This is a detailed engineering plans document for the Yellowstone National Park Rescue Creek Bridge Replacement project (MT ERFO NP YELL 2022-1(3)). The document contains comprehensive construction drawings, specifications, and technical details for replacing a pedestrian bridge over Rescue Creek in Yellowstone National Park, located along the North Entrance Road approximately 1 mile from Gardiner and 3 miles from Mammoth.
The project scope includes removing the existing bridge and constructing a new prefabricated steel truss pedestrian bridge with a 170-foot span, concrete abutments with reinforced soil foundations, approach railings, and associated trail realignment work. Key construction elements include structural excavation (191 cubic yards), structural concrete Class A(AE) (29 cubic yards), reinforcing steel (3,045 pounds), geosynthetic reinforcement for the reinforced soil foundations, placed riprap for erosion control, and temporary traffic control measures. The plans specify materials requirements including high-strength low-alloy steel conforming to ASTM A709 Grade 50WT for the truss structure, treated timber decking and railings, galvanized hardware, and expansion joints. The project includes detailed specifications for soil erosion control using fiber rolls, staging areas for construction access, and provisions for removing and resetting existing signage. Construction will require closure of the North Entrance Road to public access during bridge replacement activities, with specific staging areas designated at Wildlife Trail Pullout and Rescue Creek Trail Pullout locations.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment A003.pdf | ||
| QA_09-02-2025.pdf | ||
| QA_08-27-2025.pdf | ||
| Amendment A002.pdf | ||
| QA_08-21-2025.pdf | ||
| QA2_08-18-2025.pdf | ||
| QA_08-18-2025.pdf | ||
| Amendment A001.pdf | ||
| QA_08-14-2025.pdf | ||
| mt-ep-yell2022-1-3_xs.pdf | ||
| RFP 69056725R000010_MT ERFO NP YELL 2022-1(3).pdf | ||
| mt-ep-yell2022-1-3_Rescue Creek Bridge Final Foundation Memo.pdf | ||
| mt-ep-yell2022-1-3_Rescue creek_control-sheet.xlsx | XLSX spreadsheet | |
| mt-ep-yell2022-1-3_ali.pdf | ||
| Physical Data.zip | ZIP file | |
| RescueCreek_Waterway_Hydraulics_Memo_95pct.pdf | ||
| mt-ep-yell2022-1-3_earthwork.pdf |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
:2
P
M
M a y
S h e e t
I n d e x c p w w o r k
\d
\m t-e p y e ll a a .d g n
SHEET INDEX
PROJECT
NUMBER
SHEET
MT ERFO NP YELL 2022-1(3) A.2
NPS Drwg No. 101/195340 NPS PMIS No. 349455
MT ERFO NP YELL 2022-1(3)
MT ERFO NP YELL 2022-1(3) A.3
NPS PMIS No. 349455 NPS Drwg No. 101/195340
GPS
GPS
GPS
N
North Entrance Station
Wilson Wy
Robert Reamer Ave
Trail
Pullout
Wildlife and trail realignment
Bridge replacement staging area
Wildlife Trail Pullout staging area
Rescue Creek Trail Pullout
END PROJECT
BEGIN PROJECT
G a r d n e r R iv e r
BEGIN PROJECT
END PROJECT
and trail realignment
Bridge replacement
Scale in feet
400200075150
N O
R T
H E
N T
R A
N C
E R
O A
D
Road Closed to the public
G a r d n e r R iv e r
"MAIN 05" 100+00
"MAIN 05" 104+20
"MAIN 05" 100+00
"MAIN 05" 104+20
1 m ile to
G ardiner m ile s to
M a m m o th
:2
M a y
V p w w o r k
\d
\m t-e p y e ll a a .d g n
VICINITY MAP
PROJECT
NUMBER
SHEET
A.4
N
18000 SQFT
E= 2466007.0075
N= 1976319.7508
Wildlife Trail Pullout staging area
7500 SQFT
E= 2466828.3965
N= 1975100.5974
Rescue Creek Trail Pullout staging area Scale in feet
100 0 100 200 300
© 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS
Note:
or storing.
of way approved by the CO for staging staging area, and portions of the right staging area, Rescue Creek Pullout
1. Use only the Wildlife Trail Pullout
:4
A
J u n e
S ta g in g A r e a s p w w o r k
\d
\m t-e p y e ll g e n s ta g in g .d g n
STAGING AREAS
PROJECT
NUMBER
SHEET
MT ERFO NP YELL 2022-1(3) A.5
NPS PMIS No. 349455 NPS Drwg No. 101/195340
Sheet and Description
Section D Section E Section F Section G Section H
Plan - Profile
Soil Erosion and
Sediment Control
Drainage Bridge Temporary
Traffic Control
Allowance Bid Schedule
A0020 15101-0000 MOBILIZATION LPSM ALL
A0040 15201-0000 CONSTRUCTION SURVEY AND STAKING LPSM ALL
A0060 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL
A0080 15401-0000 CONTRACTOR TESTING LPSM ALL
A0100 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A0120 15705-1400 SOIL EROSION CONTROL, FIBER ROLL LNFT 624 26 650
A0140 15802-0000 WATERING FOR DUST CONTROL LPSM ALL
A0160 20101-0000 CLEARING AND GRUBBING ACRE 0.2 0.2
A0180 20304-2000 REMOVAL OF BRIDGE LPSM All ALL
A0200 20401-0000 ROADWAY EXCAVATION CUYD 308 42 350
A0220 20403-0000 UNCLASSIFIED BORROW CUYD 475 50 525
A0240 20702-0400 GEOTEXTILE FILTER, CLASS 1, TYPE D (NON-WOVEN) SQYD 943 1,350 507 2,800
A0260 20801-0000 STRUCTURE EXCAVATION CUYD 191 191
A0280 21101-1000 ROADWAY OBLITERATION, METHOD 1 SQYD 59 6 65
A0300 25101-0300 PLACED RIPRAP, METHOD A, CLASS 3 CUYD 105 10 115
A0320 30203-2120 ROADWAY AGGREGATE, METHOD 2, SURFACE COURSE, 4-INCH DEPTH SQYD 216 14 230
A0340 55201-0200 STRUCTURAL CONCRETE, CLASS A (AE) CUYD 29 29 Contract Quantity
A0360 55235-0000 EXPANSION JOINTS LNFT 16 16 Contract Quantity
A0380 55401-1000 REINFORCING STEEL LB 3,045 3,045 Contract Quantity
A0400 55504-0000 PRE-FABRICATED STEEL BRIDGE LPSM All ALL
A0420 55601-0900 BRIDGE RAILING, STEEL LNFT 100 100
A0440 56202-0000 TEMPORARY SUPPORT STRUCTURE (WORK ACCESS BRIDGE) LPSM All ALL
A0460 57401-0000 GRS-IBS, GEOSYNTHETIC REINFORCEMENT SQYD 95 95
A0480 57402-0000 GRS-IBS, OPEN-GRADED BACKFILL TON 41 41
A0500 62201-0200 DUMP TRUCK, 8 CUBIC YARD MINIMUM CAPACITY HOUR 10
A0520 62201-0550 BACKHOE LOADER, 6 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET, 24-INCH WIDTH HOUR 10
A0540 62201-3350 HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMUM CAPACITY HOUR 10
A0560 62301-0000 GENERAL LABOR HOUR 10
A0580 62510-1000 SEEDING, DRY METHOD ACRE 0.18 0.02 0.20
A0600 62515-1000 MULCHING, DRY METHOD ACRE 0.18 0.02 0.20
A0620 63316-1000 REMOVE AND RESET SIGN EACH 2 2
A0640 63501-0000 TEMPORARY TRAFFIC CONTROL LPSM ALL
MileStone: 100% Estimate Date Completed: 07/09/25 Report Date: 07/09/25
A M E N D
Line Item No.
