This document is a Questions and Answers (Q&A) file for the Yellowstone National Park Rescue Creek Bridge project (Project No.: MT ERFO NP YELL 2022-1(3)). The Q&A addresses two key inquiries from potential contractors regarding site access and parking during the bidding process. The roadway is currently closed to vehicular traffic due to flood damage, but pedestrian access is available, with the project location approximately 0.6 miles from the vehicular traffic closure point. The National Park Service will waive entrance fees for contractors performing site reviews and advises parking just outside the closure barricade past the entrance station, ensuring emergency access remains unobstructed.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project No.: MT ERFO NP YELL 2022-1(3)
Project : Yellowstone NP Rescue Creek Bridge
# General Technical Question Answer Date
1 X
Do we have access to the project site during bidding and if so who do we contact a NPS to gain access?
The roadway is closed to vehicular traffic due to the flood damage. The area is open to pedestrian access. It is approximately 0.6 miles from the vehicular traffic closure to the project location.
8/14/25
2 X
Do we park outside the park and walk in or do we enter the park and if so would we be able to obtain a contractors pass the enter?
The entrance fee will be waived for contractor’s performing a site review.
Parking would be just outside the closure barricade past the entrance station, not blocking emergency access that might need to pass through closure the gate.
8/14/25