QA_08-18-2025.pdf

PDF 97 KB Posted

Attached to
MT ERFO NP YELL 2022-1(3), Yellowstone NP Rescue Creek Bridge Replacement
Solicitation number
69056725R000010
Issued by

About this file

This document is a Questions and Answers (Q&A) form for a National Park Service (NPS) project at Yellowstone National Park. The project, identified as Project No. MT ERFO NP YELL 2022-1(3), involves the Rescue Creek Bridge and addresses three contractor inquiries. The questions cover site access details, including pedestrian access (the roadway is closed to vehicular traffic due to flood damage), parking instructions (contractors can park outside the closure barricade), and an upcoming amendment regarding the Bid Bond Form's expiration date. The NPS has waived entrance fees for contractors performing site reviews and provided guidance on site access, with the project location approximately 0.6 miles from the vehicular traffic closure point.

View the file

Other files

File Type Posted
Amendment A003.pdf PDF
QA_09-02-2025.pdf PDF
QA_08-27-2025.pdf PDF
Amendment A002.pdf PDF
QA_08-21-2025.pdf PDF
QA2_08-18-2025.pdf PDF
Amendment A001.pdf PDF
QA_08-14-2025.pdf PDF
mt-ep-yell2022-1-3_xs.pdf PDF
RFP 69056725R000010_MT ERFO NP YELL 2022-1(3).pdf PDF
mt-ep-yell2022-1-3_Rescue Creek Bridge Final Foundation Memo.pdf PDF
mt-ep-yell2022-1-3_Rescue creek_control-sheet.xlsx XLSX spreadsheet
mt-ep-yell2022-1-3_ali.pdf PDF
mt-ep-yell2022-1-3_plans_Final.pdf PDF
Physical Data.zip ZIP file
RescueCreek_Waterway_Hydraulics_Memo_95pct.pdf PDF
mt-ep-yell2022-1-3_earthwork.pdf PDF
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project No.: MT ERFO NP YELL 2022-1(3)

Project : Yellowstone NP Rescue Creek Bridge

# General Technical Question Answer Date

1 X

Do we have access to the project site during bidding and if so who do we contact a NPS to gain access?

The roadway is closed to vehicular traffic due to the flood damage. The area is open to pedestrian access. It is approximately 0.6 miles from the vehicular traffic closure to the project location.

8/14/25

2 X

Do we park outside the park and walk in or do we enter the park and if so would we be able to obtain a contractors pass the enter?

The entrance fee will be waived for contractor’s performing a site review.

Parking would be just outside the closure barricade past the entrance station, not blocking emergency access that might need to pass through closure the gate.

8/14/25

3 X

The Bid Bond Form provided in the solicitation expires on 08/31/2025. Will this bond form still be acceptable to submit with our bid?

This will be addressed under Amendment

A001.

8/18/25