Revised Plans.pdf
PDF 6 MB Posted
- Solicitation number
- 2137057
- Issued by
- Nassau County, New York
About this file
Summary: Revised Plans for Pool Facility Renovation at Kennedy Memorial Park
This document is a comprehensive revised bid set of architectural and engineering plans prepared by H2M architects and engineers for the Pool Facility Renovation at Kennedy Memorial Park, Inc., located at 335 Greenwich Street in Hempstead, New York, under the jurisdiction of the Village of Hempstead. The project encompasses the complete renovation and reconstruction of the park's pool facilities, including a new bathhouse building (7,725 square feet), a filter building (1,437 square feet), two in-ground swimming pools (a 30' x 50' family pool with 33,660 gallons capacity and a 45' x 75' competition pool with 206,252 gallons capacity), a new spray park facility, mechanical systems, electrical and plumbing infrastructure, site drainage and grading improvements, and associated site work including new asphalt pavement, concrete sidewalks, chain-link fencing, and landscaping. The project is organized into multiple contracts: Contract G (General Construction), Contract P (Plumbing Construction), Contract X (Pool Construction), Contract H (HVAC Construction), and Contract E (Electrical Construction), with detailed drawings, specifications, and equipment schedules comprising 161 total drawing sheets. The plans were dated July 2026 and marked as "Final Bid Document," with Bid Addendum No. 1 issued on July 16, 2026. The document specifies detailed construction notes, site conditions, utility coordination requirements, water main re-routing specifications requiring a new 6-inch Class 52 C.L.D.I. water main approximately 115 feet long, equipment lists with specific manufacturer model numbers for pumps, filters, valves, chemical storage systems, and pool circulation equipment, and comprehensive hydraulic schematics for the family pool (172 GPM design flow rate with two 7.5 HP pumps), competition pool (624 GPM design flow rate with two 20 HP pumps), and spray park systems.
The document provides extensive technical specifications including filtration valve charts, heating valve configurations, recirculation systems, chemical feed requirements with chlorine and hydrochloric acid storage tanks, drainage calculations for multiple drainage systems (Systems A through E), sanitary sewer connections and sequencing, and penetration schedules for the filter building with specific sleeve materials and Link Seal specifications. Contractors are required to conduct pre-bid site inspections with owner representation, provide 24 hours' notice before commencing work, complete daily cleanup operations, maintain water-tight weather protection, minimize tree removal, restore all disturbed areas, and comply with all applicable federal, state, and local codes. The project includes substantial site amenities such as outdoor seating (dining tables and chairs), lounge seating, bleachers, lifeguard stations with umbrellas, and emergency safety facilities including eyewash and shower stations. Key infrastructure elements include new pull boxes, transformers, electrical lines, light poles, drywells with various capacities (4' to 12' diameter), sanitary and drainage cleanouts, trench drains, and a buried spray park tank with top elevation at 62.30 feet. The revised plans incorporate structured cabling systems, security systems, audiovisual infrastructure, fire alarm systems, and comprehensive controls for all mechanical and pool equipment systems.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Appendix B.pdf | ||
| BID 9 PROPOSAL PAGES.pdf | ||
| addenda #3.pdf | ||
| Appendix C.pdf | ||
| Table of Contents.pdf | ||
| 011B.4- Proposal P1D - Contract E.pdf | ||
| addenda #2.pdf | ||
| Revised Section 225116 - Aquatic Pumps.pdf | ||
| 2026-27 Bid 9 Notice.doc | DOC document | |
| HEMV2602 - Addendum No. 1 - 07.28.2026.pdf | ||
| Appendix A.pdf | ||
| Revised Section 225119 - Aquatic Filtration System.pdf | ||
| addenda #2 part 2.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Exp. Date
"IN ACCORDANCE WITH ARTICLE 145, SECTION 7209 OF THE NYS EDUCATION LAW,
ALTERATION OF THIS DOCUMENT EXCEPT BY A LICENSED PROFESSIONAL IS ILLEGAL"
architects engineers
SHEET No.
SHEET TITLE
REVIEWED BY:DRAWN BY:DESIGNED BY:
PROJECT No: DATE:
CHECKED BY:
CONSULTANTS:
CONTRACT
CLIENT
STATUS
SCALE:
AS SHOWN
DRAWING No.
OF
538 Broad Hollow Road, 4th Floor East Melville, NY 11747
631.756.8000 ▪ www.h2m.com NY Architecture & Landscape Architecture: No Certificate Required
NY Engineering Certificate of Authorization No.: 0018178
JOSEPH J. TODARO, P.E.
NY PROFESSIONAL ENGINEER Lic. No. 071079
01/31/2027
7/
/2
4:
:4
PM
Au to de sk
D oc s:
//K en ne dy M em or ia l P ar k
Po ol
F ac ilit y/
H
EM
V2
2_ C en tra l2 5_
M .rv t
G 001
FINAL BID DOCUMENT
Pool Facility Renovation at Kennedy Memorial Park
Inc. Village of Hempstead
C. MARTINEZ
JULY 2026HEMV2502
335 Greenwich St.
Hempstead, NY
16100
PROJECT SHEET LIST AND
GENERAL NOTES
ALL CONTRACTS
G. AURICCHIO Checker Approver
GENERAL CONSTRUCTION AND PROJECT NOTES:
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.
33.
34.
CONTRACTOR SHALL INSPECT THE CONSTRUCTION SITE PRIOR TO SUBMISSION OF BIDS AND SHALL MAKE NO ADDITIONAL CLAIMS
REGARDING SITE CONDITIONS THEREAFTER.
CONTRACTOR SHALL NOTIFY THE OWNER AT LEAST 24 HOURS PRIOR TO THE COMMENCEMENT OF THE WORK. THE SAME NOTICE
SHALL BE REQUIRED WHEN RESUMING WORK AFTER ANY STOPPAGE OR DELAY.
LOCATION OF ALL UNDERGROUND UTILITIES, ELECTRIC AND TELEPHONE CONDUITS, STORM DRAINS AND UNDERGROUND PIPING WERE OBTAINED FROM EITHER OLD MAPS, SURVEYS, DRAWINGS AND RECORDS SUPPLIED BY OTHERS. THE OWNER AND ENGINEER DO NOT GUARANTEE OR ACCEPT RESPONSIBILITY FOR ANY DAMAGE TO SUCH FACILITIES DUE TO DISCREPANCIES IN LOCATION AND SIZE SHOWN ON THE PLANS, NOR WILL ANY COMPENSATION BE MADE TO THE CONTRACTOR FOR ANY INCONVENIENCES CAUSED IN ENCOUNTERING THE AFOREMENTIONED UTILITIES WHICH ARE NOT SHOWN, OR ARE INCORRECTLY SHOWN ON THE PLANS. THE CONTRACTOR IS RESPONSIBLE FOR DETERMINING THE LOCATIONS OF ANY UNDERGROUND UTILITIES, GAS MAINS, ELECTRIC AND
TELEPHONE CONDUITS.
CONTRACTOR SHALL PERFORM DAILY CLEAN-UP OPERATIONS WHICH INCLUDE REMOVAL OF DEBRIS AND EXCESS CONSTRUCTION
MATERIAL TO THE SATISFACTION OF THE OWNER AND THE ENGINEER.
DURING ALL NON-WORKING HOURS, THE CONTRACTOR WILL BE REQUIRED TO STORE ALL EQUIPMENT AND MATERIALS WITHIN THE
DESIGNATED AREAS AT THE PROJECT SITE.
ALL DIMENSIONS SHOWN ARE APPROXIMATE AND SUBJECT TO THE APPROVAL OF THE OWNER AND THE ENGINEER.
CONSTRUCTION SHALL CONFORM TO ALL APPLICABLE STATE AND LOCAL CODE REQUIREMENTS, THE CONTRACT, AND SUBJECT
TO THE APPROVAL OF THE OWNER AND THE ENGINEER.
CONTRACTOR SHALL SECURE CONSTRUCTION SITE IN ACCORDANCE WITH ALL APPLICABLE SAFETY STANDARDS AND SUBJECT TO
THE APPROVAL OF THE OWNER AND THE ENGINEER.
CONTRACTOR SHALL COORDINATE ACTIVITIES WITH THE OWNER SO AS TO MINIMIZE INTERRUPTION TO THE WATER SUPPLY.
CONTRACTOR SHALL NAIL SET IN POLE NORTH SIDE OF SITE, ELEVATION 63.46' IN N.A.V.D. 1988 DATUM AND SQUARE CUT SET NORTH
OF EXISTING ONE STORY BRICK BUILDING, ELEVATION 62.40' IN N.A.V.D. 1988 DATUM.
CONTRACTOR WILL BE REQUIRED TO PROTECT AND MAINTAIN ALL BENCHMARKS AND MONUMENTS. CONTRACTOR WILL BE RESPONSIBLE TO RESTORE ALL BENCHMARKS OR MONUMENTS DISTURBED BY THE CONTRACTOR'S WORK.
CONTRACTOR SHALL BE RESPONSIBLE FOR ALL LAYOUT, SURVEY, ETC. AS REQUIRED TO COMPLETE THE WORK.
THE DRAWINGS AND SPECIFICATIONS ARE COMPLEMENTARY. THE PROJECT SPECIFICATIONS, SEPARATELY BOUND, CONTAIN THE
CONDITIONS OF THE CONTRACT, PROCEDURES AND TECHNICAL SPECIFICATIONS.
ALL CONTRACTORS ARE TO VISIT THE SITE AND BECOME FAMILIAR WITH THE CONDITIONS OF THE SITE AND DIFFICULTIES PERFORMING THE WORK. ANY SITE VISIT IS TO BE SCHEDULED THROUGH THE OWNER, BIDDERS ARE NOT PERMITTED ON-SITE
WITHOUT REPRESENTATION FROM THE OWNER.
DO NOT SCALE MEASURE ANY DRAWING. VERIFY THE FIGURES, DIMENSIONS AND DESIGN INTENTION SHOWN ON THE DRAWINGS
BEFORE BEGINNING LAYOUT OF THE WORK.
REPORT ANY ERRORS, INACCURACIES, MISSING DIMENSIONAL REQUIREMENTS OR CONFLICTS TO THE ARCHITECT/ENGINEER IN
WRITING BEFORE BEGINNING ANY WORK.
VERIFY EXACT LAYOUT CAPABILITY WITH ALL EXISTING CONDITIONS AND COORDINATE ALL WORK TO BE UNDERTAKEN PRIOR TO COMMENCEMENT. NOTIFY THE ARCHITECT/ENGINEER IN WRITING BEFORE BEGINNING WORK, IF ANY DISCREPANCIES ARE FOUND WITH CONDITIONS ENCOUNTERED, AS WELL AS ITEMS COVERED IN 20 AND 21. CONTRACTOR WILL BE RESPONSIBLE FOR ALL TEMPORARY MEASURES, TIME LOST, CHANGES TO THE WORK SCOPE WITHOUT ANY ADDITIONAL COMPENSATION IF CONTRACTOR FAILS TO PROVIDE AFOREMENTIONED VERIFICATIONS AND COORDINATION PRIOR TO COMMENCING WORK.
DISTURB ONLY THOSE AREAS OF THE SITE AFFECTED BY NEW CONSTRUCTION, UNLESS NOTED OTHERWISE. PROTECT ALL OTHER AREAS. CONTRACTOR SHALL COMPLETELY RESTORE ALL AREAS DISTURBED DURING CONSTRUCTION, INCLUDING, BUT NOT LIMITED TO GRASS AREA, LANDSCAPING, PAVEMENTS, SIDEWALKS, CURBING AND IN-GROUND SPRINKLER SYSTEMS.
PROTECT ADJOINING PROPERTIES WHEN CONDUCTING WORK.