Pay Item Number
SUMMARY OF QUANTITIES
9-
Ju l-
:4
A M
Remarks and/or Determination of Estimated QuantityPay Item Description Unit
Estimated Quantities
C
M yF ile s\
Pr oj ec ts \M
T\ M
T
ER
FO
N
P
YE
LL
2-
1( 3)
Y el lo w st on e N
P R es cu e
C re ek B ri dg e R ep la ce m en t\ [m t-ep
-y el l2
2- 1-
3_ ee ba cs
-s um m ar y.
xl sm ]S he et
PROJECT
B.1MT ERFO NP YELL 2022-1(3)
method 2, surface course, 4-inch depth
Roadway aggregate, LC grade
Profile
Existing ground
LC
Existing ground grade
Profile type D (non-woven)
Geotextile filter, class 1, Unclassified borrow
"MAIN 05"
102+62 to 102+83
2.5%2.5%
Trail
1:33 Max 1:100 Min
1:
1.
M ax li m it s
S lo p e s ta k
C o n s tr u c ti o n l im it
S lo p e s ta k e l im it s
C o n s tr u c ti o n l im it
8'
Mulching, dry method Seeding, dry method
3'
Mulching, dry method Seeding, dry method
3' Varies 14.5' to 22.1'Varies 9.0' to 36.1'
1:20 Max
1:50 Min
"MAIN 05"
100+00 to 100+90 method 2, surface course, 4-inch depth
Roadway aggregate, S lo p e s ta k e l im it s
C o n s tr u c ti o n l im it
Mulching, dry method Seeding, dry method
10'
2.5%
1:
Max
8'
Trail
S lo p e s ta k e l im it s
C o n s tr u c ti o n l im it
1:3 Max
2.5%
Mulching, dry method Seeding, dry method
10'
:4
J u n e
T y p ic a l
S e c ti o n p w w o r k \d
\m t-e p y e ll c a .d g n
(1 of 2)TYPICAL SECTION
PROJECT
C.1 method 2, surface course, 4-inch depth
Roadway aggregate, LC grade
Profile
Existing ground grade
Profile
Exisitng ground
LC
method 2, surface course, 4-inch depth
Roadway aggregate, "MAIN 05"
102+83 to 103+51
2.5%2.5%
Trail
1:
1.
M ax
1:
Mi n 1:
1.
M ax
S lo p e s ta k e l im it s
C o n s tr u c ti o n l im it
S lo p e s ta k e l im it s
C o n s tr u c ti o n l im it
8'
Mulching, dry method Seeding, dry method
3'
Mulching, dry method Seeding, dry method
3'
"MAIN 05"
103+51 to 104+20
1:
1.
M ax
1:
1.
M ax
S lo p e s ta k e l im it s
C o n s tr u c ti o n l im it
3' Varies
Mulching, dry method Seeding, dry method
S lo p e s ta k e l im it s
C o n s tr u c ti o n l im it
3'
Mulching, dry method Seeding, dry method
Trail
VariesVaries
[1]
[2][2]
[2] Cross slope varies, see Trail Width and Cross Slope table, this sheet
[1] Total trail width varies, see Trail Width and Cross Slope table, this sheet
FOOTNOTE:
:5
J u n e
T y p ic a l
S e c ti o n o f p w w o r k \d
\m t-e p y e ll c a .d g n
TYPICAL SECTION (2 of 2)
PROJECT
C.2
NPS PMIS No. 326131 NPS Drwg No. 101/195340
STATE PLANE COORDINATES GEO COORDINATES
POINT
NUMBER NORTH EAST ORTHOMETRIC
ELEVATION LATITUDE LONGITUDE ELLIPSOID
HEIGHT
COMBINED
FACTOR DESCRIPTION NOTE:
RESCUE1 1975711.098 2466461.995 5363.300 45°01'09.658818"N 110°41'42.623516"W 5334.5967 0.999711225 5/8" ir w/fhwa alum cap 1.
RESCUE2 1975323.012 2466994.953 5355.989 45°01'05.866659"N 110°41'35.163342"W 5327.2934 0.999711382 5/8" ir w/fhwa alum cap
RESCUE3 1975125.201 2466708.396 5384.745 45°01'03.892213"N 110°41'39.131765"W 5356.0494 0.999710111 5/8" ir w/fhwa alum cap
COORDINATE SYSTEM :Wyoming West SPCS NAD83 2011 VERTICAL DATUM : Orthometric elevations based on the NAVD88 GEOID18
EPOCH DATE : 2010.000
CADD SYSTEM COORDINATE SYSTEM : WY83/2011-WIF NSRS11(NAD83/2011) Wyoming, West Zone, International Foot
PROJECT : Yellowstone NP Rescue Creek Bridge Replacement DATE OF FIELD WORK :March 2024 DATE OF FINAL ADJUSTMENT : April, 2024
PROJECT UNITS : International foot
-M ay -2
:1
PM
c:
\p w
-w or k\ d0
R es cu e cr ee k_ co nt ro l-sh ee t.
xl sx
]S he et
To precisely check distances between points as measured on the ground, inverse the state plane coordinates and divide the computed distance by a mean combined factor of the two points.
