mt-ep-yell2022-1-3_earthwork.pdf
PDF 89 KB Posted
- Solicitation number
- 69056725R000010
About this file
This is a Quantities Report by Named Boundary for the Rescue Creek Earthwork project, generated on May 7, 2025, for alignment ALI05_Rescue Creek. The report presents detailed earthwork quantity calculations organized by station locations (10170.00 West and 10510.00 East) with measurements in feet, square feet, and cubic yards.
The report documents various construction elements including fill operations (2,185.556 and 291.334 cubic yards at the respective stations), cut operations (4.104 and 1,677.490 cubic yards), turf establishment areas (510.834 and 814.890 square feet), and pavement layer 3 installations (723.908 and 1,195.704 square feet). Additional infrastructure elements are quantified including baseline measurements, centerlines, pavement edges, clearing areas, and topsoil stripping limits. Volume calculations are provided for both fill and cut operations, with fill volumes totaling 2,837.431 and 475.443 cubic yards, and cut volumes at 96.505 and 3,793.211 cubic yards across the two stations. The report appears to be a technical engineering document used for construction planning and material estimation purposes.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment A003.pdf | ||
| QA_09-02-2025.pdf | ||
| QA_08-27-2025.pdf | ||
| Amendment A002.pdf | ||
| QA_08-21-2025.pdf | ||
| QA2_08-18-2025.pdf | ||
| QA_08-18-2025.pdf | ||
| Amendment A001.pdf | ||
| QA_08-14-2025.pdf | ||
| mt-ep-yell2022-1-3_xs.pdf | ||
| RFP 69056725R000010_MT ERFO NP YELL 2022-1(3).pdf | ||
| mt-ep-yell2022-1-3_Rescue Creek Bridge Final Foundation Memo.pdf | ||
| mt-ep-yell2022-1-3_Rescue creek_control-sheet.xlsx | XLSX spreadsheet | |
| mt-ep-yell2022-1-3_ali.pdf | ||
| mt-ep-yell2022-1-3_plans_Final.pdf | ||
| Physical Data.zip | ZIP file | |
| RescueCreek_Waterway_Hydraulics_Memo_95pct.pdf |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Quantities Report by Named Boundary Report Created: Wednesday, May 7, 2025
Time: 9:43:06 AM
Named Boundary Group: Rescue Creek Earthwork QTY
Alignment Name: ALI05_Rescue Creek
Input Grid Factor: Note: All units in this report are in feet, square feet and cubic yards unless specified otherwise.
Station Named Boundary Name Material Count Length Top Sloped Area Volume
10170.00 West
Fill: 2185.556
DNC:
Turf Establishment: 510.834 Cut: 4.104
Pavement Layer 3: 723.908 8.880 Volumes_Fill: 2837.431 331.152 Volumes_Cut: 96.505 0.575
Baseline: 175.000 Volumes_Topsoil Stripping Limits: 190.571
Centerline 1: 90.000 Centerline: 90.000
Prop Clearing: 190.571 Edge of Pavt: 180.000
Edge of Pavt 3: 180.000 Centerline Exist: 90.000
Fill: 180.609
10510.00 East
Turf Establishment: 814.890 Cut: 1677.490 Fill: 291.334
Volumes_Fill: 475.443 4.923 Pavement Layer 3: 1195.704 14.691
Volumes_Cut: 3793.211 308.259 Baseline: 204.963
Centerline 1: 157.749 Centerline: 157.749
Prop Clearing: 269.511 Edge of Pavt: 315.811
Edge of Pavt 3: 315.811 Centerline Exist: 157.749
Cut: 191.278 Fill: 73.683
Terrain_Exterior: 154.899
DNC:
Page 1 of 2Volumes Report
5/7/2025
Station Named Boundary Name Material Count Length Top Sloped Area Volume Volumes_Topsoil Stripping Limits:
Page 2 of 2Volumes Report
5/7/2025
File details come from the government source that posted it. Updated .