This is an email chain documenting the procurement preparation for a construction bid by the Kenton County Airport Board (KCAB), operating the CVG Centre (Cincinnati/Northern Kentucky International Airport). The project involves renovations and improvements to the Main Server Room at CVG Centre, based on findings from a CMTA, Inc. study dated September 20, 2024. The scope of work encompasses mechanical, electrical, and plumbing (MEP) services including replacement of existing HVAC equipment serving the Co-locate Server Room, installation of new HVAC systems for a newly established Server Room, replacement and installation of ductwork and piping, modification of existing fire protection systems, installation of a clean agent fire suppression system for the new Server Room, electrical modifications to support two UPS systems with redundant feeders, installation of a temporary generator docking station, and technology infrastructure including new racks and power distribution units. The solicitation is scheduled for posting on September 25, 2025, with a four-week bidding period. A pre-bid meeting and site visit are planned for Thursday, October 2, 2025 at 10:00 am at CVG Centre, 77 Comair Blvd., Erlanger, Kentucky 41018. Questions must be submitted by 11:59 pm on Monday, October 13, 2025, with answers posted no later than Thursday, October 16, 2025 at 11:59 pm. Bids are due by Thursday, October 23, 2025 at 2:00 pm, with no late submissions accepted unless extended by addendum.
The procurement documents note that IT department participation in the design process and bid review is confirmed. Physical equipment transfer to the new server room is explicitly excluded from the scope. The project does not include existing facilities or buried cable runs owned, operated, and maintained by the FAA. The solicitation will be managed through OpenGov's e-procurement portal at https://procurement.opengov.com/portal/cvgairport, with questions directed to procurement@cvgairport.com. Key project personnel include Brad Quatman (Project Manager), Diane Russ (CPM, CPPO), Chris Mason (IT), and Shkelzen Halili. No specific contract value, funding source, or award timeline is referenced in the email documentation.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
From: Chris Mason To: Brad Quatman; Diane Russ Cc: Shkelzen Halili Subject: Re: Main Server Room - Construction Bid Date: Thursday, September 18, 2025 2:47:29 PM Attachments: image001.png image002.png image003.png C2_signature_airportauthoritylogo_4kdmode-110px_3eb8a020-030a-4b89-8952-99dc552130ee.png C2_signature_airportauthoritylogo_4kdmode-110px_3eb8a020-030a-4b89-8952-99dc552130ee.png
Hi Diane, Yes, IT has participated in the design process and review. We are good to proceed.
Chris Mason cmason@cvgairport.com 859-760-0685
From: Brad Quatman <bquatman@cvgairport.com> Sent: Thursday, September 18, 2025 12:25:53 PM To: Diane Russ <DRuss@cvgairport.com>; Chris Mason <cmason@cvgairport.com> Cc: Shkelzen Halili <shalili@cvgairport.com> Subject: Re: Main Server Room - Construction Bid
@Chris Mason - I just added you as a collaborator on the OpenGov solicitation for the Main Server Room Project. As anticipated, we are ready to post for bid next Thursday (9/25). Please review the Background and Scope of Work I drafted for this (also copied below). This includes an overview of the construction-related items for the build-out - note that we left out the physical equipment transfer to the new server room as previously discussed.
Let me know if you approve or if you would like to make any changes.
Diane/Z - do we have a date and time identified yet for the Pre-Bid Meeting?
Background
This project involves the proposed renovation of the existing Server Room at the CVG Centre, based on the findings of the CMTA, Inc. study dated September 20, 2024, and subsequent coordination meetings. The scope includes the replacement of existing HVAC systems—both branch and rooftop units—serving the current Co-locate Server Room, as well as the addition of new HVAC equipment dedicated to a newly established Server Room. A new partition wall will be constructed to separate the new Server Room from the existing space. Fire protection for the new Server Room will be provided via a Clean Agent Fire Suppression system. The design also includes new technology racks with integrated rack power distribution, two (2) UPS systems with monitoring and associated electrical distribution to provide redundant power to all rack locations, and the installation of a temporary generator connection cabinet to support future emergency power needs.
Scope of Work
The following outlines the Mechanical, Electrical, and Plumbing (MEP) Scope of Services for the proposed renovation of the server room at the CVG Centre:
a. HVAC
A. Replacement of Existing HVAC Equipment:
Replace the existing HVAC equipment currently serving the Existing Co-locate Server Room, in line with the overall project scope.