PROJECT
D.1MT ERFO NP YELL 2022-1(3)
SHEET
SURVEY CONTROL
M a y
T
A B
U L
A T
IO
N
O F
P L
Q
U A
N T
IT
IE
S p w w o r k \d
\m t-e p y e ll f a .d g n
PLAN AND PROFILE
TABULATION OF QUANTITIES
PROJECT
D.2
G
S
R E S C U E
+S S
G P S
S S+
N O
R T H R
IM
[1]
Construction Access Limits
[2]
[1]
Construction Limit
See Section G for details
Rescue Creek Bridge
See Sheet D.7 for trail and other removal work
Rescue Creek Trail East
Existing "MAIN 01" to be constructed
"MAIN 05" Rescue Creek Trail
Gardner River
Scale in feet
050 50 100 150 location access bridge temporary work
Potential
[2]
Construction Limits
FOOTNOTE:
Disturb topsoil layer only within these limits.
[2]
Operate equipment only within these limits.
[1]
:3
J u n e
A
L I
R e s c u e C r e e k
O v e r v ie w w
P la n
S h e t] p w w o r k \d
\m t-e p y e ll o v e r v ie w .d g n
OVERVIEW
RESCUE CREEK PROJECT SITE
PROJECT
D.3
© 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS
N84°41'19"E N84°41'42"E
N
Construction limit
"MAIN05" Trail to be constructed
Edges of trail limits
Slope stake
See Section G
Steel Approach Rail
Existing Rescue Creek Trail West access limit
Construction
See Section G
Rescue Creek Bridge riprap layout
See Section F for
Gardner River
Existing ground
Profile grade
Profile grade
100+90
Begin Bridge
BEGIN PROJECT
BEGIN CONSTRUCTION
99+00 99+50 100+00 100+50
5,356 5,356
5,358 5,358
5,360 5,360
5,362
5,362
99+00 99+50 100+00 100+50
5,356 5,356
5,358 5,358
5,360 5,360
5,362
5,362
+1.21%
.4
+5.
.4
.2
.9
.6
SSD = 135'
K = 2
15' VC
,3
.4
15' VC
101+00 101+50 102+00
5,362 5,362
5,364 5,364
5,366 5,366
5,368
5,368
101+00 101+50 102+00
5,362 5,362
5,364 5,364
5,366 5,366
5,368
5,368
+5.
RESCUE CREEK TRAIL
A b u tm e n t
RESCUE CREEK TRAIL WEST
"MAIN05" 100+00
E = 2466581.8260 N = 19752347.9109
:1
J u n e
A
L I0
R e s c u e C re e k
P la n
S h e p w
-w o rk \d
\m t-e p -y e ll
-1
-3 p ln p p .d g n
PROJECT
D.4
N '4
"E
N °3
'2 "W
N14° 30'0
8"E e = 0.025
'95.53L =
'48.89T =
'182.00R =
(RT)30°04'29"Δ =
103+67.13PI
e = 0.025 '35.00L = '23.95T = '20.00R =
(LT)100°16'03"Δ =
102+96.07PI
102+72.12
PC
103+ 07.12
PT
103+ 18.24
PC
.7
T
N
Construction limits
Slope stake limits
Edges of trail
"MAIN05" Trail to be constructed
See Section G 102+62 End Rescue Creek Bridge
See Section G Rescue Creek Bridge
"MAIN01" Existing Rescue Creek Trail East
Gardner River
4' Lt.
+95
4' Rt.
+95
1.2' Rt.
+95
1.2' Lt.
+95
See Section G Steel Approach Rail
Profile grade
Existing ground
102+62 End Bridge
Existing ground
Profile grade
END CONSTRUCTION
END PROJECT
102+00 102+50 103+00
5,368 5,368
5,370 5,370
5,372 5,372
5,374 5,374
102+00 102+50 103+00
5,368 5,368
5,370 5,370
5,372 5,372
5,374 5,374
+5.0 0%
103+50 104+00
5,374 5,374
5,376 5,376
5,378 5,378
5,380 5,380
103+50 104+00
5,374 5,374
5,376 5,376
5,378 5,378
5,380 5,380
+5.0 0%
+4.8 0%
.0
.0
.1
.0
.3
.0
.7
5' VC
19' VC
15' VC
,3
.5
RES
CUE
CREE
K
TRAI
L
A b u tm e n t
RESCUE CREEK TRAIL EAST
"MAIN05" 104+20
E = 2467137.8968 N = 1975399.5378
:1
J u n e
A
L I0
R e s c u e C re e k
P la n
S h e p w
-w o rk \d
\m t-e p -y e ll
-1
-3 p ln p p .d g n
PROJECT
D.5
GPS
RESCUE2
N to be constructed
"MAIN 05" Trail
Rescue Creek Trail West
Existing "MAIN 01"
Offset 75' RT
STA 100+27
removed and reset
Exisiting sign to be
Offset 74' RT
STA 100+31
removed and reset
Exisiting sign to be
Note:
1. Final location of signs will be directed by the CO. Scale in feet
25 0 25 50 75
:0 a y
A
L I
R e s c u e C r e e k
P la n
S h e p w w o r k
\d
\m t-e p y e ll p tc s ig n s .d g n
SIGN REMOVAL AND RESET PLAN
PROJECT
D.6
S
R E S C U E
+S S
G P S
S S+
N
See Section G
Rescue Creek Bridge
Construction Access Limits
Construction Limit
Trail West
Existing Rescue Creek
Rescue Creek Trail East
Existing "MAIN 01"
Offset 66' LT
STA 101+74
West Abutment Removal
Offset 60' LT
STA 101+90
Pier Removal
Offset 60' LT
STA 102+34
East Abutment Removal
Gardner River
Offset 223' LT
STA 101+71
Old Bridge Deck Removal
Construction Limits
Construction limit
LEGEND:
Removal of trail
Removal of bridge abutments, pier, and old bridge
Scale in feet
0 10050 15050
:0
J u n e
R e m o v a l
R e m o v a l
S h e p w w o r k \d
\m t-e p y e ll tr a il r e m o v a l.
d g n
AND OLD BRIDGE DECK REMOVAL
RESCUE CREEK TRAIL, ABUTMENTS,
PROJECT
NUMBER
SHEET
MT ERFO NP YELL 2022-1(3) D.7
NPS Drwg No. 101/195340 NPS PMIS No. 349455
© 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS a y
T a b u la ti o n o f Q u a n ti ti s p w w o r k \d
\m t-e p y e ll p ln q ta b .d g n
CONTROL
SOIL EROSION AND SEDIMENT
TABULATION OF QUANTITIES
PROJECT
NUMBER
SHEET
MT ERFO NP YELL 2022-1(3) E.1
N
N
5360'
5370'
N
Fiber rolls, typ.
END PROJECT
Fiber rolls, typ.
Fiber rolls, typ.
Fiber rolls, typ.
