This document is a Questions and Answers (Q&A) file for a National Park Service (NPS) bridge construction project at Yellowstone National Park. The project, identified as MT ERFO NP YELL 2022-1(3), involves the Rescue Creek Bridge and addresses four key contractor inquiries. The questions cover site access during bidding, parking logistics, bid bond form validity, and steel erection certification requirements. The NPS responses indicate that the roadway is closed to vehicular traffic due to flood damage but open to pedestrian access, with entrance fees waived for contractors performing site reviews. Parking will be permitted just outside the closure barricade. The bid bond form's acceptability will be addressed in a future amendment, and contractors are instructed to bid according to the solicitation documents, specifically maintaining the AISC certification requirement for steel erectors.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project No.: MT ERFO NP YELL 2022-1(3)
Project : Yellowstone NP Rescue Creek Bridge
# General Technical Question Answer Date
1 X
Do we have access to the project site during bidding and if so who do we contact a NPS to gain access?
The roadway is closed to vehicular traffic due to the flood damage. The area is open to pedestrian access. It is approximately 0.6 miles from the vehicular traffic closure to the project location.
8/14/25
2 X
Do we park outside the park and walk in or do we enter the park and if so would we be able to obtain a contractors pass the enter?
The entrance fee will be waived for contractor’s performing a site review.
Parking would be just outside the closure barricade past the entrance station, not blocking emergency access that might need to pass through closure the gate.
8/14/25
3 X
The Bid Bond Form provided in the solicitation expires on 08/31/2025. Will this bond form still be acceptable to submit with our bid?
This will be addressed under Amendment
A001.
8/18/25
4 X
According to the supplemental specification
555.18 the steel erector is required to be AISC certified in steel erection. This requirement prohibits many bridge/steel erectors (many of which have completed work in the park) from being able to provide quotes for the project.
Please let us know if this supplemental specification was intended to limit the number of qualified contractors or if another steel erection certification could be used instead.
Please bid as shown according to the solicitation documents.
8/18/25
Check General or Technical