B. New HVAC Equipment:
Install new HVAC systems to support the newly established Server Room.
C. Ductwork and Piping:
Replacement and installation of new ductwork, HVAC piping systems, and air terminals to accommodate the separation between the existing and new Server Rooms.
Upsize and re-route glycol piping as identified in the drawings.
D. Temperature Controls:
Install new temperature control systems, with thermostats connected to the existing CVG central control system for seamless integration.
E.
Glycol:
mailto:cmason@cvgairport.com mailto:bquatman@cvgairport.com mailto:DRuss@cvgairport.com mailto:shalili@cvgairport.com mailto:cmason@cvgairport.com mailto:cmason@cvgairport.com
Draining and disposal of glycol from the existing system.
Purchase and re-charge of new glycol into the modified loop.
b. Fire Protection A. Modification of Existing Fire Protection System:
Modify the existing fire protection system to exclude the new Server Room from the current wet pipe fire protection system.
The Existing Co-locate Server Room will continue to be protected by the existing wet pipe sprinkler system.
B. Clean Agent Fire Suppression System:
Install a new clean agent fire suppression system for the new Server Room, ensuring protection of sensitive equipment.
c. Electrical A. Power Distribution Improvements:
Modify the power distribution systems to support the addition of two (2) UPS systems and provide redundant feeders to ensure reliable power to the technology equipment in the new Server Room.
B. Temporary Generator Docking Station:
Install a temporary generator docking station to facilitate emergency power requirements.
C. Modifications to Branch Circuits and Fire Alarm:
Modify existing branch circuits, lighting controls, and fire alarm devices to accommodate the new Server Room’s requirements.
d. Technology A. New Racks and Power Distribution Units (PDUs):
Add new racks to support network and server equipment, along with PDUs to ensure reliable power distribution.
B. Cabling and Network Integration:
Install new cabling to support the integration of new racks and network-connected UPS units.
Brad Quatman bquatman@cvgairport.com 859-760-5083
From: Diane Russ <DRuss@cvgairport.com> Sent: Thursday, September 18, 2025 12:10 PM To: Brad Quatman <bquatman@cvgairport.com> Cc: Shkelzen Halili <shalili@cvgairport.com> Subject: RE: Main Server Room - Construction Bid
Brad, LaDonna reviewed and wanted me to verify that IT has reviewed this scope and will be included in the review of the bids. Can you confirm?
Thanks, Diane
Diane Russ, CPM, CPPO DRuss@cvgairport.com 859-652-4147
New E-Procurement System!
CVG Airport uses OpenGov for all solicitations and responses.
Register for free at https://procurement.opengov.com/portal/cvgairport For questions, email us at procurement@cvgairport.com
From: Brad Quatman <bquatman@cvgairport.com> Sent: Tuesday, September 16, 2025 2:35 PM To: Diane Russ <DRuss@cvgairport.com>
Nope.
Thanks!
https://nam12.safelinks.protection.outlook.com/?url=https%3A%2F%2Fcvgairport.com%2F&data=05%7C02%7CDRuss%40cvgairport.com%7Cc66cef58ad7e40b707a608ddf6e3cfcd%7Ce88b51b645364ffaa129350653cdad28%7C0%7C0%7C638938180488812930%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=Sc20QQ5TmbXG3miNt2VU%2B%2BsSftra5VKpD2BibnLl8D4%3D&reserved=0 mailto:bquatman@cvgairport.com https://nam12.safelinks.protection.outlook.com/?url=https%3A%2F%2Fcvgairport.com%2F&data=05%7C02%7CDRuss%40cvgairport.com%7Cc66cef58ad7e40b707a608ddf6e3cfcd%7Ce88b51b645364ffaa129350653cdad28%7C0%7C0%7C638938180488827977%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=FfswtN6pq6qvqrZvvZDdv7mfMEAnOawVI38twUHWLdQ%3D&reserved=0 mailto:DRuss@cvgairport.com https://nam12.safelinks.protection.outlook.com/?url=https%3A%2F%2Fprocurement.opengov.com%2Fportal%2Fcvgairport&data=05%7C02%7CDRuss%40cvgairport.com%7Cc66cef58ad7e40b707a608ddf6e3cfcd%7Ce88b51b645364ffaa129350653cdad28%7C0%7C0%7C638938180488845079%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=muIFWyQAEwM47PafacogGw37SXiBA8LVWI4Xs%2F4ukZM%3D&reserved=0 mailto:%20procurement@cvgairport.com
Brad Quatman bquatman@cvgairport.com 859-760-5083
From: Diane Russ <DRuss@cvgairport.com> Sent: Tuesday, September 16, 2025 2:02 PM To: Brad Quatman <bquatman@cvgairport.com>
Subject: RE: Main Server Room - Construction Bid
Actually, this is the last question: does this project include existing facilities and buried cable runs that are owned, operated, and maintained by the FAA?
