RFP 69056725R000010_MT ERFO NP YELL 2022-1(3).pdf

PDF 10 MB Posted

Attached to
MT ERFO NP YELL 2022-1(3), Yellowstone NP Rescue Creek Bridge Replacement
Solicitation number
69056725R000010
Issued by

View the file

Other files

File Type Posted
Amendment A003.pdf PDF
QA_09-02-2025.pdf PDF
QA_08-27-2025.pdf PDF
Amendment A002.pdf PDF
QA_08-21-2025.pdf PDF
QA2_08-18-2025.pdf PDF
QA_08-18-2025.pdf PDF
Amendment A001.pdf PDF
QA_08-14-2025.pdf PDF
mt-ep-yell2022-1-3_xs.pdf PDF
mt-ep-yell2022-1-3_Rescue Creek Bridge Final Foundation Memo.pdf PDF
mt-ep-yell2022-1-3_Rescue creek_control-sheet.xlsx XLSX spreadsheet
mt-ep-yell2022-1-3_ali.pdf PDF
mt-ep-yell2022-1-3_plans_Final.pdf PDF
Physical Data.zip ZIP file
RescueCreek_Waterway_Hydraulics_Memo_95pct.pdf PDF
mt-ep-yell2022-1-3_earthwork.pdf PDF
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

YELLOWSTONE, GRAND TETON, & SURROUNDING AREA MATOC

TASK ORDER REQUEST FOR PROPOSALS

Solicitation No. 69056725R000010

MT ERFO NP YELL 2022-1(3)

Yellowstone NP Rescue Creek Bridge Replacement

Solicitation, Offer & Award, Bid Schedule, Contract Clauses

Minimum Wage Schedule, Special Contract Requirements, and Plans

This solicitation cites

Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-14

This project uses U.S. Customary units of measure.

ISSUING OFFICE:

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

610 EAST FIFTH STREET

VANCOUVER, WA 98661-3801

Phone (360) 619-7520

EMAIL: WFL.CONTRACTS@DOT.GOV

WORLD HERITAGE SITE

QUICK INDEX

Page Item --- Special Notice

--- Offer Submittal Checklist --- Authority to Sign --- Bid Bond --- Table of Contents A-1 Notice to Offerors A-3 SF1442, Solicitation, Offer and Award A-7 Bid Schedule B-1 Solicitation Provisions C-1 Contract Clauses D-1 Davis-Bacon Wage Rates E-1 Special Contract

Requirements H-1 Permits I-1 Yellowstone National Park

Size and Weight Limitations of Traffic

Proposal Due Date:

See Page A-3, Block 13A

PROPOSAL REMINDERS

Electronic bids will not be accepted. Submit printed copy of bid to the address listed on the enclosed SF 1442. Before submitting your bid, please review the following:

• Have you rechecked your bid figures?

• Have you completed the bid schedule?

• Have you completed and signed the SF 1442, Solicitation, Offer & Award?

• Have you acknowledged all amendments?

• Have you completed the Representations & Certifications (Page B-1)?

• Is your bid guarantee enclosed in proper form and amount (see FAR Clause 52.228-1), including Power of Attorney affidavit?

• Does the lower left corner of the proposal envelope state “Proposal Enclosed”?

• Does the lower left corner include the Solicitation Number and MT ERFO NP YELL 2022-1(3), Yellowstone NP Rescue Creek Bridge Replacement?

mailto:wfl.contracts@dot.gov

PROJECT No/Name MT ERFO NP YELL 2022-1(3), Yellowstone NP

Rescue Creek Bridge Replacement

BEGINNING AT See plans

ENDING AT See plans

LENGTH (miles) 0.08

NATIONAL PARK Yellowstone National Park

COUNTY Park

STATE Montana

FIXED COMPLETION DATE See SF1442, page A-5

SPECIAL NOTICE

Project No.: MT ERFO NP YELL 2022-1(3) Project Name: Yellowstone NP Rescue Creek Bridge Replacement

Solicitation No.: 69056725R000010

THIS “TASK ORDER REQUEST FOR PROPOSAL” IS SOLELY FOR THE

FOLLOWING CONTRACTS AND CONTRACTORS:

Contract Number Contractor Name Phone

69056724D000010 H-K CONTRACTORS, INC. 208-523-6600

69056724D000011 M.A. DEATLEY CONSTRUCTION, INC. 509-751-1580

69056724D000012 MISSOURI RIVER CONTRACTORS, LLC 406-443-2524

69056724D000013 OFTEDAL CONSTRUCTION, INC. 406-232-5911

69056724D000014 RIVERSIDE CONTRACTING INC 406-721-9267

69056724D000015 SUNDT CONSTRUCTION, INC. 801-853-8070

THIS PROJECT IS BEING ADVERTISED ON SAM.GOV TO ANNOUNCE

THE UPCOMING PROJECT AND ASSIST POTENTIAL SUBCONTRACTORS

BY PUBLICIZING OPPORTUNITIES. A PROPOSAL WILL ONLY BE

ACCEPTED FROM THE ABOVE PRIME CONTRACTORS.

This information is also available on our website:

Yellowstone/Grand Teton MATOC1:

https://highways.dot.gov/federal-lands/business/construction-contracting/yellowstone-grand-teton

1 A Multiple Award Task Order Contract (MATOC) is a group of contracts awarded to several contractors for upcoming work in a certain geographical area (in this case, work in Yellowstone and Grand Teton National Parks).

The contracts allow the contractor to compete for upcoming highway/bridge construction projects.

https://highways.dot.gov/federal-lands/business/construction-contracting/yellowstone-grand-teton https://highways.dot.gov/federal-lands/business/construction-contracting/yellowstone-grand-teton

Offer Submittal Checklist

Project: MT ERFO NP YELL 2022-1(3), Yellowstone NP Rescue Creek Bridge Replacement

Before submitting your offer, please review the following:

Done?