ALL WORK SHALL COMPLY WITH ALL APPLICABLE CODES, LAWS, AGENCIES HAVING JURISDICTION, AND STATUTES AS REQUIRED.
CONTRACTOR SHALL STRICTLY ADHERE TO MANUFACTURER'S PRINTED INSTRUCTIONS.
VERIFY ALL CHANGES TO WORK IN WRITING WITH THE ARCHITECT/ENGINEER AND OWNER BEFORE BEGINNING RELATED WORK.
PROVIDE POSITIVE DRAINAGE AWAY FROM THE BUILDING PERIMETER, PITCH 1/4" PER FOOT. NOTIFY ARCHITECT/ENGINEER OF ANY
DISCREPANCIES WITH THIS REQUIREMENT BEFORE PROCEEDING.
IF APPLICABLE, ALL CONTRACTORS MUST REVIEW ALL DRAWINGS CONTAINED IN THE SET SO AS TO BECOME FAMILIAR WITH THE WORK REQUIRED UNDER THEIR SCOPE AND THE WORK OF ALL OTHER CONTRACTORS. ADDITIONALLY, ALL CONTRACTORS ARE RESPONSIBLE FOR THE COORDINATION OF THEIR WORK WITH ALL OTHER TRADES AND CONTRACTORS.
DIMENSIONS NOTED AS "EQUAL" OR "EQ" WITHIN A ROOM REFER TO A DISTANCE RELATIONSHIP CONTAINED ONLY IN THAT ROOM AT
AN OPPOSING OR PARALLEL WALL UNLESS NOTED OTHERWISE.
VERIFY AND ADJUST APPROXIMATE DIMENSIONS (+/-) IN THE FIELD. VERIFY WITH ARCHITECT/ENGINEER PRIOR TO CONSTRUCTION.
ALL ITEMS DETAILED OR SPECIFIED TO RUN WITHIN OR ATTACHED TO WALLS AND CEILINGS ARE TO BE CONCEALED OR RECESSED
UNLESS NOTED OTHERWISE.
CONTRACTOR SHALL LOCATE ALL PENETRATIONS REQUIRED TO ACCOMMODATE ALL WORK DETAILED OR SPECIFIED FOR THEIR
SCOPE, AND COORDINATE THIS WORK WITH OTHERS.
CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING WATER-TIGHT WEATHER PROTECTION THROUGHOUT ALL WORK AREAS AND EXISTING AREAS IMMEDIATELY ADJACENT TO THOSE WORK AREAS, FOR THE DURATION OF THE ENTIRE PROJECT.
CONTRACTOR SHALL PROTECT ALL ADJACENT EXISTING CONSTRUCTION, ITEMS, FINISHES, ETC. AND SHALL PATCH, REPAIR AND/OR REPLACE, AND REFINISH AS REQUIRED TO RESTORE ANY AND ALL AREAS DAMAGED DURING CONSTRUCTION.
CONTRACTOR SHALL PROVIDE, AND COORDINATE THE INSTALLATION OF, ALL ACCESS PANELS THAT ARE NEEDED TO ACCESS OR
SERVICE FOR ALL ITEMS INSTALLED AS PART OF THEIR SCOPE OF WORK.
PROVIDE TEMPORARY FENCING TO PROTECT ALL WORK AREAS.
CONTRACTOR SHALL MINIMIZE REMOVAL OF EXISTING TREES. CONTRACTOR SHALL BE RESPONSIBLE FOR SITE LAYOUT, TAGGING AND REMOVAL OF TREES REQUIRED TO COMPLETE ALL WORK. OWNER SHALL APPROVE TREES TO BE REMOVED PRIOR TO ACTUAL REMOVALS. REMOVALS SHALL INCLUDE REMOVAL OF COMPLETE STUMP AND ROOT SYSTEM. CONTRACTOR SHALL NOT BE
PERMITTED TO GRIND STUMPS.
CONCRETE SIDEWALKS AND CURBS SHALL BE REMOVED BACK TO NEAREST EXPANSION OR CONTROL JOINTS, OR AS DIRECTED BY
THE OWNER.
SYMBOLS LEGEND
CENTERLINE
Level Name
G 001
G 001
DETAIL KEY
ELEVATION LEVEL
NORTH ARROW
1 Drawing Title
SCALE:
DRAWING TITLE
SECTION CUT KEY
N
POOL SCHEMATIC LEGEND
BALL VALVE
BUTTERFLY VALVE
CHECK VALVE
SOLENOID VALVE
CHEMICAL INJECTION POINT
SIGHT GLASS
UV / AOP CHAMBER
STRUCTURE
STRUCTURE NAME
CHEMICAL METERING PUMP
VERTICAL CHEMICAL BULK
STORAGE TANK
PUMP MANIFOLD
FLOW METER
CHEMICAL STORAGE TANK
FS FLOW SWITCH
PG PRESSURE GUAGE
CG COMPOUND GUAGE
FILTER AND STRAINER
PROJECT SHEET LIST
SHEET NO. DRAWING NO. SHEET TITLE CONTRACT
1 G 000 COVER SHEET ALL CONTRACTS
2 G 001 PROJECT SHEET LIST AND GENERAL NOTES ALL CONTRACTS
3 G1 010 BATHHOUSE NEW YORK STATE CODE & ENERGY ANALYSIS CONTRACT G - GENERAL CONSTRUCTION
4 G1 011 BATHHOUSE CODE COMPLIANCE PLANS CONTRACT G - GENERAL CONSTRUCTION
5 G2 010 FITLER BUILDING NEW YORK STATE CODE & ENERGY ANALYSIS CONTRACT G - GENERAL CONSTRUCTION
6 G2 011 FILTER BUILDING CODE COMPLIANCE PLANS CONTRACT G - GENERAL CONSTRUCTION
7 G 021 SPRAY PARK HYDRAULIC SCHEMATIC ALL CONTRACTS
8 G 022 FAMILY POOL HYDRAULIC SCHEMATIC ALL CONTRACTS
9 G 023 COMPETITION POOL HYDRAULIC SCHEMATIC ALL CONTRACTS
10 G2 110 FILTER BUILDING PENETRATION FLOOR PLAN ALL CONTRACTS
11 V 100 EXISTING CONDITIONS PLAN CONTRACT G - GENERAL CONSTRUCTION
12 CD 100 DEMOLITION SITE PLAN CONTRACT G - GENERAL CONSTRUCTION
13 CS 100 DIMENSIONAL SITE PLAN CONTRACT G - GENERAL CONSTRUCTION
14 C 100 GRADING AND DRAINAGE PLAN CONTRACT G - GENERAL CONSTRUCTION
15 C 120 SOIL EROSION & SEDIMENT CONTROL PLAN CONTRACT G - GENERAL CONSTRUCTION
16 C 200 SANITARY SEWER CONTRACT G - GENERAL CONSTRUCTION
17 C 500 SITE DETAILS CONTRACT G - GENERAL CONSTRUCTION
18 C 501 SITE DETAILS CONTRACT G - GENERAL CONSTRUCTION
19 C 502 SITE DETAILS CONTRACT G - GENERAL CONSTRUCTION
20 C 503 SITE DETAILS CONTRACT G - GENERAL CONSTRUCTION
21 S 000 GENERAL NOTES CONTRACT G - GENERAL CONSTRUCTION
22 S 001 GENERAL NOTES CONTRACT G - GENERAL CONSTRUCTION
23 S 002 SPECIAL INSPECTIONS CONTRACT G - GENERAL CONSTRUCTION
24 S1 100 BATHHOUSE FOUNDATION PLAN CONTRACT G - GENERAL CONSTRUCTION
25 S1 111 BATHHOUSE SLAB FLOOR PLAN CONTRACT G - GENERAL CONSTRUCTION
26 S1 140 BATHHOUSE LOW ROOF FRAMING PLAN CONTRACT G - GENERAL CONSTRUCTION
27 S1 141 BATHHOUSE ROOF FRAMING PLAN BATH HALL CONTRACT G - GENERAL CONSTRUCTION
28 S2 100 FILTER BUILDING FOUNDATION PLAN CONTRACT G - GENERAL CONSTRUCTION
29 S2 101 FILTER BUILDING SLAB PLAN CONTRACT G - GENERAL CONSTRUCTION
30 S2 140 FILTER BUILDING FRAMING ROOF PLAN CONTRACT G - GENERAL CONSTRUCTION
31 S1 200 FRAMING SECTIONS CONTRACT G - GENERAL CONSTRUCTION
32 S2 300 FILTER BUILDING FRAMING SECTIONS CONTRACT G - GENERAL CONSTRUCTION
33 S 500 TYPICAL FOUNDATION DETAILS CONTRACT G - GENERAL CONSTRUCTION
34 S 501 TYPICAL FOUNDATION DETAILS CONTRACT G - GENERAL CONSTRUCTION
35 S 502 TYPICAL SLAB DETAILS CONTRACT G - GENERAL CONSTRUCTION
36 S 503 TYPICAL SLAB DETAILS CONTRACT G - GENERAL CONSTRUCTION
37 S 504 TYPICAL MASONRY DETAILS CONTRACT G - GENERAL CONSTRUCTION
38 S 505 TYPICAL STEEL DETAILS CONTRACT G - GENERAL CONSTRUCTION
39 S 506 TYPICAL STEEL DETAILS CONTRACT G - GENERAL CONSTRUCTION
40 S 507 TYPICAL STEEL BAR JOIST DETAILS CONTRACT G - GENERAL CONSTRUCTION
41 S 508 FILTER BUILDING FOUNDATION DETAILS CONTRACT G - GENERAL CONSTRUCTION
42 S 509 FRAMING DETAILS CONTRACT G - GENERAL CONSTRUCTION
43 S 510 FRAMING DETAILS CONTRACT G - GENERAL CONSTRUCTION
44 S 511 FRAMING DETAILS CONTRACT G - GENERAL CONSTRUCTION
45 S 512 STAIR & RAILING & MISC DETAILS CONTRACT G - GENERAL CONSTRUCTION
46 S 600 COLUMN SCHEDULE AND DETAILS CONTRACT G - GENERAL CONSTRUCTION
47 S 610 JOIST & LINTEL DIAGRAMS & SCHEDULE CONTRACT G - GENERAL CONSTRUCTION
48 A 001 GENERAL NOTES AND LEGENDS CONTRACT G - GENERAL CONSTRUCTION
49 A1 101 BATHHOUSE FLOOR PLAN AND NOTES CONTRACT G - GENERAL CONSTRUCTION
50 A1 121 BATHHOUSE REFLECTED CEILING PLAN FIRST FLOOR CONTRACT G - GENERAL CONSTRUCTION
51 A1 130 BATHHOUSE ROOF PLAN CONTRACT G - GENERAL CONSTRUCTION
52 A1 200 BATHHOUSE BUILDING ELEVATIONS CONTRACT G - GENERAL CONSTRUCTION
53 A1 201 BATHHOUSE BUILDING ELEVATIONS CONTRACT G - GENERAL CONSTRUCTION
54 A1 300 BATHHOUSE BUILDING SECTIONS CONTRACT G - GENERAL CONSTRUCTION
55 A1 310 BATHHOUSE WALL SECTIONS CONTRACT G - GENERAL CONSTRUCTION
56 A1 311 BATHHOUSE WALL SECTIONS CONTRACT G - GENERAL CONSTRUCTION
57 A1 312 BATHHOUSE WALL SECTIONS CONTRACT G - GENERAL CONSTRUCTION
58 A1 313 BATHHOUSE WALL SECTIONS CONTRACT G - GENERAL CONSTRUCTION
59 A1 410 BATHHOUSE ENLARGED TOILET PLANS AND DETAILS CONTRACT G - GENERAL CONSTRUCTION 60 A1 411 BATHHOUSE ENLARGED TOILET PLANS AND DETAILS CONTRACT G - GENERAL CONSTRUCTION
61 A1 412 BATHHOUSE ENLARGED PLANS AND DETAILS CONTRACT G - GENERAL CONSTRUCTION
62 A1 430 BATHHOUSE ENLARGED STAIR PLAN CONTRACT G - GENERAL CONSTRUCTION
63 A2 101 FILTER BUILDING FLOOR PLAN FIRST FLOOR CONTRACT G - GENERAL CONSTRUCTION 64 A2 121 FILTER BUILDING REFLECTED CEILING PLAN FIRST FLOOR CONTRACT G - GENERAL CONSTRUCTION