WORK (ABUTMENT REMOVAL)
BEGIN SITE
(ABUTMENT REMOVAL)
WORK
END SITE
Slope stake limits
Rescue Creek Trail West
Existing "MAIN 01"
Rescue Creek Trail West
Existing "MAIN 01"
Rescue Creek Trail East
Existing "MAIN 01"
Resuce Creek Trail East
Existing "MAIN 01"
Edges of trail
BEGIN PROJECT
Slope stake limit
Slope stake limit
Gardner River
Construction limits
Construction limits
Construction limits
Construction limits
Construction Access Limit
Slope stake limits
Edges of trail
Slope stake limits
LEGEND:
fiber rolls. See Sheet E.3 for details.
Install soil erosion control, END CONSTRUCTION
"MAIN 05" 104+20
Offset 66' LT
"MAIN 05" 101+74
Offset 46' LT
"MAIN 05" 102+34
BEGIN CONSTRUCTION
"MAIN 05" 100+00
:0 a y
B
L A lt
R
C
P la n
S h e p w w o r k
\d
\m t-e p y e ll p ln e c .d g n
CONTROL PLAN
SOIL EROSION AND SEDIMENT
PROJECT
E.2
NO SCALE
Spacing Slope
STAKES REQUIRED
1:1
1:2
1:3
1:4 or flatter for each roll
Stakes required
FIBER ROLL SPACING
Fiber roll length
Fl ow
T o e o f fi ll s lo p e
ELEVATION
PLAN
disturbed areas
Runoff from
INSTALLATION BEYOND TOE OF SLOPE
INSTALLATION ALONG SLOPES
FIBER ROLL STAKING DETAIL
PROPERLY STAKED AND ENTRENCHED FIBER ROLL
Existing ground (typ.)
Fiber roll
Flow direction
Slope
Direction ofrunoff from disturbed areas sp ac in g ch ar t
S ee
Fi be r
R ol l
Fiber roll ff o n ur f o n oi t c er i
D along contours
Install fiber rolls
Fiber roll
Slope
Fi ll slo pe
Direction of runoff ground
Existing soil to match ground level
Backfilled and compacted
Flow larger than fiber roll wood stakes. See Note 2.
Pay lim its
Pay lim its
SLOPE PROTECTION INSTALLATION
ALTERNATE FIBER ROLL JOINT DETAIL
FIBER ROLL LAPPING DETAIL
on uphill side of fiber roll
Place excavated materialStagger joints (typ.)
2.
1.
permanent installations. Do not crush fiber roll while staking.
roll is secure to slope. Live stakes may be used for and install fiber rolls
Step 1: Excavate trench Step 2: Backfill soil against fiber rolls
FIBER ROLL
(FT)
(FT)
2" (min.) Excavate trench 2"
1" x 1" or 1" Ø ove rlap
12" (m in.)
t o m in m in
1" x 1" Wood stake as specified in plans
3' min. or
3' (min.)
Drive stakes at each end and at 4-foot spacing until fiber fiber roll and space stakes at 4-foot max.
6-inches from fiber roll end angles towards the adjacent
Overlap fiber rolls 12-inch minimum. Drive stakes at
NOTE:
WFLHD DETAIL
DETAIL APPROVED FOR USE 10/2014
7/2016REVISED:
157-21W
:2
A
M
F e b r u a r y
D e t
W c p w w o r k
\d
\W
.d g n
DETAIL
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
PROJECT
QUANTITIES DRAINAGE
TABULATION OF
:5
J u ly
T a b
H y d r o
Q u a n t p w w o r k
\d
\m t-e p y e ll ta b d r a in a g e .d g n
PROJECT
F.1
2 103
Placed riprap, Method A, Class 3
Class 3
Placed riprap, Method A, Type D (non-woven)
Geotextile filter, Class 1, Foundations
Existing Rescue Creek
Limits
Excavation
Excavation Limits
N
OHWM, El. 5351.50
100-yr Water surface elev.
OHWM
OHWM
See G Sheets.
Soil Foundation
Reinforced
G a r d n e r R iv e r
13'
.6
32.2'
45.2'
.2
.3
9'
1.2'
7.5'
8.3'
2'
:11
:1
2.318122Class E183305
Material
Streambed
Furnished
(CUYD)
Bank Stone
(in.±4)
Diameter
Bank stone
(CUYD)
Cobble
Streambed
Gradation
Cobble
Streambed
(CUYD)
Sediment
Streambed
CUYD
1:1.5
RIPRAP LAYOUT
RESCUE CREEK
:1
J u ly
[S
H E
E T
P
L A
N P
R O
F
IL
E p w w o r k
\d
\m t-e p y e ll
H
Y
C O
R
.2
.d g n
PROJECT
NUMBER
SHEET
MT ERFO NP YELL 2022-1(3)
MT ERFO NP YELL 2022-1(3) F.2
T U
A L
F
IL
E
X X
X
D
G.1
NO. DATE BY REVISIONS NO. DATE BY REVISIONS
1" = 10' 1 RG3321-A
PLAN & ELEVATION
Profile
Proposed Ground at Structure Centerline
Existing Ground Profile
Steel Approach Rail
5.00%
Elev. 5357.00
Elev. 5365.48
Gardner River
CL
CL
5361.0
Low Chord Elevation Footing (typ.)
Reinforced Concrete to be constructed
"Main 05" Trail
Creek Trail East
Existing "MAIN 01" Rescue
End Bridge
Trail
Structure
Elev. 5363.00
Sta. 100+90.00
Begin Bridge
N
Exp.
Fixed
Truss Pedestrian Bridge
Prefabricated Steel
CL
CL
li ar
T k e er C eucseR
Foundation
Reinforced Soil
Foundation
Reinforced Soil
Creek Trail West
Existing "MAIN 01" Rescue
Steel Approach Rail (typ.)
100-yr El. 5353.00
OHWM El. 5351.50
PROJECT TEAM LEADER BRIDGE DRAWING
of
DATESCALECHECKED BYDRAWN BYDESIGNED BYREVISIONSNO. DATE BY REVISIONS NO. DATE BY
ERFO NP YELL 2022-1(3)MT
10 O. ELTAYEBM. SALASM. SALAS
B. OLTMANN JUNE 2025
STATE PROJECT
SHEET
NO.
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
WESTERN FEDERAL LANDS HIGHWAY DIVISION
RESCUE CREEK PEDESTRIAN BRIDGE
PARK COUNTY, MONTANA
YELLOWSTONE NATIONAL PARK
DRAWING NO.
Abutment 1 Abutment 2
N84°41'42"E
170'
:3
J u ly
D e f a u lt
I:
\T e c h S e rv ic e s \B ri d g e \B rd g D g n \C
A D
D \S e e d F il e s \P ro je c t\
R
X S
H T
.D
T U
A L
F
IL
E
X X
G.2
No Scale 2 RG3321-B
-MT. - 10% min.
-Visual - 100%Fillet welds:
Perform non-destructive testing of welds as follows:
electrodes classified E7028.