Is this in the envelope?

Bid Envelope Did I correctly address the envelope? (See page A-3, blocks 7 & 8)

Does the lower left corner of the envelope include the Solicitation Number and the project name/number?

Pages A-3 & A-4 (SF 1442, Solicitation Offer & Award)

Did I include our firm name and address in block 14?

Did I include our firm’s phone number in block 15?

Did I include our firm’s remittance address in block 16?

(Use when different than block 14)

Did I include my unique entity identifier and my Cage Code?

Did I include the number & date of all amendments in block 19?

Did the appropriate official sign/date in block 20A, 20B & 20C?

Bid Schedule (see page A-7)

Did I insert “Unit Bid Price” and “Amount Bid” for each bid item?

Did the appropriate official initial corrections?

When applicable, did I include the totals for each schedule in the summary page? (See last page of bid schedules.)

Bid Bond (Standard Form 24)

Bids received without a valid bid bond will be rejected.

Did I complete my bid bond correctly?

Did I include the original?

Did I attach the Power of Attorney to the bid bond?

Authority to Sign

Did I include a completed form for each person signing the SF1442 and Bid Bond?

Representations & Certifications & FAR Clause

Did I include the completed B-pages (beginning on B-1)?

Did I include the completed clause 1252.228-74 Notification of Payment Bond Protection (See page C-114)?

System for Award Management (SAM) SAM.gov

Do we have up-to-date data in SAM?

Veteran Reporting (FAR Clause 52.222-37) If applicable, did I ensure our firm has completed this annual report?

NOTE: The Contractor is fully responsible to verify that all data is correct each time a offer package is submitted. Failure to properly input and/or update your data may cause the offer to be rejected.

https://sam.gov/content/home

Project: MT ERFO NP YELL 2022-1(3), Yellowstone NP Rescue Creek Bridge Replacement

Driving Directions to our Vancouver Washington Office:

Directions to WFLHD https://www.google.com/maps/place/610+E+5th+St,+Vancouver,+WA+98661/data=!4m2!3m1!1s0x5495a8ae3f2d7083:0x5b7adcfa96ade37a?hl=en

Authority to Sign

INSTRUCTIONS: When the offeror/principal is a corporation, include this certification with your offer/bid.

Corporate Certificate

I, ____________________________________________ (name), certify that I am the

________________________________________(title), of the corporation named as the Offeror/Principal herein;

that _________________________________________(name), who signed this offer and/or bid bond on behalf of ___________________________ (company name) is

________________________________________ (title) of this corporation;

that the offer was duly signed for and on behalf of said corporation by authority and scope of its governing body, and within the scope of its corporate powers.

_____________________________________ (signature) Affix Corporate Seal

_____________________________________ (title)

Authority to Sign

INSTRUCTIONS: When the offeror/principal is a limited liability company, include this certification with your offer/bid.

Limited Liability Certificate

I, ____________________________________________ (name), certify that I am the

________________________________________(title), of the limited liability company named as the Offeror/Principal herein;

that _________________________________________(name), who signed this offer and/or bid bond on behalf of ___________________________ (company name) is

________________________________________ (title) of this company;

that the offer was duly signed for and on behalf of said company by authority and scope of its governing body, and within the scope of its powers.

_____________________________________ (signature) Affix Company Seal (as applicable) ___________________________________ (title)

Bid Bond (See Instructions on Page 3)

Date Bond Executed (Must Not Be Later Than Bid Opening Date)

OMB Control Number: 9000-0045 Expiration Date: 8/31/2025

Principal (Legal Name And Business Address) Type Of Organization ("X" One)

State Of Incorporation

Surety(ies) (Name And Business Address)

Percent Of Bid Price

Penal Sum Of Bond Amount Not To Exceed Million(s) Thousand(s) Hundred(s) Cents

Bid Identification Bid Date Invitation Number

Authorized For Local Reproduction Previous Edition Is Not Usable

STANDARD FORM 24 (REV. 10/2023)

Prescribed by GSA - FAR (48 CFR) 53.228(a)

Obligation:

We, the Principal and Surety(ies) are firmly bound to the United States of America (hereinafter called the Government) in the above penal sum. For payment of the penal sum, we bind ourselves, our heirs, executors, administrators, and successors, jointly and severally. However, where the Sureties are corporations acting as co-sureties, we, the Sureties, bind ourselves in such sum "jointly and severally" as well as "severally" only for the purpose of allowing a joint action or actions against any or all of us. For all other purposes, each Surety binds itself, jointly and severally with the Principal, for the payment of the sum shown opposite the name of the Surety. If no limit of liability is indicated, the limit of liability is the full amount of the penal sum.

Conditions:

The Principal has submitted the bid identified above.

Therefore:

The above obligation is void if the Principal - (a) upon acceptance by the Government of the bid identified above, within the period specified therein for acceptance (sixty (60) days if no period is specified), executes the further contractual documents and gives the bond(s) required by the terms of the bid as accepted within the time specified (ten (10) days if no period is specified) after receipt of the forms by the Principal; or (b) in the event of failure to execute such further contractual documents and give such bonds, pays the Government for any cost of procuring the work which exceeds the amount of the bid.

Each Surety executing this instrument agrees that its obligation is not impaired by any extension(s) of the time for acceptance of the bid that the Principal may grant to the Government. Notice to the Surety(ies) of extension(s) is waived. However, waiver of the notice applies only to extensions aggregating not more than sixty (60) calendar days in addition to the period originally allowed for acceptance of the bid.

Other (Specify) Individual Partnership Joint Venture Corporation

69056725R000010 For (Construction, Supplies Or Services) Construction:

MT ERFO NP YELL 2022-1(3), Yellowstone NP Rescue Creek Bridge Replacement

2.

(Seal)2.(Seal)

1.

1.

1.