65 A2 130 FILTER BUILDING ROOF PLAN CONTRACT G - GENERAL CONSTRUCTION
66 A2 200 FILTER BUILDING BUILDING ELEVATIONS CONTRACT G - GENERAL CONSTRUCTION
67 A2 300 FILTER BUILDING BUILDING SECTIONS CONTRACT G - GENERAL CONSTRUCTION
68 A2 430 FITLER BUILDING ENLARGED STAIR PLAN CONTRACT G - GENERAL CONSTRUCTION
69 A 500 DETAILS CONTRACT G - GENERAL CONSTRUCTION
70 A 501 DETAILS CONTRACT G - GENERAL CONSTRUCTION
71 A 502 DETAILS CONTRACT G - GENERAL CONSTRUCTION
72 A 600 FINISH SCHEDULE CONTRACT G - GENERAL CONSTRUCTION
73 A 601 FINISH SCHEDULE CONTRACT G - GENERAL CONSTRUCTION
74 A 602 BATHHOUSE FURNITURE REFERENCE PLAN CONTRACT G - GENERAL CONSTRUCTION
75 A 610 WINDOW SCHEDULE LOUVERS & DETAILS CONTRACT G - GENERAL CONSTRUCTION
76 A 611 ENLARGED CURTAIN WALL CONTRACT G - GENERAL CONSTRUCTION
77 A 620 DOOR SCHEDULE & DETAILS CONTRACT G - GENERAL CONSTRUCTION
78 Q1 110 CONCESSION STAND PLAN CONTRACT G - GENERAL CONSTRUCTION
79 FA1 001 FIRE ALARM LEGENDS CONTRACT E - ELECTRICAL CONSTRUCTION
80 FA1 100 BATHHOUSE FIRE ALARM PLAN CONTRACT E - ELECTRICAL CONSTRUCTION
81 P 001 PLUMBING GENERAL NOTES, LEGENDS, AND ABBREVIATIONS CONTRACT P - PLUMBING CONSTRUCTION
82 PS 100 PLUMBING SITE PLAN CONTRACT P - PLUMBING CONSTRUCTION
83 P1 120 BATHHOUSE DOMESTIC WATER PLAN CONTRACT P - PLUMBING CONSTRUCTION
84 P1 130 BATHHOUSE UNDERSLAB SANITARY, VENT, AND STORM PLAN CONTRACT P - PLUMBING CONSTRUCTION 85 P1 131 BATHHOUSE FIRST FLOOR SANITARY, VENT, AND STORM PLAN CONTRACT P - PLUMBING CONSTRUCTION
86 P1 140 BATHHOUSE ROOF PLUMBING PLAN CONTRACT P - PLUMBING CONSTRUCTION
87 P 500 PLUMBING DETAILS CONTRACT P - PLUMBING CONSTRUCTION
88 P 600 PLUMBING SCHEDULES CONTRACT P - PLUMBING CONSTRUCTION
89 P 610 PLUMBING DOMESTIC WATER RISER DIAGRAMS CONTRACT P - PLUMBING CONSTRUCTION 90 P 620 PLUMBING SANITARY, VENT, AND STORM RISER DIAGRAMS CONTRACT P - PLUMBING CONSTRUCTION
91 X 001 GENERAL NOTES AND DECK EQUIPMENT LIST CONTRACT X - POOL CONSTRUCTION
92 XS 100 POOL PIPING SITE PLAN CONTRACT X - POOL CONSTRUCTION
93 XS 101 SPRAY PARK PIPING SITE PLAN CONTRACT X - POOL CONSTRUCTION
94 XS 102 SPRAY PARK DRAINAGE PLAN CONTRACT X - POOL CONSTRUCTION
95 XS 500 POOL SITE DETAILS CONTRACT X - POOL CONSTRUCTION
96 XS 501 SPRAY PARK TANK DETAILS CONTRACT X - POOL CONSTRUCTION
97 X 100 COMPETITION AND FAMILY POOL PLAN CONTRACT X - POOL CONSTRUCTION
98 X 101 COMPETITION AND FAMILY POOL PLAN (ALTERNATE) CONTRACT X - POOL CONSTRUCTION
99 X 300 POOL SECTIONS CONTRACT X - POOL CONSTRUCTION
100 X 301 POOL SECTIONS (ALTERNATE) CONTRACT X - POOL CONSTRUCTION
101 X 500 SWIMMING POOL DETAILS CONTRACT X - POOL CONSTRUCTION
102 X 501 SWIMMING POOL DETAILS CONTRACT X - POOL CONSTRUCTION
103 X 502 SWIMMING POOL DETAILS (ALTERNATE) CONTRACT X - POOL CONSTRUCTION
PROJECT SHEET LIST
SHEET NO. DRAWING NO. SHEET TITLE CONTRACT
104 X 503 SPRAY PARK FEATURES AND PIPING (1) CONTRACT X - POOL CONSTRUCTION
105 X 504 SPRAY PARK FEATURES AND PIPING (2) CONTRACT X - POOL CONSTRUCTION
106 X 505 SPRAY PARK FEATURES AND PIPING (3) CONTRACT X - POOL CONSTRUCTION
107 X2 110 FILTER BUILDING FLOOR PLAN CONTRACT X POOL CONSTRUCTION - CONTRACT P
PLUMBING CONSTRUCTION
108 X2 300 FILTER BUILDING POOL EQUIPMENT SECTIONS CONTRACT X - POOL CONSTRUCTION 109 X2 301 FILTER BUILDING POOL EQUIPMENT SECTIONS CONTRACT X - POOL CONSTRUCTION
110 X2 500 FILTER BUILDING EQUIPMENT DETAILS (1) CONTRACT X - POOL CONSTRUCTION
111 X2 501 FILTER BUILDING EQUIPMENT DETAILS (2) CONTRACT X - POOL CONSTRUCTION
112 X-E 100 FILTER BUILDING ELECTRICAL CONTROL PLAN CONTRACT X - POOL CONSTRUCTION 113 X-E 500 POOL ELECTRICAL CONTROL DIAGAMS AND DETAILS CONTRACT X - POOL CONSTRUCTION 114 X-E 501 POOL ELECTRICAL CONTROL DIAGRAMS AND DETAILS CONTRACT X - POOL CONSTRUCTION 115 X-E 502 POOL ELECTRICAL CONTROL DIAGRAMS AND DETAILS CONTRACT X - POOL CONSTRUCTION
116 X-E 503 POOL BONDING PLAN CONTRACT X - POOL CONSTRUCTION
117 M 001 GENERAL NOTES AND LEGENDS CONTRACT H - HVAC CONSTRUCTION
118 M1 110 BATHHOUSE CONSTRUCTION PLAN CONTRACT H - HVAC CONSTRUCTION
119 M1 120 BATHHOUSE ROOF PLAN CONTRACT H - HVAC CONSTRUCTION
120 M2 110 FILTER BUILDING PLAN CONTRACT H - HVAC CONSTRUCTION
121 M 500 DETAILS (1 OF 2) CONTRACT H - HVAC CONSTRUCTION
122 M 501 DETAILS (2 OF 2) CONTRACT H - HVAC CONSTRUCTION
123 M 600 SCHEDULES CONTRACT H - HVAC CONSTRUCTION
124 E 001 ELECTRICAL LEGENDS CONTRACT E - ELECTRICAL CONSTRUCTION
125 ES 100 ELECTRICAL SITE PLAN CONTRACT G - GENERAL CONSTRUCTION
126 E1 100 BATHHOUSE ELECTRICAL POWER PLAN CONTRACT E - ELECTRICAL CONSTRUCTION
127 E1 101 BATHHOUSE ROOF ELECTRICAL POWER PLAN CONTRACT E - ELECTRICAL CONSTRUCTION
128 E1 110 BATHHOUSE HVAC POWER PLAN CONTRACT E - ELECTRICAL CONSTRUCTION
129 E1 120 BATHHOUSE ELECTRICAL LIGHTING PLAN CONTRACT E - ELECTRICAL CONSTRUCTION 130 E2 100 FILTER BUILDING ELECTRICAL POWER PLAN CONTRACT E - ELECTRICAL CONSTRUCTION
131 E2 110 FILTER BUILDING HVAC POWER PLAN CONTRACT E - ELECTRICAL CONSTRUCTION
132 E2 120 FILTER BUILDING ELECTRICAL LIGHTING PLAN CONTRACT E - ELECTRICAL CONSTRUCTION
133 E 500 ELECTRICAL DETAILS CONTRACT E - ELECTRICAL CONSTRUCTION
134 E 501 ELECTRICAL DETAILS CONTRACT E - ELECTRICAL CONSTRUCTION
135 E 502 ELECTRICAL DETAILS CONTRACT E - ELECTRICAL CONSTRUCTION
136 E 600 ELECTRICAL SCHEDULES CONTRACT E - ELECTRICAL CONSTRUCTION
137 E 601 ELECTRICAL PANEL SCHEDULES CONTRACT E - ELECTRICAL CONSTRUCTION
138 E 610 ELECTRICAL SINGLE LINE DIAGRAM CONTRACT E - ELECTRICAL CONSTRUCTION
139 T-001 SYMBOLS, ABBREVIATIONS, & DRAWING LIST CONTRACT E - ELECTRICAL CONSTRUCTION
140 T-002 GENERAL NOTES CONTRACT E - ELECTRICAL CONSTRUCTION
141 TA-100 AUDIOVISUAL - SITE FACILITY PLAN CONTRACT E - ELECTRICAL CONSTRUCTION
142 TA-101 AUDIOVISUAL - LEVEL 01 - FACILITY PLAN CONTRACT E - ELECTRICAL CONSTRUCTION
143 TA-201 AUDIOVISUAL - LEVEL 01 - LOW VOLTAGE REFLECTED CEILING
PLAN CONTRACT E - ELECTRICAL CONSTRUCTION
144 TA-300 AUDIOVISUAL - LOW VOLTAGE SITE PLAN CONTRACT E - ELECTRICAL CONSTRUCTION 145 TA-301 AUDIOVISUAL - LEVEL 01 - LOW VOLTAGE FLOOR PLAN CONTRACT E - ELECTRICAL CONSTRUCTION
146 TA-302 AUDIOVISUAL - TR01 ENLARGED PLANS, SECTIONS, AND
ELEVATIONS CONTRACT E - ELECTRICAL CONSTRUCTION
147 TA-501 AUDIOVISUAL SYSTEMS - BLOCK DIAGRAM & RACK ELEVATION CONTRACT E - ELECTRICAL CONSTRUCTION 148 TC-100 STRUCTURED CABLING - SITE FACILITY PLAN CONTRACT E - ELECTRICAL CONSTRUCTION 149 TC-101 STRUCTURED CABLING - LEVEL 01 - FLOOR PLAN CONTRACT E - ELECTRICAL CONSTRUCTION 150 TC-201 STRUCTURED CABLING - LEVEL 01 - REFLECTED CEILING PLAN CONTRACT E - ELECTRICAL CONSTRUCTION
151 TC-300 STRUCTURED CABLING - TR01 ENLARGED PLANS, SECTIONS,
AND ELEVATIONS CONTRACT E - ELECTRICAL CONSTRUCTION
152 TC-800 STRUCTURED CABLING - DETAILS CONTRACT E - ELECTRICAL CONSTRUCTION
153 TC-801 STRUCTURED CABLING - DETAILS CONTRACT E - ELECTRICAL CONSTRUCTION
154 TC-900 STRUCTURED CABLING - OUTLET SCHEDULES CONTRACT E - ELECTRICAL CONSTRUCTION
155 TY-100 SECURITY - SITE FACILITY PLAN CONTRACT E - ELECTRICAL CONSTRUCTION
156 TY-101 SECURITY - LEVEL 101 - FLOOR PLAN CONTRACT E - ELECTRICAL CONSTRUCTION 157 TY-201 SECURITY - LEVEL 01 - REFLECTED CEILING PLAN CONTRACT E - ELECTRICAL CONSTRUCTION
158 TY-300 SECURITY - TR01 ENLARGED PLANS, SECTIONS, AND
ELEVATIONS CONTRACT E - ELECTRICAL CONSTRUCTION
159 TY-500 SECURITY - SINGLE LINE DIAGRAMS CONTRACT E - ELECTRICAL CONSTRUCTION
160 TY-800 SECURITY - DETAILS CONTRACT E - ELECTRICAL CONSTRUCTION
161 TY-900 SECURITY - EQUIPMENT SCHEDULE CONTRACT E - ELECTRICAL CONSTRUCTION
WATER MAIN RE-ROUTING NOTES:
1.
