Days after reporting period
“N”DARC Days after receipt of comments “N”DTC Days after test completion
NLT No later than EOC End of contract
EOM End of month EOQ End of quarter
See item #14 Use to indicate requirement is described in item 14. Used in lieu of other codes where such are inadequate to define requirement or used in addition to other codes when amplification is included in item 14.
The “N” is assigned a value indicating the number of days, e.g., 30 DAC
13. Date of Subsequent Submission. Due date(s) for subsequent data submission(s), if data is to be submitted more than once. If submittal is constrained by a specific event or milestone, the constraint will be given using a code from Table 2.
14. Remarks. Contains all pertinent information not specified elsewhere and any amplification of other items on this format (e.g., DID tailoring, approval criteria and authority, inspection and acceptance clarification, distributions statements, specific submission instructions, explanation of reproducible copy and delivery requirements, alternative medium for delivery of the data item, etc.).
15. Distribution. Addressees and the number of draft and final copies (regular or reproducible) to be provided to each. FAA facility designator and/or office symbols/codes may be used; however, an explanation of these will be provided in the Addressee Listing. When reproducible copies (e.g., magnetic diskettes/tape, vellum, negative, etc.) are required, an explanation will be provided in item 14. If deferred delivery is required, amplification will be given in item 14.
16. Total. Total number of draft and final (regular/reproducible) copies required.
17. Price Group. Not used. 18. Estimated Total Price. Not used.
File details come from the government source that posted it. Updated .