1. 3.2.

Name(s) (Typed)

Signature(s)

Individual Surety(ies)

Name(s) And Title(s) (Typed)

Corporate Seal

(Seal)

3.

(Seal)

2.

(Seal) Signature(s)

Principal

2.

State Of Incorporation Liability Limit ($)

2.

2.

1.Name(s) And Title(s) (Typed)

Signature(s) 1. 2. Corporate Seal

Corporate Seal

Su re ty C

Name And Address

Signature(s) Name(s) And Title(s) (Typed)

1.

1.

2.

2.

State Of Incorporation Liability Limit ($)

Corporate Seal

Name(s) And Title(s) (Typed)

Su re ty D

Signature(s)

Name And Address

1.

1.

2.

2.

State Of Incorporation Liability Limit ($)

Corporate Seal

Liability Limit ($)State Of Incorporation

1.

1.

Su re ty A

Name And Address

Su re ty B

Name(s) And Title(s) (Typed)

Signature(s)

Name And Address

Corporate Surety(ies)

Witness:

The Principal and Surety(ies) executed this bid bond and affixed their seals on the above date.

STANDARD FORM 24 (REV. 10/2023) PAGE 2

STANDARD FORM 24 (REV. 10/2023) PAGE 3

Corporate Seal

Su re ty F

Name And Address

Signature(s) Name(s) And Title(s) (Typed)

1.

1.

State Of Incorporation

2.

2.

Liability Limit ($)

Corporate Seal

Name(s) And Title(s) (Typed)

Su re ty G

Signature(s)

Name And Address

1.

1.

2.

2.

State Of Incorporation Liability Limit ($)

Corporate Seal

State Of Incorporation Liability Limit ($)

2.

2.

1.

1.

Name And Address

Signature(s) Name(s) And Title(s) (Typed)

Su re ty E

Instructions

1. This form is authorized for use when a bid guaranty is required. Any deviation from this form will require the written approval of the Administrator of General Services.

2. Insert the full legal name and business address of the Principal in the space designated "Principal" on the face of the form. An authorized person shall sign the bond. Any person signing in a representative capacity (e.g., an attorney-in-fact) must furnish evidence of authority if that representative is not a member of the firm, partnership, or joint venture, or an officer of the corporation involved.

3. The bond may express penal sum as a percentage of the bid price. In these cases, the bond may state a maximum dollar limitation (e.g., 20% of the bid price but the amount not to exceed dollars).

4. (a) Corporations executing the bond as sureties must appear on the Department of the Treasury's list of approved sureties and must act within the limitations listed therein. The value put into the Liability

Limit block is the penal sum (i.e., the face value) of the bond, unless a co-surety arrangement is proposed.

(b) When multiple corporate sureties are involved, their names and addresses shall appear in the spaces (Surety A, Surety B, etc.) headed "Corporate Surety(ies)." In the space designated

"Surety(ies)" on the face of the form, insert only the letter identifier corresponding to each of the sureties. Moreover, when co-surety arrangements exist, the parties may allocate their respective limitations of liability under the bond, provided that the sum total of their liability equals 100% of the bond penal sum.

(c) When individual sureties are involved, a completed Affidavit of Individual Surety (Standard Form 28) for each individual surety, shall accompany the bond. The Government may require the surety to furnish additional substantiating information concerning its financial capability.

5. Corporations executing the bond shall affix their corporate seals. Individuals shall execute the bond opposite the word "Corporate Seal"; and shall affix an adhesive seal if executed in Maine, New

Hampshire, or any other jurisdiction requiring adhesive seals.

6. Type the name and title of each person signing this bond in the space provided.

7. In its application to negotiated contracts, the terms "bid" and "bidder" shall include "proposal" and

"offeror."

STANDARD FORM 24 (REV. 10/2023) PAGE 4

Paperwork Reduction Act Statement - This information collection meets the requirements of 44 USC §

3507, as amended by section 2 of the Paperwork Reduction Act of 1995. You do not need to answer these questions unless we display a valid Office of Management and Budget (OMB) control number. The OMB control number for this collection is 9000-0045. We estimate that it will take 1 hour to read the instructions, gather the facts, and answer the questions. Send only comments relating to our time estimate, including suggestions for reducing this burden, or any other aspects of this collection of information to: General

Services Administration, Regulatory Secretariat Division (M1V1CB), 1800 F Street, NW, Washington, DC

20405.

Notice to Offeror

TABLE OF CONTENTS

07/01/24–FP14

DESCRIPTION PAGE

Notice to Offeror ......................................................................................................................... A-1

Solicitation, Offer, and Award (SF 1442) ................................................................................... A-3

Bid Schedule ............................................................................................................................... A-7

Solicitation Provisions ................................................................................................................ B-1

Contract Clauses ......................................................................................................................... C-1

General Wage Decision .............................................................................................................. D-1

SCRs Table of Contents

SPECIAL CONTRACT REQUIREMENTS (SCR)

The following Special Contract Requirements amend and supplement the Standard

Specifications for Construction of Roads and Bridges on Federal Highway Projects

(FP-14), U.S. Department of Transportation, Federal Highway Administration.

Division 100 ..................................................................................................................... E-1

Division 150 ................................................................................................................... E-37

Division 200 ..................................................................................................................... F-1

Division 300 ..................................................................................................................... F-7

Division 550 ..................................................................................................................... F-9

Division 600 ................................................................................................................... F-20

Division 700 .................................................................................................................... G-1

Permits ........................................................................................................................................ H-1

Yellowstone National Park Size and Weight Limitations of Traffic ............................................. I-1

(This page intentionally left blank)

A-1

Project: MT ERFO NP YELL 2022-1(3), Yellowstone NP Rescue Creek Bridge Replacement

NOTICE TO OFFEROR

11/01/24–FP14

THIS PROJECT IS BEING SOLICITED AND AWARDED UNDER FP-14.