2.
3.
4.
5.
6.
7.
NEW WATER MAIN SHALL BE 6"Ø CLASS 52 C.L.D.I. ~115 FEET LONG.
THE NEW WATER MAIN SHALL BE INSTALLED IN ACCORDANCE WITH THE LATEST VERSION OF ANSI/AWWA C600.
THE NEW WATER MAIN SHALL BE HYDROSTATICALLY TESTED AND CONFORM TO THE LEAKAGE ALLOWANCE SET FORTH IN THE
LATEST VERSION OF ANSI/AWWA C600.
THE WATER MAIN SHALL BE DISINFECTED IN ACCORDANCE WITH ANSI/AWWA C651.
IF THERE IS ANY POSSIBILITY OF THE CHLORINATED DISCHARGE CAUSING DAMAGE TO THE ENVIRONMENT, A NEUTRALIZING CHEMICAL SHALL BE APPLIED TO THOROUGHLY NEUTRALIZE THE RESIDUAL CHLORINE, IN ACCORDANCE WITH ANSI/AWWA C655.
TWO (2) CONSECUTIVE SETS OF BACTERIOLOGICAL SAMPLES, TAKEN A DAY APART, MUST BE COLLECTED FROM THE NEWLY INSTALLED WATER MAIN. THE SAMPLES MUST BE COLLECTED AFTER FINAL FLUSHING AND WHEN THE CHLORINE CONCENTRATION IN THE WATER LEAVING THE MAIN IS NO HIGHER THAN THAT GENERALLY PREVAILING IN THE DISTRIBUTION SYSTEM. THE CHLORINE
RESIDUAL MUST ALSO BE FIELD MEASURED AND RECORDED IN LABORATORY REPORTS.
THE WATER MAIN SHALL NOT BE PLACED INTO SERVICE UNTIL THE WATER MAIN INSTALLATION HAS BEEN CERTIFIED BY THE ENGINEER OF RECORD AND RECEIVED APPROVAL FROM THE NASSAU COUNTY DEPARTMENT OF HEALTH.
MARK DATE DESCRIPTION
1 07-16-2026 BID ADDENDUM NO. 1
FILTER
BACKWASH
6"
FILTER EFFLUENT
3"
3"
PO
OL
R
ET
UR
N
2" PVC
POINT OF
APPLICATION FOR
CHLORINE
2" PVC
1/4" BALL VALVE
1/2" BALL VALVE
POINT OF
APPLICATION
FOR ACID
CHLORINE
AND pH
PROBES
CHEMICAL FEED CONTROLLER
3"
FILTER INFLUENT
6"
MAIN DRAIN
6"
SKIMMER
9" AIR GAP
3"
POOL RETURN
POOL RETURN
3"
POOL RETURN
1/2"
FS
PG
PG
PG
PG
FILTER INFLUENT
3"
3"
POOL RETURN
1/2
9" AIR GAP
DRAIN
3"
WATER LEVEL CONTROLLER
6" AIR GAP
O
G
D
Q P
T
M
C
D
J R
N
E
E
CG
BL
DG
IN
TE
RI
OR
BL
DG
E
XT
ER
IO
R
TO CHEM
CONTROL
1/4" BALL VALVE
1/2" BALL VALVE
P
S CHLORINE STORAGE TANK
ON GRATING
BLUE WHITE FLOW METER
E
40*
FAMILY POOL PUMP 1
B
H
A
6" x 6"
FAMILY POOL PUMP 2
B
H
A
6" x 6"
C
K
CG
V
FROM FAMILY POOL
FROM FAMILY POOL
TO FAMILY POOL
E
FROM COMPETITION
POOL BACKWASH
E
FROM SPRAY PARK
BACKWASH
3"
PO
OL
R
ET
UR
N
W
2"
WATER SERVICE
I
TO
E
YE
W
AS
H
AN
D
SH
OW
ER
1 1/2"
BALANCE TANK FILL
X
6"
TANK OVERFLOW
LEVEL
GAUGE
W
AT
ER
L
EV
EL
S
EN
SO
RS
6"
PUMP SUCTION
TO DRYWELL
D D
I
D
U
L
Y
E
E
FROM COMPETITION
POOL DRAIN
E
FROM SPRAY PARK
DRAIN
E
TO SANITARY SEWER
8"
TO DRYWELL
6"
PG
Exp. Date
"IN ACCORDANCE WITH ARTICLE 145, SECTION 7209 OF THE NYS EDUCATION LAW,
ALTERATION OF THIS DOCUMENT EXCEPT BY A LICENSED PROFESSIONAL IS ILLEGAL"
architects engineers
SHEET No.
SHEET TITLE
REVIEWED BY:DRAWN BY:DESIGNED BY:
PROJECT No: DATE:
CHECKED BY:
CONSULTANTS:
CONTRACT
CLIENT
STATUS
SCALE:
AS SHOWN
DRAWING No.
OF
538 Broad Hollow Road, 4th Floor East Melville, NY 11747
631.756.8000 ▪ www.h2m.com NY Architecture & Landscape Architecture: No Certificate Required
NY Engineering Certificate of Authorization No.: 0018178
JOSEPH J. TODARO, P.E.
NY PROFESSIONAL ENGINEER Lic. No. 071079
01/31/2027
7/
/2
4:
:5
PM
Au to de sk
D oc s:
//K en ne dy M em or ia l P ar k
Po ol
F ac ilit y/
H
EM
V2
2_ C en tra l2 5_
M .rv t
G 022
FINAL BID DOCUMENT
Pool Facility Renovation at Kennedy Memorial Park
Inc. Village of Hempstead
C. MARTINEZ
JULY 2026HEMV2502
335 Greenwich St.
Hempstead, NY
16101
FAMILY POOL HYDRAULIC
SCHEMATIC
ALL CONTRACTS
G. AURICCHIO Checker Approver
1 Family Pool Hydraulic Schematic
SCALE: NTS
EQUIPMENT LIST
ITEM QTY DESCRIPTION MANUFACTURER MODEL # NOTES:
A 2 FILTER PUMP SPECK 65/250 CLOSE COUPLED END SUCTION PUMP RATED AT 172 GPM AT 70.8 TDH,
7.5 HP, 208V/3, 60 CYCLE, 1750 RPM.
B 2 STRAINER SPECK 6"X6" STRAINER (2) SUCTION FLANGE ADAPTOR (6") FOR PUMP
TANK
C 2 COMPOUND GAUGE WEKSLER BA14-PCC4-LW 30HG-0-60 PSI, 2"/1 PSI GRADATION RANGE WITH SHOCK
LOOP AND STOP COCK. 4 1/2" DIAL, BBV-F NEEDLE VALVE
D 4 PRESSURE GAUGE WEKSLER AA 26 AR 0-60 PSI, 1 PSI CALIBRATION WITH SHOCK LOOP BA14-PPE4-LW
AND STOPCOCK 1/2" DIAL, BBV4-FF NEEDLE VALVE
E 9 CHECK VALVE TECHNO 5051-316 CAST IRON BODY, SS SPRING SHAFT, BRONZE
PLATES, MOUNT ON FILTER BACKWASH
F 16 BUTTERFLY VALVE BRAY CONTROLS SERIES 30 NYLON 11 COATED
G 1 FILTER MER-MADE 143-56 44" DIAMETER, 62" LENGTH, FIBERGLASS HORIZONTAL HIGH FLOW
PRESSURE SAND FILTER 16.2 SQUARE FEET OF FILTER AREA
H 2 VFD DRIVE HORLICK CO. INC. ONE VFD PER PAIR OF PUMPS
I 2 HEAT PUMPS AQUACAL T 100 TWO (2) 47" x 21" x 35" FAMILY POOL HEAT PUMPS
J 1 SIGHT GLASS GF PIPING SYSTEMS SCH 80 PVC 6"Ø CLEAR SCH 80 PVC, 6" LONG
K 1 FLOW METER SIGNET 2551 MOUNT ON RETURN LINE, REMOTE TO PANEL
L 1 THERMAL SENSOR CHROMALOX PR-18-2-100 100 OHM PLATINUM RTD PROBE ELEMENT WITH 304SS SHEATH
-1/4-6/C RTD TEMPERATURE CONTROLLER SHALL BE MODEL 1601-1-1-5-0
M 1 FLOW SWITCH MCDONNEL MILLER FS254 MOUNT ON RETURN LINE, REMOTE TO PANEL
N 1 FILL SOLENOID ASCO 8210 NORMALLY CLOSED SOLENOID VALVE WIRED TO WATER LEVEL
CONTROL RELAY AND AUTOMATIC WATER LEVEL CONTROLLER
O 1 AIR RELEASE VALVE
P 2 CHEMICAL FEEDER STENNER PUMPS 85M3 MINIMUM 0.08 GPH, MAXIMUM 1.67 GPH AT 25 PSI, WIRED
TO POOL CONTROL PANEL.
Q 1 ACID STORAGE TANK CHEMTAINER TC1840AA/AB 40 GAL OPEN TOP, FLAT BOTTOM CYLINDRICAL TANK
TC2236AA/AB IN 55 GAL TANK
R 1 BLUE WHITE FLOW METER BLUE-WHITE F-30600P MOUNT ON BACKWASH LINE
S 1 CHLORINE STORAGE TANK CHEMTAINER TC3448DC 150 GAL DOUBLE WALLED CONTAINMENT TANK
T 1 CHEMICAL CONTROLLER LINK AUTOMATION MODEL 501
U 1 AUTOMATIC WATER OMEGA ENG. LVCN-120 MOUNT SENSOR IN BALANCING TANK, COORDINATE INSTALLATION
LEVEL CONTROLLER WITH ELECTRICAL CONTRACTOR CONTROLLER TO BE MOUNTED
IN MOTOR CONTROL CENTER BY ELECTRICAL CONTRACTOR
V 1 OUTDOOR CHLORINE SNYDER INDUSTRIES 5990902N 750 GAL VERTICAL DOUBLE WALL STORAGE TANK WITH UV
INHIBITORS
W 1 RPZ FEBCO LF009 2" REDUCED PRESSURE ZONE ASSEMBLY
X 1 SPILL CONTAINMENT DECK PIG PAK1070 66 GALLON YELLOW BLADDER POLY SPILL CONTAINMENT DECK
CHLORINE DELIVERY RATE
PUMP MAX DELIVERY RATE
NUMBER OF UNITS PROVIDED
DELIVERY RATE @
DELIVERY RATE @
1.67 GAL/HR
0.86 GAL/HR
0.086 GAL/HR
FAMILY POOL DESIGN DATA
NO.
