Drawings_CVG_Cenre_-_Server_Room_Improvements_-_Bid_Set.pdf

PDF 5 MB Posted

Attached to
CVG Centre Server Room Renovations & Improvements
Solicitation number
25-057-ITB
Issued by
Bell County, Kentucky

About this file

This is a comprehensive set of architectural and engineering design documents for the CVG Centre Server Room Improvements project at the Cincinnati & Northern Kentucky International Airport, prepared by CMTA, Inc. The project involves extensive renovations to the server room facilities located at 77 Comair Boulevard in Erlanger, Kentucky. The design documents cover multiple disciplines including architectural, mechanical, electrical, fire protection, and technology systems, with detailed plans for demolition and new infrastructure installation. The project scope includes replacing existing air conditioning units, upgrading glycol cooling systems, installing new electrical and technology infrastructure, and implementing improved fire protection and security systems.

The project documents indicate a significant investment in modernizing the server room's critical infrastructure, with specific attention to redundancy, cooling efficiency, and system reliability. The design includes new CRAC (Computer Room Air Conditioning) units with redundant operation, a glycol-based cooling system with dual dry coolers, upgraded electrical distribution with new UPS systems, and enhanced grounding and bonding infrastructure. The technology improvements feature new equipment racks, inter-rack cabling, wireless access points, and access control systems. The project appears to be funded internally by the airport authority, with a planned bidding process in September 2025 and implementation following the review and approval stages. The comprehensive nature of the design suggests a strategic approach to updating the facility's technological and mechanical systems to support current and future operational requirements.

View the file

Other files

File Type Posted
CVG_Centre_Server_Room_Renovations_&_Improvements_(Addendum_#2_Revision).pdf PDF
CVG_Centre_Server_Room_Impvs_-_Dwgs_-_Addendum_#2_10.15.25.pdf PDF
25-057-ITB_Pre-Bid_Sign_In_Sheet.pdf PDF
25-057-ITB_Pre-Bid_Meeting_Agenda.pdf PDF
CVG_Centre_Server_Room_Renovations_&_Improvements.pdf PDF
Re__Main_Server_Room_-_Construction_Bid_-_C._Mason.pdf PDF
Re__Main_Server_Room_-_Construction_Bid_-_B._Quatman.pdf PDF
25-057-ITB_CVG_Server_Room_Renovations_&_Upgrades_-_Notice_to_Bidders.pdf PDF
25-057-ITB_CVG_Server_Room_Reno_&_Upgrades_-_Exhibit_A-Proposal_Forms.pdf PDF
25-057-ITB_CVG_Server_Room_Reno_&_Upgrades_-_Exhibit_B-Contract_&_Bonds.pdf PDF
KCAB_-_RSVP_Instructional_Guide_for_OpenGov.pdf PDF
Specifications_-_CVG_Centre_-_Server_Romm_Improvements_-_Bid_Set.pdf PDF
Q4_2024_-_Business_Case_-_Main_Server_Room_Relocation_and_Server_Load_Stabilization.pdf PDF
2025.08.27_Construction_Cost_Estimate.pdf PDF
Certification_of_Offeror-Bidder_Regarding_Tax_Delinquency_and_Felony_Convictions.docx DOCX document
NonSegregated_Facilities_Certification.docx DOCX document
Affirmative_Action_Certification.docx DOCX document
Buy_American_Certification-Construction_Projects.docx DOCX document
EEO_Certification.docx DOCX document
Disclosure_of_Lobbying_Activities_Certification.docx DOCX document
Buy_American_Certification-Equipment-Building_Projects.docx DOCX document
Non_Debarment_or_Suspension_Certification.docx DOCX document
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

I.T.

Storage xxx

485.94 sf

I.T. Data Room xxx

485.94 sf

STAIRS

EXISTING

CO-LOCATESERVER

ROOM

CVGSERVER

ROOM

GENERAL NOTES - FIRE PROTECTION

A. ALL AREAS ARE PRESENTLY PROTECTED BY A 100% WET PIPE FIRE

SUPPRESSION SYSTEM. CONTRACTOR SHALL MODIFY THE SYSTEM AS

REQUIRED TO MAINTAIN 100% PROTECTION, IN ACCORDANCE WITH NFPA

13, STATE BUILDING CODE AND SPECIFICATIONS.

B. THE SUCCESSFUL FIRE PROTECTION CONTRACTOR SHALL OBTAIN AND

UTILIZE THE ARCHITECTURAL REFLECTED CEILING PLAN FOR LAYING OUT

THE SPRINKLER HEADS. THE REFLECTED CEILING PLANS SHOWN ARE TO

COORDINATE CEILING TYPES AND LOCATIONS. REFER TO THE MECHANICAL

AND ELECTRICAL DRAWINGS FOR CEILING DEVICE LOCATIONS. REFER TO

THE SPECIFICATIONS FOR COORDINATION DRAWING REQUIREMENTS.

C. INSTALL HEADS IN CENTER OF 2'X2' TILES. INSTALL HEADS ON 1/4 POINTS

OF THE 4' DIMENSION AND CENTER OF THE 2' DIMENSION IN 2'X4' TILES.

DO NOT MOUNT HEADS IN CENTER OF 2'X4' TILE IF IT IS SCORED TO LOOK

LIKE TWO 2'X2' TILES.

D. ALL SPRINKLER HEADS SHALL BE "SEMI-RECESSED", QUICK RESPONSE

SPRINKLER HEADS (UNLESS OTHERWISE NOTED ON THE PLANS.) HEADS

SHALL BE FED FROM A RETURN BEND ARRANGEMENT.

E. UTILIZE UPRIGHT AND/OR WALL-MOUNTED TYPE SPRINKLER HEADS IN

AREAS WITHOUT CEILINGS.

F. THE FIRE PROTECTION CONTRACTOR SHALL PERFORM HIS OWN FLOW TEST

PRIOR TO SUBMITTING SHOP DRAWINGS.

G. REFER TO A COMPLETE SET OF DOCUMENTS (ARCHITECTURAL,

STRUCTURAL, MECHANICAL AND ELECTRICAL PLANS AND SPECIFICAITONS)

FOR COORDINATION OF TRADES, ROOMS, STRUCTURE AND EQUIPMENT.

HVAC DUCTWORK MAINS SHALL BE INSTALLED PRIOR TO FIRE PROTECTION

PIPING. PROVIDE DRAIN VALVES IN THE FIRE PROTECTION SYSTEM WHERE

REQUIRED TO COMPLETELY DRAIN THE SYSTEM.

H. REFER TO THE SPECIFICATIONS FOR SPRINKLER HEAD TYPES.

I. PROVIDE ALL REQUIRED DRAIN PIPING TO TEST FLOW SWITCHES.

DISCHARGE DRAIN PIPING TO OUTDOORS OR A FLOOR DRAIN.

J. SIZE ALL FIRE PROTECTION PIPING IN ACCORDANCE WITH NFPA 13. PIPE

SIZING SHALL BE ACCOMPLISHED USING HYDRAULIC CALCULATIONS.

K. SUBMIT HYDRAULIC CALCULATIONS AND SYSTEMS DESIGN FOR REVIEW TO

THE M/E ENGINEER.

L. THE CONTRACTOR SHALL EXERCISE EXTREME CARE IN THE COURSE OF

THEIR WORK SO AS TO ENSURE THAT THEY DO NOT INTERRUPT ANY

EXISTING SERVICE. FOR SAFETY PURPOSES, PAY PARTICULAR ATTENTION

TO THIS PRECAUTION RELATIVE TO NATURAL GAS AND ELECTRICAL LINES.

VERIFY THE LOCATION, SIZE, TYPE, ETC., OF EACH UNDERGROUND OR

OVERHEAD UTILITY. ALL WORK SHALL BE PERFORMED IN ACCORD WITH

ALL FEDERAL, STATE AND/OR LOCAL RULES, REGULATIONS, STANDARD

AND SAFETY REQUIREMENTS.

M. WHERE WORK IS REQUIRED ABOVE EXISTING LAY-IN, PLASTER OR GYPSUM

BOARD CEILINGS, THE CONTRACTOR SHALL BE RESPONSIBLE FOR

REMOVAL AND REINSTALLATION (OR REPLACEMENT, IF DAMAGED) OF ALL

CEILING OR TILE AND GRID MEMBERS NECESSARY TO PERFORM HIS WORK.

NEW TILE AND GRID SHALL MATCH THE SURROUNDING AREAS. ALL

PATCHING WORK SHALL MATCH ADJACENT SURFACES.

N. ALL NEW WORK SHALL BE HUNG FROM STRUCTURE, NOT FROM THE WORK

OF OTHER TRADES, WHETHER EXISTING OR NEW.

O. COORDINATE ALL WORK WITH PROJECT PHASING REQUIREMENTS.

P. PATCH, REPAIR AND PAINT OR PROVIDE WALL COVERING FOR (TO OWNER'S

STANDARDS) EXISTING WALLS, CEILINGS, ETC., THAT ARE TO REMAIN IF

DAMAGED DURING CONSTRUCTION. REPAIRS SHALL MATCH ADJACENT

SURFACES TO THE SATISFACTION OF THE ARCHITECT AND OWNER.

Q. OBSERVE ALL APPLICABLE CODES, RULES AND REGULATIONS THAT MAY

APPLY TO THE WORK UNDER THIS CONTRACT. (CITY, COUNTY, LOCAL,

FEDERAL, MUNICIPALITY, UTILITY COMPANY, STATE, ETC.)

R. CONTRACTOR SHALL BE AWARE OF UNSEEN FIRE PROTECTION WORK

DURING DEMOLITION. IF ITEMS ARE UNCOVERED DURING DEMOLITION

THEN FIELD VERIFY THE USE OF THE ITEMS AND PLAN AN ALTERNATE

ROUTE TO RUN THESE ITEMS. THEN CONTACT THE ENGINEERS TO REVIEW

THE ROUTING.

S. ALL PENETRATIONS OF FIRE AND SMOKE RATED ASSEMBLIES SHALL BE

APPROPRIATELY FIRE STOPPED PER AN APPROVED U.L. LISTED STANDARD.

CONTRACTOR SHALL PAY PARTICULAR ATTENTION TO INSULATED PIPING

PENETRATIONS.

T. ALL WORK REQUIRING DOWNTIME OF ANY AREA IN THE BUILDING SHALL

BE SCHEDULED 2 WEEKS IN ADVANCE, AND SHALL COMPLY WITH INTERIM

LIFE SAFETY MEASURES.

U. WHERE CEILINGS ARE INDICATED ALL SPRINKLER PIPING MUST BE

INSTALLED ABOVE CEILINGS. SPRINKLER PIPING MUST BE COORDINATED

WITH OTHER TRADES. PIPING MUST BE OFFSET TO AVOID CONFLICTS

WITH DUCTWORK, CONDUIT, ALL EQUIPMENT, ETC.

V. LOCATIONS OF PIPING, DUCTS AND EQUIPMENT ARE APPROXIMATE AND

SUBJECT TO MINOR ADJUSTMENTS IN THE FIELD. DO NOT SCALE THE

DRAWINGS.

W. ALL OFFSETS IN PIPING ARE NOT NECESSARILY SHOWN. PROVIDE

ADDITIONAL OFFSETS WHERE NECESSARY.

X. COORDINATE ALL FIRE PROTECTION WORK WITH ELECTRICAL, PLUMBING

AND OTHER TRADES TO AVOID INTERFERENCE WITH PIPING, DUCTS,

CONDUIT AND OTHER EQUIPMENT.

Y. SEAL AIRTIGHT AROUND ALL PIPING PENETRATIONS THROUGH WALLS,

FLOORS AND ROOF. PROVIDE FIRE STOPPING IN FIRE PARTITION.

Z. THE CONTRACTOR SHALL RELOCATE OR AVOID ANY EXISTING EQUIPMENT

APPURTENANCES, ETC., THAT CONFLICT WITH NEW WORK.