The FP-14 is FLH’s Standard Specifications for Construction of Roads and Bridges on Federal

Highway Projects. To view the FP-14 electronically go to:

https://highways.dot.gov/federal-lands/specs.

The FP-14 is a dual unit document with U.S. Customary units being the primary unit shown.

Metric equivalents are shown in parenthesis.

When submitting bids, drawings, calculations, and other construction documents, use only

U.S. Customary units of measure, unless otherwise stated.

I. Project Location

General Location. The project work is located approximately 1 mile south of Gardiner, Montana in Park County. Approximate Global Positioning System (GPS) coordinates for the beginning of the project are N= 1975237.9109, E= 2466851.8260.

Project Limits. Signs have not been erected to identify the project limits. No Government personnel will be available for show-me tours.

II. Pre-proposal Information.

GENERAL AND TECHNICAL QUESTIONS REGARDING PROPOSED WORK FOR

THIS PROJECT WILL BE ACCEPTED UNTIL CLOSE-OF-BUSINESS ON 08/15/2025.

Refer to page A-5 for information on how to submit questions related to General Information and

Technical Information. Answers to General and Technical Questions will be posted at https://sam.gov/workspace/contract/opp/f84de0e74a0343fea6ef2fe44e1feaab/view.

Every attempt to respond to questions will be made. However, response to questions received after the above posted date is not guaranteed.

MATOC. This solicitation is solicited under the Yellowstone, Grand Teton, and Surrounding

Area Multiple Award Task Order Contract (MATOC). Selection of the successful offer is based on price.

Disclosure of Price Tabulations. After receipt of proposals, price tabulations (bid tabs) will be made publicly available and posted to sam.gov; unless the offeror submits an acceptable pricing confidentiality justification on or before the Task Order proposal due date. See Subsection 102.05.

https://highways.dot.gov/federal-lands/specs https://sam.gov/workspace/contract/opp/f84de0e74a0343fea6ef2fe44e1feaab/view

A-2

Project: MT ERFO NP YELL 2022-1(3), Yellowstone NP Rescue Creek Bridge Replacement

Electronic Plan Sheets. This solicitation includes electronic plan sheets available at https://sam.gov/workspace/contract/opp/f84de0e74a0343fea6ef2fe44e1feaab/view.

Physical Data. Physical data applicable to this project is listed in FAR Clause 52.236-4 Physical

Data.

Representations & Certifications. Submit or update Representations and Certifications online at https://www.sam.gov/SAM/ before bid submittal. For more details go to FAR Provision 52.204-

8 Annual Representations and Certifications (see page B-2.). If you have previously registered on-line and the NAICS code for this solicitation is different than the code listed in your online file, please note the amended changes on the lines provided in FAR 52.204-8.

Requests for Information. Requests for technical information (Plan and Division 100 – 700

Specification questions only) about this project will only be accepted in writing (see Block 9 on page A-5).

SF 1442, Solicitation, Offer, and Award. Particular attention should be paid to Standard Form l442, Solicitation, Offer and Award, to assure that Blocks 14, 15, 16, 19, 20A, and 20C are completed correctly. Sign Block 20B according to the instructions in Subsection 102.02. You must submit a completed ‘Authority to Sign’ document. You must also complete the representations and certifications contained in the Contract Provisions beginning on page B-1.

Failure to furnish or complete any of the above may result in your bid being considered nonresponsive and being rejected.

Issuance of this solicitation does not guarantee that an award will be made. Any resulting awards are subject to the availability of funding and the discretion of the awarding entity, including cancellation or amendment based on a determination of change in agency needs.

PLEASE NOTE: Federal Acquisition Regulation (FAR) Clause 52.211-10, Commencement, Prosecution, and Completion of Work has been removed due to the FAR Overhaul. See the SF-

1442 and Block 11 for contract requirements related to the fixed completion date.

Facsimile and email offers, modifications, and withdrawals. Facsimile and email offers are not authorized for this solicitation. Offers may be modified or withdrawn by email, if such notice is received by the time specified for receipt of offers. The Government will not be responsible for any failure attributable to the transmission or receipt of email data. See FAR Provision 52.215-1, Instructions to Offerors – Competitive Acquisition. EMAIL WFL.Contracts@dot.gov. To confirm receipt, call 360.619.7520.

Surety Bond Guarantee Program. Small businesses that need surety bonds can qualify for U.S.

Small Business Administration (SBA) backed surety bonds. SBA assistance in locating a participating surety company or agent, and completing application forms is available online. For more information on the U.S. SBA’s Surety Bond Guarantee program, go online to http://www.sba.gov/content/contractors or call 1-800-U-ASK-SBA.

Fraud Alert. Current and potential U.S. Department of Transportation (DOT) Contractors have recently been receiving fraudulent letters purporting to be issued by DOT. These fraudulent letters https://sam.gov/workspace/contract/opp/f84de0e74a0343fea6ef2fe44e1feaab/view https://www.sam.gov/SAM/ https://www.acquisition.gov/far-overhaul mailto:WFL.Contracts@dot.gov http://www.sba.gov/content/contractors

A-2a

Project: MT ERFO NP YELL 2022-1(3), Yellowstone NP Rescue Creek Bridge Replacement request that the Contractors resubmit their banking information to DOT. If you receive such a letter, please DO NOT complete the requested worksheet that is attached to the letters and DO

NOT release any information. To register or update information, Contractors are required to go directly through the System for Award Management (SAM) website and never through a third party. You can access SAM at https://www.sam.gov/SAM/ .

III. Post Award Information.

Insurance. Insurance requirements are described in Subsection 107.05.

Contractor Performance Evaluations. This office posts performance evaluations in the

Contractor Performance Assessment Reporting System (CPARS); for additional information, see http://www.cpars.gov/index.htm. Upon receiving an email notice of evaluation availability, you will have 14-60 days to review the evaluation online and submit comments. If you are unable to access the system, call 360.619.7520 for assistance or for a copy of the evaluation.