1,500
DESCRIPTION MAIN POOL
SURFACE AREA OF POOL (SQ FT)
PERIMETER OF POOL (FT)
MAXIMUM NUMBER OF BATHERS
VOLUME OF POOL (GAL)
REQUIRED TURNOVER RATE (HRS)
DESIGN TURNOVER RATE (HRS)
REQUIRED FLOW RATE (BASED ON TOTAL GPM)
DESIGN FLOW RATE (GPM)
33,660
3.32
PUMP SELECTION
FLOW RATE PER PUMP (GPM)
NUMBER OF PUMPS
PUMP MOTOR (HP)
BACKWASH FLOW RATE (GPM)
BACKWASH TIME (MIN)
7.5
POOL DRAINAGE DESIGN
NO.
33,660
ITEM SIZE
VOLUME OF SWIMMING POOL (GALLONS)
VOLUME OF SWIMMING POOL (CUBIC FEET)172 GPM, 10 PPM
172 GPM, 1 PPM
FAMILY POOL FILTRATION VALVE CHART
VALVE ID DESCRIPTION SIZE TYPE CONTROL FUNCTION
20 FILTER FEED 4" BUTTERFLY LEVER DIVERSION
21 FILTER BACKWASH
RETURN
4" BUTTERFLY LEVER DIVERSION
22 FILTER BACKWASH
FEED
4" BUTTERFLY LEVER DIVERSION
23 FILTER RETURN 4" BUTTERFLY LEVER DIVERSION
FAMILY POOL HEATING VALVE CHART
VALVE ID DESCRIPTION SIZE TYPE CONTROL FUNCTION
30 HEAT EXCHANGER 2" BALL LEVER ISOLATION
31 HEAT EXCHANGER 2" BALL LEVER ISOLATION
32 HEAT EXCHANGER 2" BALL LEVER ISOLATION
33 HEAT EXCHANGER 2" BALL LEVER ISOLATION
34 HEAT EXCHANGER 3" THROTTLE LEVER FLOW CONTROL
FAMILY POOL RECIRCULATION VALVE CHART
VALVE ID DESCRIPTION SIZE TYPE CONTROL FUNCTION
10 MAIN DRAIN 6" BUTTERFLY LEVER THROTTLE
11 MAIN DRAIN 6" BUTTERFLY LEVER FLOAT
12 PERIMETER
OVERFLOW
6" BUTTERFLY LEVER ISOLATION
13 PUMP SUCTION 1 6" BUTTERFLY LEVER ISOLATION
14 PUMP DISCHARGE 1 3" BUTTERFLY LEVER ISOLATION
15 PUMP SUCTION 2 6" BUTTERFLY LEVER ISOLATION
16 PUMP DISCHARGE 2 3" BUTTERFLY LEVER ISOLATION
4,500
1.
2.
3.
4.
5.
NOTES:
ALL BUTTERFLY VALVES TO BE BRAY SERIES 30, NYLON 11 COATED,
VALVES IN CHEMICAL FEED SYSTEM TO BE 1/2" PVC BALL TYPE, UNION ENDS.
VALVES 8" AND LARGER TO BE GEAR OPERATED, 6" AND SMALLER TO BE LEVER OPERATED.
INSTALL 1/2" BRASS RELIEF VALVES AT HIGH POINTS OF ALL PIPES.
INSTALL 1/2" BRASS STOPCOCKS AT LOW POINTS OF ALL PIPES.
*NOTE: ONLY 1 PUMP WILL OPERATE AT A TIME, OTHER PUMP IS REDUNDANT
FAMILY POOL WATER FILL VALVE CHART
VALVE ID DESCRIPTION SIZE TYPE CONTROL FUNCTION
50 MANUAL FILL 2" BALL LEVER BYPASS
51 AUTOMATIC FILL 2" BALL LEVER ISOLATION
52 AUTOMATIC FILL 2" BALL LEVER ISOLATION
FAMILY POOL DRAINAGE VALVE CHART
VALVE ID DESCRIPTION SIZE TYPE CONTROL FUNCTION
40* POOL DRAIN 3" BUTTERFLY LEVER DIVERSION
41 FILTER FEED 3" BUTTERFLY LEVER DIVERSION
EQUIPMENT LIST
ITEM QTY DESCRIPTION MANUFACTURER MODEL # NOTES:
Z 4 SKIMMER HAYWARD SP 1082 2"Ø FAMILY POOL SKIMMER
ZA 8 INLET HAYWARD SP 1424 1 1/2" ADJUSTABLE POOL INLET
ZB 2 MAIN DRAIN DALDORADO DALMAX-
SG-242412
24x24x12 SUMP AND GRATE MAIN
DRAIN
Y 1 FLOAT VALVE MER-MADE FV-D 6" DUAL ARM FLOAT VALVE
*VALVE SHALL BE FURNISHED WITH LIMIT SWITCH
ZC 2 FLOW CONTROL
VALVE
FLOMATIC FLO-TROL 2" FLO-TROL VALVE
ZC ZC
FILTER
BACKWASH
6"
FILTER EFFLUENT
6"
COMPETITION POOL
PUMP 2
6"
PO
OL
R
ET
UR
N
TO CHEM
CONTROL
2" PVC
POINT OF
APPLICATION FOR
CHLORINE
2" PVC
1/4" BALL VALVE
1/2" BALL VALVE
POINT OF
APPLICATION
FOR ACID
CHLORINE
AND pH
PROBES
6" X 4" REDUCER 10"
MAIN DRAIN
10"
GUTTER DRAIN
10"
GUTTER DRAIN
9" AIR GAP
6"
POOL RETURN
POOL RETURN
6"
1/2"
FS
PG
PG
PG
FILTER INFLUENT
6"
1/2
9" AIR GAP
DRAIN
6"
WATER LEVEL CONTROLLER
O
G
D
R P1
U
M
B
D
H
J
N
E
E
A
BL
DG
IN
TE
RI
OR
BL
DG
E
XT
ER
IO
R
41*
40*
1/4" BALL VALVE
1/2" BALL VALVE
T
P2
CHLORINE STORAGE TANK
ON GRATING
S
K
BLUE WHITE FLOW METER
8" X 8"
COMPETITION POOL
PUMP 1
6" X 4" REDUCER
B
H A
8" X 8"
6"
FILTER INFLUENT
PG
CG
CG
C
C
W
X
FROM COMPETITION POOL
FROM COMPETITION POOL
FROM COMPETITION POOL
TO COMPETITION POOL
FROM SPRAY PARK
BACKWASH
FROM FAMILY POOL
BACKWASH
31A 31B
6"
POOL RETURN
2"
WATER SERVICE
ZC
BACKWASH
6"
TO
E
YE
W
AS
H
AN
D
SH
OW
ER
2"
BALANCE TANK FILL
Y
LEVEL
CONTROLLER
W
AT
ER
L
EV
EL
S
EN
SO
RS
6" AIR GAP
PUMP SUCTION
8"
TANK OVERFLOW
6"
TO DRYWELL
32A 32B
ZC
33A 33B
ZC
34B
ZC
35A 35B
ZC
36A 36B
ZC
L
V
Z
E
E
FROM SPRAY PARK
DRAIN
FROM FAMILY POOL
DRAIN
TO SANITARY SEWER
8"
TO DRYWELL
6"
34A
F
IIIIII
DPG
Exp. Date
"IN ACCORDANCE WITH ARTICLE 145, SECTION 7209 OF THE NYS EDUCATION LAW,
ALTERATION OF THIS DOCUMENT EXCEPT BY A LICENSED PROFESSIONAL IS ILLEGAL"
architects engineers
SHEET No.
SHEET TITLE
REVIEWED BY:DRAWN BY:DESIGNED BY:
PROJECT No: DATE:
CHECKED BY:
CONSULTANTS:
CONTRACT
CLIENT
STATUS
SCALE:
AS SHOWN
DRAWING No.
OF
538 Broad Hollow Road, 4th Floor East Melville, NY 11747
631.756.8000 ▪ www.h2m.com NY Architecture & Landscape Architecture: No Certificate Required
NY Engineering Certificate of Authorization No.: 0018178
JOSEPH J. TODARO, P.E.
NY PROFESSIONAL ENGINEER Lic. No. 071079
01/31/2027
7/
/2
4:
:5
PM
Au to de sk
D oc s:
//K en ne dy M em or ia l P ar k
Po ol
F ac ilit y/
H
EM
V2
2_ C en tra l2 5_
M .rv t
G 023
FINAL BID DOCUMENT
Pool Facility Renovation at Kennedy Memorial Park
Inc. Village of Hempstead
C. MARTINEZ
JULY 2026HEMV2502
335 Greenwich St.
Hempstead, NY
16101
COMPETITION POOL HYDRAULIC
SCHEMATIC
ALL CONTRACTS
G. AURICCHIO Checker Approver
SCALE: NTS1 Competition Pool Hydraulic Schematic
EQUIPMENT LIST
ITEM QTY DESCRIPTION MANUFACTURER MODEL # NOTES:
A 2 FILTER PUMP SPECK 100/250 CLOSE COUPLED END SUCTION PUMP RATED AT 624 GPM AT 63.5 TDH, 20
HP, 208V/3, 60 CYCLE, 1750 RPM
B 2 STRAINER SPECK 8"X8" STRAINER TWO (2) SUCTION FLANGE ADAPTOR (8") FOR PUMP
TANK
C 2 COMPOUND GAGE WEKSLER BA14-PC4-LW 30HG-0-60 PSI, 2"/1 PSI GRADATION RANGE WITH SHOCK
LOOP AND STOP COCK. 4 1/2" DIAL, BBV-F NEEDLE VALVE
D 5 PRESSURE GAGE WEKSLER BA14-PPE4-LW 0-60 PSI, 1 PSI CALIBRATION WITH SHOCK LOOP
AND STOPCOCK 4 1/2" DIAL, BBV4-FF NEEDLE VALVE
E 8 CHECK VALVE TECHNO 5051-316 CAST IRON BODY, SS SPRING SHAFT, BRONZE
PLATES, MOUNT ON FILTER BACKWASH
F 19 BUTTERFLY VALVE BRAY CONTROLS SERIES 30 NYLON 11 COATED
G 1 FILTER MER-MADE 160-109 62.5" DIAMETER, 113" LENGTH, FIBERGLASS HORIZONTAL HIGH FLOW
PRESSURE SAND FILTER 41.6 SQUARE FEET OF FILTER AREA
H 2 VFD DRIVE HORLICK CO. INC. ONE VFD PER PAIR OF PUMPS
I 6 HEAT PUMP AQUACAL T130 SIX (6) 46" x 21" x 47" COMPETITION POOL HEAT PUMPS.
J 1 SIGHT GLASS GF PIPING SYSTEMS SCH 80 PVC 6"Ø CLEAR SCH 80 PVC, 6" LONG
K 1 FLOW METER SIGNET 2551 MOUNT ON RETURN LINE, REMOTE TO PANEL
L 1 THERMAL SENSOR CHROMALOX PR-18-2-100 100 OHM PLATINUM RTD PROBE ELEMENT WITH 304SS
-1/4-6/C RTD SHEATH TEMPERATURE CONTROLLER SHALL BE
MODEL 1601-1-1-5-0
M 1 FLOW SWITCH MCDONNEL MILLER FS254 MOUNT ON RETURN LINE, REMOTE TO PANEL
N 1 FILL SOLENOID ASCO 8210 NORMALLY CLOSED SOLENOID VALVE WIRED TO WATER
LEVEL CONTROL RELAY AND AUTOMATIC WATER LEVEL CONTROLLER
O 1 AIR RELEASE VALVE
P1 1 ACID FEEDER STENNER PUMPS 85M3 MINIMUM 0.08 GPH, MAXIMUM 1.67 GPH AT 25
PSI, WIRED TO POOL CONTROL PANEL.