Perform welding process manual shielded metal arc welding (SMAW) using low hydrogen
Perform all welding in accordance with the current AASHTO/AWS D1.5 Bridge Welding Code.
Welding:
Copper-8-Quinolinolate (Oxine Copper) for timber rub rail.
Provide treated Douglas Fir, Grade 1, Grading Rules Agency - WWPA, WCLIB for all lumber used for timber handrails. Use
Provide hot dipped galvanized fasteners conforming to ASTM A307.
Furnish steel tubes, angles, and bars conforming to ASTM A709.
Bridge Rail, Hand Rail, and Approach Rail:
Furnish welded anchors conforming to ASTM M169.
after fabrication.
Furnish strucutral metal for guard angles and beveled sole plates conforming to ASTM A36. Galvanize guard angle assemblies
Furnish diaphragm anchor bolts conforming to ASTM A307.
Miscellaneous Structural Steel:
Copper Naphthenate (CuN) in Light Oil (Type C Solvent) for timber deck planks.
Treat all timber according to AWPA Use Category System U1 for Use Category 3B Above Ground - Exposed (UC3B). Use structural timber used for timber plank deck.
Provide treated Coastal Region Douglas Fir - Larch Rough Sawn No. 1 Grade, Grading Rules Agency WWPA, WCLIB for all
Galvanize hardware according to AASHTO M 232.
Furnish structural timber conforming to AASHTO M 168.
Structural Timber:
with ASTM A563 Grade C nuts and ASTM F463 washer unless other noted on the plans.
Furnish slip critical, friction type, Class A, field connections conforming to AASHTO M164, Type 1, (ASTM A325 Type 1)
Requiements, 583 (for Zone 2), and 593.
Furnish main load carrying member components subjected to tensile stress conforming to the ASTM A847 Supplemental
Furnish shear connectors conforming to AASHTO M169 (ASTM A108).
for truss steel and floor beam steel system.
Furnish high-strength low alloy corrosion resistant structural steel conforming to AASHTO M 270 (ASTM A709), Grade 50WT
Structural Steel:
plans.
face of any bar of 2 inches, unless noted otherwise on the plans. Minimum splice lengths for all bar sizes are shown on the
Furnish reinforcing steel conforming to AASHTO M 31, or M 322, Grade 60 deformed. Use minimum concrete cover to the
Reinforcing Steel:
Furnish expansion joint filler meeting the requirements of AASHTO M 213.
Joint Fillers:
Provide Type 1L cement for all concrete.
inch, unless noted otherwise on the plans.4
Chamfer exposed edges of all concrete
Furnish structural concrete Class A(AE) with a minimum 28-day compressive strength f'c=4500 psi for abutments.
Cast-in-place Concrete:
MATERIALS:
Accumulated Snowpack Condition
Snow Load: 19 lbs. per cubic foot.
Snow Load:
Ground Surface Category C
Design Wind Speed = 115 MPH
Wind Load:
Live Load Surcharge: 3.8 feet.
At-Rest Pressure: Equivalent to a fluid unit weight of soil = 56 pounds per cubic foot.
Active Pressure: Equivalent to a fluid unit weight of soil = 34 pounds per cubic foot.
Lateral Earth Pressure:
Equestrian Live Load: Patch load of 1 kip over a square area measuring 4 inches on a side.
Pedestrian Live Load: 90 lbs. per square foot.
H-5. Maximum Dynamic Load Allowance (Impact), IM=33%, applied to design truck only.
Live Loads:
Structural Steel: 490 lbs. per cubic foot.
Soil: 120 lbs. per cubic foot.
Concrete: 150 lbs. per cubic foot.
Dead Load:
DESIGN LOADS:
Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-14.
Construction:
AASHTO LRFD Guide Specifications for the Design of Pedestrian Bridges, 2009 Edition
AASHTO LRFD Bridge Design Specifications, Ninth Edition, 2020.
Design:
SPECIFICATIONS:
GENERAL NOTES
INDEX OF BRIDGE PLAN SHEETS
DRAWING NO. SHEET TITLE
RG3321-J
RG3321-I
RG3321-H
RG3321-G
RG3321-F
RG3321-E
RG3321-D
RG3321-C
RG3321-B
RG3321-A
Rebar List
Approach Rail Details
Rail Details
Miscellaneous Details
Typical Section
Abutment Reinforcement
Abutment Layout
Foundation Layout
General Notes
Plan & Elevation
ESTIMATE OF QUANTITIES
Item No. Item Quantity Unit Notes
20801-0000 Structure Excavation CUYD
Structural Concrete, Class A(AE)
Reinforcing Steel
Pre-Fabricated Steel Bridge
Bridge Railing, Steel (Approach)
CUYD
LBS
LPSM
LNFT
55201-0200
55401-1000
55504-0000
55601-0900 100
ALL
(1)
(1)
(1) Contract Quantity
20304-2000 LPSMALLRemoval of Bridge
(1)LNFTBridge Expansion Joint55235-0000 16
Administration, Western Federal Lands Division.
November 5th, 2024, prepared by the U.S. Department of Transportation, Federal Highway
For boring logs and other geotechnical information, See Geotechnical Report No. GM2624, dated
GEOTECHNICAL REPORT:
AASHTO LRFD Design method "A" for elastomeric pad design.
Furnish steel shim plates that conform to ASTM A36.
elastomer Grade 5 or higher.
Furnish elastomeric bearing pad conforming to AASHTO M 251 with 60 Durometer hardness, Bearings:
SQYD95GRS-IBS, Geosynthetic Reinforcement57401-0000
TON41GRS-IBS, Open-Graded Backfill57402-0000
LPSMALLTemporary Support Structure (Work Bridge)56202-0000
PROJECT TEAM LEADER BRIDGE DRAWING
of
DATESCALECHECKED BYDRAWN BYDESIGNED BYREVISIONSNO. DATE BY REVISIONS NO. DATE BY
SHEET
NO.
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
WESTERN FEDERAL LANDS HIGHWAY DIVISION
RESCUE CREEK PEDESTRIAN BRIDGE
PARK COUNTY, MONTANA
YELLOWSTONE NATIONAL PARK
DRAWING NO.
:2
J u n e
D e f a
\T e c h S e rv ic e s \B ri d g e \B rd g D g n \C
A D
D \S e e d F il e s \P ro je c t\
R
X S
H T
.D
T U
A L
F
IL
E
X X
G.3
As Shown 3 RG3321-C
FOUNDATION LAYOUT
Begin Bridge End Bridge
CL
CL Trail
Structure
(typ.)