IV. Specifications and Permits.

Specifications. This solicitation and subsequent contract are governed by the Federal Acquisition

Regulation (FAR), agency supplemental regulations, and the Standard Specifications for

Construction of Roads and Bridges on Federal Highway Projects, FP-14. An electronic version may be found at https://highways.dot.gov/federal-lands/specs.

Electronic Documentation. Requires all documents (including but not limited to correspondence, notifications, submittals, reports, and pay notes) to be submitted in a pdf format, or an approved fixed-layout electronic format. See Subsection 103.06.

Material Sources. Government-provided material sources have been identified under Subsection

105.02(b). Government-provided water sources have been identified under Subsection 105.02A.

Government-provided staging, storage, and disposal sites have been identified under Subsection

105.04. Other sites have not been identified for this project. Secure all permits and clearances for

Contractor-located sites and sources. See Subsection 105.02(c).

Progress Schedules. This project includes new specifications for Prosecution and Progress and for Schedules for Construction Contracts. Carefully review Special Contract Requirements

Section 108 - Prosecution and Progress, and Section 155 – Schedules for Construction Contracts.

https://www.sam.gov/SAM/ http://www.cpars.gov/index.htm https://highways.dot.gov/federal-lands/specs

A-2b

This page intentionally left blank.

SOLICITATION, OFFER,

AND AWARD

2. TYPE OF SOLICITATION

6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.

PAGE OF PAGES

7. ISSUED BY CODE 8. ADDRESS OFFER TO

SOLICITATION

(Construction, Alteration, or Repair)

1. SOLICITATION NO. 3. DATE ISSUED

IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.

9.

INFORMATION

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."

CALL:

FOR

SEALED BID (IFB)

NEGOTIATED (RFP)

Federal Highway Administration

FHWA WESTERN FED LANDS DIVISION

610 E FIFTH STREET

Vancouver WA 98661

690567

Federal Highway Administration

FHWA WESTERN FED LANDS DIVISION

610 E FIFTH STREET

Vancouver WA 98661

a. NAME

ACQUISITIONS

b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

360-619-7520

See Block 10 x 08/07/2025

69056725R000010

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)

This solicitation is designated MT ERFO NP YELL 2022-1(3), Yellowstone NP Rescue Creek Bridge Replacement

IN STRICT ACCORDANCE WITH:

Federal Acquisition Regulations (FAR) and Transportation Acquisition Regulations

(TAR)

General Wage Decision

Special Contract Requirements

Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-14

11. The Contractor shall begin performance within

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and is not required.is, b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

d. Offers providing less than

12b. CALENDAR DAYSYES NO

(If "YES", indicate within how many calendar days after award in Item 12b.)

10 calendar days and complete it within ________________ ________________ calendar days after receiving

*Page A-5

_______________________ 09/09/2025

NSN 7540-01-155-3212

x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . ___________60______

STANDARD FORM 1442 (Rev. 8/2014)

Prescribed by GSA

FAR(48 CFR) 53.236-1(d)

A-3

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than item 14.)

CODE FACILITY CODE

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGEMENT OF AMENDMENTS

OFFER (Must be fully completed by offeror)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this document and return (Contractor is not required to sign this document.)

Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.

No further contractual document is necessary.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE

BY

2PAGE OF

Federal Highway Administration

FHWA WESTERN FED LANDS DIVISION

610 E FIFTH STREET

Vancouver WA 98661

690567

REBEKAH WEBB

28. NEGOTIATED AGREEMENT 29. AWARD

Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

copies to issuing office.)

10 U.S.C. 2304(c) 41 U.S.C. 3304(a)

STANDARD FORM 1442 (REV. 8/2014) BACK

A-4

Unique Entity Identifier(SAM.gov):

Cage Code:

See bid schedule.

All items on bid schedule.

See page A-5

Federal Highway Administration

FHWA WESTERN FED LANDS DIVISION

610 E FIFTH STREET

Vancouver WA 98661

X

A-5

Continuation SF 1442

Project: MT ERFO NP YELL 2022-1(3), Yellowstone NP Rescue Creek Bridge Replacement

Block 9 FOR GENERAL INFORMATION, call 360.619.7520 from the hours of 8:00 a.m. to

4:00 p.m. local time or e-mail us at wfl.contracts@dot.gov.

FOR TECHNICAL INFORMATION (plan and specification questions only), requests for technical information about this project will only be accepted in writing.

Submit questions via e-mail at wfl.plans-spec@dot.gov.

QUESTIONS/ANSWERS POSTED ONLINE. You can view questions and answers on the Contract Opportunities Website SAM.gov.

• Insert the solicitation number in search box.

• Scroll to the project.

• Make sure you are on the most recent view and look in the right section of the page for the most recent Q&A document.

Block 11

Block 12A

Block 13B

FOR DAVIS-BACON WAGE RATE INFORMATION go to the U.S. Department of

Labor, Branch of Construction Wage Determinations Website:

https://www.dol.gov/agencies/whd/government-contracts/state-assignments.

FOR PHYSICAL DATA, See FAR Contract Clause 52.236-4, Physical Data, (clauses begin on page C-1) for a listing of available data. Physical Data will be posted with the solicitation on the SAM.gov website.

COMPLETION DATE: The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 11/17/2026, subject to such extensions as may be authorized. The time stated for completion shall include final cleanup of the premises.

The completion date is based on the assumption that the successful offeror will receive the notice to proceed by 10/21/2025. The completion date will be extended by the number of calendar days after the above date that the Contractor receives the notice to proceed, except to the extent that the delay in issuance of the notice to proceed results from the failure of the Contractor to execute the contract and give the required performance and payment bonds within the time specified in the offer.