P2 1 CHLORINE FEEDER STENNER PUMPS 85M5 MINIMUM 0.18 GPH, MAXIMUM 3.54 GPH AT 25 PSI, WIRED
TO POOL CONTROL PANEL.
R 1 ACID STORAGE TANK CHEMTAINER TC1840AA/AB 40 GAL OPEN TOP, FLAT BOTTOM CYLINDRICAL TANK
TC2236AA/AB IN 55 GAL TANK
S 1 BLUE WHITE FLOW METER BLUE-WHITE F-30600P MOUNT ON BACKWASH LINE
T 1 CHLORINE STORAGE TANK CHEMTAINER TC3448DC 150 GAL DOUBLE WALLED CONTAINMENT TANK
U 1 CHEMICAL CONTROLLER LINK AUTOMATION MODEL 501
V 1 AUTOMATIC WATER OMEGA ENG. LVCN-120 MOUNT SENSOR IN BALANCING TANK, COORDINATE INSTALLATION WITH
LEVEL CONTROLLER ELECTRICAL CONTRACTOR CONTROLLER TO BE MOUNTED IN MOTOR
CONTROL CENTER BY ELECTRICAL CONTRACTOR
W 1 OUTDOOR CHLORINE SNYDER INDUSTRIES 5990902N 750 GAL VERTICAL DOUBLE WALL STORAGE TANK WITH UV INHIBITORS
X 1 RPZ FEBCO LF009 2" REDUCED PRESSURE ZONE ASSEMBLY
Y 1 SPILL CONTAINMENT DECK PIG PAK7010 66 GALLON YELLOW BLADDER POLY SPILL CONTAINMENT DECK
CHLORINE DELIVERY RATE
PUMP MAX DELIVERY RATE
NUMBER OF UNITS PROVIDED
DELIVERY RATE @
DELIVERY RATE @
3.54 GAL/HR
3.12 GAL/HR
0.31 GAL/HR
COMPETITION POOL DESIGN DATA
NO.
3,375
DESCRIPTION MAIN POOL
SURFACE AREA OF POOL (SQ FT)
PERIMETER OF POOL (FT)
MAXIMUM NUMBER OF BATHERS
VOLUME OF POOL (GAL)
REQUIRED TURNOVER RATE (HRS)
DESIGN TURNOVER RATE (HRS)
REQUIRED FLOW RATE (BASED ON TOTAL GPM)
MAX BATHER CAPACITY
206,252
5.51
572.92
PUMP SELECTION
FLOW RATE PER PUMP (GPM)
NUMBER OF PUMPS
PUMP MOTOR (HP)
BACKWASH FLOW RATE (GPM)
BACKWASH TIME (MIN)
POOL DRAINAGE DESIGN
NO.
206,252
ITEM SIZE
VOLUME OF SWIMMING POOL (GALLONS)
VOLUME OF SWIMMING POOL (CUBIC FEET) 25,574624 GPM, 10 PPM
624 GPM, 1 PPM
COMPETITION POOL FILTRATION VALVE CHART
VALVE ID DESCRIPTION SIZE TYPE CONTROL FUNCTION
20 FILTER FEED 6" BUTTERFLY LEVER DIVERSION
21 FILTER BACKWASH
RETURN
6" BUTTERFLY LEVER DIVERSION
22 FILTER BACKWASH
FEED
6" BUTTERFLY LEVER DIVERSION
23 FILTER RETURN 6" BUTTERFLY LEVER DIVERSION
COMPETITION POOL HEATING VALVE CHART
VALVE ID DESCRIPTION SIZE TYPE CONTROL FUNCTION
30 HEAT EXCHANGER 6" THROTTLE LEVER FLOW CONTROL
31A HEAT EXCHANGER 2" BALL LEVER ISOLATION
31B HEAT EXCHANGER 2" BALL LEVER ISOLATION
32A HEAT EXCHANGER 2" BALL LEVER ISOLATION
32B HEAT EXCHANGER 2" BALL LEVER ISOLATION
33A HEAT EXCHANGER 2" BALL LEVER ISOLATION
33B HEAT EXCHANGER 2" BALL LEVER ISOLATION
34A HEAT EXCHANGER 2" BALL LEVER ISOLATION
34B HEAT EXCHANGER 2" BALL LEVER ISOLATION
35A HEAT EXCHANGER 2" BALL LEVER ISOLATION
35B HEAT EXCHANGER 2" BALL LEVER ISOLATION
36A HEAT EXCHANGER 2" BALL LEVER ISOLATION
36B HEAT EXCHANGER 2" BALL LEVER ISOLATION
COMPETITION POOL RECIRCULATION VALVE...
VALVE ID DESCRIPTION SIZE TYPE CONTROL FUNCTION
10 MAIN DRAIN 10" BUTTERFLY GEAR ISOLATION
11 MAIN DRAIN 10" BUTTERFLY GEAR THROTTLE
12 GUTTER 10" BUTTERFLY GEAR ISOLATION
13 PUMP SUCTION 1 10" BUTTERFLY GEAR ISOLATION
14 PUMP DISCHARGE 1 6" BUTTERFLY LEVER ISOLATION
15 PUMP SUCTION 2 10" BUTTERFLY GEAR ISOLATION
16 PUMP DISCHARGE 2 6" BUTTERFLY LEVER ISOLATION
1.
2.
3.
4.
5.
NOTES:
ALL BUTTERFLY VALVES TO BE BRAY SERIES 30, NYLON 11 COATED,
VALVES IN CHEMICAL FEED SYSTEM TO BE 1/2" PVC BALL TYPE, UNION ENDS.
VALVES 8" AND LARGER TO BE GEAR OPERATED, 6" AND SMALLER TO BE LEVER OPERATED.
INSTALL 1/2" BRASS RELIEF VALVES AT HIGH POINTS OF ALL PIPES.
INSTALL 1/2" BRASS STOPCOCKS AT LOW POINTS OF ALL PIPES.
*NOTE: ONLY 1 PUMP WILL OPERATE AT A TIME, OTHER PUMP IS REDUNDANT COMPETITION POOL DRAINAGE VALVE CHART
VALVE ID DESCRIPTION SIZE TYPE CONTROL FUNCTION
40* POOL DRAIN 6 BUTTERFLY LEVER DIVERSION
41* FILTER INFLUENT 6" BUTTERFLY LEVER DIVERSION
COMPETITION POOL WATER FILL VALVE CHART
VALVE ID DESCRIPTION SIZE TYPE CONTROL FUNCTION
50 MANUAL FILL 2" BALL LEVER BYPASS
51 AUTOMATIC FILL 2" BALL LEVER ISOLATION
52 AUTOMATIC FILL 2" BALL LEVER ISOLATION
8 DESIGN FLOW RATE (GPM) 624
EQUIPMENT LIST
ITEM QTY DESCRIPTION MANUFACTURER MODEL # NOTES:
ZA 8 INLET HAYWARD SP 1424 1 1/2" ADJUSTABLE POOL INLET
ZB 2 MAIN DRAIN DALDORADO DALMAX-
SG-183628
18x18x16.5 SUMP AND GRATE
MAIN DRAIN
Z 1 FLOAT VALVE MER-MADE FD-V 10" DUAL ARM FLOAT VALVE
*VALVE SHALL BE FURNISHED WITH LIMIT SWITCH
ZC 6 FLOW CONTROL
VALVE
2" FLO-TROL VALVEFLOMATIC FLO-TROL
MARK DATE DESCRIPTION
P1 P2
P3 P4
P5P6
P7
P8
P9 P10
P11
P12 P14
P13 P15
P20
P21
P16 P17 P18 P19
P22
P2
P2
P2
P2
P2
COMPETITION POOL
BALANCING TANK
FAMILY POOL
BALANCING TANK
9' - 2 3/4" 2' - 5 1/4" 3' - 2 1/2" 1' - 2 1/4" 3' - 4 1/2" 1' - 8 7/8" 16' - 10 1/4"
3 3 /4"
3'
- 7
1'
- 6
6'
- 8
5/ 8"
1'
- 1
0" 7'
- 9
3'
- 4
1/ 2"
7'
- 4
3/ 4"
1'
- 3
7/ 8"
3'
- 9
3/ 4"
16' - 6 5/8" 14' - 1 1/8"
0'
- 5
5/ 8"
4'
- 2
8'
- 4
5'
- 4
3/ 8"
REFERENCED MODEL NUMBERS ARE PRODUCTS AS MANUFACTURED BY GARLOCK SEALING TECHNOLOGIES SUBSTITUTIONS MAY BE SUBMITTED FOR REVIEW BY THE ENGINEER. THE "XX" THAT APPEARS IN SOME MODEL NUMBERS REFER TO A SPECIFIC PARAMETER THAT HAS NOT BEEN DEFINED. THE CONTRACTOR SHALL DETERMINE THE APPROPRIATE PARAMETER VALUE BASED ON THE CONSTRAINTS OF THE PROJECT.
NOTES:
1.
2.
3.
4.
5.
6.
EACH CONTRACTOR PROVIDING MATERIALS SHALL SUBMIT, FOR THE ENGINEER'S REVIEW AND APPROVAL, PIPING LAYOUT, CONDUIT, EQUIPMENT, PENETRATION, AND SLEEVE LOCATION DRAWINGS TO A SCALE OF 1/4" = 1' - 0". EACH CONTRACTOR SHALL NOT INSTALL INSERTS, SLEEVES, AND FORMWORK UNTIL THE LOCATIONS AND ELEVATIONS OF ALL SLAB AND WALL PENETRATIONS HAVE BEEN VERIFIED AND CHECKED FOR ACCURACY BY THE ENGINEER AND OTHER CONTRACTORS REQUIRING COORDINATION. THE LOCATIONS OF WALL SLEEVES, OPENINGS, AND OTHER CONCRETE INSERTS SHOWN ON THE DRAWINGS ARE BASED ON EQUIPMENT AND VALVES WHICH MAY OR MAY NOT HAVE DIMENSIONS EQUAL TO THAT BEING USED FOR THE PROJECT. LAYOUT DRAWINGS SHALL BE PREPARED IN ACCORDANCE WITH THE REQUIREMENTS OF SECTION 013300 ·SUBMITTALS.
THE LAYOUT DRAWINGS SHALL USE THE DIMENSIONS OF EQUIPMENT AND VALVES BEING USED FOR THE PROJECT OR PROVISIONS SHALL BE MADE TO ACCOUNT FOR DIMENSIONAL DIFFERENCES IN EQUIPMENT. THE CONTRACTOR SHALL SUBMIT THE LAYOUT DRAWINGS FAR ENOUGH IN ADVANCE SO THAT CONCRETE INSERTS CAN BE ORDERED AND INSTALLED IN SEQUENCE AND IN ACCORDANCE WITH THE CONSTRUCTION SCHEDULE.
PENETRATIONS FOR PIPE 3"Ø AND LARGER ARE SHOWN ON THIS SCHEDULE. OTHER PENETRATIONS HAVE NOT BEEN SHOWN AND SHOULD BE
COORDINATED WITH OTHER CONTRACTS AS REQUIRED.
