About this file

This document is a standard Request for Approval of Substitution form, which appears to be associated with a construction project involving tub and shower installations at Phyllis Circle apartments in Billings, Montana. The form provides a structured mechanism for a contractor or supplier to propose an alternative product or material in place of a specification originally outlined in the project documents. The form allows for detailed documentation of the proposed substitution, including technical data, potential impacts on dimensions, other trades, and any differences from the originally specified item.

The form includes sections for the proposing firm to provide comprehensive details about the substitution, such as whether it affects drawing dimensions, impacts other trades, and how manufacturer guarantees might differ. There are checkboxes and spaces for explaining these potential variations. The form also includes a response section for the project specifier to approve, conditionally approve, or deny the substitution request, with spaces for official documentation and potential follow-up communication. While this specific form does not contain pricing information, it represents a critical part of the procurement and construction documentation process, allowing for potential product alternatives while maintaining project specification standards.

View the file

Other files

File Type Posted
(HUD-5372) Construction Progress Schedule.pdf PDF
(HUD-92010) EEOC.pdf PDF
Advertisement.pdf PDF
Article 50 SupplementaryConditions.pdf PDF
Bidder statements 5369-a.pdf PDF
G704-2017 - Certificate of Substantial Completion.pdf PDF
Section 3 60002A.pdf PDF
Signature sheet.pdf PDF
(HUD-51002) Schedule of C.O.s.pdf PDF
(HUD-51003) Schedule of Materials Stored.pdf PDF
2328 - HomeFront Tub Surrounds Addendum No 1.pdf PDF
Attachment D (Section 3 Clause).pdf PDF
Disclosure of Lobbying Activites (SF-LLL).pdf PDF
G706-1994 - Contractor_s Affidavit of Payment of Debts and Claims.pdf PDF
Instructions to bidder form 5369.pdf PDF
Low-income Resident Hiring Plan - Contract.pdf PDF
NoticeToProceed.pdf PDF
SpecialCond.pdf PDF
(HUD-50071) Cert. of Payments.pdf PDF
(HUD-51000) Sched. of Payments.pdf PDF
(HUD-51001) Periodic Payments.pdf PDF
(HUD-5370) General Conditions.pdf PDF
(HUD-92554M) Supplementary Conditions.pdf PDF
(Supplemental Conditions to HUD-5370).pdf PDF
G706A-1994 - Contractor_s Affidavit of Release of Liens.pdf PDF
G707-1994 - Consent Of Surety to Final Payment.pdf PDF
Release and waiver.pdf PDF
TUB SURROUNDS Bid Set.pdf PDF
(HUD-11) Record of Employee Interview.pdf PDF
(HUD-2554) Supplementary Conditions.pdf PDF
(HUD-51004) Schedule of materials.pdf PDF
Agreement for storage.pdf PDF
Bid Form.pdf PDF
DB 01-2023.pdf PDF
Davis Bacon Standards HUD-4010.pdf PDF
IFB 8.1.1 - Attachment G-1.1 (Supplemental Conditions to HUD-5370).pdf PDF
Spec Cover.pdf PDF
TABLE OF CONTENTS.pdf PDF
bid - hab non collusive affidavit.pdf PDF
Show all 39

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2328 Request for Approval of Substitution - 1

REQUEST FOR APPROVAL OF SUBSTITUTION

PROJECT: ________________________________ DATE: _________________________________ _________________________________________ NO. : _________________________________

BID DATE: ________________________________

We hereby submit for your consideration the following product instead of the specified item for the above project:

SECTION LINE NO. SPECIFIED ITEM

Proposed Substitution:____________________________________________________________________________

____ Complete technical data, including laboratory tests, if applicable, is attached.

(Include complete information on changes to Drawings and/or Specifications which proposed substitutions will require for its proper installation).

Does the substitution affect dimensions shown on Drawings? _____ Yes _____ No

Describe _________________________________________________________________________________________

Will the undersigned pay for changes to the building design, including engineering and detailing costs caused by the requested substitution? ______ Yes ______ No

Does substitution affect other trades? ______ Yes ______ No

Describe differences between proposed substitution and specified items. ______________________________________

Manufacturers= guarantees of the proposed and specified items are different: (Explain on attachment) _______Yes _______No

Submitted By: Response of Specifier*

Signature:________________________________ ___________ Request is approved subject to compliance with the specification and an addendum will be Firm:____________________________________ issued.

Address:_________________________________ ___________ Approval cannot be granted because the _________________________________ request did not reach this office within the _________________________________ specified time.

Date: _________________________________ ___________ Approval cannot be granted at this time.

Telephone: ______________________________ ___________ Prior approval is not required by the specified for the substitution requested.

By:___________________________________________ Signature

Date *Written response will be made if stamped, self-addressed envelope is submitted with request.