Work shall be completed on or before the date specified above, subject to such extensions as may be authorized by the terms of the contract and the specifications made a part thereof.

PERFORMANCE & PAYMENT BONDS: See FAR Clause, 52.228-15, Performance and Payment Bonds - Construction (clauses begin on page C-1) and Subsection 102.06 of the Standard Specifications for Construction of Roads and Bridges on Federal Highway

Projects, FP-14, U.S. Customary Units.

BID BOND AMOUNT: See FAR Clause 52.228-1, Bid Guarantee (clauses begin on page C-1).

ADDITIONAL INFORMATION: See Subsections 102.03 and 102.04 of Standard

Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-

14, U.S. Customary Units.

mailto:wfl.contracts@dot.gov mailto:wfl.plans-spec@dot.gov https://sam.gov/content/home https://www.dol.gov/agencies/whd/government-contracts/state-assignments https://sam.gov/content/home

A-6

Continuation SF 1442

Block 24 SUBMITTING INVOICES: See Subsection 109.08 of the Standard Specifications for

Construction of Roads and Bridges on Federal Highway Projects FP-14, U.S. Customary

Units.

ESTIMATED PRICE RANGE. The price range of the project work is between $700,000 and

$2,000,000.

A - 7

Bidder/Offeror please note: Before preparing the bid, carefully read the Solicitation Provisions. Insert a unit bid price, in figures, for each pay item for which a quantity appears in the bid schedule. Multiply the unit price by the quantity for each pay item and show the amount bid. Should any mathematical check made by the Government show a mistake in the amount bid, the corrected unit price extension shall govern. When the word "LPSM" (Lump Sum) appears as a unit bid price, insert an amount for each lump sum pay item. When a sum based on a fixed rate appears for any pay item in the amount bid column, include the Government inserted amount bid for the item in the total bid amount. Total all of the amounts bid for each pay item and show the total bid amount.

Bid Schedule

Project No:MT ERFO NP YELL 2022-1(3)

Project Name:Yellowstone NP Rescue Creek Bridge Replacement

A - 8

Contract Quantity Pay Items

55201-0200 STRUCTURAL CONCRETE, CLASS A (AE)

55235-0000 EXPANSION JOINTS

55401-1000 REINFORCING STEEL

Item No. Pay Item No. Description Quantity Unit Unit Price Amount

A0020 15101-0000 MOBILIZATION

ALL LPSM $___LPSM_____ $____________

A0040 15201-0000 CONSTRUCTION SURVEY AND STAKING

ALL LPSM $___LPSM_____ $____________

A0060 15301-0000 CONTRACTOR QUALITY CONTROL

ALL LPSM $___LPSM_____ $____________

A0080 15401-0000 CONTRACTOR TESTING

ALL LPSM $___LPSM_____ $____________

A0100 15501-0000 CONSTRUCTION SCHEDULE

ALL LPSM $___LPSM_____ $____________

A0120 15705-1400 SOIL EROSION CONTROL, FIBER ROLL

650 LNFT $____________ $____________

A0140 15802-0000 WATERING FOR DUST CONTROL

ALL LPSM $___LPSM_____ $____________

A0160 20101-0000 CLEARING AND GRUBBING

0.2 ACRE $____________ $____________

A0180 20304-2000 REMOVAL OF BRIDGE

ALL LPSM $___LPSM_____ $____________

A0200 20401-0000 ROADWAY EXCAVATION

350 CUYD $____________ $____________

A0220 20403-0000 UNCLASSIFIED BORROW

525 CUYD $____________ $____________

A0240 20702-0400 GEOTEXTILE FILTER, CLASS 1, TYPE D (NON-WOVEN)

2,800 SQYD $____________ $____________

Bid Schedule Schedule:A Schedule Type:Base

A - 9

A0260 20801-0000 STRUCTURE EXCAVATION

191 CUYD $____________ $____________

A0280 21101-1000 ROADWAY OBLITERATION, METHOD 1

65 SQYD $____________ $____________

A0300 25101-0300 PLACED RIPRAP, METHOD A, CLASS 3

115 CUYD $____________ $____________

A0320 30203-2120 ROADWAY AGGREGATE, METHOD 2, SURFACE COURSE, 4-INCH DEPTH

230 SQYD $____________ $____________

A0340 55201-0200 STRUCTURAL CONCRETE, CLASS A (AE)

29 CUYD $____________ $____________

A0360 55235-0000 EXPANSION JOINTS

16 LNFT $____________ $____________

A0380 55401-1000 REINFORCING STEEL

3,045 LB $____________ $____________

A0400 55504-0000 PRE-FABRICATED STEEL BRIDGE

ALL LPSM $___LPSM_____ $____________

A0420 55601-0900 BRIDGE RAILING, STEEL

100 LNFT $____________ $____________

A0440 56202-0000 TEMPORARY SUPPORT STRUCTURE (WORK ACCESS BRIDGE)

ALL LPSM $___LPSM_____ $____________

A0460 57401-0000 GRS-IBS, GEOSYNTHETIC REINFORCEMENT

95 SQYD $____________ $____________

A0480 57402-0000 GRS-IBS, OPEN-GRADED BACKFILL

41 TON $____________ $____________

A0500 62201-0200 DUMP TRUCK, 8 CUBIC YARD MINIMUM CAPACITY

10 HOUR $____________ $____________

A0520 62201-0550 BACKHOE LOADER, 6 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET,

24-INCH WIDTH

10 HOUR $____________ $____________

Bid Schedule Schedule:A Schedule Type:Base

A - 10

A0540 62201-3350 HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMUM CAPACITY

10 HOUR $____________ $____________

A0560 62301-0000 GENERAL LABOR

10 HOUR $____________ $____________

A0580 62510-1000 SEEDING, DRY METHOD

0.20 ACRE $____________ $____________

A0600 62515-1000 MULCHING, DRY METHOD

0.20 ACRE $____________ $____________

A0620 63316-1000 REMOVE AND RESET SIGN

2 EACH $____________ $____________

A0640 63501-0000 TEMPORARY TRAFFIC CONTROL

ALL LPSM $___LPSM_____ $____________

Submitted by:____________________________________ Schedule Total:____________

Bid Schedule Schedule:A Schedule Type:Base

DOT COMPLIANCE WITH PRESIDENT

TRUMP'S PRIORITIES AND AGENDA

Notice of intent for the Department of Transportation (DOT) to take immediate action to begin forbearing enforcement of all contract clauses, provisions, terms, and conditions, related to any and all subsequent Executive

Orders (EOs) issued by President Trump and implementing guidance.