SLEEVES TO BE SUPPLIED BY THE SPECIFIED CONTRACT AND INSTALLED BY CONTRACT 'G', UNLESS OTHERWISE NOTED.
ALL PENETRATION CAULKING SHALL BE BY CONTRACT 'G'.
SLEEVES SHALL BE SIZED AND INSTALLED FLUSH WITH FINISHED SURFACES, UNLESS OTHERWISE NOTED.
CONTRACT 'G' SHALL COORDINATE ALL SLEEVE LOCATIONS WITH CONTRACTOR SUPPLYING SLEEVES PRIOR TO ERECTION OF WORK TO VERIFY THAT FIELD CONDITIONS ARE ACCURATE TO DIMENSIONS AND LOCATIONS SHOWN ON THE DRAWINGS. SHOULD FIELD CONDITIONS VARY, CONTRACTOR SHALL NOTIFY THE ENGINEER PRIOR TO ERECTION OF THE WORK.
PENETRATION / SLEEVE SCHEDULE
ID NO. SLEEVE PROCESS DESCRIPTION
NOMINAL
PIPE / DUCT
SIZE SLEEVE MATERIAL
NOMINAL
SLEEVE
SIZE SLEEVE MODEL NO. LINK SEAL
OFFSET HEIGHT
TO CENTERLINE
(REFERECED
FROM FIRST
FLOOR) Level P1 FROM COMPETITION POOL 10" HDPE/STEEL 14" CS-14-XX LS-410-XX -4' 0 251/256" First Floor (0' - 0") P2 FROM COMPETITION POOL 10" HDPE/STEEL 14" CS-14-XX LS-410-XX -4' 0 251/256" First Floor (0' - 0") P3 FROM FAMILY POOL 6" HDPE/STEEL 10" CS-10-XX LS-475-XX -4' 0 251/256" First Floor (0' - 0") P4 FROM FAMILY POOL 6" HDPE/STEEL 10" CS-10-XX LS-475-XX -4' 0 251/256" First Floor (0' - 0") P5 BALANCING TANK DRAINAGE 6" HDPE/STEEL 10" CS-10-XX LS-475-XX -2' 3 5/16" First Floor (0' - 0")
P6 UV BYPASS TO SPRAY PARK
TANK
6" HDPE/STEEL 10" CS-10-XX LS-475-XX -1' 7 61/256" First Floor (0' - 0")
P7 FROM SPRAY PARK TANK 8" HDPE/STEEL 12" CS-12-XX LS-400-XX -3' 0 35/64" First Floor (0' - 0") P8 FROM SPRAY PARK TANK 8" HDPE/STEEL 12" CS-12-XX LS-400-XX -3' 0 111/128" First Floor (0' - 0") P9 TO SPRAY PARK TANK 4" HDPE/STEEL 8" CS-8-XX LS-475-XX -3' 8 7/16" First Floor (0' - 0")
P10 FROM SPRAY PARK TANK 8" HDPE/STEEL 12" CS-12-XX LS-400-XX -3' 0 35/64" First Floor (0' - 0") P11 TO DRYWELL 6" HDPE/STEEL 10" CS-10-XX LS-475-XX -3' 3 77/256" First Floor (0' - 0") P12 TO SPRAY PARK TANK 6" RECYCLED PAPER 10" SONOCO SONOVOID ---- -1' 0" First Floor (0' - 0") P13 TO SPRAY PARK TANK 6" RECYCLED PAPER 10" SONOCO SONOVOID ---- -2' 3 5/16" First Floor (0' - 0") P14 FILTER BACKWASH WASTE 8" HDPE/STEEL 10" CX-10-XX ---- -1' 0" First Floor (0' - 0") P15 FILTER BACKWASH WASTE 8" HDPE/STEEL 12" CS-12-XX LS-400-XX -2' 4 81/256" First Floor (0' - 0") P16 FROM FAMILY POOL HEAT PUMP 3" HDPE/STEEL 8" CS-8-XX LS-475-XX 0' 3 245/256" First Floor (0' - 0") P17 TO FAMILY POOL HEAT PUMP 4" HDPE/STEEL 8" CS-8-XX LS-475-XX 0' 3 245/256" First Floor (0' - 0")
P18 FROM COMPETITION POOL HEAT
PUMP
6" HDPE/STEEL 10" CS-10-XX LS-475-XX 1' 1 1/128" First Floor (0' - 0")
P19 TO COMPETITION POOL HEAT
PUMP
6" HDPE/STEEL 10" CS-10-XX LS-475-XX 1' 1 1/128" First Floor (0' - 0")
P20 TO COMPETITION POOL 6" ---- 8" CX-10-XX LS-475-XX -1' 0" First Floor (0' - 0") P21 TO COMPETITION POOL 3" HDPE/STEEL 4" CX-4-XX LS-475-XX -1' 0" First Floor (0' - 0") P22 TO COMPETITION POOL 6" HDPE/STEEL 10" CS-10-XX LS-475-XX -2' 5 61/64" First Floor (0' - 0")
P23 COMPETITION POOL SUCTION
FILTER
6" HDPE/STEEL 10" CS-10-XX LS-475-XX -0' 7 127/128" First Floor (0' - 0")
P23 TO FAMILY POOL 3" HDPE/STEEL 8" CS-8-XX LS-475-XX -1' 8 49/64" First Floor (0' - 0") P24 SURGE TANK OVERFLOW 8" HDPE/STEEL 12" CS-12-XX LS-400-XX -3' 0 13/16" First Floor (0' - 0") P25 FAMILY POOL FILTER SUCTION 6" HDPE/STEEL 10" CS-10-XX LS-475-XX -3' 10 51/256" First Floor (0' - 0") P26 SURGE TANK OVERFLOW 6" HDPE/STEEL 10" CS-10-XX LS-475-XX -0' 7 127/128" First Floor (0' - 0")
Exp. Date
"IN ACCORDANCE WITH ARTICLE 145, SECTION 7209 OF THE NYS EDUCATION LAW,
ALTERATION OF THIS DOCUMENT EXCEPT BY A LICENSED PROFESSIONAL IS ILLEGAL"
architects engineers
SHEET No.
SHEET TITLE
REVIEWED BY:DRAWN BY:DESIGNED BY:
PROJECT No: DATE:
CHECKED BY:
CONSULTANTS:
CONTRACT
CLIENT
STATUS
SCALE:
AS SHOWN
DRAWING No.
OF
538 Broad Hollow Road, 4th Floor East Melville, NY 11747
631.756.8000 ▪ www.h2m.com NY Architecture & Landscape Architecture: No Certificate Required
NY Engineering Certificate of Authorization No.: 0018178
JOSEPH J. TODARO, P.E.
NY PROFESSIONAL ENGINEER Lic. No. 071079
01/31/2027
7/
/2
4:
:5
PM
Au to de sk
D oc s:
//K en ne dy M em or ia l P ar k
Po ol
F ac ilit y/
H
EM
V2
2_ C en tra l2 5_
M .rv t
G2 110
FINAL BID DOCUMENT
Pool Facility Renovation at Kennedy Memorial Park
Inc. Village of Hempstead
C. MARTINEZ
JULY 2026HEMV2502
335 Greenwich St.
Hempstead, NY
16100
FILTER BUILDING PENETRATION
FLOOR PLAN
ALL CONTRACTS
G. AURICCHIO Checker Approver
SCALE: 3/8" = 1'-0"1 Penetration Floor Plan
HDPE/STEEL
N
X X
X
X
X
X
X X
X X
X X
X X
X X
X X
XXXX
X X
X X
X X
XX
X X
X X
X
X X X X X X
X X
X X
X X
X X
X X
X X
X X
X X
X X X
X X
X X
X X
X X
X X
X X
X X
X
X
X
X X X X
X
X X
X
X X
X X
X
S
42"
24"
18"
18"
D
24" 24"
Metal Shed on Concrete
X
X
X
X
X
X
X
X
X X X X X X X X X X X X X X X
X X
X
X
X
X
X
X
X
X
X
X
One St ory Bri ck Bu ildi ng
6' Chain Link Fence On Concrete Curb
6' Chain Link Fence
E
E
Electric Hatch
O/HO/HO/HO/HO/HO/HO/HO/HO/H
O/H
O/H
O/H
O/H
O/H
O/H
O/H
O/H
O/H
O/H
O/H
O/H
O/H
O/H
O/H
O/H
Co nc re te
D
3 P ark ing Sp ac es
Concrete
Rim 60.71 No Pipes Visible
Bottom 48.6 8' ∅
61.47
61.4
61.7 61.48
61.50
61.5
61.6
Rim 61.55 Inv. SE 56.7
Bottom 48.88' ∅
12" Concrete
S
6" Concrete
Rim 62.07 Inv. E 57.2 Inc. S 55.8
Inv. SW 55.8 4' ∅
62.4
63.5
62.6
61.9
62.3
62.4
62.1
61.5
61.5
61.2
W
W
62.4 62.45
62.35
62.39
62.19
62.
62.42
62.14
62.1
62.1
61.8
61.8
61.8
Asphalt
As ph alt
62.36
62.68
62.76
62.72
62.56
62.26
62.29
.78
.59
.02
.1
.1
.06
62.09 62.06
62.11
61.46
61.0
62.13
62.05
62.0
62.22
.10
62.25
62.47
.11
.19
61.02
61.07
61.26
61.22
61.28
61.38
61.44
61.72
61.65
61.
62.
62.63
.39
62.87
62.51
62.64
.45
62.20 62 .15
62.63
62.34
62.28
62.57
.64
62.65
62.59
62.
62.25
.22
.55
62.48
.49
62.30
62.76 62.76
62.46
62.4462 .36
62.32
.36
.35
62.36
62.51
62.44 62.30
.10
62.10 62.18
.71
62.20
62.2862.37 62.75
62.75
62.76
62.79
62.1
.59
62.58
62.47
62.54
62.58
62.58
63.7
62.10
62.5
62.64
.1
.5
.64
.66
62.
.74
62.67
Be nc hm ark
Sq ua re
Cu t S et
Ele va tio n 6
2.4
.87
.92
.59
62.36
.56
.58
.60
.81
62.55
61.83
Benchmark:
Nail Set in Pole Elevation 63.46
62.44
.8'
.18
19.8'
.1'
D 16"
ER
ER
ER
ER
ER
S
X X
X X
X X
X X
X X
X
X X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
W W
W
60.8
60.7
61.1
61.13 61.15
62.05
60.5
60.8
60.5
60.8
61.0
61.54
67.0'
9.7
67.0'
9.6
2.7'
60.7
61.3
61.3
61.9
12' Chain Link Fence
Tennis Courts
(No Access)
Asphalt Driveway
Concrete Wall
Concrete
Handball Court
X
Basketball Court
10' Chain Link Fence
One Story
Frame Building on Concrete
6' Metal Fence
Gate Skate Park
Concrete
' C ha in
Lin k F en ce
' C ha in
Lin k F en ce
Concrete Window Well
Concrete
ConcreteStep
Dirt
Con cre te
Roo f O ve r
6' Chain Link Fence
6' Chain Link Fence on Concrete
Ga te
6' Chain Link Fence
6' Chain Link Fence on Concrete
Concrete Curb Planter
8' x 10'Frame Shed
S8" Cla y
S
S
S
S
S
S
S
S
S
S
S
S
8" Clay
Rim 61.28 Inv. E 53.8
Inv. SW 53.8 4' ∅
60.74
60.67
60.89
61.05
60.99
60.59 60.59
60.40
60.57
60.78
60.69
60.83
60.72
61.00
60.96
61.09
60.88
61.18
61.08
61.2
61.20 61.38
61.3
61.2
61.27
61.12
61.02
61.2 61.09
.1061
.3561 .3
61.2
61.03
61.07
60.9
61.2
61.18
61.01
61.04
61.12
61.02
60.94
60.99
61.02
61.02 61.07
61.08
61.3
61.4
61.34
61.53
61.47
61.30 61.53 61.36
61.60
61.37
61.6360.77 60.96 60.90 61.09 61.39
61.66 61.86
61.69
.90
61.96
61.91
.09
.02
.61
62.56
.22
62.
