This document is a Questions and Answers (Q&A) log for the Yellowstone National Park Rescue Creek Bridge project (Project No.: MT ERFO NP YELL 2022-1(3)). The log contains six technical questions from potential contractors regarding site access, parking, bid bond validity, steel erection certification requirements, rub rail specifications, and approach railing materials. The National Park Service (NPS) provides responses, with most answers directing bidders to follow the existing solicitation documents. Key details include: the project site is currently closed to vehicular traffic but open to pedestrian access, entrance fees will be waived for contractors performing site reviews, and parking will be available just outside the closure barricade. The Q&A log is dated between 8/14/2025 and 8/19/2025, with some questions to be addressed in future amendments.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project No.: MT ERFO NP YELL 2022-1(3) Project : Yellowstone NP Rescue Creek Bridge
# General Technical Question Answer Date
1 X Do we have access to the project site during bidding and if so who do we contact a NPS to gain access?
The roadway is closed to vehicular traffic due to the flood damage. The area is open to pedestrian access. It is approximately 0.6 miles from the vehicular traffic closure to the project location.
8/14/25
2 X Do we park outside the park and walk in or do we enter the park and if so would we be able to obtain a contractors pass the enter?
The entrance fee will be waived for contractor’s performing a site review.
Parking would be just outside the closure barricade past the entrance station, not blocking emergency access that might need to pass through closure the gate.
8/14/25
3 X The Bid Bond Form provided in the solicitation expires on 08/31/2025. Will this bond form still be acceptable to submit with our bid?
This will be addressed under Amendment A001.
8/18/25
4 X
According to the supplemental specification
555.18 the steel erector is required to be AISC certified in steel erection. This requirement prohibits many bridge/steel erectors (many of which have completed work in the park) from being able to provide quotes for the project.
Please let us know if this supplemental specification was intended to limit the number of qualified contractors or if another steel erection certification could be used instead.
Please bid as shown according to the solicitation documents.
8/18/25
5 X
Rub Rail – specs state DF # 1 1” x 4” using Copper- 8- Quinolinolate…This treatment is no longer being used by most suppliers. Is 5/4” x 6” Ipe wood acceptable in its’ place? (higher quality and longer lasting)
This will be addressed in the next amendment.
8/19/2025
6 X Approach Railing decorative weathering steel spheres – can this material be iron or some other material other than weathering steel?
Bid as shown. 8/19/2025