Concrete footing
FOUNDATION PLAN
N
CL
CL
6'-0"
G a r d n e r R iv e r
FOUNDATION ELEVATION
Begin Bridge
End Bridge
CLAbutment 1
CLAbutment 2 at Structure Centerline
Existing Ground Profile Elev. 5357.00
Elev. 5365.48
(typ.)
Concrete footing
N 84°42'42" E around Open-Graded Backfill
Reinforcement Geotextile wrapped
Backfill
Open Graded drawings.
Verify final elevations with bridge manufacturer's approved shop4.
Provide GRS Reinforcment Geotextile according to Subsection 714.06.3.
Provide GRS Open-Graded Backfill according to Subsection 703.18.2.
Construct Reinforced Soil Foundation according to Subsection 208.08(f).1.
Notes:
Foundation
Reinforced Soil at Structure Centerline
Existing Ground Profile
Abutment 2
Abutment 1
2'-0"
" = 10'Scale:1
" = 1'2
Scale:
PROJECT TEAM LEADER BRIDGE DRAWING
of
DATESCALECHECKED BYDRAWN BYDESIGNED BYREVISIONSNO. DATE BY REVISIONS NO. DATE BY
SHEET
NO.
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
WESTERN FEDERAL LANDS HIGHWAY DIVISION
RESCUE CREEK PEDESTRIAN BRIDGE
PARK COUNTY, MONTANA
YELLOWSTONE NATIONAL PARK
DRAWING NO.
2'-6"4'-0"4'-0"2'-6"
2'-0"
Fully overlap under footing Extrude Geotextile 1'-0"
2'-0""16
168'-22'-0"
:5
J u n e
D e f a
\T e c h S e rv ic e s \B ri d g e \B rd g D g n \C
A D
D \S e e d F il e s \P ro je c t\
R
X S
H T
.D
T U
A L
F
IL
E
X X
G.4
3/4" = 1' 4 RG3321-D
ABUTMENT LAYOUT
Bearing
Begin/End Bridge
CL
See Note 1
LC
LC
A
A
(typ.)
Constr. jt.
StructureCL
Elev. B
Elev. A
ELEVATIONS
ELEV. ABUT. 1 ABUT. 2
B
Bearing
Abutment
(typ.)
Constr. jt.
See "MISCELLANEOUS DETAILS"
Expansion Joint
StructureCL
ABUTMENT PLAN
ABUTMENT ELEVATION
SECTION A-A
SECTION B-B
B
B joint details.
See “MISCELLANEOUS DETAILS” sheet for additional expansion6.
appropriate grade and size of anchor rod.
grade 105. Furnish nuts conforming to ASTM A563 for Furnish galvanized anchor rods conforming to ASTM F1554, 5.
height with bridge manufacturer’s approved shop drawings.
bearing assembly to top of deck. Verify backwall and cheekwall Match backwall and cheekwall height to sum of bottom of 4.
may be cast into the footing cheekwall, or holes drilled in the field.
Logger box and conduit line to be installed by others. Bolt inserts 3.
approach rail details.
drilled in the field. See "APPROACH RAIL" sheet for additional reinforcing. Anchor inserts may be cast into the footing, or holes Locate approach rail anchor bolts to avoid conflict with abutment2.
into the footing, or holes drilled in the field.
determined by bridge manufacturer. Anchor inserts may be cast Bearing assembly anchor bolts size, embed depth and locations1.
Notes:
approved shop drawings.
bridge manufacturer's *Verify final elevations with
See Note 2
See Note 3
5357.00
5359.50
5365.48
5367.98
(Abutment 1 shown, Abutment 2 similar)
(Abutment 1 shown, Abutment 2 similar)
PROJECT TEAM LEADER BRIDGE DRAWING
of
DATESCALECHECKED BYDRAWN BYDESIGNED BYREVISIONSNO. DATE BY REVISIONS NO. DATE BY
SHEET
NO.
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
WESTERN FEDERAL LANDS HIGHWAY DIVISION
RESCUE CREEK PEDESTRIAN BRIDGE
PARK COUNTY, MONTANA
YELLOWSTONE NATIONAL PARK
DRAWING NO.
1'-2" 1'-0" 4'-10"
7'-0"7'-0"
1'-2"1'-0"4'-10"
14'-0"
S e e N o te
4'-10"1'-2" 1'-0" 4'-10" 1'-2"1'-0"
14'-0"
S e e N o te
4'-0" 4'-0"
8'-0"
4"
S e e N o te
8'-0"
2'-0"
2'-0"
D e fa
\T e c h
S e rv ic e s \B ri d g e
\B rd g D g n
\C A
D D
\S e e d
F il e s \P ro je c t\
R X
S
H T
.D
:5
J u n e
T U
A L
F
IL
E
X X
G.5
3/4" = 1' 5 RG3321-E
ABUTMENT REINFORCEMENT
LC Structure
#5A4
A
#4A8
#4A9
ABC
ABC
PLAN
LC Structure
#5A3
A e .f
#6A1 #6A1
#5A2
#4A7
#5A4 (Typ.)
#5A5
ELEVATION
A e .f
#5A2 bott., #4A7 top
(Typ.)
#5A5
" m in m in m in
L a p
#6A1
#5A3
SECTION A-A
A
A e
.f m in
L a p
#5A4
#5A4 m in
2" 2
2"
#5A4
SECTION B-B
m in
L a p
#5A2 bott., #4A7 top
#6A1
#5A6 #5A3
#5A5
SECTION C-C
Key:
n.f. = near face f.f. = far face e.f. = each face
"2
2 "2 m in
L a p
6 Spa. @ 1'-0" = 6'-0"
6 Spa. @ 1'-0" = 6'-0"
S p a
S p a
9" 9"
S p a
9"9"
7"
(Abutment 1 shown, Abutment 2 similar)
(Abutment 1 shown, Abutment 2 similar)
PROJECT TEAM LEADER BRIDGE DRAWING
of
DATESCALECHECKED BYDRAWN BYDESIGNED BYREVISIONSNO. DATE BY REVISIONS NO. DATE BY
SHEET
NO.
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
WESTERN FEDERAL LANDS HIGHWAY DIVISION
RESCUE CREEK PEDESTRIAN BRIDGE
PARK COUNTY, MONTANA
YELLOWSTONE NATIONAL PARK
DRAWING NO.
11 Spa. @ 1'-0" = 11'-0"
S p a
16 Spa. @ 10" = 13'-4"
16 Spa. @ 5" = 6'-8" 16 Spa. @ 5" = 6'-8"3" 3"
4 Spa. @ 1'-0" = 4'-0""2
"2
:5
J u n e
D e f a
\T e c h S e rv ic e s \B ri d g e \B rd g D g n \C
A D
D \S e e d F il e s \P ro je c t\
R
X S
H T
.D
T U
A L
F
IL
E
X X
G.6
1" = 1' 6 RG3321-F
TYPICAL SECTION
LC Structure
Timber Rub Rail
Deck
Treated Timber
Floor Beam
Stringer Diagonal Brace
Bottom Chord
Top Chord
S te e l
T r u s s M in
D e p th
TYPICAL SECTION
See “RAILING DETAILS”sheet for additional details.4.
and erecting bridge.
repair any damage to coating due to shipping, handling, After truss installation and timber deck placement, 3.
in accordance with Section 104.