.69
.95
63.45
62.85
62.38 62.14
.10
61.95
.69
.72
61.8
61.4
61.8
61.89
61.2
61.5
61.38
60.9
.07
61.
61.3
61.70
.90
62.1062.66
61.13
16.3'
.9'
16.4'
.9'Ent. El. 61.52
Roo f O ve r
Ent. El. 63.01
Ent. El. 63.01
1.4
60.81
60.5
60.5
60.6
60.9
61.5
61.5
61.4
Asphalt61.1
61.2
61.5
Rim 61.48 Bottom 51.5
Pipes Not Visible 8' ∅
Rim 60.79
Inv. W 59.2
Bottom 58.3 2' X 2'
1.5
2.8'
Rim 61.35 Inv. NW 58.1
Bottom 52.08' ∅
X
D
8" PVC
60.96
Ga te
.76
62.60
.8
Asphalt
PE
E
E
E
E
E
PE
HH
E
E E E
E E E E
E
HH
E
E
E
E
E
E
E
T
T T
T
T
HH
T
T
T
T HH
HH
T T
T T
T
T
T
E
E
T T
W
W
W
W
W
W
W W
W W
S S
S S
S
NEW WATER LINE (TYP) (BY CONTRACT 'X')
S
S
NEW LIGHTPOLE (TYP) (BY CONTRACT 'E')
FF EL. 61.85
61.05 61.20
61.02
61.00
60.89 61.00 61.00
60.96
NEW 10'Ø DRYWELL WITH OPEN GRATE (TYP)
POOL
PERIMETER
ELEVATION =
61.55
POOL PERIMETER
ELEVATION = 61.55
S S
S
FF EL. 62.87
NEW PULL BOX (BY CONTRACT 'E')
NEW TRANSFORMER (BY CONTRACT 'E')
NEW ELECTRICAL LINE (TYP) (BY CONTRACT 'E')
NEW BURIED SPRAY PARK TANK
(TOP EL. = 62.30) (BY CONTRACT 'X')
NEW SANITARY MANHOLE (TYP)
NEW SANITARY DOGHOUSE MANHOLE
OVER EXISTING SANITARY LINE AT INV. =
54.56. SEE SANITARY SEQUENCING NOTES.
NEW TRENCH DRAIN - 6" WIDE NDS-DURA SLOPE WITH
ADA COMPLIANT POLY SLOTTED GRATE OR APPROVED
EQUAL. GRATE COLOR TO BE SELECTED BY OWNER (TYP)
CONNECT NEW 8"Ø SANITARY LINE TO EXISTING SANITARY
MANHOLE AT INV. = 57.17. CONTRACTOR TO FILL BOTTOM OF
STRUCTURE WITH 4,000 PSI CONCRETE TO PROPOSED INVERT
ELEVATION. FORM A UNIFORM, SMOOTH-FINISHED FLOW
CHANNEL BETWEEN THE INCOMING AND OUTGOING PIPES.
PROVIDE SLOPED BENCHING (SHELVES) FROM MANHOLE WALLS
TO CHANNEL EDGES WITH A ROUGHENED FINISH FOR TRACTION.
SEE SANITARY SEQUENCING NOTES.
S
S
S
S
S
S
S
S
S
NEW 4'Ø SANITARY MANHOLE
S
CONNECT NEW 6"Ø SANITARY
LINE TO EXISTING SANITARY
MANHOLE AT INVERT EL. = 53.80
ELEVATIONS TO MATCH EXISTING IN KIND FOR NEW ASPHALT
PAVEMENT AND BASE AS NEEDED TO INSTALL SANITARY UTILITIES
INV. = 60.12
NEW CHEMICAL STORAGE TANK (BY CONTRACT 'X')
TOP OF PAD
EL. = 62.60
D
D
D
D
NEW DRAINAGE CLEANOUT (TYP)
NEW OVERFLOW DRAIN VAULT (TOP EL. = 62.20) (BY CONTRACT 'X')
NEW DRAIN VALVE VAULT (TOP EL. = 62.20) (BY CONTRACT 'X')
NEW POOL GUTTER (BY CONTRACT 'X')
NEW SPRAY PARK FEATURE PIPING (BY CONTRACT 'X') (TYP)
NEW COMPETITION POOL RETURN PIPING (TYP) (BY CONTRACT 'X')
NEW COMPETITION POOL MAIN DRAIN
PIPING (TYP) (BY CONTRACT 'X')
NEW COMPETITION POOL GUTTER PIPING (TYP) (BY CONTRACT 'X')
NEW SPRAY PARK DRAINAGE
PIPING (BY CONTRACT 'X') (TYP)
SPRAY PARK PERIMETER
ELEVATION = 61.55
61.7561.75
61.75
61.75 61.75
61.75 61.75
61.75
61.8561.8561.85
61.8561.85
61.85
61.85
61.85
61.45 61.30
61.44
61.80
61.06
61.40
61.25
61.45
61.43
61.43
61.85
61.8561.85 61.70 61.35
61.33
61.25
61.45
61.45
61.15
61.15 61.1561.21
61.2061.25
61.15
61.15
61.70 61.70
61.25
61.25
61.45 61.45
61.45
61.45
61.55 61.55
61.55 61.55
61.55 61.55
61.55
61.55
61.45 61.45
61.4561.45
61.20 61.45
61.45
62.02 62.08
61.95 61.90
61.80
62.00
61.90
62.20 62.10
62.10 62.00
61.85 61.85
61.85
61.85
61.85
61.85 61.85
61.85 61.85
61.85
61.85
61.85 61.85
61.85 61.85
61.60
61.80
61.60
61.72
61.75
61.00
60.90
61.25 61.17
61.0561.15
61.00
60.85
61.00
61.05
61.25
61.25 61.30
61.75
61.65
61.75
60.70 60.95
61.2561.35
61.35 62.10
62.1062.20
62.00
61.6761.56
62.37
62.87
62.37
62.37 62.47
62.47
62.87
62.65
62.65
61.63
61.59
62.37
S S
S S
S S
S S
S
INV. = 55.75
INV. = 55.75
INV. = 55.75
NEW SANITARY LINE FROM BATH HOUSE. CONTRACT
'G' RESPONSIBLE FOR SANITARY PIPING BEYOND 5'
FROM BUILDING. CONTRACT 'P' RESPONSIBLE FOR
SANITARY PIPING WITHIN 5' OF BUILDING. (TYP FOR 3
CONNECTIONS AT BATHHOUSE)
NEW SANITARY CLEANOUT (TYP)
CONNECT NEW 4"Ø WASTE LINE TO 8"Ø SEWER
LINE VIA WYE CONNECTION (TYP FOR 3)
SEE PROFILE 1 ON SHEET C200 FOR
SANITARY SA PROFILE
SEE PROFILE 2 ON SHEET C200 FOR SANITARY SB PROFILE
C503
C502
1,2 C503
C503
1,2 C502
D D
62.30 62.36
62.26
62.60
62.70
62.50
62.40
RL
R
RL
R
RL
R
RL
R
RL
R
RL
RRR
RRR
RL
RL
RL
RL
RL
61.00
60.65
61.15
D
D
D
NO UTILITY MARKOUT WAS COMPLETED WITHIN THE EXISTING
DRIVEWAY. CONTRACTOR SHALL VERIFY EXISTING UTILITY
LOCATIONS AND POTENTIAL CONFLICTS PRIOR TO INSTALLATION
OF PROPOSED SANITARY UTILITIES. ANY CONFLICTS
ENCOUNTERED SHALL BE REPORTED TO THE ENGINEER FOR
REVIEW AND DIRECTION PRIOR TO PROCEEDING.
C502
NEW 4'Ø MANHOLE WITH
OPEN GRATE
2,3 C502
61.15
D D
61.10 60.95
D
NEW DRAINAGE CLEANOUT (TYP)4
C502
CONNECT 4"Ø ROOF LEADER LINE TO 4"Ø
DRAINAGE LINE VIA WYE CONNECTION
NEW 10'Ø DRYWELL WITH SOLID COVER (TYP)
1,2
C502
INV. = 59.18 (4" PVC)
DE-2
DE-3
DE-4
DE-5
DE-6
DE-7
DE-8
DE-9
DE-10
61.30 61.53 61.53
61.30
61.60
61.40 61.70
61.77 61.50
61.70
NEW DURA SLOPE CATCH BASIN
(DS-340) OR APPROVED EQUAL (TYP)
DA-1
DE-1
NEW 4'Ø MANHOLE WITH
SOLID COVER
DB-1
DB-2 DB-3
61.50
D
DC-4
DC-5
D
DC-2
DC-3
DC-1
SA-1
SA-2
SA-3
SB-1
6"Ø PVC FILTER DRAIN (INV. = 59.32)
NEW SPRAY PARK DRAIN LINE (CONTRACT 'X')
2 3 61.20
60.65
61.20
61.20
61.10 61.15
61.05
60.85
60.70
60.75
60.80
60.75
R R
DD-1
DD-2
DD-3
NEW INSPECTION PORT (TYP FOR 5)
C502
NEW (36) CULTEC RECHARGER
330XLHD HORIZONTAL LEACHING
CHAMBERS WITH 6" STONE BASE.
BOTTOM OF CHAMBER EL. = 56.00
INVERT ELEVATION = 56.20
C502
60.80
D
D
D
D
D
D
NEW 6"Ø PERFORATED HDPE DRAIN LINE.
CONTRACTOR TO SLOPE PIPE AT MINIMUM
0.5% SLOPE TOWARD LINEAR LEACHING
CHAMBERS (TYP FOR 2 IN TURF EVENT SPACE)
C502
NEW DOWNSPOUT TO BOOT (TYP)
TRENCH DRAIN
HIGH POINT
TRENCH
DRAIN
HIGH
POINT
TRENCH
DRAIN
HIGH
POINT
D
DA-2
NEW 12'Ø DRYWELL WITH
SOLID COVER
1,2 C502
LIMIT OF DISTURBANCE (TYP)
C502
NEW PRIMARY ELECTRIC LINE (BY CONTRACT 'E')
NEW WATER LINE (BY CONTRACT 'P')
NEW PULL BOX (TYP) (BY CONTRACT 'E')
1,6 C503
RIDGE LIN
E
RI
DG
E
LIN
E
NEW WATER LINE (BY CONTRACT 'P')
W W
W
W
W
W W
NEW 6"Ø WATER MAIN. WATER MAIN
INSTALLATION TO BE PERFORMED
BY A VILLAGE OF HEMPSTEAD
APPROVED CONTRACTOR, SEE
NOTES ON SHEET G 001
61.15
61.00
W
CUT IN AND CONNECT TO EXISTING
6"Ø WATER MAIN FOLLOWING
HEALTH DEPARTMENT APPROVAL,
TYP. OF 2
EXISTING 6"Ø WATER MAIN
NEW 6" BENDS, AS
REQUIRED
61.25
C500
C500
R R
R
R R
R
R R
R
61.45
61.20
61.2561.15
61.35
61.40 61.25 61.35
61.30
61.20
R30'
R40'
R40'
D
DB-4
TRENCH DRAIN
HIGH POINT20
.0'
DB-5
INV. = 59.18 (4" PVC)
D
D
CONNECT NEW 2" SUMP PUMP LINES TO 6" DRAIN
LINE VIA WYE CONNECTION (TYP FOR 2)
D
61.69
61.58
D
2,3 C502
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .