2328 - HomeFront Tub Surrounds Addendum No 1.pdf

PDF 1000 KB Posted

Attached to
Tub Surround Installation - Phyllis Circle
Solicitation number
B23001
Issued by
Yellowstone County, Montana

About this file

This document is Addendum No. 1 for the Tub Surrounds Project (CF-20-07-02) in Billings, Montana, issued on December 22, 2023. The project involves renovating bathrooms across three apartment buildings located at 355, 2742, and 2757 Phyllis Circle, with specific focus on removing existing tubs, tiles, and shower components, and installing new handicap-accessible shower units. The addendum provides detailed instructions for the general contractor, including requirements for surveying and leveling plywood surfaces prior to new unit installation, ensuring proper water flow to drains, and specifying exact replacement components like the shower unit (4LSS26331A75B.V2 by Best Bath).

The renovation scope includes removing wall tiles, gypsum board, existing fixtures, and installing new walls, blocking, gyp board, ceramic tiles, shower curtain rods, and grab bars. The project appears to be a comprehensive bathroom accessibility upgrade, with specific technical specifications for threshold details, wall preparation, and unit installation. The addendum emphasizes the contractor's responsibility to ensure proper surface preparation, drainage, and installation of new handicap-accessible shower components, with particular attention to maintaining water flow and structural integrity during the renovation process.

View the file

Other files

File Type Posted
(HUD-5372) Construction Progress Schedule.pdf PDF
(HUD-92010) EEOC.pdf PDF
Advertisement.pdf PDF
Article 50 SupplementaryConditions.pdf PDF
Bidder statements 5369-a.pdf PDF
G704-2017 - Certificate of Substantial Completion.pdf PDF
Request for Approval of Substitutions.pdf PDF
Section 3 60002A.pdf PDF
Signature sheet.pdf PDF
(HUD-51002) Schedule of C.O.s.pdf PDF
(HUD-51003) Schedule of Materials Stored.pdf PDF
Attachment D (Section 3 Clause).pdf PDF
Disclosure of Lobbying Activites (SF-LLL).pdf PDF
G706-1994 - Contractor_s Affidavit of Payment of Debts and Claims.pdf PDF
Instructions to bidder form 5369.pdf PDF
Low-income Resident Hiring Plan - Contract.pdf PDF
NoticeToProceed.pdf PDF
SpecialCond.pdf PDF
(HUD-50071) Cert. of Payments.pdf PDF
(HUD-51000) Sched. of Payments.pdf PDF
(HUD-51001) Periodic Payments.pdf PDF
(HUD-5370) General Conditions.pdf PDF
(HUD-92554M) Supplementary Conditions.pdf PDF
(Supplemental Conditions to HUD-5370).pdf PDF
G706A-1994 - Contractor_s Affidavit of Release of Liens.pdf PDF
G707-1994 - Consent Of Surety to Final Payment.pdf PDF
Release and waiver.pdf PDF
TUB SURROUNDS Bid Set.pdf PDF
(HUD-11) Record of Employee Interview.pdf PDF
(HUD-2554) Supplementary Conditions.pdf PDF
(HUD-51004) Schedule of materials.pdf PDF
Agreement for storage.pdf PDF
Bid Form.pdf PDF
DB 01-2023.pdf PDF
Davis Bacon Standards HUD-4010.pdf PDF
IFB 8.1.1 - Attachment G-1.1 (Supplemental Conditions to HUD-5370).pdf PDF
Spec Cover.pdf PDF
TABLE OF CONTENTS.pdf PDF
bid - hab non collusive affidavit.pdf PDF
Show all 39

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2328 Addendum #1 - 1 -

ADDENDUM NO. One (1) PROJECT: Tub Surrounds CF-20-07-02 Billings, MT

PROJECT NO.: 2328

DATE ISSUED: December 22, 2023

TO: All Bidders of Record

Acknowledge receipt of this Addendum by inserting its number in space provided on Bid Form.

Failure to do so may subject Bidder disqualification. This Addendum forms part of Bidding Documents and modifies them as follows.

DRAWINGS:

Sheet 3.2 – Shower Threshold Detail – See Revised Notations:

General Contractor is to survey plywood surface and is to assure the subsurface is level prior to start. If out of level, provide leveler prior to setting new H.C. unit and new level support. Water must remain in the H.C. unit and must flow to the drain.

END OF ADDENDUM #1

6'-5"

5'- 3 1

/2"

2'-0"

3'-0"

1'-6"

4'-1 1/2"

1'-4"

6'- 4 1

/2" 4'-

0 1 /2"

3'-0"

4'- 0 1

/2"

1'-4"

6'-5"

4'-1 1/2" 2'-0"

5'- 3 1

/2"

2'- 0"

6" 1'-

0"

2'- 0"

6"5'- 0"

2'-5"

2'- 0"

1'- 0"

3.2

H.C. UNIT BATHROOM

1/2" = 1'

Project No.

Date

Drawn by

TU

B

SU

R

R O

U N

D S

30 NOVEMBER, 2023

AP

Issue Issue Description

BI

LL

IN

G

S, M

T.

R

EV

IS

IO

N S

PH

YL

LI

S

C

IR

C

LE

N U

M

BE

R D

ES

C

R

IP

TI

O

N D

AT

E

ALLEN F. RAPACZ

ANATNOM

SGNILLIB

TCETIHCRADESNECI

L

ANATNOMFOETATS

11. 30. 23

P H

YL

LI

S C

IR

N

P H

YL

LI

S C

IR

S

P H

YL

LI

S C

IR

E

AD

D

EN

D U

M N o.

/2

2/

REMOVE TUB

EXIST.

SHELF

EXIST.

METAL

BASEBOARD

HEAT UNIT

REMOVE EXIST.

TILE

REMOVE

EXIST.

TILE

EXIST.

SHELVES

ELEVATION 1

1/2" = 1'

3.1

ELEVATION 2

1/2" = 1'

3.1

ELEVATION 3

1/2" = 1'

3.1

ELEVATION 4

1/2" = 1'

3.1

4 3.0

REMOVE EXIST. TILE

& GRAB BARS, ETC.

REMOVE EXIST.

TILE

H.C. UNIT BATHROOM

1/2" = 1'

ELEVATION 1

1/2" = 1'

3.1

ELEVATION 2

1/2" = 1'

3.1

ELEVATION 3

1/2" = 1'

3.1

ELEVATION 4

1/2" = 1'

3.1

4 3.0

BATHROOM IMAGES

REMOVE SHOWER

TRIM VALVE & DRAIN

SYSTEM

CERAMIC TILE

TO REMAIN

FIXTURES TO

REMAIN

REMOVE TUB

EXIST. TO REMAIN

REMOVE ALL GRAB

BARS

REMOVE ALL GRAB

BARS

REMOVE EXIST

SHOWER ROD

REMOVE EXIST

SHOWER ROD

LOWER FLOOR

BATHROOM

DEMO AND

REMODEL

PLANS

H.C. UNITS

PROVIDE NEW

SHOWER TRIM

VALVE & DRAIN

SYSTEM

REMOVE TUB REMOVE TUB

NEW GYP. BD.

NEW SHOWER CURTAIN

ROD

CUT OUT EXIST GYP

BD. & ABOVE NEW

SURROUND

CUT OUT EXIST GYP

BD. & ABOVE NEW

SURROUND

CUT OUT EXIST GYP

BD. & ABOVE NEW

SURROUND

NEW BASE TO MATCH.

NEW GYP. BD.

NEW 2" X 12"

BLOCKING

IN WALL

NEW 2" X 6"

BLOCKING

IN WALL

NEW 2" X 12"

BLOCKING

IN WALL

NEW WALL NEW WALL

BATHROOM REMODEL "C" LOWER FLOOR H.C.

UNITS TYPICAL OF 3.

NEW OR RELOCATED

CERAMIC TILE

REPAIR / INFILL

NEW SHOWER CURTAIN

ROD

NEW SHOWER CURTAIN

ROD

NOTE:

1. CONTRACTOR TO REMOVE WALL TILE & ALL GYPSUM BOARD BEHIND CERAMIC TILE.

2. CONTRACTOR TO PAINT ALL WALLS, SHELVES & CEILING.

3. REMOVE ALL MISC. WALL HUNG ITEMS AND SALVAGE TO OWNER.

NOTE:

NEW WALL WILL BE BASED ON LOCATION OF FLOOR TRUSSES

AND RELOCATED WASTE LINE.

REMOVE CERAMIC TILE & PROVIDE NEW CERAMIC TILE @NEW EDGE ONLY.

NEW CERAMIC

TILE

SHOWER UNIT: 4LSS26331A75B.V2 BY BEST BATH

PROVIDE GRAB BARS, FOLDING SEAT, CURTAIN,

ROD & "T" SHAPED RUBBER WATER STOPPER KIT.

NOTE:

CONTRACTOR TO RELOCATE DRAIN WASTE TO NEW UNIT .

SEE UNIT CONFIRMATION TO ALLOW ROUGH-IN BETWEEN

BOTTOM OF UNIT & FLOOR SURFACE.

NEW GYP. BD.

GENERAL CONTRACTOR IS TO SURVEY PLYWOOD SURFACE AND IS TO

ASSURE THE SUBSURFACE IS LEVEL PRIOR TO START. IF OUT OF

LEVEL, PROVIDE LEVELER PRIOR TO SETTING NEW H.C UNIT AND NEW

LEVEL SUPPORT. WATER MUST REMAIN IN THE H.C UNIT AND MUST

FLOW TO THE DRAIN.

BY GENERAL CONTRACTOR

SHOWER THRESHOLD DETAIL

NOT TO SCALE

3.2.pdf
Sheets and Views
Layout1

File details come from the government source that posted it. Updated .