AA. VALVES OR ANY MECHANICAL/ELECTRICAL ITEM REQUIRING ACCESS SHALL

NOT BE LOCATED ABOVE A HARD CEILING. IF THIS IS NOT POSSIBLE, THEN

AN APPROPRIATELY SIZED ACCESS DOOR SHALL BE PLACED UNDER THE

ITEM TO ALLOW EASY MAINTENANCE AND ADJUSTMENT. ADDITIONALLY ALL

SUCH ITEMS SHALL NOT BE LOCATED AN UNREASONABLE DISTANCE ABOVE

THE CEILINGS. IN GENERAL ALL SUCH ITEMS UNLESS INDICATED

OTHERWISE SHALL BE MOUNTED SIX TO TWELVE INCHES ABOVE THE

CEILING. IF IN DOUBT, CONTACT ENGINEER PRIOR TO INSTALLING.

PHASING NOTES

A. THIS PROJECT INTERFACES EXTENSIVELY WITH EXISTING BUILDING

SERVICES. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO

COORDINATE AND PHASE ALL TIE-INS AND INTERRUPTIONS OF EXISTING

SERVICES TO MINIMIZE OR ELIMINATE DOWNTIME. AS AN EXAMPLE, MAIN

GAS SERVICE, WATER SERVICE, ELECTRICAL SERVICE, HVAC SERVICES,

STEAM GENERATION, ETC., WILL BE AFFECTED AND REPLACED OR MOVED

DURING THIS PROJECT. THE CONTRACTOR SHALL INSTALL ALL NEW

SERVICES AND EQUIPMENT AND HAVE THEM TESTED AND FULLY AND

RELIABLY FUNCTIONAL PRIOR TO INTERRUPTING, RELOCATING OR

REMOVING ANY EXISTING SERVICES. IT SHALL BE THE CONTRACTOR'S

RESPONSIBILITY TO BARE ANY AND ALL COSTS ASSOCIATED WITH THIS

PHASING, INCLUDING TEMPORARY SERVICES, TEMPORARY RELOCATION,

PREMIUM TIME WORK, ETC. CONTRACTOR SHALL COORDINATE ALL SAID

WORK WITH THE OWNER AND APPLICABLE UTILITIES PER THE CONTRACT

DOCUMENTS.

HAZARDOUS MATERIALS NOTES

A. THE CONTRACTOR IT IS HEREBY ADVISED THAT IS POSSIBLE THAT

ASBESTOS AND/OR OTHER HAZARDOUS MATERIALS ARE OR WERE PRESENT

IN THIS BUILDING(S). ANY WORKER, OCCUPANT, VISITOR, ETC., WHO

ENCOUNTERS ANY MATERIAL OF WHOSE CONTENT THEY ARE NOT CERTAIN

SHALL PROMPTLY REPORT THE EXISTENCE AND LOCATION OF THAT

MATERIAL TO THE OWNER. FURTHERMORE, THE CONTRACTOR SHALL

INSURE THAT NO ONE COMES NEAR TO OR IN CONTACT WITH ANY SUCH

MATERIAL OR FUMES THEREFROM UNTIL ITS CONTENT CAN BE

ASCERTAINED TO BE NON-HAZARDOUS.

B. CMTA, INC. HAS NO EXPERTISE IN THE DETERMINATION OF THE PRESENCE

OF ANY HAZARDOUS MATERIAL. THEREFORE, NO ATTEMPT HAS BEEN

MADE BY CMTA TO IDENTIFY THE EXISTENCE OR LOCATION OF ANY SUCH

HAZARDOUS MATERIAL. FURTHERMORE, CMTA NOR ANY AFFILIATE HEREOF

WILL NOT OFFER OR MAKE ANY RECOMMENDATIONS RELATIVE TO THE

REMOVAL, HANDLING OR DISPOSAL OF SUCH MATERIAL.

C. IF THE WORK WHICH IS TO BE PERFORMED INTERFACES, CONNECTS OR

RELATES IN ANY PHYSICAL WAY WITH OR TO EXISTING COMPONENTS

WHICH CONTAIN OR BEAR ANY HAZARDOUS MATERIAL, ASBESTOS BEING

ONE, THEN IT SHALL BE THE CONTRACTOR'S SOLE RESPONSIBILITY TO

CONTACT THE OWNER AND SO ADVISE HIM/HER IMMEDIATELY.

D. THE CONTRACTOR BY EXECUTION OF THE CONTRACT FOR ANY WORK

AND/OR BY THE ACCOMPLISHMENT OF ANY WORK THEREBY AGREE TO

BRING NO CLAIM RELATIVE TO HAZARDOUS MATERIALS FOR NEGLIGENCE,

BREACH OF CONTRACT, INDEMNITY, OR ANY OTHER SUCH ITEM AGAINST

CMTA, ITS PRINCIPALS, EMPLOYEES, AGENTS OR CONSULTANTS. ALSO,

THE CONTRACTOR FURTHER AGREES TO DEFEND, INDEMNIFY AND HOLD

CMTA, ITS PRINCIPALS, EMPLOYEES, AGENTS AND CONSULTANTS

HARMLESS FROM ANY SUCH RELATED CLAIMS WHICH MAY BE BROUGHT BY

ANY SUBCONTRACTORS, SUPPLIERS OR ANY OTHER THIRD PARTIES.

E. THE CONTRACTOR IS DIRECTED TO THE SPECIFICATIONS FOR FURTHER

INFORMATION.

AREA NOT IN SCOPE

AREA NOT IN SCOPE

AREA NOT IN SCOPE

AREA NOT IN SCOPE

IT OFFICE

EXISTING

SERVER ROOM

MDF ROOM

RM 001

RM 015

RM 014

RM 013

CLEAN AGENT

CYLINDERS

RELEASING

PANEL

AREAS WITH THIS HATCH ARE TO BE PROVIDED WITH A

FK-5-1-12 CLEAN AGENT SYSTEM. EXISTING WET SPRINKLER

SYSTEM IN THESE ROOM SHALL BE REMOVED BACK TO MAINS.

AREAS WITH THIS HATCH ARE NOT IN SCOPE. EXISTING

SPRINKLER SYSTEM IN THESE AREAS TO REMAIN.

FP HATCH LEGEND

CHECKED:

DATE:

DRAWN:

F

IL

E N A M E

P

LO

T

TI

M E

CLIENT/CMTA JOB #:

C

U se rs \B

B ru e n in g \D o cu m e n ts

\O C V G

-0

M

E P R b b ru e n in g M

S A .r v t

/1

/2

:1 :4

P

M

F-001

9/25/25

BSB

MES

C V G

C E N

T R E S

E R V E R R

O O

M I

M P R O

V E M

E N

T S

C

IN

C

IN

N A T I

N

O R T H

E R N

K E N

T U

C K Y I

N T E R N

A T

IO

N A L A

IR

P O

R T

C

O M

A

IR

B L D

E R L A N

G E R K Y

F

IR

E P

R O

T E C T

IO

N F

L O

O R P

L A N

OCVG25-03

1/4" = 1'-0"F-001

FIRE PROTECTION SERVER ROOM1

REVISIONS

1 30% REVIEW 6/13/25

2 60% REVIEW 7/18/25

3 90% REVIEW 8/22/25

4 BIDDING 9/25/25

ABBREVIATIONSGENERAL NOTES - MECHANICAL

1. THE CONTRACTOR'S ATTENTION IS DIRECTED TO THE GENERAL AND SPECIAL CONDITIONS,

"GENERAL CONDITIONS - MECHANICAL" OF THE PROJECT SPECIFICATIONS AND TO ALL OTHER

CONTRACT DOCUMENTS AS THEY APPLY TO THIS BRANCH OF WORK. ATTENTION IS ALSO

DIRECTED TO ALL OTHER SECTIONS OF THE CONTRACT DOCUMENTS WHICH AFFECTS THE

WORK AND WHICH ARE HEREBY MADE A PART OF THE WORK SPECIFIED.

2. ALL MANUFACTURERS, SUPPLIERS, FABRICATORS, CONTRACTORS, ETC. SUBMITTING PROPOSALS

FOR ANY PART OF THE WORK, SERVICES, MATERIALS OR EQUIPMENT TO BE USED ON OR

APPLIED TO THIS PROJECT ARE HEREBY DIRECTED TO FAMILIARIZE THEMSELVES WITH THE

CONTRACT DOCUMENTS. IN CASE OF CONFLICTS, THE CONTRACTOR SHALL CONTACT THE

ENGINEER FOR CLARIFICATION AND FINAL DETERMINATION PRIOR TO THE BID.

3. THE WORK SHALL CONSIST OF FURNISHING ALL LABOR, EQUIPMENT, TRANSPORTATION,

SUPPLIES, MATERIALS, APPURTENANCES AND SERVICES NECESSARY FOR THE SATISFACTORY

INSTALLATION OF THE COMPLETE AND OPERATING SYSTEMS INDICATED OR SPECIFIED IN THE

CONTRACT DOCUMENTS.

4. ANY MATERIALS, LABOR, EQUIPMENT OR SERVICES NOT MENTIONED SPECIFICALLY HEREIN

WHICH MAY BE NECESSARY TO COMPLETE ANY PART OF THE SYSTEMS IN A SUBSTANTIAL

MANNER, IN COMPLIANCE WITH THE REQUIREMENTS STATED, IMPLIED OR INTENDED IN THE

PLANS AND SPECIFICATIONS, SHALL BE INCLUDED IN THE BID AS PART OF THE CONTRACT.

5. THE ENGINEER DOES NOT DEFINE THE SCOPE OF INDIVIDUAL TRADES, SUBCONTRACTORS,

MATERIAL SUPPLIERS AND VENDORS. ANY SHEET NUMBERING OR SPECIFICATION NUMBERING

SYSTEM USED WHICH IDENTIFIES DISCIPLINES IS SOLELY FOR THE ENGINEER'S CONVENIENCE

AND IS NOT INTENDED TO DEFINE A SUBCONTRACTOR'S SCOPE OF WORK. INFORMATION

REGARDING INDIVIDUAL TRADES, SUBCONTRACTORS, MATERIAL SUPPLIERS AND VENDORS MAY

BE DETAILED, DESCRIBED AND INDICATED AT DIFFERENT LOCATIONS THROUGHOUT THE

CONTRACT DOCUMENTS. NO CONSIDERATION WILL BE GIVEN TO REQUESTS FOR CHANGE

ORDERS FOR FAILURE TO OBTAIN AND REVIEW THE COMPLETE SET OF CONTRACT DOCUMENTS

WHEN PREPARING BIDS, PRICES AND QUOTATIONS. UNLESS STATED OTHERWISE, THE

SUBDIVISION AND ASSIGNMENT OF WORK UNDER THE VARIOUS SECTIONS SHALL BE THE

RESPONSIBILITY OF THE CONTRACTOR HOLDING THE PRIME CONTRACT.

6. IT IS THE INTENTION OF THE CONTRACT DOCUMENTS TO CALL FOR A COMPLETE AND

OPERATIONAL SYSTEM, INCLUDING ALL COMPONENTS, ACCESSORIES, FINISH WORK, ETC

NECESSARY FOR TROUBLE FREE OPERATION; TESTED AND READY FOR OPERATION. ANYTHING

THAT MAY BE REQUIRED, IMPLIED, OR INFERRED BY THE CONTRACT DOCUMENTS SHALL BE

PROVIDED AND INCLUDED AS PART OF THE BID.

7. ALL CONTRACTORS AND VENDORS PROVIDING A BID FOR THIS PROJECT SHALL REVIEW THE

PLANS AND SPECIFICATIONS AND DETERMINE ANY MODIFICATIONS AND/OR ADJUSTMENTS

NECESSARY RELATIVE TO THE PROPOSED EQUIPMENT AND MATERIALS WITH SPECIFIC

MANUFACTURER'S INSTALLATION REQUIREMENTS. INCLUDE IN THE BID ANY NECESSARY

METHODS, FEATURES, OPTIONS, ACCESSORIES, ETC. NECESSARY TO INSTALL THE PROPOSED

EQUIPMENT AND MATERIALS, REGARDLESS OF WHETHER USED AS BASIS OF DESIGN OR BEING

OFFERED AS A SUBSTITUTION, IN ACCORDANCE WITH THE SPECIFIC MANUFACTURER'S

INSTALLATION REQUIREMENTS, WHETHER SPECIFICALLY DETAILED OR NOT, WITHIN THE PLANS

AND SPECIFICATIONS.