Submit shop drawings for approval before fabrication 2.
illustration purposes only.
The sketch of the bridge typical section is for 1.
Notes:
PROJECT TEAM LEADER BRIDGE DRAWING
of
DATESCALECHECKED BYDRAWN BYDESIGNED BYREVISIONSNO. DATE BY REVISIONS NO. DATE BY
SHEET
NO.
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
WESTERN FEDERAL LANDS HIGHWAY DIVISION
RESCUE CREEK PEDESTRIAN BRIDGE
PARK COUNTY, MONTANA
YELLOWSTONE NATIONAL PARK
DRAWING NO.
8'-0"
S te e l T ru s s M a x D e p th
:0
J u n e
D e fa
\T e c h
S e rv ic e s \B ri d g e
\B rd g D g n
\C A
D D
\S e e d
F il e s \P ro je c t\
R X
S
H T
.D
T U
A L
F
IL
E
X X
G.7
No Scale 7 RG3321-G
MISCELLANEOUS DETAILS
3" holes @ 1'-0" Spa." Ø 16
CL
GUARD ANGLE
Use one continuous angle to fit full deck width.1.
Guard Angle Note:
(See Detail)
Guard Angle"4
3"x4"x
(See Expansion Joint Plan detail)
"Ø x10" Bolt 6 Spa. @ 1'-0" = 6'-0"2
Treated Timber Deck
5.00%
A beads and silicone band Field-applied silicone corner
"4
L 2"x2"x anchor @ 1'-0"
"Ø x2" stud4
Concrete backwall foam Impregnated on both sides Expoxy adhesive silicone Precompressed
EXPANSION JOINT
width.
and contraction from 2" nominal setting Furnish seal capable of 50% expansion2.
system, as shown.
Provide a water tight, continuous seal1.
Expansion Joint Note:
at time of expansion joint installation.
Note: Temperature is ambient temperature
"4
Temperature (°F) "A" (in.)
TEMPERATURE SETTING TABLE
"8
"8
"16
"2
"16
"8
"8
Treated Timber Deck
(See Detail)
Guard Angle"4
3"x5"x silicone Precompressed
"4
L 2"x2"x
Concrete backwall
StructureLC
" Ø x10" Bolt2
" Ø stud anchor4
2"x
EXPANSION JOINT PLAN
"4
Guard angle & L 2"x2"x
BearingLC
BearingLC
BearingLC
Steel Plate
Laminated Bearing Pad
EXPANSION TOP PLATE
EXPANSION BOTTOM PLATE
FIXED TOP & BOTTOM &
Furnish and install bearings.4.
bearing.
Furnish galvanized steel for all exposed surfaces of steel for3.
prior to installation.
Submit sketch and design of bearing to the CO for approval,2.
The sketch of the bearing is for illustration only.1.
Bearing Note:
BEARING
PROJECT TEAM LEADER BRIDGE DRAWING
of
DATESCALECHECKED BYDRAWN BYDESIGNED BYREVISIONSNO. DATE BY REVISIONS NO. DATE BY
SHEET
NO.
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
WESTERN FEDERAL LANDS HIGHWAY DIVISION
RESCUE CREEK PEDESTRIAN BRIDGE
PARK COUNTY, MONTANA
YELLOWSTONE NATIONAL PARK
DRAWING NO.
6 Spa. @ 1'-0" = 6'-0"
8 Spa. @ 1'-0" = 8'-0"
8'-0"
:0
J u n e
D e f a
\T e c h S e rv ic e s \B ri d g e \B rd g D g n \C
A D
D \S e e d F il e s \P ro je c t\
R
X S
H T
.D
T U
A L
F
IL
E
X X
As Shown 8 RG3321-H
RAIL DETAILS
A
A
RAILING SYSTEM ELEVATION
" = 1'2
Scale:
SECTION A-A
" = 1'1Scale:
S p a
"8
L 1"x1"x
1"x4"
Timber Rub Rail
Treated Timber Deck
Bottom Chord
Top Chord
Floor Beam
Stringer drawing of the truss.
Match height of rail shown with approved shop7.
prior to fabrication.
Submit shop drawings to the CO for approval6.
timber rub rail.
Sand and smooth all exposed surface of the5.
bridge. Stagger the joints of the rail at a 5’ offset.
with field adjustments to fit the length of the Provide timber rub rails typically 15’ in length4.
Treat all timber after fabrication.3.
superstructure.
to the horizontal and vertical alignment of the Shop fabricate structural steel angle L 1”x 1”x 1/8"2.
illustration purposes only.
The sketch of the bridge railing system is for1.
Notes:
G.8
PROJECT TEAM LEADER BRIDGE DRAWING
of
DATESCALECHECKED BYDRAWN BYDESIGNED BYREVISIONSNO. DATE BY REVISIONS NO. DATE BY
SHEET
NO.
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
WESTERN FEDERAL LANDS HIGHWAY DIVISION
RESCUE CREEK PEDESTRIAN BRIDGE
PARK COUNTY, MONTANA
YELLOWSTONE NATIONAL PARK
DRAWING NO.
:0
J u n e
D e fa
\T e c h
S e rv ic e s \B ri d g e
\B rd g D g n
\C A
D D
\S e e d
F il e s \P ro je c t\
R X
S
H T
.D
T U
A L
F
IL
E
X X
G.9
As Shown 9 RG3321-I
APPROACH RAIL DETAILS
APPROACH RAIL PLAN
20' Approach Rail
20' Approach Rail
40' Approach Rail
5.00%
Concrete Backwall
Concrete Footings (Typ.)
" Ø x9" Anchor Bolt2
Detail A
"4
2 L 2"x2"x
"4
2 L 2"x2"x " Steel Bar8
1"x
S p a
5"x5" Vertical Steel Post
Timber Rub Rail
APPROACH RAIL ELEVATION
" = 1'4
Scale:
SECTION A-A
A
A
R
Anchor Bolt
" Ø x9"2
#4R2
SECTION B-B
B B
Rail
Timber Rub
"4
2 L 2"x2"x
"4
2 L 2"x2"x
Bar
"x1" Steel8
#3R1
#4R2
" = 1'Scale:3
DETAIL A
" = 1'Scale:3
" = 1'2
Scale:1
2" 6" 1
2"
2"
" = 1'16
Scale:
Furnish and install approach rail footings.10.
Match grade of approach rail to grade of trail.9.
manufacturer's approved shop drawings.
rail height and approach rail locations with bridge
Verify rubshop drawing of the bridge timber rub rail.
Match height of timber rub rail shown with approved8.
to fabrication.
Submit shop drawings to the CO for approval prior7.
Top all other vertical posts with a flat, ornamental cap.
diameter of steel spherical head to width of vertical post.
posts at beginning of each approach rail. Match Furnish steel spherical heads atop the vertical steel6.
rail.
field adjustments to fit the length of each approach Provide timber rub rails typically 10’ in length with5.
smooth all exposed surface of the timber rub rail.
Treat timber rub rail after fabrication. Sand and4.
approach rail.
to the horizontal and vertical alignment of the Shop fabricate structural steel angle L 2”x 2”x ¼”3.
Grade 50W for approach rail steel.
conforming to AASHTO M 270 (ASTM A709), Furnish high-strength low-alloy structural steel2.
illustration purposes only.
The sketch of the approach railing system is for1.
Notes:
See Note 6
PROJECT TEAM LEADER BRIDGE DRAWING
of
DATESCALECHECKED BYDRAWN BYDESIGNED BYREVISIONSNO. DATE BY REVISIONS NO. DATE BY
SHEET
NO.
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
WESTERN FEDERAL LANDS HIGHWAY DIVISION
RESCUE CREEK PEDESTRIAN BRIDGE
PARK COUNTY, MONTANA
YELLOWSTONE NATIONAL PARK
DRAWING NO.
° 1
75°
10'-0" 10'-0"
8 Spa. @ 1'-2" = 9'-4"
1'-5" Ø
S p a
3" 3"
1'-5"
"2
9"
:0
J u n e
D e fa
\T e c h
S e rv ic e s \B ri d g e
\B rd g D g n
\C A
D D
\S e e d
F il e s \P ro je c t\
R X
S
H T
.D
T U
A L
F
IL
E
X X
G.10
No Scale 10 RG3321-J
REBAR LIST
ABUTMENT 1
#6A1
B C D E F G H J O K
6 2 FOOTING LONG. BOTT.
FOOTING TRANS. BOTT.25#5A2
FOOTING LONG. TOP25#5A3
VERT. IN ALL WALLS175#5A4
FOOTING HORZ.STR5#5A5
FOOTING HORZ.STR5#5A6
FOOTING TRANS. TOP24#4A7
BACKWALL HORZ.STR4#4A8
CHEEKWALL HORZ.4#4A9
REINFORCING STEEL SCHEDULE DIMENSION TABLE
SIZE TYP PIN SZ LOCATION QTY LENGTH WEIGHTBAR MK A
O K J H G F E D C B
ABUTMENT 2
SIZE TYP PIN SZ LOCATION QTY LENGTH WEIGHTBAR MK A
SUBTOTAL LBS
#6A1 6 2 FOOTING LONG. BOTT.
FOOTING TRANS. BOTT.25#5A2
FOOTING LONG. TOP25#5A3
VERT. IN ALL WALLS175#5A4
FOOTING HORZ.STR5#5A5
FOOTING HORZ.STR5#5A6
FOOTING TRANS. TOP24#4A7
BACKWALL HORZ.STR4#4A8
CHEEKWALL HORZ.4#4A9
SUBTOTAL LBS
O K J H G F E D C B
APPROACH RAIL
SIZE TYP PIN SZ LOCATION QTY LENGTH WEIGHTBAR MK A
#3R1 3 T2 TIE
VERT.STR4#4R2
LBSSUBTOTAL
B
C
D
OPTIONAL LEG
TYPE 17
A
B
C
D
E
G
TYPE T2
GA
B
TYPE 2
0'-4½"
0'-3¾"
0'-3¾"
0'-3¾"
0'-3"
0'-3"
0'-4½"
0'-3¾"
0'-3¾"
0'-3¾"
0'-3"
0'-3"
0'-2"
B
STR
VERTICALVERT.
TRANSVERSETRANS.
LONGITUDINALLONG.
HORIZONTALHORZ.
BOTTOMBOTT.
Legend:
PROJECT TEAM LEADER BRIDGE DRAWING
of
DATESCALECHECKED BYDRAWN BYDESIGNED BYREVISIONSNO. DATE BY REVISIONS NO. DATE BY
SHEET
NO.
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
WESTERN FEDERAL LANDS HIGHWAY DIVISION
RESCUE CREEK PEDESTRIAN BRIDGE
PARK COUNTY, MONTANA
YELLOWSTONE NATIONAL PARK
DRAWING NO.
:1
J u n e
D e f a
\T e c h S e rv ic e s \B ri d g e \B rd g D g n \C
A D
D \S e e d F il e s \P ro je c t\
R
X S
H T
.D
GPS
N
North Entrance Station
Wilson Wy
Robert Reamer Ave and trail realignment
Bridge replacement
END PROJECT
BEGIN PROJECT
G a r d n e r R iv e r
Scale in feet
400200075150
N O
R T
H E
N T
R A
N C
E R
O A
D and closed to the public currently inaccessible
Road to the south is
ROAD
CLOSED
ROAD
CLOSED
R11-2 Road Closed
Type 3 Barricade
"MAIN 05" 100+00
"MAIN 05" 104+20
1 m ile to
G ardiner m ile s to
M a m m o th
:0
M a y
V p w w o r k
\d
\m t-e p y e ll tt c .d g n
PLAN
TEMPORARY TRAFFIC CONTROL
PROJECT
H.1
| E_sheets.pdf |
| e3.pdf |
| WFL Detail Drawings |
| W157-21: Fiber Roll |
| Metric |
| US Customary |
| G_sheets.pdf |
| S.01 - RESCUECREEK_1(3)_PE-Default- |
| S.02 - RESCUECREEK_1(3)_GN-Default- |
| S.03 - RESCUECREEK_1(3)_FL-Default- |
| S.04 - RESCUECREEK_1(3)_AL-Default- |
| S.05 - RESCUECREEK_1(3)_AR-Default- |
| S.06 - RESCUECREEK_1(3)_TYP SEC-Default- |
| S.07 - RESCUECREEK_1(3)_MISC-Default- |
| S.08 - RESCUECREEK_1(3)_RAIL-Default- |
| S.09 - RESCUECREEK_1(3)_APPR RAIL-Default- |
| S.10 - RESCUECREEK_1(3)_REBAR-Default- |
Proj-Num:
| W157-21: E.3 |
| NPS: NPS PMIS No. 349455 NPS Drwg No. 101/195340 |
File details come from the government source that posted it. Updated .