Consistent with President Trump’s priorities and agenda, to the maximum extent permitted by law, DOT intends to take immediate action to begin forbearing enforcement of all Federal

Acquisition Regulation (FAR) or Transportation Acquisition Regulation (TAR) contract clauses, provisions, terms, and conditions, if inconsistent with EOs and implementing guidance issued by the current administration, including but not limited to:

• Executive Order (EO) 14168, Defending Women from Gender Ideology Extremism and

Restoring Biological Truth to the Federal Government (January 20, 2025);

• Executive Order (EO) 14151, Ending Radical and Wasteful Government DEI Programs and Preferencing (January 20, 2025);

• Executive Order (EO) 14148, Initial Rescissions of Harmful Executive Orders and

Actions (January 20, 2025);

• Executive Order (EO) 14173, Ending Illegal Discrimination And Restoring Merit-Based

Opportunity (January 21, 2025);

• Executive Order (EO) 14168, Defending Women from Gender Ideology Extremism and

Restoring Biological Truth to the Federal Government (January 20, 2025);

• OPM Memorandum, Initial Guidance Regarding President Trump’s Executive Order

Defending Women (January 29, 2025);

• Executive Order (EO) 14208, Ending Procurement and Forced Use of Paper Straws

(February 10, 2025);

• Executive Order (EO) 14222, Implementing the President's "Department of Government

Efficiency" Cost Efficiency Initiative (February 26, 2025);

• Executive Order (EO) 14240, Eliminating Waste and Saving Taxpayer Dollars by

Consolidating Procurement (March 20, 2025);

• Executive Order (EO) 14269, Restoring America's Maritime Dominance (April 9, 2025);

• Executive Order (EO) 14275, Restoring Common Sense to Federal Procurement (April

15, 2025); and

• Executive Order (EO) 14271, Ensuring Commercial, Cost-Effective Solutions in Federal

Contracts (April 16, 2025.

DOT remains committed to ensuring its acquisition policies and practices reflect the direction of the current administration and reserves the right to issue further guidance or take additional action as necessary. Contractors are reminded that compliance with applicable laws, regulations, and Executive Orders is a condition of doing business with the Federal Government and DOT. It is the responsibility of each contractor to monitor for updates and adjust operations accordingly.

The subject notice was posted to SAM.gov on April 29, 2025.

https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fsam.gov%2Fopp%2F97f04f32ac684f829bf4d786d203e638%2Fview&data=05%7C02%7CStephanie.Curtis%40dot.gov%7C9eb4c00a514e475ff36108dd88e7a8bf%7Cc4cd245b44f04395a1aa3848d258f78b%7C0%7C0%7C638817250897977785%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=wQvr%2F58kgQhYQiIg6b1uXaYicbZQdApZ5ItplfRLnsQ%3D&reserved=0

B-1

Solicitation Provisions

Project: MT ERFO NP YELL 2022-1(3), Yellowstone NP Rescue Creek Bridge

Federal Acquisition Regulation

SOLICITATION PROVISIONS

REPRESENTATIONS, CERTIFICATIONS AND

OTHER STATEMENTS OF OFFEROR

NOTICE:

System updates may lag policy updates. The System for Award Management (SAM) may continue to require entities to complete representations based on provisions that are not included in agency solicitations. Examples include:

• 52.223-22, Public Disclosure of Greenhouse Gas Emissions and Reduction Goals-

Representation,

• 52.222-25, Affirmative Action Compliance, and

• 52.212-3(d) and (t), Offeror Representations and Certifications—Commercial Products and

Commercial Services.

Contracting officers will not consider these representations when making award decisions or enforce requirements. Entities are not required to, nor are they able to, update their entity registration to remove these representations in SAM.

To the extent that any of the following Provisions may conflict with the Provisions in the IDIQ contract, the following Provisions will control.

The Offeror Makes the Following Representations and Certifications as a Part of its Offer.

52.204-8 Annual Representations and Certifications. (Jan 2025) [(DEVIATION FEB 2025)]

(a)

(1) The North American Industry Classification System (NAICS) code for this acquisition is__

NAICS 237310 – Highway, Street & Bridge Construction.

(2) The small business size standard is $45 million.

(3) The small business size standard for a concern that submits an offer, other than on a construction or service acquisition, but proposes to furnish an end item that it did not itself manufacture, process, or produce is 500 employees, or 150 employees for information technology value-added resellers under NAICS code 541519 if the acquisition—

Completing FAR provision 52.204-8 Annual Representation and Certifications.

• This solicitation is issued under NAICS 237310 – Highway, Street & Bridge Construction with a small business size standard of $45 million. If your average annual gross receipts for the past 3 years are above $45 million you are a large business for this solicitation. If they are below $45 million you are a small business. Please complete the certification listed in paragraph (d).

• Before submitting bids, please ensure you have completed your annual representations and certifications electronically at the System for Award Management (SAM) website: https://www.sam.gov https://www.sam.gov/

B-2

(i) Is set aside for small business and has a value above the simplified acquisition threshold;

(ii) Uses the HUBZone price evaluation preference regardless of dollar value, unless the offeror waives the price evaluation preference; or

(iii) Is an 8(a), HUBZone, service-disabled veteran-owned, economically disadvantaged women-owned, or women-owned small business set-aside or sole-source award regardless of dollar value.

(b)

(1) If the provision at 52.204-7, System for Award Management, is included in this solicitation, paragraph (d) of this provision applies.

(2) If the provision at 52.204-7, System for Award Management, is not included in this solicitation, and the Offeror has an active registration in the System for Award Management (SAM), the Offeror may choose to use paragraph (d) of this provision instead of completing the corresponding individual representations and certifications in the solicitation.

The Offeror shall indicate which option applies by checking one of the following boxes:

(i) □ Paragraph (d) applies.

(ii) □ Paragraph (d) does not apply and the offeror has completed the individual representations and certifications in the solicitation.

(c) 1)The following representations or certifications in SAM are applicable to this solicitation as indicated:

(i) 52.203-2, Certificate of Independent Price Determination. This provision applies to solicitations when a firm-fixed-price contract or fixed-price contract with economic price adjustment is contemplated, unless–

(A) The acquisition is to be made under the simplified acquisition procedures in part 13;

(B) The solicitation is a request for technical proposals under two-step sealed bidding procedures;

or

(C) The solicitation is for utility services for which rates are set by law or regulation.

(ii) 52.203-11, Certification and Disclosure Regarding Payments to Influence Certain Federal

Transactions. This provision applies to solicitations expected to exceed $150,000.

(iii) 52.203-18, Prohibition on Contracting with Entities that Require Certain Internal

Confidentiality Agreements or Statements-Representation. This provision applies to all solicitations.

(iv) 52.204-3, Taxpayer Identification. This provision applies to solicitations that do not include the provision at 52.204-7, System for Award Management.

(v) 52.204-5, Women-Owned Business (Other Than Small Business). This provision applies to solicitations that-

(A) Are not set aside for small business concerns;

(B) Exceed the simplified acquisition threshold; and

(C) Are for contracts that will be performed in the United States or its outlying areas.

(vi) 52.204-26, Covered Telecommunications Equipment or Services-Representation. This provision applies to all solicitations.

(vii) 52.209-2, Prohibition on Contracting with Inverted Domestic Corporations-Representation.

(viii) 52.209-5, Certification Regarding Responsibility Matters. This provision applies to solicitations where the contract value is expected to exceed the simplified acquisition threshold.

(ix) 52.209-11, Representation by Corporations Regarding Delinquent Tax Liability or a

Felony Conviction under any Federal Law. This provision applies to all solicitations.

(x) 52.214-14, Place of Performance-Sealed Bidding. This provision applies to invitations for bids except those in which the place of performance is specified by the Government.

(xi) 52.215-6, Place of Performance. This provision applies to solicitations unless the place of performance is specified by the Government.

(xii) 52.219-1, Small Business Program Representations (Basic, Alternates I, and II). This provision applies to solicitations when the contract is for supplies to be delivered or services to be https://www.acquisition.gov/far/part-52#FAR_52_204_7 https://www.acquisition.gov/far/part-52#FAR_52_204_7 https://www.acquisition.gov/far/part-52#FAR_52_203_2 https://www.acquisition.gov/far/part-13#FAR_Part_13 https://www.acquisition.gov/far/part-52#FAR_52_203_11 https://www.acquisition.gov/far/part-52#FAR_52_203_18 https://www.acquisition.gov/far/part-52#FAR_52_204_3 https://www.acquisition.gov/far/part-52#FAR_52_204_7 https://www.acquisition.gov/far/part-52#FAR_52_204_5 https://www.acquisition.gov/far/part-52#FAR_52_204_26 https://www.acquisition.gov/far/part-52#FAR_52_209_2 https://www.acquisition.gov/far/part-52#FAR_52_209_5 https://www.acquisition.gov/far/part-52#FAR_52_209_11 https://www.acquisition.gov/far/part-52#FAR_52_214_14 https://www.acquisition.gov/far/part-52#FAR_52_215_6 https://www.acquisition.gov/far/part-52#FAR_52_219_1

B-3 performed in the United States or its outlying areas, or when the contracting officer has applied part 19 in accordance with 19.000(b)(1)(ii).

(A) The basic provision applies when the solicitations are issued by other than DoD, NASA, and the Coast Guard.

(B) The provision with its Alternate I applies to solicitations issued by DoD, NASA, or the Coast

Guard.

(C) The provision with its Alternate II applies to solicitations that will result in a multiple-award contract with more than one NAICS code assigned.

(xiii) 52.219-2, Equal Low Bids. This provision applies to solicitations when contracting by sealed bidding and the contract is for supplies to be delivered or services to be performed in the United States or its outlying areas, or when the contracting officer has applied part 19 in accordance with 19.000(b)(1)(ii).

(xiv) [RESERVED]52.222-22, Previous Contracts and Compliance Reports. This provision applies to solicitations that include the clause at 52.222-26, Equal Opportunity.

(xv) [RESERVED]52.222-25, Affirmative Action Compliance. This provision applies to solicitations, other than those for construction, when the solicitation includes the clause at 52.222-26, Equal Opportunity.

(xvi) 52.222-38, Compliance with Veterans’ Employment Reporting Requirements. This provision applies to solicitations when it is anticipated the contract award will exceed the simplified acquisition threshold and the contract is not for acquisition of commercial products or commercial services.

(xvii) 52.223-1, Biobased Product Certification. This provision applies to solicitations that require the delivery or specify the use of biobased products in USDA-designated product categories; or include the clause at 52.223-2, Reporting of Biobased Products Under Service and Construction Contracts.

(xviii) 52.223-4, Recovered Material Certification. This provision applies to solicitations that are for, or specify the use of, EPA–designated items.

(xix)…

This is the start of the file's text. The full file is on GovTribe.