859-652-4147
New E-Procurement System!
CVG Airport uses OpenGov for all solicitations and responses.
Register for free at https://procurement.opengov.com/portal/cvgairport For questions, email us at procurement@cvgairport.com From: Brad Quatman <bquatman@cvgairport.com> Sent: Tuesday, September 16, 2025 12:35 PM To: Diane Russ <DRuss@cvgairport.com>
Sorry - I was out in the field all morning and am just getting thru emails now!
1. Let's put it out for the full 4 weeks. I'm anticipating a lot of sub-contracting so the extra week will help GCs get more pricing back.
2. 13-YES; 14-NO; 15-NO
3. We do not need to include the CMTA study. This was all accounted for in the drawings.
859-760-5083
Sent: Tuesday, September 16, 2025 9:56 AM To: Brad Quatman <bquatman@cvgairport.com>
One more, do we want to include the CMTA study from Sept 2024?
859-652-4147
New E-Procurement System!
CVG Airport uses OpenGov for all solicitations and responses.
Register for free at https://procurement.opengov.com/portal/cvgairport For questions, email us at procurement@cvgairport.com From: Diane Russ <DRuss@cvgairport.com> Sent: Tuesday, September 16, 2025 9:55 AM https://nam12.safelinks.protection.outlook.com/?url=https%3A%2F%2Fcvgairport.com%2F&data=05%7C02%7CDRuss%40cvgairport.com%7Cc66cef58ad7e40b707a608ddf6e3cfcd%7Ce88b51b645364ffaa129350653cdad28%7C0%7C0%7C638938180488861070%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=oE%2FQ0cJtHuKVle0YTlmm%2BYcDGM0nY0Ci1DUiEB6%2FZy4%3D&reserved=0 mailto:bquatman@cvgairport.com mailto:DRuss@cvgairport.com mailto:bquatman@cvgairport.com mailto:shalili@cvgairport.com https://nam12.safelinks.protection.outlook.com/?url=https%3A%2F%2Fcvgairport.com%2F&data=05%7C02%7CDRuss%40cvgairport.com%7Cc66cef58ad7e40b707a608ddf6e3cfcd%7Ce88b51b645364ffaa129350653cdad28%7C0%7C0%7C638938180488875950%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=49gVtKAV1McbINg3Ya9r8ytyrO%2BE69L1gOrZOpBpN%2F0%3D&reserved=0 mailto:DRuss@cvgairport.com https://nam12.safelinks.protection.outlook.com/?url=https%3A%2F%2Fprocurement.opengov.com%2Fportal%2Fcvgairport&data=05%7C02%7CDRuss%40cvgairport.com%7Cc66cef58ad7e40b707a608ddf6e3cfcd%7Ce88b51b645364ffaa129350653cdad28%7C0%7C0%7C638938180488889843%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=DYpmIRA%2Fr7JJSyl8CCaqmpMgowCCrhBJptAgoBpBIcM%3D&reserved=0 mailto:%20procurement@cvgairport.com mailto:bquatman@cvgairport.com mailto:DRuss@cvgairport.com mailto:shalili@cvgairport.com https://nam12.safelinks.protection.outlook.com/?url=https%3A%2F%2Fcvgairport.com%2F&data=05%7C02%7CDRuss%40cvgairport.com%7Cc66cef58ad7e40b707a608ddf6e3cfcd%7Ce88b51b645364ffaa129350653cdad28%7C0%7C0%7C638938180488903422%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=%2BlhdMMP0aPK6hLF5%2Fccn723UQeNLvBBbiftmKDm03%2Bc%3D&reserved=0 mailto:bquatman@cvgairport.com mailto:DRuss@cvgairport.com mailto:bquatman@cvgairport.com mailto:shalili@cvgairport.com https://nam12.safelinks.protection.outlook.com/?url=https%3A%2F%2Fcvgairport.com%2F&data=05%7C02%7CDRuss%40cvgairport.com%7Cc66cef58ad7e40b707a608ddf6e3cfcd%7Ce88b51b645364ffaa129350653cdad28%7C0%7C0%7C638938180488917085%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=nzN1M9S689%2Bd8afTdUYsK%2FMMrN3pOS1JIuUQw1SqPrE%3D&reserved=0 mailto:DRuss@cvgairport.com https://nam12.safelinks.protection.outlook.com/?url=https%3A%2F%2Fprocurement.opengov.com%2Fportal%2Fcvgairport&data=05%7C02%7CDRuss%40cvgairport.com%7Cc66cef58ad7e40b707a608ddf6e3cfcd%7Ce88b51b645364ffaa129350653cdad28%7C0%7C0%7C638938180488930500%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=JNAAwuTGCu5oHVT3aAQ%2BzWIAjZxZkV24sC0I5XGOUA8%3D&reserved=0 mailto:%20procurement@cvgairport.com mailto:DRuss@cvgairport.com
To: Brad Quatman <bquatman@cvgairport.com>
Actually, another question: Yes or No to these three questions:
859-652-4147
New E-Procurement System!
CVG Airport uses OpenGov for all solicitations and responses.
Register for free at https://procurement.opengov.com/portal/cvgairport For questions, email us at procurement@cvgairport.com From: Diane Russ Sent: Tuesday, September 16, 2025 8:54 AM To: Brad Quatman <bquatman@cvgairport.com> Cc: Shkelzen Halili <shalili@cvgairport.com> Subject: RE: Main Server Room - Construction Bid
Once last question, do you want this out for 3 weeks or 4 weeks? A lot of P&D has been doing 4 weeks lately but don’t know if this bid would require the extra week or not.
859-652-4147
New E-Procurement System!
CVG Airport uses OpenGov for all solicitations and responses.
Register for free at https://procurement.opengov.com/portal/cvgairport For questions, email us at procurement@cvgairport.com From: Brad Quatman <bquatman@cvgairport.com> Sent: Monday, September 15, 2025 8:38 AM To: Diane Russ <DRuss@cvgairport.com> Cc: Shkelzen Halili <shalili@cvgairport.com> Subject: Re: Main Server Room - Construction Bid
Sounds good.
Yes - Pre-Bid Meeting will be at the CVG Centre.
859-760-5083 mailto:bquatman@cvgairport.com mailto:shalili@cvgairport.com https://nam12.safelinks.protection.outlook.com/?url=https%3A%2F%2Fcvgairport.com%2F&data=05%7C02%7CDRuss%40cvgairport.com%7Cc66cef58ad7e40b707a608ddf6e3cfcd%7Ce88b51b645364ffaa129350653cdad28%7C0%7C0%7C638938180488944012%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=cJxk9o0Jkg5doDyU2ryhHokzXezfWcieYAkU9VbR5dY%3D&reserved=0 mailto:DRuss@cvgairport.com https://nam12.safelinks.protection.outlook.com/?url=https%3A%2F%2Fprocurement.opengov.com%2Fportal%2Fcvgairport&data=05%7C02%7CDRuss%40cvgairport.com%7Cc66cef58ad7e40b707a608ddf6e3cfcd%7Ce88b51b645364ffaa129350653cdad28%7C0%7C0%7C638938180488957282%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=n%2Blk%2BHD%2Bv9mqBiz459orQmBrol%2BbVBsNP%2BVV5wfUycU%3D&reserved=0 mailto:%20procurement@cvgairport.com mailto:bquatman@cvgairport.com mailto:shalili@cvgairport.com https://nam12.safelinks.protection.outlook.com/?url=https%3A%2F%2Fcvgairport.com%2F&data=05%7C02%7CDRuss%40cvgairport.com%7Cc66cef58ad7e40b707a608ddf6e3cfcd%7Ce88b51b645364ffaa129350653cdad28%7C0%7C0%7C638938180488970663%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=UqKeqTdAI5WSkbtngH72dExvGBlvA%2BTUdMCQUA2jCSY%3D&reserved=0 mailto:DRuss@cvgairport.com https://nam12.safelinks.protection.outlook.com/?url=https%3A%2F%2Fprocurement.opengov.com%2Fportal%2Fcvgairport&data=05%7C02%7CDRuss%40cvgairport.com%7Cc66cef58ad7e40b707a608ddf6e3cfcd%7Ce88b51b645364ffaa129350653cdad28%7C0%7C0%7C638938180488984332%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=9RpVM%2BgFPpq2mTEYoix%2BNVUVSwz0bEa4lSqxYEyMs9s%3D&reserved=0 mailto:%20procurement@cvgairport.com mailto:bquatman@cvgairport.com mailto:DRuss@cvgairport.com mailto:shalili@cvgairport.com https://nam12.safelinks.protection.outlook.com/?url=https%3A%2F%2Fcvgairport.com%2F&data=05%7C02%7CDRuss%40cvgairport.com%7Cc66cef58ad7e40b707a608ddf6e3cfcd%7Ce88b51b645364ffaa129350653cdad28%7C0%7C0%7C638938180489000137%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=4daiNW%2BTgNz7OpD0kdZgat84ntQPMB77o0h4b4bzZ8E%3D&reserved=0 mailto:bquatman@cvgairport.com
Sent: Monday, September 15, 2025 8:02 AM To: Brad Quatman <bquatman@cvgairport.com> Cc: Shkelzen Halili <shalili@cvgairport.com> Subject: RE: Main Server Room - Construction Bid
Thanks Brad! This shouldn’t be an issue. I’ll put the bid together and let you know if I have any questions.
Since I still won’t be able to drive, just an FYI, I will handle the bidding and pre-bid meeting, but Z will be in attendance so he can handle the site visit which is all at the CVG Centre, correct?
859-652-4147
New E-Procurement System!
CVG Airport uses OpenGov for all solicitations and responses.
Register for free at https://procurement.opengov.com/portal/cvgairport For questions, email us at procurement@cvgairport.com From: Brad Quatman <bquatman@cvgairport.com> Sent: Monday, September 15, 2025 7:22 AM To: Diane Russ <DRuss@cvgairport.com> Subject: Main Server Room - Construction Bid
Diane - welcome back!
I just submitted the intake form for the Main Server Room Construction Bid. We are wanting to post this for bid next Thursday (9/25) if possible.
Let me know if you would like to discuss.
CVG Airport Authority
Project Manager
Cincinnati/Northern Kentucky International Airport
M: 859-760-5083 mailto:DRuss@cvgairport.com mailto:shalili@cvgairport.com https://nam12.safelinks.protection.outlook.com/?url=https%3A%2F%2Fcvgairport.com%2F&data=05%7C02%7CDRuss%40cvgairport.com%7Cc66cef58ad7e40b707a608ddf6e3cfcd%7Ce88b51b645364ffaa129350653cdad28%7C0%7C0%7C638938180489014443%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=OCZB2rCftJzeP%2BYSc59JSH%2BmQBbkvntA6MbXv5Z75yY%3D&reserved=0 mailto:DRuss@cvgairport.com https://nam12.safelinks.protection.outlook.com/?url=https%3A%2F%2Fprocurement.opengov.com%2Fportal%2Fcvgairport&data=05%7C02%7CDRuss%40cvgairport.com%7Cc66cef58ad7e40b707a608ddf6e3cfcd%7Ce88b51b645364ffaa129350653cdad28%7C0%7C0%7C638938180489028241%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=LsbiWvfI3jwAXPSm71BUWcp3DhV0TB38zLiLJDJVJAg%3D&reserved=0 mailto:%20procurement@cvgairport.com mailto:bquatman@cvgairport.com mailto:DRuss@cvgairport.com https://nam12.safelinks.protection.outlook.com/?url=https%3A%2F%2Fcvgairport.com%2F&data=05%7C02%7CDRuss%40cvgairport.com%7Cc66cef58ad7e40b707a608ddf6e3cfcd%7Ce88b51b645364ffaa129350653cdad28%7C0%7C0%7C638938180489041638%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=jLM2KHlILZQ3xgaQ5rLoe5pG1xVJmVFhMaj0KWlUXGE%3D&reserved=0