8. THE BIDDER/PROPOSER SHALL COMPLETELY REVIEW THE CONTRACT DOCUMENTS. ANY

INTERPRETATION AS TO DESIGN INTENT OR SCOPE SHALL BE PROVIDED BY THE ENGINEER.

SHOULD ANY INTERPRETATION BE REQUIRED, THE BIDDER/PROPOSER SHALL REQUEST A

CLARIFICATION NOT LESS THAN TEN (10) DAYS PRIOR TO THE SUBMISSION OF THE BID SO

THAT THE CONDITION MAY BE CLARIFIED BY ADDENDUM. IN THE EVENT OF ANY CONFLICT,

DISCREPANCY, OR INCONSISTENCY DEVELOPS; THE INTERPRETATION OF THE ENGINEER SHALL

BE FINAL.

9. THE CONTRACTOR SHALL PROVIDE LAYOUT CONFIRMATION OF EQUIPMENT LOCATIONS TO

VERIFY THAT ALL COMPONENTS WILL FIT IN THE PROPOSED SPACE AND HAVE ADEQUATE

CLEARANCE FOR SERVICES. COORDINATE THE LOCATION OF DRAINS, CONNECTIONS, ETC.

PRIOR TO COMMENCING INSTALLATION. WORK NOT SO COORDINATED SHALL BE REMOVED AND

PROPERLY INSTALLED AT THE EXPENSE OF THE RESPONSIBLE CONTRACTOR(S).

10. EQUIPMENT AND MATERIALS SUBSTITUTIONS OR DEVIATIONS SHALL COMPLY WITH "GENERAL

PROVISIONS - MECHANICAL PART 6." ANY VENDOR WISHING TO OBTAIN AN EQUIPMENT

SUBSTITUTION SHALL REQUEST A CLARIFICATION NOT LESS THAN TEN (10) DAYS PRIOR TO THE

SUBMISSION OF THE PROPOSAL SO THAT IT MAY BE CONSIDERED AND POTENTIALLY INCLUDED

BY ADDENDUM. REQUESTS MADE AFTER THIS PERIOD WILL BE REJECTED.

11. CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLIANCE REGARDLESS IF CONTRACTOR IS

IGNORANT OF CODES, RULES, REGULATIONS, LAWS, ETC. THE CONTRACTOR SHALL ALSO BE

VERSED IN ALL CODES, RULES, REGULATIONS, LAWS, ETC. PERTINENT TO THEIR PART OF THE

WORK PRIOR TO SUBMISSION OF THE PROPOSAL.

12. ALL WARRANTIES SHALL BEGIN STARTING AT THE PROJECT'S SUBSTANTIAL COMPLETION DATE.

ALL EQUIPMENT, MATERIAL AND LABOR WARRANTIES SHALL BE FURNISHED BY THE EQUIPMENT

SUPPLIER/VENDOR.

13. WHEREVER WORK PENETRATES ROOFING, IT SHALL BE DONE IN A MANNER THAT WILL NOT

DIMINISH OR VOID THE ROOFING GUARANTEE OR WARRANTY IN ANY WAY. COORDINATE ALL

SUCH WORK WITH THE ROOFING INSTALLER.

14. DUCTWORK, PIPING AND EQUIPMENT SHALL BE KEPT CLEAN AT ALL TIMES. DUCTWORK STORED

ON THE JOB SITE SHALL BE PLACED A MINIMUM OF 4" ABOVE THE FLOOR AND BE COMPLETELY

COVERED IN PLASTIC. INSTALLED DUCTWORK SHALL BE PROTECTED WITH PLASTIC. DO NOT

INSTALL THE DUCTWORK OR INSULATION (PIPE OR DUCT) IF THE BUILDING IS NOT "DRIED-IN".

IF THIS IS REQUIRED, THE ENTIRE LENGTHS SHALL BE COVERED IN PLASTIC TO PROTECT. THE

OWNER/ENGINEER SHALL PERIODICALLY INSPECT THAT THESE PROCEDURES ARE FOLLOWED. IF

DEEMED UNACCEPTABLE, THE CONTRACTOR SHALL BE REQUIRED TO CLEAN THE DUCT SYSTEM

UTILIZING A NADCA CERTIFIED CONTRACTOR.

15. THE PERMANENT SYSTEMS, WHEN INSTALLED, MAY BE USED FOR TEMPORARY SERVICES WITH

THE CONSENT OF THE ENGINEER AND IN STRICT ACCORDANCE WITH "GENERAL PROVISIONS -

MECHANICAL - TEMPORARY USE OF EQUIPMENT."

16. THE CONTRACTOR AND THEIR SUBCONTRACTORS SHALL INCLUDE IN THE BID TO PROVIDE

EQUIPMENT AND CONTROLS STARTUP AND VERIFICATION FOR ALL MECHANICAL SYSTEMS

SPECIFIED FOR THIS PROJECT AND IN STRICT ACCORDANCE WITH "GENERAL PROVISIONS -

MECHANICAL - EQUIPMENT/CONTROLS STARTUP & VERIFICATION."

17. THE CONTRACTOR SHALL DETERMINE FROM THE CONTRACT DOCUMENTS, THE DATE OF

COMPLETION FOR THE PROJECT AND INSURE THAT EQUIPMENT DELIVERY SCHEDULES CAN BE

MET SO AS TO ALLOW THIS COMPLETION TO BE MET.

18. THROUGH COORDINATION WITH OTHER CONTRACTORS, VENDORS, AND SUPPLIERS ASSOCIATED

WITH THIS PROJECT, THIS CONTRACTOR SHALL INSURE, 100% FUNCTIONAL, TESTED,

INSPECTED AND APPROVED SYSTEMS. CLAIMS FOR ADDITIONAL COST OR CHANGE ORDERS

WILL BE REJECTED.

19. PRIOR TO ORDERING ANY MATERIALS OR ROUGH-IN OF ANY KIND, THE MECHANICAL

CONTRACTOR SHALL BE RESPONSIBLE FOR FINAL COORDINATION OF ALL ELECTRICAL

REQUIREMENTS (I.E. VOLTAGE, PHASE, CIRCUIT BREAKER, WIRE SIZING, ETC.) WITH THE

ELECTRICAL CONTRACTOR. THERE WILL BE NO CHANGE IN THE CONTRACT AMOUNT FOR ANY

DISCREPANCIES.

20. ALL OFFSETS, TURNS, FITTINGS, TRIM, DETAIL, ETC., MAY NOT BE INDICATED, BUT SHALL BE

PROVIDED AS REQUIRED. ADDITIONAL ALLOWANCES SHALL BE INCLUDED FOR SAME AT EACH

PROPOSERS' DISCRETION.

21. DO NOT SCALE FROM DRAWINGS, PRINTING DISTORTS SCALE. WORK SHALL BE LAID OUT FROM

CONTRACTOR GENERATED DIMENSIONED DRAWINGS.

22. THE CONTRACTOR SHALL ENSURE PROPER COORDINATION BETWEEN ALL TRADES SUCH THAT

CONDUITS, PIPING, DUCTWORK, ETC, DOES NOT BLOCK ACCESS TO VALVES, EQUIPMENT, DUCT

ACCESS DOORS, ETC. ITEMS THAT HAVE BEEN INSTALLED WHERE ACCESS IS COMPROMISED

SHALL BE RELOCATED AT THE CONTRACTOR'S EXPENSE.

23. THESE DRAWINGS ARE ACCURATE TO THE BEST OF OUR KNOWLEDGE, HOWEVER LOCATIONS

AND SIZES WERE TAKEN FROM DIFFERENT SOURCES AND ARE SUBJECT TO DEVIATION. THE

CONTRACTOR SHALL ASSUME SOME DEVIATIONS AND INCLUDE OFFSETS, ADDITIONAL PIPING,

ETC. AT THE TIME OF BID.

24. THIS CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING AND PATCHING REQUIRED FOR

THEIR WORK. ALL CUTTING AND PATCHING SHALL MATCH ADJACENT SURFACES AND

PERFORMED BY SKILLED WORKERS OF THE TRADE. REFER TO SPECIFICATION SECTION

"SLEEVING, CUTTING, PATCHING, REPAIRING, ETC." AND ARCHITECTURAL DRAWINGS FOR

ADDITIONAL INFORMATION.

25. ALL SUPPORTS FOR EQUIPMENT, DEVICES OR FIXTURES SHALL BE UNIQUE, FROM THE BUILDING

STRUCTURE. DO NOT SUPPORT WORK FROM OTHER TRADES, EQUIPMENT OR SUPPORTS

WITHOUT WRITTEN PERMISSION FROM THE ENGINEER AND CONSENT OF THE OTHER TRADE, IN

WRITING.

26. PRIOR TO PURCHASE OR FABRICATION OF PIPING, THE CONTRACTOR SHALL COORDINATE

INSTALLATION WITH ACTUAL CONDITIONS AND INSTALL ACCORDINGLY.

27. VALVES, BALANCING DAMPERS OR ANY MECHANICAL/ELECTRICAL ITEM SHALL NOT BE LOCATED

ABOVE A HARD CEILING. IF THIS IS NOT POSSIBLE, THEN AN APPROPRIATELY SIZED ACCESS

DOOR SHALL BE PLACED AT NO ADDITIONAL COST UNDER THE ITEM WHETHER SHOWN OR NOT

ON THE PLANS TO ALLOW ACCESS AND ADJUSTMENT.

28. THE CONTRACTOR SHALL VISIT THE SITE FOR EXACT LOCATIONS OF ALL WALL AND CEILING

DEVICES. THIS SHALL INCLUDE PLUMBING FIXTURES, CEILING GRILLES AND DIFFUSERS, ETC.

29. CONTRACTOR SHALL CLEAN UP CONSTRUCTION DEBRIS AT ALL TIMES DURING CONSTRUCTION.

TAGGED NOTE DESIGNATOR

GENERAL SYMBOLS

X REVISION TRIANGLE

ROOM NAME

RM # ROOM TAG

AFF ABOVE FINISHED FLOOR

AFR ABOVE FINISHED ROOF

ADJ ADJUSTABLE

APD AIR PRESSURE DROP

HVAC LEGEND

SUPPLY AIR DIFFUSER

TRANSFER AIR GRILLE W/ SOUND ATTENUATING BOOT

POINT OF CONNECTION / CONNECT TO EXISTING

POINT OF DEMOLITION

SIDEWALL DIFFUSER/GRILLE

RETURN AIR GRILLE

EXHAUST AIR DIFFUSER

MECHANICAL PIPING LEGEND

AIR DEVICE TAG (REGISTER, GRILLE, DIFFUSER,LOUVER)

AIRFLOW

TAG

SA AIR DUCT TURNING UP

SA AIR DUCT TURNING DOWN

SUPPLY AIR DUCT

RETURN AIR DUCT

EXHAUST AIR DUCT

OUTSIDE AIR DUCT

TRANSFER AIR DUCT

COMBUSTION AIR EXHAUST DUCT

COMBUSTION AIR INTAKE DUCT

RA AIR DUCT TURNING UP

RA AIR DUCT TURNING DOWN

EA AIR DUCT TURNING UP

EA AIR DUCT TURNING DOWN

DUCT TO BE DEMOLISHED - (XXX) DENOTES SYSTEM

EXISTING DUCT - (XXX) DENOTES SYSTEM

RA

SA

EA

OA

TA

CAE

CAI

SA

SA

RA

RA

EA

EA

D(XXX)

E(XXX)

DUCT TO BE ABANDONED IN PLACE - (XXX) DENOTES SYSTEMA(XXX)

RECTANGULAR DUCT

ROUND/SPIRAL DUCT

FLAT OVAL DUCT

#ø

##x##

PIPE ELBOW TURNING DOWN

PIPE ELBOW TURNING UP

PIPE TEE; CONNECTION ON BOTTOM

PIPE TEE; CONNECTION ON TOP

EXISTING PIPING - (XXX) DENOTES SYSTEM

PIPING TO BE DEMOLISHED - (XXX) DENOTES SYSTEMD(XXX)

E(XXX)

CONDENSATE DRAINCD

CHILLED WATER SUPPLY/RETURNCHWS/R

GLYCOL WATER SUPPLY/RETURN

HEAT PUMP WATER SUPPLY/RETURN

GS/R

HPS/R

CONDENSER WATER SUPPLY/RETURN

DUAL TEMP. WATER SUPPLY/RETURN

CWS/R

DTS/R

HIGH PRESSURE STEAM CONDENSATEHPC

HIGH PRESSURE STEAM; (#) DENOTES PRESSUREHPS(#)

LOW PRESSURE STEAM; (#) DENOTES PRESSURE

LOW PRESSURE STEAM CONDENSATE

LPS(#)

LPC

HEATING WATER SUPPLY/RETURNHWS/R

MPS(#) MEDIUM PRESSURE STEAM; (#) DENOTES PRESSURE

MEDIUM PRESSURE STEAM RETURNMPC

HEAT RECOVERY SUPPLY/RETURN PIPINGHRS/R

MAKEUP WATERMW

PIPE CAP

FLEXIBLE DUCT

THERMOSTAT

TS

T

C

TEMPERATURE SENSOR

CARBON DIOXIDE SENSOR

TC TEMPERATURE & CARBON DIOXIDE SENSOR

MANUAL BALANCING/VOLUME DAMPER

MOTORIZED DAMPER

H HUMIDITY SENSOR

VERT. HORIZ.

VERT. HORIZ.

MITERED ELBOW WITH TURNING VANES

EQUIPMENT TAG

BAS BUILDING AUTOMATION SYSTEM

AVG AVERAGE

BHP BREAK HORSEPOWER

CAV CONSTANT AIR VOLUME

BTU BRITISH THERMAL UNIT

CFM CUBIC FEET PER MINUTE

CO CARBON MONOXIDE

CO2 CARBON DIOXIDE

DB DRY BULB

ABBREVIATIONS (CONTINUED)

FIRE PROTECTION CONTRACTORFPC

FEET PER MINUTEFPM

FEET PER SECONDFPS

GALLON (-S)GAL

GENERAL CONTRACTORGC

GALLONS PER MINUTEGPM

GRAINSGR

HEADHD

H (-ORSEPOWER, -EAT PUMP)HP

KILOWATTkW

LEAVING AIR TEMPERATURELAT

LEAVING WATER TEMPERATURELWT

BTU PER HOUR [THOUSANDS]MBH

MINIMUM CIRCUIT AMPSMCA

MANUFACTURERMFG

MAXIMUM OVERCURRENT PROTECTION [AMPS]MOCP

ID I (-DENTIFICATION, -NSIDE DIAMETER, -NSIDE DIMENSION)

FIRE DAMPERFD

FULL LOAD AMPSFLA

NOISE CRITERIA OR NORMALLY CLOSEDNC

NORMALLY OPEN OR NUMBERNO

NOT TO SCALENTS

OUTSIDE DI (-AMETER, -MENSION)OD

OWNER FURNISHED, CONTRACTOR INSTALLEDOFCI

OWNER FURNISHED, OWNER INSTALLEDOFOI

PLUMBING CONTRACTORPC

PHASE [ELECTRICAL]PH

PARTS PER MILLIONPPM

PRESSURE DROPPD

PRESSURE REDUCING STATIONPRS

PRESSURE REDUCING VALVE (STEAM, WATER, GAS)PRV

POUNDS PER SQUARE INCHPSI

POUNDS PER SQUARE FOOTPSF

PSI GAUGEPSIG

RELATIVE HUMIDITY [%]RH

REVOLUTIONS PER MINUTERPM

SMOKE DAMPERSD

STATIC PRESSURESP

SQUARE FEET OR FOOTSQ FT

TYPICALTYP

UNLESS NOTED OTHERWISEUNO

TOTAL STATIC PRESSURETSP

VOLT (-AGE, -S)V

VARI (-ABLE, -IES)VAR

VARIABLE AIR VOLUMEVAV

VELOCITYVEL

VARIABLE FEQUENCY DRIVEVFD

WATT (-AGE, -S)W

WET BULBWB

WATER PRESSURE DROPWPD

DIFFERENTIAL PRESSUREΔP

TEMPERATURE DIFFERENCEΔT

℄ CENTERLINE

NOTE: NOT ALL SYMBOLS AND ABBREVIATIONS MAY BE USED ON THIS PROJECT

DDC DIRECT DIGITAL CONTROLS

DN DOWN

EAT ENTERING AIR TEMPERATURE

EC ELECTRICAL CONTRACTOR

EWT ENTERING WATER TEMPERATURE

ESP EXTERNAL STATIC PRESSURE

ETR EXISTING TO REMAIN

FREE AREAFA

GENERAL NOTES - DEMOLITION

A. THE CONTRACTOR SHALL REFER TO THE ARCHITECTURAL PLANS FOR AREAS IN WHICH THE

CEILING IS REMAINING. THE CONTRACTOR IS RESPONSIBLE FOR REMOVING THE EXISTING

CEILING AS REQUIRED AND REINSTALLATION. TEMPORARILY SUPPORT LIGHTS, DIFFUSERS,

CEILING ETC. REPLACE BROKEN CEILING TILES WITH NEW AT NO ADDITIONAL COST TO OWNER.

FIELED VERIFY EXACT REQUIREMENTS.

B. ALL OUTAGES SHALL BE SCHEDULED THROUGH THE PROJECT REPRESENTATIVE FOR PROPER

COORDINATION. A REQUEST FOR AN OUTAGE SHALL BE SUBMITTED IN WRITING A MINIMUM OF

TWO WEEKS IN ADVANCE.

C. DURING SPRINKLER SYSTEM OUTAGES THE CONTRACTORS SHALL PROVIDE FIRE WATCH OF

AREAS WITH OUTAGES.

D. ALL WALLS AND FLOOR SLABS SHALL BE REPAIRED TO MATCH EXISTING AND TO A LIKE NEW

CONDITION. ALL RATED WALLS AND FLOOR SLABS SHALL BE PATCHED AND REPAIRED TO

MAINTAIN RATING.

E. ALL EXISTING BUILDING FINISHES SHALL BE PROTECTED DURING THE DEMOLITION PHASE.

F. HEAVY DASHED LINES INDICATE ITEMS FOR REMOVAL (U.O.N) AND LIGHT SOLID LINES INDICATE

EXISTING ITEMS TO REMAIN.

G. COORDINATE DISPOSAL OF ALL FIXTURES, DEVICES, ETC. (INDICATED FOR DEMOLITION) WITH

THE OWNER.

PHASING NOTES

A. THIS PROJECT INTERFACES EXTENSIVELY WITH EXISTING BUILDING SERVICES. IT SHALL BE

THE CONTRACTOR'S RESPONSIBILITY TO COORDINATE AND PHASE ALL TIE-INS AND

INTERRUPTIONS OF EXISTING SERVICES TO MINIMIZE OR ELIMINATE DOWNTIME. AS AN

EXAMPLE, MAIN GAS SERVICE, WATER SERVICE, ELECTRICAL SERVICE, HVAC SERVICES, STEAM

GENERATION, ETC., WILL BE AFFECTED AND REPLACED OR MOVED DURING THIS PROJECT. THE

CONTRACTOR SHALL INSTALL ALL NEW SERVICES AND EQUIPMENT AND HAVE THEM TESTED

AND FULLY AND RELIABLY FUNCTIONAL PRIOR TO INTERRUPTING, RELOCATING OR REMOVING

ANY EXISTING SERVICES. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO BARE ANY

AND ALL COSTS ASSOCIATED WITH THIS PHASING, INCLUDING TEMPORARY SERVICES,

TEMPORARY RELOCATION, PREMIUM TIME WORK, ETC. CONTRACTOR SHALL COORDINATE ALL

SAID WORK WITH THE OWNER AND APPLICABLE UTILITIES PER THE CONTRACT DOCUMENTS.

HAZARDOUS MATERIALS NOTES

A. THE CONTRACTOR IT IS HEREBY ADVISED THAT IS POSSIBLE THAT ASBESTOS AND/OR OTHER

HAZARDOUS MATERIALS ARE OR WERE PRESENT IN THIS BUILDING(S). ANY WORKER,

OCCUPANT, VISITOR, ETC., WHO ENCOUNTERS ANY MATERIAL OF WHOSE CONTENT THEY ARE

NOT CERTAIN SHALL PROMPTLY REPORT THE EXISTENCE AND LOCATION OF THAT MATERIAL

TO THE OWNER. FURTHERMORE, THE CONTRACTOR SHALL INSURE THAT NO ONE COMES

NEAR TO OR IN CONTACT WITH ANY SUCH MATERIAL OR FUMES THEREFROM UNTIL ITS

CONTENT CAN BE ASCERTAINED TO BE NON-HAZARDOUS.

B. CMTA, INC. HAS NO EXPERTISE IN THE DETERMINATION OF THE PRESENCE OF ANY

HAZARDOUS MATERIAL. THEREFORE, NO ATTEMPT HAS BEEN MADE BY CMTA TO IDENTIFY

THE EXISTENCE OR LOCATION OF ANY SUCH HAZARDOUS MATERIAL. FURTHERMORE, CMTA

NOR ANY AFFILIATE HEREOF WILL NOT OFFER OR MAKE ANY RECOMMENDATIONS RELATIVE

TO THE REMOVAL, HANDLING OR DISPOSAL OF SUCH MATERIAL.

C. IF THE WORK WHICH IS TO BE PERFORMED INTERFACES, CONNECTS OR RELATES IN ANY

PHYSICAL WAY WITH OR TO EXISTING COMPONENTS WHICH CONTAIN OR BEAR ANY

HAZARDOUS MATERIAL, ASBESTOS BEING ONE, THEN IT SHALL BE THE CONTRACTOR'S SOLE

RESPONSIBILITY TO CONTACT THE OWNER AND SO ADVISE HIM/HER IMMEDIATELY.

D. THE CONTRACTOR BY EXECUTION OF THE CONTRACT FOR ANY WORK AND/OR BY THE

ACCOMPLISHMENT OF ANY WORK THEREBY AGREE TO BRING NO CLAIM RELATIVE TO

HAZARDOUS MATERIALS FOR NEGLIGENCE, BREACH OF CONTRACT, INDEMNITY, OR ANY

OTHER SUCH ITEM AGAINST CMTA, ITS PRINCIPALS, EMPLOYEES, AGENTS OR CONSULTANTS.

ALSO, THE CONTRACTOR FURTHER AGREES TO DEFEND, INDEMNIFY AND HOLD CMTA, ITS

PRINCIPALS, EMPLOYEES, AGENTS AND CONSULTANTS HARMLESS FROM ANY SUCH RELATED

CLAIMS WHICH MAY BE BROUGHT BY ANY SUBCONTRACTORS, SUPPLIERS OR ANY OTHER

THIRD PARTIES.

E. THE CONTRACTOR IS DIRECTED TO THE SPECIFICATIONS FOR FURTHER INFORMATION.

XXX-X

FSD FIRE SMOKE DAMPER

CHECKED:

DATE:

DRAWN:

F

IL

E N A M E

P L O T

T

IM

E

2429 Members Way

Lexington, KY 40504

T: 859 253.0892 F: 859 231.8357

CLIENT/CMTA JOB #:

C

U se rs \C

M cC o n n e ll\

D o cu m e n ts

\O C V G

-0

M

E P R C M cC o n n e ll4

L .r v t

/1

/2

:1 :4

P

M

M-000

9/25/25

C.MCCONNELL

T.ANDERSON

C V G

C E N

T R

E S

E R

V E R R

O O

M I

M P R

O V E M

E N

T S

C

IN

C

IN

N A T I

N

O R

T H

E R

N K

E N

T U

C K Y I

N T E R N

A T

IO

N A L A

IR

P O

R T

C

O M

A

IR

B L D

E R L A N

G E R K Y

M E C H

A N

IC

A L L

E G

E N

D

OCVG25-03

REVISIONS

1 30% REVIEW 6/13/25

2 60% REVIEW 7/18/25

AREA B

(LOWER LEVEL)

AREA A

(LOWER LEVEL)

ROOFTOP

EQUIPMENT

(FIRST LEVEL)

CHECKED:

DATE:

DRAWN:

F

IL

E N A M E

P L O T

T

IM

E

2429 Members Way

Lexington, KY 40504

T: 859 253.0892 F: 859 231.8357

CLIENT/CMTA JOB #:

C

U se rs \C

M cC o n n e ll\

D o cu m e n ts

\O C V G

-0

M

E P R C M cC o n n e ll4

L .r v t

/1

/2

:1 :4

P

M

M-001

9/25/25

C.MCCONNELL

T.ANDERSON

C V G

C E N

T R

E S

E R

V E R R

O O

M I

M P R

O V E M

E N

T S

C

IN

C

IN

N A T I

N

O R

T H

E R

N K

E N

T U

C K Y I

N T E R N

A T

IO

N A L A

IR

P O

R T

C

O M

A

IR

B L D

E R L A N

G E R

M E C H

A N

IC

A L A

R E A S O

F W

O R

K

OCVG25-03

REVISIONS

1 30% REVIEW 6/13/25

2 60% REVIEW 7/18/25

3 90% REVIEW 8/22/25

4 BIDDING 9/25/25

1/16" = 1'-0"M-001

FIRST FLOOR AREAS OF WORK1

1/16" = 1'-0"M-001

ROOFTOP AREAS OF WORK2

xxx

485.94 sf

I.T. Data Room xxx

485.94 sf

STAIRS

EXISTING

CO-LOCATESERVER

ROOM

CVGSERVER

ROOM

AREA NOT IN SCOPE

AREA NOT IN SCOPE

AREA NOT IN SCOPE

AREA NOT IN SCOPE

IT OFFICE

MDF ROOM

RM 001

RM 015

RM 014

RM 013

AC-4

(EX.)

AC-3

(EX.)

2 1/2" E(GS)

2 1/2" E(GR)

1/2" E(MW)

6" E

(H W

R

6" E

(H W

S

8" E

(C H

W R

8" E

(C H

W S

4" E(GR)

4" E(GS)

AC-1

(EX)

AC-2

(EX)

3/4" CD 3/4" CD

1/

2" G

R

1/

2" G

S 1/

2" M

W

2 1/2" GS

2 1/2" GR

1/2" MW

M4

1 1/2" E(GS)

1 1/2" E(GR)

1 1/2" E(GS)

1 1/2" E(GR)

M6

M6

AREA A

(LOWER LEVEL)

CHECKED:

DATE:

DRAWN:

F

IL

E N A M E

P

LO

T

TI

M E

CLIENT/CMTA JOB #:

C

U se rs \C

M cC o n n e ll\

D o cu m e n ts

\O C V G

-0

M

E P R C M cC o n n e ll4

L .r v t

/1

/2

:1 :4

P

M

M-100

9/25/25

C.MCCONNELL

T.ANDERSON

C V G

C E N

T R

E S

E R

V E R R

O O

M I

M P R

O V E M

E N

T S

C

IN

C

IN

N A T I

N

O R

T H

E R

N K

E N

T U

C K Y I

N T E R N

A T

IO

N A L A

IR

P O

R T

C

O M

A

IR

B L D

E R L A N

G E R

A R

E A A

M E C H

A N

IC

A L D

E M

O L

IT

IO

N

P L A N

OCVG25-03

REVISIONS

1 30% REVIEW 6/13/25

2 60% REVIEW 7/18/25

3 90% REVIEW 8/22/25

4 BIDDING 9/25/25

TAGGED NOTES

M4 IN BID ALTERNATE, THIS GLYCOL PIPING MAIN IS TO BE

DEMOLISHED IN ITS TOTALITY AND REPLACED WITH THE NEW

PIPING. THE EXISTING BRANCH PIPING SERVING AC-1 AND

AC-2 SHALL BE REUSED AND RECONNECTED TO THE NEW

PIPING MAIN.

M6 DEMOLISH EXISTING AIR CONDITIONING UNITS. THIS SHALL

INCLUDE ALL ELECTRICAL AND WIRING CONNECTIONS AND

RAISED FLOOR SUPPORTS. ALL PIPING TO BE DEMOLISHED

BACK TO THE POINT OF DEMOLITION SHOWN.

1/4" = 1'-0"M-100

AREA A MECHANICAL DEMOLITION1

CAFE

CONFERENCE

ROOM

STAIRS

SYSTEM OPERATIONS

CONTROL CENTER

ELEVATOR

EXERCISE ROOM

4" E(GR)

4" E(GS)

4" GR UP4" GS UP

ALL WORK HAPPENING BEYOND THIS

POINT IN TENET SPACE MUST BE

COORDINATED WITH TENET IN ADVANCE

AND COMPLETED WITH ESCORT.

M4

M7

AREA B

(LOWER LEVEL)

CHECKED:

DATE:

DRAWN:

F

IL

E N A M E

P L O T

T

IM

E

CLIENT/CMTA JOB #:

C

U se rs \C

M cC o n n e ll\

D o cu m e n ts

\O C V G

-0

M

E P R C M cC o n n e ll4

L .r v t

/1

/2

:1 :4

P

M

M-101

9/25/25

C.MCCONNELL

T.ANDERSON

C V G

C E N

T R

E S

E R

V E R R

O O

M I

M P R

O V E M

E N

T S

C

IN

C

IN

N A T I

N

O R

T H

E R

N K

E N

T U

C K Y I

N T E R N

A T

IO

N A L A

IR

P O

R T

C

O M

A

IR

B L D

E R L A N

G E R

A R

E A B

M E C H

A N

IC

A L D

E M

O L

IT

IO

N

P L A N

OCVG25-03

TAGGED NOTES

M4 IN BID ALTERNATE, THIS GLYCOL PIPING MAIN IS TO BE

DEMOLISHED IN ITS TOTALITY AND REPLACED WITH THE NEW

PIPING. THE EXISTING BRANCH PIPING SERVING AC-1 AND

AC-2 SHALL BE REUSED AND RECONNECTED TO THE NEW

PIPING MAIN.

M7 ALL PIPING AND SUPPORTS ABOVE TENET SPACE TO BE

DEMOLISHED FROM THE POINT SHOWN TO THE EQUIPMENT

ON THE ROOF. ALL DEMOLITION WORK IS TO BE

COORDINATED WITH THE TENET TO ENSURE THAT CRITICAL

OPERATIONS ARE NOT DISRUPTED.

REVISIONS

1 30% REVIEW 6/13/25

2 60% REVIEW 7/18/25

DC-1

(EX)

DC-2

(EX)

P-1 (EX) 4" GR DN

4" GS DN

M8

ROOFTOP

(FIRST LEVEL)

CHECKED:

DATE:

DRAWN:

F

IL

E N A M E

P L O T

T

IM

E

CLIENT/CMTA JOB #:

C

U se rs \C

M cC o n n e ll\

D o cu m e n ts

\O C V G

-0

M

E P R C M cC o n n e ll4

L .r v t

/1

/2

:1 :4

P

M

M-102

9/25/25

C.MCCONNELL

T.ANDERSON

C V G

C E N

T R

E S

E R

V E R R

O O

M I

M P R

O V E M

E N

T S

C

IN

C

IN

N A T I

N

O R

T H

E R

N K

E N

T U

C K Y I

N T E R N

A T

IO

N A L A

IR

P O

R T

C

O M

A

IR

B L D

E R L A N

G E R

R O

O F M

E C H

A N

IC

A L D

E M

O L

IT

IO

N

P L A N

OCVG25-03

TAGGED NOTES

M8 THE EXISTING EQUIPMENT ON ROOF ASSOCIATED WITH THE

GLYCOL COOLING SYSTEM TO BE DEMOLISHED AND

REMOVED. THIS SHALL INCLUDE ALL ELECTRICAL

CONNECTIONS, WIRING, AND SUPPORTS. THE EXISTING

PIPING CURB THROUGH ROOF TO BE SEALED WITH AN

INSULATED CAP THAT IS WATERTIGHT.

REVISIONS

1 30% REVIEW 6/13/25

2 60% REVIEW 7/18/25

3 90% REVIEW 8/22/25

4 BIDDING 9/25/25

1/4" = 1'-0"M-102

ROOF MECHANICAL DEMOLITION1

xxx

485.94 sf

I.T. Data Room xxx

485.94 sf

STAIRS

EXISTING

CO-LOCATESERVER

ROOM

CVGSERVER

ROOM

AREA NOT IN SCOPE

AREA NOT IN SCOPE

AREA NOT IN SCOPE

AREA NOT IN SCOPE

IT OFFICE

RM 001

RM 015

AC-3 AC-4 AC-5 AC-6

4" GS

4" GR

8" CHWS

8" CHWR

6" HWS

6" HWR

AC-1

(EX)

AC-2

(EX)

3/4" CD 3/4" CD 3/4" CD

1/2" E(MW)

RM 014

3" GS

3" GR

3" GS

3" GR

2 1/2" GS

2 1/2" GR

1/2" MW1/2" MW

1/2" MW

4" E(GR)

4" E(GS)

M4

1 1/2" E(GS)

1 1/2" E(GR)

1 1/2" E(GR)

1 1/2" E(GS)

REPLACE DEMOLISHED AIR

CONDITIONING UNITS WITH RAISED

FLOOR SYSTEM IN THIS LOCATION

REPLACE DEMOLISHED AIR

CONDITIONING UNITS WITH RAISED

FLOOR SYSTEM IN THIS LOCATION

AREA A

(LOWER LEVEL)

CHECKED:

DATE:

DRAWN:

F

IL

E N A M E

P

LO

T

TI

M E

CLIENT/CMTA JOB #:

C

U se rs \C

M cC o n n e ll\

D o cu m e n ts

\O C V G

-0

M

E P R C M cC o n n e ll4

L .r v t

/1

/2

:1 :4

P

M

M-200

9/25/25

C.MCCONNELL

T.ANDERSON

C V G

C E N

T R

E S

E R

V E R R

O O

M I

M P R

O V E M

E N

T S

C

IN

C

IN

N A T I

N

O R

T H

E R

N K

E N

T U

C K Y I

N T E R N

A T

IO

N A L A

IR

P O

R T

C

O M

A

IR

B L D

E R L A N

G E R

A R

E A A

M E C H

A N

IC

A L P

L A N

OCVG25-03

TAGGED NOTES

M4 IN BID ALTERNATE, THIS GLYCOL PIPING MAIN IS TO BE

DEMOLISHED IN ITS TOTALITY AND REPLACED WITH THE NEW

PIPING. THE EXISTING BRANCH PIPING SERVING AC-1 AND

AC-2 SHALL BE REUSED AND RECONNECTED TO THE NEW

PIPING MAIN.

REVISIONS

1 30% REVIEW 6/13/25

2 60% REVIEW 7/18/25

3 90% REVIEW 8/22/25

4 BIDDING 9/25/25

1/4" = 1'-0"M-200

FIRST FLOOR AREA A MECHANICAL PLAN1

CAFE

CONFERENCE

ROOM

STAIRS

SYSTEM OPERATIONS

CONTROL CENTER

ELEVATOR

EXERCISE ROOM

4" GS UP 4" GR UP

INCLUDE A DRIP TRAY BENEATH ALL

PIPING IN TENET SPACE.

W

WATER SENSOR

M3

M4

AREA B

(LOWER LEVEL)

CHECKED:

DATE:

DRAWN:

F

IL

E N A M E

P L O T

T

IM

E

CLIENT/CMTA JOB #:

C

U se rs \C

M cC o n n e ll\

D o cu m e n ts

\O C V G

-0

M

E P R C M cC o n n e ll4

L .r v t

/1

/2

:1 :4

P

M

M-201

9/25/25

C.MCCONNELL

T.ANDERSON

C V G

C E N

T R

E S

E R

V E R R

O O

M I

M P R

O V E M

E N

T S

C

IN

C

IN

N A T I

N

O R

T H

E R

N K

E N

T U

C K Y I

N T E R N

A T

IO

N A L A

IR

P O

R T

C

O M

A

IR

B L D

E R L A N

G E R

A R

E A B

M E C H

A N

IC

A L P

L A N

OCVG25-03

TAGGED NOTES

M3 INSTALL DRIP TRAY BENEATH ALL PIPING ABOVE TENET

SPACE. DRIP TRAY TO HAVE SLOPE OF 1/8" PER FOOT IN THE

DIRECTION OF WATER SENSOR.

M4 IN BID ALTERNATE, THIS GLYCOL PIPING MAIN IS TO BE

DEMOLISHED IN ITS TOTALITY AND REPLACED WITH THE NEW

PIPING. THE EXISTING BRANCH PIPING SERVING AC-1 AND

AC-2 SHALL BE REUSED AND RECONNECTED TO THE NEW

PIPING MAIN.

REVISIONS

1 30% REVIEW 6/13/25

2 60% REVIEW 7/18/25

DC-2

DC-1

P1

M1

G R

G S

M2

P2

ROOFTOP

(FIRST LEVEL)

CHECKED:

DATE:

DRAWN:

F

IL

E N A M E

P L O T

T

IM

E

CLIENT/CMTA JOB #:

C

U se rs \C

M cC o n n e ll\

D o cu m e n ts

\O C V G

-0

M

E P R C M cC o n n e ll4

L .r v t

/1

/2

:1 :5

P

M

M-202

9/25/25

C.MCCONNELL

T.ANDERSON

C V G

C E N

T R

E S

E R

V E R R

O O

M I

M P R

O V E M

E N

T S

C

IN

C

IN

N A T I

N

O R

T H

E R

N K

E N

T U

C K Y I

N T E R N

A T

IO

N A L A

IR

P O

R T

C

O M

A

IR

B L D

E R L A N

G E R

R O

O F M

E C H

A N

IC

A L P

L A N

OCVG25-03

TAGGED NOTES

M1 PROVIDE PIPING DOGHOUSE IN THIS LOCATION FOR GLYCOL

PIPING. REFER TO DETAIL ON SHEET M300.

M2 PROVIDE PIPE SUPPORTS AS NECESSARY FOR GLYCOL

PIPING.

1/4" = 1'-0"M-202

ROOF MECHANICAL PLAN1

REVISIONS

1 30% REVIEW 6/13/25

2 60% REVIEW 7/18/25

TYPICAL INSULATED CURB OPENING,

THYCURB TC-1, OR EQUAL. CURB

SHALL BE 18'' TALL.

SPACE ALLOWED FOR ROOFING

MATERIAL UNDER PORTAL

CONVENIENCE OUTLET (CAULK ALL

PENETRATIONS)

13X13 PORTAL TO BE

16 GAUGE ALUMINUM

CONSTRUCTION

UNISTRUT BACKING CHANNEL

INSIDE

WELDED CORNERS

(MICRO SEALED)

FASTENERS

(TYPICAL)

REMOVABLE WATERTIGHT

COVER.

GLUE 1/2" ARMAFLEX INSULATION

TO THE INSIDE OF THE PORTAL.

1" LIP

ROOF PRODUCTS, INC. MODEL

RPPC-90 OR APPROVED EQUAL.

HOLE SAW PIPE PENETRATIONS

ACCOUNT FOR INSULATION IF

APPLICABLE. CAULK OPENING AFTER

CONDUIT INSTALLATION.

SUPPORT PIPE WITH UNISTRUT

ATTACHED TO ROOF CURB WITH

HYDRAZORB CLAMPS.

* GALVANIZED STEEL IS NOT

ACCEPTABLE.

AV ZONE

AO CLG SP

CRAC UNIT

RUN CONDITIONS - SCHEDULED:

THE UNIT SHALL RUN UNDER ITS OWN CONTROLS. THE BAS SHALL MONITOR THE ROOM

TEMPERATURE AND LISTED POINTS AVAILABLE ON THE BACNET INTERFACE. ADDITIONAL POINTS

ARE AVAILABLE AND MAY BE MONITORED BY THE BAS.

ALARMS SHALL BE PROVIDED AS FOLLOWS:

• TEMPERATURE ALARM: IF THE ZONE TEMPERATURE IS GREATER THAN THE COOLING

SETPOINT BY A USER DEFINABLE AMOUNT (ADJ.).

• HUMIDITY ALARM: IF THE ZONE HUMIDITY IS OUTSIDE OF ITS SETPOINTS BY A USER

DEFINABLE AMOUNT (ADJ.)

• EQUIPMENT FAULT: IF ANY OF THE EQUIPMENT REPORTS A FAULT CONDITION

UNITS AC 3 AND AC 4 ARE REDUNDANT AND SHALL ALTERNATE OPERATION EVERY 7 DAYS. IF

THERE IS A FAULT IN ONE UNIT, IT SHALL SWITCH TO THE OTHER UNIT.

UNITS AC 5 AND AC 6 ARE REDUNDANT AND SHALL ALTERNATE OPERATION EVERY 7 DAYS. IF

THERE IS A FAULT IN ONE UNIT, IT SHALL SWITCH TO THE OTHER UNIT.

IF LEAK IS DETECTED IN CONDENSATE OVERFLOW SENSOR IN THE CRAC UNIT, THE UNIT SHALL

SHUT DOWN AND THE OTHER PAIRED UNIT SHALL ACTIVATE UNTIL RESET.

BACnet I-FACE

COORDINATE WITH

UNIT MANUFACTURER

FOR AVAILABLE

POINTS LIST.

(TYPICAL)

DV CLG ON

DV DEHUM

AV %CAP

DV STAT

AV HUM

AO HUM SP

DV FILT

DV T ALM

DV H ALM

POINTS SHOWN HERE ARE FOR EXAMPLE.

INCLUDE ALL AVAILABLE POINTS APPLICABLE

TO THE EQUIPMENT

DUAL PUMP

PACKAGE

(P1 & P2)

GLYCOL DRY COOLER

(DC-1)

DI PAST

DI PBST

DI PA FLT

DI PB FLT

DV FAULT

DI DCST

DI DC FLT

AI DC ENT

AI DC LVG

AC-2

(EXISTING)

(ROOM 014)

AC-1

(EXISTING)

(ROOM 014)AC-6

(EXISTING SERVER ROOM 001)

AC-5

(EXISTING SERVER ROOM 001)

AC-3

(SERVER ROOM

002)

AC-4

(SERVER ROOM

002)

PIPE ROOF CURB

(SEE DETAIL)

2" GS 2" GS 2-1/2" GS 2-1/2" GS

4" GS

4" GS

4" GR

(EXISTING)

1-1/2" GS

(EXISTING)

1-1/2" GS

3/4" CD3/4" CD 3/4" CD 3/4" CD

3" GS

3" GR

2" GR 2" GR 2-1/2" GR 2-1/2" GR

2-1/2" GS

2-1/2" GR

4" GR

(EXISTING)

1-1/2" GR

(EXISTING)

1-1/2" GR

CAP FOR FUTURE

EXPANSION

CAP FOR

FUTURE

EXPANSION

3" GS

3" GR

4" GS

4" GR

DI DCST

DI DC FLT

AI DC ENT

AI DC LVG

1/2" MW

25-GALLON EXPANSION TANK

PROVIDED BY DRY COOLER

MANUFACTURER

GLYCOL DRY COOLER

(DC-2)

1/2" MW

1/2" MW

1/2" MW

(EXISTING)

1/2" MW

(EXISTING)

1/2" MW

HOSE CONNECTION

FOR WATER/GLYCOL

REFILL

FS

3/4" DRAIN HOSE

CONNECTION

P P

4" GS

4" GR

3/4" DRAIN HOSE

CONNECTION

NOTE: INITITALLY CHARGE SYSTEM WITH 40%

PROPYLENE GLYCOL SOLUTION BY VOLUME

DI CNDOF

3-WAY VALVE

INTEGRAL TO

EQUIPMENT

(TYPICAL)

AUTOMATIC

BALANCING VALVE

AUTOMATIC

BALANCING VALVE

AUTOMATIC

BALANCING VALVE

AUTOMATIC

BALANCING VALVE

SPRING ISOLATORS

BY HVAC

CONTRACOTR

(TYPICAL)

AV RH

DV SATO

DV SATU

DV F ALM

DV SMK

DV AF ALM

DO ON/OFF

AV SAT

TS

FS

PS

TWO-WAY CONTROL VALVE

THREE-WAY CONTROL VALVE

AUTOMATIC AIR VENT (AAV)

AUTOMATIC BALANCING VALVE (BV)

BALL VALVE

BUTTERFLY VALVE

CHECK VALVE

FLEXIBLE PIPE CONNECTION

FLOW METER (VENTURI)

FLOW SWITCH

PRESSURE SWTICH

TAMPER SWITCH

THERMOMETER

DOUBLE CHECK VALVE ASSEMBLY

PIPING UNION

PETE'S PLUG; TEMPERATURE/PRESSURE PORT

MANUAL AIR VENT (MAV)

TRIPLE DUTY VALVE (TDV)

MANUAL ISOLATION VALVE

GLOBE VALVE

OS&Y (GATE) VALVE

AUTO-FLOW CONTROL VALVE

STRAINER

PRESSURE REDUCING VALVE (STEAM, GAS, WATER, ETC.)

PIPING ACCESSORY LEGEND

DO XXXX

DI XXXX

AI XXXX

AO XXXX

DV XXXX

AV XXXX ANALOG VALUE

DIGITAL OUTPUT

DIGITAL INPUT

DIGITAL VALUE

ANALOG INPUT

ANALOG OUTPUT

AFMS AIR FLOW MEASURING STATION

TEMPERATURE SENSOR

HUMIDITY SENSOR

CARBON DIOXIDE SENSOR

STATIC PRESSURE SENSOR

LOW LIMIT THERMOSTAT (FREEZESTAT)

HIGH LIMIT STATIC PRESSURE STAT

LOW LIMIT STATIC PRESSURE STAT

DIFFERENTIAL PRESSURE SWITCH

SMOKE DETECTOR

MOTORIZED DAMPER

DIFFERENTIAL PRESSURE SENSOR

M

C

DPS

LL

SP

DSP-HL

SD

H

Ts

DP

DSP-LL

CONTROLS LEGEND

VFD VARIABLE FREQUENCY DRIVE

BACnet I-FACE BACnet INTERFACE INTEGRATION

FLOW METERF

CURRENT TRANSMITTERCT

CURRENT STATUS SWITCHCS

PRESSURE SENSORP

CONTROLS LEGEND (CONT.)

ZONE

CLG SP

CLG ON

DEHUM

% CAP

STAT

HUM

HUM SP

FILT

T ALM

H ALM

FAULT

CONDENSATE OVERFLOW

PAST

PA FLT

PBST

PB FLT

CNDOF

DC FLT

DC ENT

DC LVG

DCST

FAULT

HUMIDITY ALARM

TEMPERATURE ALARM

FILTER STATUS

HUMIDITY SETPOINT

HUMIDIFICATION ON/OFF

SYSTEM STATUS

% CAPACITY

DEHUMIFICATION ON/OFF

COOLING ON/OFF

COOLING TEMPERATURE SETPOINT

ZONE TEMPERATURE

PUMP A STATUS

PUMP A FAULT

PUMP B STATUS

PUMP B FAULT

DRY COOLER STATUS

DRY COOLER FAULT

DRY COOLER ENTERING WATER TEMPERATURE

DRY COOLER LEAVING WATER TEMPERATURE

RH RETURN AIR RELATIVE HUMIDITY

SATO

SATU

F ALM

SMK

AF ALM

SYSTEM ON/OFF CONTROLON/OFF

LOSS OF AIRFLOW

SMOKE DETECTED

FAN ISSUE

SUPPLY AIR UNDER TEMPERATURE

SUPPLY AIR OVER TEMPERATURE

SAT SUPPLY AIR TEMPERATURE

CHECKED:

DATE:

DRAWN:

F

IL

E N A M E

P L O T

T

IM

E

CLIENT/CMTA JOB #:

C

U se rs \C

M cC o n n e ll\

D o cu m e n ts

\O C V G

-0

M

E P R C M cC o n n e ll4

L .r v t

/1

/2

:2 :0

P

M

M-300

9/25/25

C.MCCONNELL

T.ANDERSON

C V G

C E N

T R

E S

E R

V E R R

O O

M I

M P R

O V E M

E N

T S

C

IN

C

IN

N A T I

N

O R

T H

E R

N K

E N

T U

C K Y I

N T E R N

A T

IO

N A L A

IR

P O

R T

C

O M

A

IR

B L D

E R L A N

G E R

M E C H

A N

IC

A L S

C H

E D

U L E S

D E T A

IL

S

OCVG25-03

REVISIONS

1 30% REVIEW 6/13/25

2 60% REVIEW 7/18/25

3 90% REVIEW 8/22/25

4 BIDDING 9/25/25

DATA ROOM COOLING UNIT SCHEDULE

MARK MANUFACTURER MODEL #

DIMENSIONS (IN.)

WEIGHT (LBS)

SENSIBLE

CAPACITY

(BTUH)

TOTAL

CAPACITY

(BTUH)

REHEAT

CAPACITY

(KW)

AIRFLOW

RATE (CFM)

ENTERING WATER

TEMPERATURE (°F)

WATER FLOW

RATE (GPM)

PRESSURE

DROP (FT)

HUMIDIFIER

TYPE

HUMIDIFIER

CAPACITY (LBS/HR)

ELECTRICAL

REMARKS LENGTH WIDTH HEIGHT VOLTAGE PHASE FLA MOCP

AC-3 LIEBERT PX029DG1AD 34 33 78 810 81,900 96,200 12 3,900 104°F 26.4 50.4 INFRARED 7.7 460 3 34.8 50 1

AC-4 LIEBERT PX029DG1AD 34 33 78 810 91,900 96,200 12 3,900 104°F 26.4 50.4 INFRARED 7.7 460 3 34.8 50 1

AC-5 LIEBERT DS042KDAEI 34 85 78 1930 122,000 127,000 15 5,500 104°F 39.9 37 INFRARED 11 460 3 37.7 50 1

AC-6 LIEBERT DS042KDAEI 34 85 78 1930 122,000 127,000 15 5,500 104°F 39.9 37 INFRARED 11 460 3 37.7 50 1

DRY COOLER SCHEDULE

MARK MANUFACTURER MODEL #

DIMENSIONS (IN.)

WEIGHT

(LBS)

TOTAL

COOLING

(KBTU) EWT LWT

ELECTRICAL

REMARKS LENGTH WIDTH HEIGHT VOLTAGE PHASE FLA MOCP

DC-1 LIEBERT DDNT498A64 164 87 44 2430 365000.0 115°F 104°F 460 3 7 A 15 1

DC-2 LIEBERT DDNT498A64 164 87 44 2430 365000.0 115°F 104°F 460 3 7 A 15 1

GLYCOL PUMP SCHEDULE

MARK MANUFACTURER MODEL #

DIMENSIONS (IN.)

WEIGHT

(LBS)

HEAT

PRESSURE

(FT)

ELECTRICAL

REMARKS LENGTH WIDTH HEIGHT VOLTAGE PHASE FLA

MOC

P

P1 LEIBERT D7.5ANT 42 33 20 276 125.0 460 3 11 A 15

P2 LEIBERT D7.5ANT 42 33 20 276 125.0 460 3 11 A 15

NO SCALE

PIPE ROOF CURB DETAIL

REMARKS:

1. UNITS TO BE DESIGNED FOR A 40% PROPYLENE GLYCOL MIXTURE

REMARKS:

1. UNITS TO BE DESIGNED FOR A 40% PROPYLENE GLYCOL MIXTURE

NO SCALE

GLYCOL SYSTEM SCHEMATIC

DRIP PAN

DI

WATER SENSOR IN DRIP PAN

A. DRIP PAN WATER SENSORS

1. BAS CONTRACTOR SHALL INSTALL FLOOR MOUNTED WATER

SENSORS IN DRIP TRAY ABOVE TENET SPACE IN LOCATION

SHOWN ON M-201 THAT WILL ALARM THE BAS IF WATER IS

DETECTED.

a. WATER (DI)

C

SD

UON

EM

CFOI

OFOI

CFCI

OFCI

J

DESCRIPTION

S

S

S 3

S D

SK

PC

SOS

OS

GROUND FAULT PROTECTED DUPLEX WITH

WEATHER-PROOF "WHILE IN USE" TYPE DIE-CAST

METAL COVERPLATE WITH LOCKABLE

ENCLOSURE AT OUTLET - SEE SPECIFICATIONS

WP

DUPLEX FOR ELECTRIC WATER COOLER: PROVIDE

REMOTE, READILY ACCESSIBLE GFI DEVICE AT 48"

ADJACENT TO WATER COOLER, COORDINATE EXACT

LOCATION WITH PLUMBING CONTRACTOR TO

CONCEAL OUTLET BEHIND COOLER

EWC

DOOR RELEASE CARD READER STATION. PROVIDE

ANY ADDITIONAL ROUGH-IN FOR ''EMERGENCY

RELEASE'' OPERATOR STATIONS AS REQUIRED.

FLOORBOX, COMBINATION POWER AND LOW

VOLTAGE, REFER TO FLOORBOX SCHEDULE

CDCARBON MONOXIDE DUCT DETECTOR

POWER SUPPLY/CONTROL FOR AUDIO/VISUAL DEVICES

SLASH THROUGH ANY DEVICE INDICATES MOUNTING

ABOVE COUNTERTOP 2" ABOVE BACKSPLASH, OR AT

48" WHERE NO COUNTER IS PRESENT

OVERHEAD PROJECTOR: PROVIDE DUPLEX

RECEPTACLE, ONE DATA, HDMI, 3.5mm AUDIO, AND VGA OUTLET ON (3) PLATES

SVS

VS

LV

FILLED CENTER BAR INDICATES INTEGRAL GROUND

FAULT PROTECTION (GFCI)

NON-REVERSING MOTOR STARTER SNAP SWITCH

CONTRACTOR FURNISHED OWNER INSTALLED

CONTRACTOR FURNISHED CONTRACTOR INSTALLED

OWNER FURNISHED OWNER INSTALLED

OWNER FURNISHED CONTRACTOR INSTALLED

CONNECTION TO SPRINKLER TAMPER

SWITCH WITH ADDRESSABLE MODULE

PHOTO-ELECTRIC SMOKE DETECTOR

MAIN CONTROL PANEL CENTRAL PROCESSING

UNIT (CPU)

ELECTRONIC LOCKS

LIGHT SWITCH:GENERAL PURPOSE

AS NOTED

AS NOTED

6'-6'' TO

TOP

46" TO

LEVERPULL STATION : DOUBLE ACTION

AUDIO-ONLY NOTIFICATION APPLIANCE

VISUAL-ONLY NOTIFICATION APPLIANCE

AUDIO/VISUAL NOTIFICATION APPLIANCE

HEAT DETECTOR

DOOR HOLDER : WALL TYPE

DOOR HOLDER : CLOSURE TYPE

DUCT SMOKE DETECTOR

REMOTE L.C.D. FIRE ALARM ANNUNCIATOR

ISOLATION MODULE

H.V.A.C. SMOKE DAMPER CONNECTION

UNLESS OTHERWISE NOTED

INDICATES EMERGENCY POWER

SPECIAL OUTLETS

HD

ABV CLG

DH

ABV DOOR DH

ABV CLG DD

FS

46"

I

ZONE ADDRESSABLE MODULE Z

SM

ABBREVIATIONS

STRIP FIXTURE

CROSS-HATCHING INDICATES LIGHT IS POWERED

FROM THE EMERGENCY-CRITICAL BRANCH

PARALLEL-HATCHING INDICATES LIGHT IS

POWERED FROM THE EMERGENCY-LIFE SAFETY

BRANCH

POWER OUTLETS

SIMPLEX RECEPTACLE

DUPLEX RECEPTACLE-SAFETY TYPE,

TAMPER-RESISTANT

DUPLEX RECEPTACLE

QUADRUPLEX RECEPTACLE

JUNCTION BOX, CEILING OR WALL

VOLTAGE/1PH RECEPTACLE, AS NOTED

VOLTAGE/3PH RECEPTACLE, AS NOTED

DIMMER SWITCH

THREE-WAY SWITCH

KEYED SWITCH

OCCUPANCY OR VACANCY SENSOR SWITCH

OCCUPANCY OR VACANCY SENSOR, CEILING MOUNT

LOW VOLTAGE SWITCH

PHOTO-CELL AS NOTED

EXIT LIGHT (CEILING, END, WALL MOUNT)

LIGHTING

SECURITY ACCESS CONTROL

DOOR

FRAME

WALL, CLG

CLG

CLG

54"

46"

46"

46"

46"

46"

46"

1'-6"

1'-6"

1'-6"

1'-6"

1'-6"

1'-6"

2'-2"

CLG

AS NOTED

46''

CLG

FLOOR

S S M

M O

U N

TI

N

G H

EI

G

H T

(T O

C

EN

TE

R

O F

B O

X)

D R

A W

IN

G

SY

M B

O L

SURFACE OR SUSPENDED CEILING FIXTURE (SLASH

INDICATES RECESSED)

POLE MOUNTED AREA LIGHT

WALL MOUNT FIXTURE ,

FLOODLIGHT

V

A

F

F

INDICATES VANDAL-PROOF POLYCARBONATE COVER,

VANDAL PROOF COVERS SHALL BE UL LISTED FOR USE

WITH THE SPECIFIC DEVICE THEY ARE PROTECTING

PC

WALL

WALL

ADDRESSABLE RELAY MODULE R

FLOORBOX, POWER ONLY, AS SCHEDULED FLOOR

FIRE RATED POKE THOUGH FLOOR BOX, COORDINATE

EXACT COVER REQUIREMENTS WITH ARCHITECTURAL

FINISHES, DEVICES AS SCHEDULED

WP

WGWIREGUARD - PROVIDE MANUFACTURER'S

SPECIFIC GUARD FOR DEVICE NOTED

CONDUIT CONCEALED IN WALLS OR IN CEILING

SPACE: ARROW(S) INDICATE(S) HOME RUN & #

OF CIRCUITS: HASHMARKS INDICATE # OF

CONDUCTORS. DASHED LINE INDICATES

CONDUIT BELOW FLOOR.

PANELBOARD, SURFACE OR FLUSH MOUNTED,

HATCHING INDICATES EMERGENCY

EQUIPMENT TAG, REFER TO EQUIPMENT SCHEDULE

MECHANICAL EQUIPMENT DESIGNATOR

(SEE MECH. SCHEDULES)

EQUIPMENT HARDWIRE CONNECTION (SEE DETAIL)

AS NOTED

AS SHOWN

MISCELLANEOUS

DISCONNECT SWITCH

MAGNETIC STARTER

MAGNETIC COMBINATION STARTER

ENCLOSED FLUSH MTD. CIRCUIT BREAKER

WEATHERPROOF - NEMA-3R, WET LOCATION LISTED.

PROVIDE COVERS, RATINGS, ETC, AS SUITABLE FOR

OUTDOORS.

PUSHBUTTON STATION

FLEXIBLE CONDUIT

TRANSFORMER

TAGGED NOTE

REVISION TAG

WIRE BASKET CABLE TRAY, SIZE AS NOTED

LOW VOLTAGE CABLE PATH

5'-0"

5'-0"

5'-0"

5'-0"

46"

6'-6'' TO TOP

GENERATOR ANNUNCIATOR PANEL - SEE

SPECIFICATIONS

46''

THERMOSTAT PROVIDED BY MECHANICAL

CONTRACTOR, ELECTRICAL CONTRACTOR SHALL

PROVIDE BACK-BOX CONDUIT STUB-UP, REFER TO

MECHANICAL DRAWINGS FOR LOCATIONS

SWITCHES

TIMER SWITCH S T46"

FIRE ALARM

E,EMINDICATES EMERGENCY POWER

GEN-A

J

NAC

EL

CR

FAA

FACP

T

AS SHOWNLADDER CABLE TRAY, SIZE AS NOTED

AS SHOWNSOLID BOTTOM CABLE TRAY, SIZE AS NOTED

EQUIP-1

GROUND

NEUTRAL

PHASE

WALL, CLG

WALL, CLG V

A

F, INDICATES CHIME AUDIBLE NOTIFACTION CH

DEVICE USED FOR ELEVATOR CONTROL EL

FIRE ALARM CONTROL EXTENDER EXT

TRANSPONDER CABINET 46" TRAN

BE , BRPROJECTED BEAM SMOKE DETECTOR; EMITTER

(BE) AND RECEIVER (BR)

FLOOR

AV

AUDIO/VISUAL SYSTEM OUTLET WITH DUPLEX

RECEPTACLE, REFER TO ASSOCIATED DETAIL FOR

ADDITIONAL INFORMATION

1'-6"

COMBINATION POWER AND DATA OUTLET LOCATION,

REFER TO ASSOCIATED DETAIL FOR ADDITIONAL

INFORMATION

1'-6"

COMBINATION POWER AND DATA OUTLET LOCATION,

GFCI DUPLEX RECEPTACLE, REFER TO ASSOCIATED

DETAIL FOR ADDITIONAL INFORMATION

1'-6"

FILLED OUTER BARS INDICATES INTEGRAL INTEGRAL

USB OUTLETS IN ADDITION TO POWER RECEPTACLES 1'-6"

, J

VARIABLE FREQUENCY DRIVE 5'-0"

MOTOR CONNECTION, REFER TO EQUIPMENT

CONNECTION SCHEDULE

DUPLEX RECEPTACLE, CEILING MOUNTED CLG

#D/#V

#D

INTERMEDIATE DISTRIBUTION FRAME - REFERENCE

DATA SYSTEM SCHEMATICS AND DETAILS FOR

ADDITIONAL REQUIREMENTS

MAIN DISTRIBUTION FRAME - REFERENCE DATA

SYSTEM SCHEMATICS AND DETAILS FOR ADDITIONAL

REQUIREMENTS

WIRELESS ACCESS POINT WITH PROVISIONS FOR (1

DATA OUTLET FOR ANTENNA. PROVIDE A COMPLETE

DATA OUTLET WITH FACEPLATE ABOVE CEILING,

MOUNTED AT AN ACCESSIBLE HEIGHT NO MORE THAN

24" ABOVE CEILING. AT EACH OUTLET, PROVIDE A 20'

COIL OF CABLE AHEAD OF THE OUTLET FOR

ADJUSTMENT OF FINAL OUTLET LOCATION. THE

CONTRACTOR SHALL COORDINATE EXACT LOCATIONS

WITH THE OWNER AND ADJUST OUTLET LOCATIONS AT

SUBSTANTIAL COMPLETION TO ACCOMMODATE

OWNER'S WAP LOCATIONS. WAP'S ARE OWNER-

FURNISHED, OWNER-INSTALLED

WAP

DATA OUTLET : NUMBER BESIDE OUTLET

INDICATES NUMBER OF DATA JACKS

VOICE OUTLET : NUMBER BESIDE OUTLET

INDICATES NUMBER OF VOICE JACKS

COMBINATION OUTLET : NUMBER BESIDE OUTLET

INDICATES NUMBER OF DATA/VOICE JACKS

DATA / VOICE

1'-6"

1'-6"

1'-6"

#V

MDF

IDF

CONDUIT UP

CONDUIT DOWN

GROUND BUS BAR ON INSULATED STANDOFFS 2'-0''

DESCRIPTION M

O

U N

TI

N

G H

EI

G

H T

(T O

C

EN

TE

R

O F

B O

X)

D R

A W

B

O L

REFER TO LUMINAIRE SCHEDULE FOR EXACT FIXTURE

SPECIFICATIONS, MOUNTING HEIGHTS, ETC.

DESCRIPTION M

O

U N

TI

N

G H

EI

G

H T

(T O

C

EN

TE

R

O F

B O

X)

D R

A W

B

O L

LV#S,

C

AB

LI

N

G

C O

N D

U C

TO

R

S

- O

F O

I

C

AB

LI

N

G

C O

N D

U C

TO

R

S

- O

F C

I

C O

N D

U

IT

R

O U

G H

-IN

O F

O I

IT

EM

U

SE

D O

N P

R O

JE

C

T

D

EV

IC

ES

O

F C

I

D

EV

IC

ES

C

F C

I

SYSTEM D

EV

IC

ES

O

F O

I

SECURITY: ACCESS CONTROL

SECURITY: CCTV

SYSTEM

RESPONSIBILITY

MATRIX

FIRE ALARM

A.

B.

C.

D.

E.

F.

G.

SYSTEM RESPONSIBILITY GENERAL NOTES:

CMTA IS NOT RESPONSIBILE FOR ASSIGNING SCOPE(S) OR WORK. THE INTENT OF

CONTRACTOR IN THIS MATRIX IS TO SEPERATE OWNER PROVIDED ITEMS FROM THE

GENERAL CONTRACTOR / CONSTRUCTION MANAGER. THE GC OR CM SHALL BE

RESPONSIBLE FOR A COMPLETE SCOPE OF WORK.

REFER TO VENDOR DRAWINGS FOR COMPLETE SCOPE OF WORK RELATING TO

VENDOR-FURNISHED EQUIPMENT. ALL WORK INDICATED ON VENDOR DRAWINGS SHALL

BE INCLUDED BY THE CONTRACTOR.

REFER TO ARCHITECTURAL DOOR HARDWARE SPECIFICATIONS FOR ACCESS CONTROL

DEVICE SPECIFICATIONS AND FURTHER REQUIREMENTS.

PROVIDE BACKBOXES AND CONDUIT WITH PULL-STRINGS FOR ALL SYSTEMS.

CONTRACTOR SHALL VERIFY BACKBOX SIZES, CONDUIT, ETC. AND EXACT

INSTALLATION LOCATIONS/REQUIREMENTS WITH SUCCESSFUL VENDORS OF ALL

SYSTEMS PRIOR TO CONSTRUCTION.

AT ALL SYSTEMS EQUIPMENT CABINET/TERMINAL BOARD LOCATIONS, CONTRACTOR

SHALL PROVIDE SIZE AND NUMBER OF CONDUIT STUB-OUTS TO CABLE PATHS AS

REQUIRED BY SYSTEM VENDORS, TERMINATE CONDUITS AT CABINETS/ON

BACKBOARDS AS REQUIRED. COORDINATE EXACT REQUIREMENTS WITH APPROPRIATE

VENDORS PRIOR TO CONSTRUCTION.

REFER TO SPECIFICATIONS FOR REQUIREMENTS APPLICABLE TO ALL SYSTEMS

INCLUDING CABLING, CABLE MANAGEMENT, INSTALLATION, GROUNDING, TESTING,

LABELING, ETC.

WHERE INDICATED AS CFCI, THE CONTRACTOR SHALL PROVIDE THE SYSTEM

COMPLETE, INCLUDING ALL ROUGH-INS, CABLING, DEVICES, POWER, ETC. THE

CONTRACTOR SHALL CONTACT THE LISTED VENDOR FOR PRICING PRIOR TO BID. ALL

SYSTEMS SHALL MATCH EXISTING FACILITY STANDARDS AND BE FULLY COMPATIBLE

WITH ANY EXISTING SYSTEMS. ALL SYSTEM VENDORS SHALL COORDINATE EXACT

SYSTEM REQUIREMENTS WITH OWNER PRIOR TO BID. NEW COMPONENTS SHALL BE

INTERCONNECTED WITH EXISTING SYSTEMS WHERE POSSIBLE. ALL NEW SYSTEM

DESIGNS AND PROGRAMMING SHALL BE COORDINATED WITH THE OWNER PRIOR TO

ORDERING. ALL PROGRAMMING SHALL BE INCLUDED AS REQUIRED BY THE OWNER.

PROVIDE 4 HOURS OF TRAINING FOR EACH SYSTEM.

DESCRIPTION

W H

IT

E

DEVICE

FIRE ALARM DEVICES - WALL

WALL SWITCHES

VOICE / DATA DEVICES

DEVICE COLOR

MATRIX

RECEPTACLE

CEILING OCCUPANCY SENSORS

DEVICE COVERPLATES

THERMOSTATS (COORDINATE WITH HVAC TYPICALLY NO

COLOR OPTIONS)

DEVICE COLOR GENERAL NOTES:

A. DEVICE PLATE TO MATCH DEVICE UNLESS NOTED OTHERWISE.

B. NOT ALL DEVICES MAYBE USED THAT ARE SHOWN.

C. IF DEVICE COLOR NOT DEFINED REFER TO SPECIFICATIONS.

DESCRIPTION

IV

O

R Y

R

ED

BL

AC

K

BL

U

E

YE

LL

O W

C U

ST

O

M

ST

AI

N

LE

SS

S

TE

EL

LEGEND

INDICATES SELECTED COLOR

INDICATES COLOR NOT AVAILABLE

INDICATES COLOR NOT SELECTED

LEGEND

INDICATES SELECTED SYSTEM

INDICATES NOT AVAILALBE

INDICATES NOT SELECTED

C O

N D

U

IT

R

O U

G H

-IN

O F

C I

C O

N D

U

IT

R

O U

G H

-IN

C F

C I

C

AB

LI

N

G

C O

N D

U C

TO

R

S

- C

F C

I

PR

O

G R

AM

M

IN

G

SE

TU

P

- O F

O I

PR

O

G R

AM

M

IN

G

SE

TU

P

- O F

C I

PR

O

G R

AM

M

IN

G

SE

TU

P

- C F

C I

STRUCTURED CABLING

DATA RACKS, PATCH PANELS

IT EQUIPMENT

FIRE ALARM DEVICES - CEILING

CHECKED:

DATE:

DRAWN:

FI

LE

N

AM

E:

PL

O T

TI

M E:

CLIENT/CMTA JOB #:

C:

\U se rs

\B Ub er ti\

Do cu m en ts \R ev it

Co pi es \O

CV

G2

5-

_M

EP

_R

_B Ub er ti.

rv t

9/

/2

:4 8:

P

M

E-000

9/25/25

B.UBERTI

J.MESSNER

CV

G

CE

NT

RE

S

ER

VE

R

RO

OM

IM

PR

OV

EM

EN

TS

CI

NC

IN

NA

TI

N

OR

TH

ER

N

KE

NT

UC

KY

IN

TE

RN

AT

IO

NA

L

AI

RP

OR

T

C

OM

AI

R

BL

D, E

RL

AN

GE

R, K Y

EL

EC

TR

IC

AL

L

EG

EN

D

OCVG25-03

ELECTRICAL GENERAL NOTES:

A.

B.

C.

D.

E.

F.

G.

H.

I.

J.

K.

L.

M.

N.

O.

P.

Q.

R.

S.

T.

U.

V.

W.

X.

Y.

Z.

AA.

AB.

AC.

AD.

AE.

AF.

AG.

AH.

AI.

AJ.

AK.

AL.

AM.

AN.

AO.

AP.

AQ.

AR.

AS.

AT.

AU.

EACH CONTRACTOR, PROPOSER, SUPPLIER AND/OR MANUFACTURER SHALL REFER TO ALL DOCUMENTS PERTAINING TO THIS PROJECT AND COORDINATE ACCORDINGLY SO AS TO ENSURE ADEQUACY OF FIT, COMPLIANCE WITH SPECIFICATIONS, PROPER VOLTAGE AND CURRENT CHARACTERISTICS TO AVOID

CONFLICT WITH ANY OTHER BUILDINGS SYSTEMS. VERIFY SAME WITH SHOP DRAWINGS.

ADDITIONAL ELECTRICAL REQUIREMENTS MAY BE SHOWN ON PLANS FROM OTHER DISCIPLINES IN THIS SET.

IT IS THE CONTRACTOR’S RESPONSIBILITY TO REVIEW ALL PLANS AND SPECIFICATIONS FOR A COMPLETE

UNDERSTANDING OF THE PROJECT REQUIREMENTS.

WORK SHALL BE IN ACCORDANCE WITH THE LATEST EDITION OF ALL LOCAL, STATE, AND NATIONAL CODES.

INCLUDING BUT NOT LIMITED TO NFPA 70 (NEC), NFPA 72, INTERNATIONAL…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .