This is a comprehensive set of architectural and engineering design documents for the CVG Centre Server Room Improvements project at the Cincinnati & Northern Kentucky International Airport, prepared by CMTA, Inc. The project involves extensive renovations to the server room facilities located at 77 Comair Boulevard in Erlanger, Kentucky. The design documents cover multiple disciplines including architectural, mechanical, electrical, fire protection, and technology systems, with detailed plans for demolition and new infrastructure installation. The project scope includes replacing existing air conditioning units, upgrading glycol cooling systems, installing new electrical and technology infrastructure, and implementing improved fire protection and security systems.
The project documents indicate a significant investment in modernizing the server room's critical infrastructure, with specific attention to redundancy, cooling efficiency, and system reliability. The design includes new CRAC (Computer Room Air Conditioning) units with redundant operation, a glycol-based cooling system with dual dry coolers, upgraded electrical distribution with new UPS systems, and enhanced grounding and bonding infrastructure. The technology improvements feature new equipment racks, inter-rack cabling, wireless access points, and access control systems. The project appears to be funded internally by the airport authority, with a planned bidding process in September 2025 and implementation following the review and approval stages. The comprehensive nature of the design suggests a strategic approach to updating the facility's technological and mechanical systems to support current and future operational requirements.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
I.T.
Storage xxx
485.94 sf
I.T. Data Room xxx
485.94 sf
STAIRS
EXISTING
CO-LOCATESERVER
ROOM
CVGSERVER
ROOM
GENERAL NOTES - FIRE PROTECTION
A. ALL AREAS ARE PRESENTLY PROTECTED BY A 100% WET PIPE FIRE
SUPPRESSION SYSTEM. CONTRACTOR SHALL MODIFY THE SYSTEM AS
REQUIRED TO MAINTAIN 100% PROTECTION, IN ACCORDANCE WITH NFPA
13, STATE BUILDING CODE AND SPECIFICATIONS.
B. THE SUCCESSFUL FIRE PROTECTION CONTRACTOR SHALL OBTAIN AND
UTILIZE THE ARCHITECTURAL REFLECTED CEILING PLAN FOR LAYING OUT
THE SPRINKLER HEADS. THE REFLECTED CEILING PLANS SHOWN ARE TO
COORDINATE CEILING TYPES AND LOCATIONS. REFER TO THE MECHANICAL
AND ELECTRICAL DRAWINGS FOR CEILING DEVICE LOCATIONS. REFER TO
THE SPECIFICATIONS FOR COORDINATION DRAWING REQUIREMENTS.
C. INSTALL HEADS IN CENTER OF 2'X2' TILES. INSTALL HEADS ON 1/4 POINTS
OF THE 4' DIMENSION AND CENTER OF THE 2' DIMENSION IN 2'X4' TILES.
DO NOT MOUNT HEADS IN CENTER OF 2'X4' TILE IF IT IS SCORED TO LOOK
LIKE TWO 2'X2' TILES.
D. ALL SPRINKLER HEADS SHALL BE "SEMI-RECESSED", QUICK RESPONSE
SPRINKLER HEADS (UNLESS OTHERWISE NOTED ON THE PLANS.) HEADS
SHALL BE FED FROM A RETURN BEND ARRANGEMENT.
E. UTILIZE UPRIGHT AND/OR WALL-MOUNTED TYPE SPRINKLER HEADS IN
AREAS WITHOUT CEILINGS.
F. THE FIRE PROTECTION CONTRACTOR SHALL PERFORM HIS OWN FLOW TEST
PRIOR TO SUBMITTING SHOP DRAWINGS.
G. REFER TO A COMPLETE SET OF DOCUMENTS (ARCHITECTURAL,
STRUCTURAL, MECHANICAL AND ELECTRICAL PLANS AND SPECIFICAITONS)
FOR COORDINATION OF TRADES, ROOMS, STRUCTURE AND EQUIPMENT.
HVAC DUCTWORK MAINS SHALL BE INSTALLED PRIOR TO FIRE PROTECTION
PIPING. PROVIDE DRAIN VALVES IN THE FIRE PROTECTION SYSTEM WHERE
REQUIRED TO COMPLETELY DRAIN THE SYSTEM.
H. REFER TO THE SPECIFICATIONS FOR SPRINKLER HEAD TYPES.
I. PROVIDE ALL REQUIRED DRAIN PIPING TO TEST FLOW SWITCHES.
DISCHARGE DRAIN PIPING TO OUTDOORS OR A FLOOR DRAIN.
J. SIZE ALL FIRE PROTECTION PIPING IN ACCORDANCE WITH NFPA 13. PIPE
SIZING SHALL BE ACCOMPLISHED USING HYDRAULIC CALCULATIONS.
K. SUBMIT HYDRAULIC CALCULATIONS AND SYSTEMS DESIGN FOR REVIEW TO
THE M/E ENGINEER.
L. THE CONTRACTOR SHALL EXERCISE EXTREME CARE IN THE COURSE OF
THEIR WORK SO AS TO ENSURE THAT THEY DO NOT INTERRUPT ANY
EXISTING SERVICE. FOR SAFETY PURPOSES, PAY PARTICULAR ATTENTION
TO THIS PRECAUTION RELATIVE TO NATURAL GAS AND ELECTRICAL LINES.
VERIFY THE LOCATION, SIZE, TYPE, ETC., OF EACH UNDERGROUND OR
OVERHEAD UTILITY. ALL WORK SHALL BE PERFORMED IN ACCORD WITH
ALL FEDERAL, STATE AND/OR LOCAL RULES, REGULATIONS, STANDARD
AND SAFETY REQUIREMENTS.
M. WHERE WORK IS REQUIRED ABOVE EXISTING LAY-IN, PLASTER OR GYPSUM
BOARD CEILINGS, THE CONTRACTOR SHALL BE RESPONSIBLE FOR
REMOVAL AND REINSTALLATION (OR REPLACEMENT, IF DAMAGED) OF ALL
CEILING OR TILE AND GRID MEMBERS NECESSARY TO PERFORM HIS WORK.
NEW TILE AND GRID SHALL MATCH THE SURROUNDING AREAS. ALL
PATCHING WORK SHALL MATCH ADJACENT SURFACES.
N. ALL NEW WORK SHALL BE HUNG FROM STRUCTURE, NOT FROM THE WORK
OF OTHER TRADES, WHETHER EXISTING OR NEW.
O. COORDINATE ALL WORK WITH PROJECT PHASING REQUIREMENTS.
P. PATCH, REPAIR AND PAINT OR PROVIDE WALL COVERING FOR (TO OWNER'S
STANDARDS) EXISTING WALLS, CEILINGS, ETC., THAT ARE TO REMAIN IF
DAMAGED DURING CONSTRUCTION. REPAIRS SHALL MATCH ADJACENT
SURFACES TO THE SATISFACTION OF THE ARCHITECT AND OWNER.
Q. OBSERVE ALL APPLICABLE CODES, RULES AND REGULATIONS THAT MAY
APPLY TO THE WORK UNDER THIS CONTRACT. (CITY, COUNTY, LOCAL,
FEDERAL, MUNICIPALITY, UTILITY COMPANY, STATE, ETC.)
R. CONTRACTOR SHALL BE AWARE OF UNSEEN FIRE PROTECTION WORK
DURING DEMOLITION. IF ITEMS ARE UNCOVERED DURING DEMOLITION
THEN FIELD VERIFY THE USE OF THE ITEMS AND PLAN AN ALTERNATE
ROUTE TO RUN THESE ITEMS. THEN CONTACT THE ENGINEERS TO REVIEW
THE ROUTING.
S. ALL PENETRATIONS OF FIRE AND SMOKE RATED ASSEMBLIES SHALL BE
APPROPRIATELY FIRE STOPPED PER AN APPROVED U.L. LISTED STANDARD.
CONTRACTOR SHALL PAY PARTICULAR ATTENTION TO INSULATED PIPING
PENETRATIONS.
T. ALL WORK REQUIRING DOWNTIME OF ANY AREA IN THE BUILDING SHALL
BE SCHEDULED 2 WEEKS IN ADVANCE, AND SHALL COMPLY WITH INTERIM
LIFE SAFETY MEASURES.
U. WHERE CEILINGS ARE INDICATED ALL SPRINKLER PIPING MUST BE
INSTALLED ABOVE CEILINGS. SPRINKLER PIPING MUST BE COORDINATED
WITH OTHER TRADES. PIPING MUST BE OFFSET TO AVOID CONFLICTS
WITH DUCTWORK, CONDUIT, ALL EQUIPMENT, ETC.
V. LOCATIONS OF PIPING, DUCTS AND EQUIPMENT ARE APPROXIMATE AND
SUBJECT TO MINOR ADJUSTMENTS IN THE FIELD. DO NOT SCALE THE
DRAWINGS.
W. ALL OFFSETS IN PIPING ARE NOT NECESSARILY SHOWN. PROVIDE
ADDITIONAL OFFSETS WHERE NECESSARY.
X. COORDINATE ALL FIRE PROTECTION WORK WITH ELECTRICAL, PLUMBING
AND OTHER TRADES TO AVOID INTERFERENCE WITH PIPING, DUCTS,
CONDUIT AND OTHER EQUIPMENT.
Y. SEAL AIRTIGHT AROUND ALL PIPING PENETRATIONS THROUGH WALLS,
FLOORS AND ROOF. PROVIDE FIRE STOPPING IN FIRE PARTITION.
Z. THE CONTRACTOR SHALL RELOCATE OR AVOID ANY EXISTING EQUIPMENT
APPURTENANCES, ETC., THAT CONFLICT WITH NEW WORK.
AA. VALVES OR ANY MECHANICAL/ELECTRICAL ITEM REQUIRING ACCESS SHALL
NOT BE LOCATED ABOVE A HARD CEILING. IF THIS IS NOT POSSIBLE, THEN
AN APPROPRIATELY SIZED ACCESS DOOR SHALL BE PLACED UNDER THE
ITEM TO ALLOW EASY MAINTENANCE AND ADJUSTMENT. ADDITIONALLY ALL
SUCH ITEMS SHALL NOT BE LOCATED AN UNREASONABLE DISTANCE ABOVE
THE CEILINGS. IN GENERAL ALL SUCH ITEMS UNLESS INDICATED
OTHERWISE SHALL BE MOUNTED SIX TO TWELVE INCHES ABOVE THE
CEILING. IF IN DOUBT, CONTACT ENGINEER PRIOR TO INSTALLING.
PHASING NOTES
A. THIS PROJECT INTERFACES EXTENSIVELY WITH EXISTING BUILDING
SERVICES. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO
COORDINATE AND PHASE ALL TIE-INS AND INTERRUPTIONS OF EXISTING
SERVICES TO MINIMIZE OR ELIMINATE DOWNTIME. AS AN EXAMPLE, MAIN
GAS SERVICE, WATER SERVICE, ELECTRICAL SERVICE, HVAC SERVICES,
STEAM GENERATION, ETC., WILL BE AFFECTED AND REPLACED OR MOVED
DURING THIS PROJECT. THE CONTRACTOR SHALL INSTALL ALL NEW
SERVICES AND EQUIPMENT AND HAVE THEM TESTED AND FULLY AND
RELIABLY FUNCTIONAL PRIOR TO INTERRUPTING, RELOCATING OR
REMOVING ANY EXISTING SERVICES. IT SHALL BE THE CONTRACTOR'S
RESPONSIBILITY TO BARE ANY AND ALL COSTS ASSOCIATED WITH THIS
PHASING, INCLUDING TEMPORARY SERVICES, TEMPORARY RELOCATION,
PREMIUM TIME WORK, ETC. CONTRACTOR SHALL COORDINATE ALL SAID
WORK WITH THE OWNER AND APPLICABLE UTILITIES PER THE CONTRACT
DOCUMENTS.
HAZARDOUS MATERIALS NOTES
A. THE CONTRACTOR IT IS HEREBY ADVISED THAT IS POSSIBLE THAT
ASBESTOS AND/OR OTHER HAZARDOUS MATERIALS ARE OR WERE PRESENT
IN THIS BUILDING(S). ANY WORKER, OCCUPANT, VISITOR, ETC., WHO
ENCOUNTERS ANY MATERIAL OF WHOSE CONTENT THEY ARE NOT CERTAIN
SHALL PROMPTLY REPORT THE EXISTENCE AND LOCATION OF THAT
MATERIAL TO THE OWNER. FURTHERMORE, THE CONTRACTOR SHALL
INSURE THAT NO ONE COMES NEAR TO OR IN CONTACT WITH ANY SUCH
MATERIAL OR FUMES THEREFROM UNTIL ITS CONTENT CAN BE
ASCERTAINED TO BE NON-HAZARDOUS.
B. CMTA, INC. HAS NO EXPERTISE IN THE DETERMINATION OF THE PRESENCE
OF ANY HAZARDOUS MATERIAL. THEREFORE, NO ATTEMPT HAS BEEN
MADE BY CMTA TO IDENTIFY THE EXISTENCE OR LOCATION OF ANY SUCH
HAZARDOUS MATERIAL. FURTHERMORE, CMTA NOR ANY AFFILIATE HEREOF
WILL NOT OFFER OR MAKE ANY RECOMMENDATIONS RELATIVE TO THE
REMOVAL, HANDLING OR DISPOSAL OF SUCH MATERIAL.
C. IF THE WORK WHICH IS TO BE PERFORMED INTERFACES, CONNECTS OR
RELATES IN ANY PHYSICAL WAY WITH OR TO EXISTING COMPONENTS
WHICH CONTAIN OR BEAR ANY HAZARDOUS MATERIAL, ASBESTOS BEING
ONE, THEN IT SHALL BE THE CONTRACTOR'S SOLE RESPONSIBILITY TO
CONTACT THE OWNER AND SO ADVISE HIM/HER IMMEDIATELY.
D. THE CONTRACTOR BY EXECUTION OF THE CONTRACT FOR ANY WORK
AND/OR BY THE ACCOMPLISHMENT OF ANY WORK THEREBY AGREE TO
BRING NO CLAIM RELATIVE TO HAZARDOUS MATERIALS FOR NEGLIGENCE,
BREACH OF CONTRACT, INDEMNITY, OR ANY OTHER SUCH ITEM AGAINST
CMTA, ITS PRINCIPALS, EMPLOYEES, AGENTS OR CONSULTANTS. ALSO,
THE CONTRACTOR FURTHER AGREES TO DEFEND, INDEMNIFY AND HOLD
CMTA, ITS PRINCIPALS, EMPLOYEES, AGENTS AND CONSULTANTS
HARMLESS FROM ANY SUCH RELATED CLAIMS WHICH MAY BE BROUGHT BY
ANY SUBCONTRACTORS, SUPPLIERS OR ANY OTHER THIRD PARTIES.
E. THE CONTRACTOR IS DIRECTED TO THE SPECIFICATIONS FOR FURTHER
INFORMATION.
AREA NOT IN SCOPE
AREA NOT IN SCOPE
AREA NOT IN SCOPE
AREA NOT IN SCOPE
IT OFFICE
EXISTING
SERVER ROOM
MDF ROOM
RM 001
RM 015
RM 014
RM 013
CLEAN AGENT
CYLINDERS
RELEASING
PANEL
AREAS WITH THIS HATCH ARE TO BE PROVIDED WITH A
FK-5-1-12 CLEAN AGENT SYSTEM. EXISTING WET SPRINKLER
SYSTEM IN THESE ROOM SHALL BE REMOVED BACK TO MAINS.
AREAS WITH THIS HATCH ARE NOT IN SCOPE. EXISTING
SPRINKLER SYSTEM IN THESE AREAS TO REMAIN.
FP HATCH LEGEND
CHECKED:
DATE:
DRAWN:
F
IL
E N A M E
P
LO
T
TI
M E
CLIENT/CMTA JOB #:
C
U se rs \B
B ru e n in g \D o cu m e n ts
\O C V G
-0
M
E P R b b ru e n in g M
S A .r v t
/1
/2
:1 :4
P
M
F-001
9/25/25
BSB
MES
C V G
C E N
T R E S
E R V E R R
O O
M I
M P R O
V E M
E N
T S
C
IN
C
IN
N A T I
N
O R T H
E R N
K E N
T U
C K Y I
N T E R N
A T
IO
N A L A
IR
P O
R T
C
O M
A
IR
B L D
E R L A N
G E R K Y
F
IR
E P
R O
T E C T
IO
N F
L O
O R P
L A N
OCVG25-03
1/4" = 1'-0"F-001
FIRE PROTECTION SERVER ROOM1
REVISIONS
1 30% REVIEW 6/13/25
2 60% REVIEW 7/18/25
3 90% REVIEW 8/22/25
4 BIDDING 9/25/25
ABBREVIATIONSGENERAL NOTES - MECHANICAL
1. THE CONTRACTOR'S ATTENTION IS DIRECTED TO THE GENERAL AND SPECIAL CONDITIONS,
"GENERAL CONDITIONS - MECHANICAL" OF THE PROJECT SPECIFICATIONS AND TO ALL OTHER
CONTRACT DOCUMENTS AS THEY APPLY TO THIS BRANCH OF WORK. ATTENTION IS ALSO
DIRECTED TO ALL OTHER SECTIONS OF THE CONTRACT DOCUMENTS WHICH AFFECTS THE
WORK AND WHICH ARE HEREBY MADE A PART OF THE WORK SPECIFIED.
2. ALL MANUFACTURERS, SUPPLIERS, FABRICATORS, CONTRACTORS, ETC. SUBMITTING PROPOSALS
FOR ANY PART OF THE WORK, SERVICES, MATERIALS OR EQUIPMENT TO BE USED ON OR
APPLIED TO THIS PROJECT ARE HEREBY DIRECTED TO FAMILIARIZE THEMSELVES WITH THE
CONTRACT DOCUMENTS. IN CASE OF CONFLICTS, THE CONTRACTOR SHALL CONTACT THE
ENGINEER FOR CLARIFICATION AND FINAL DETERMINATION PRIOR TO THE BID.
3. THE WORK SHALL CONSIST OF FURNISHING ALL LABOR, EQUIPMENT, TRANSPORTATION,
SUPPLIES, MATERIALS, APPURTENANCES AND SERVICES NECESSARY FOR THE SATISFACTORY
INSTALLATION OF THE COMPLETE AND OPERATING SYSTEMS INDICATED OR SPECIFIED IN THE
CONTRACT DOCUMENTS.
4. ANY MATERIALS, LABOR, EQUIPMENT OR SERVICES NOT MENTIONED SPECIFICALLY HEREIN
WHICH MAY BE NECESSARY TO COMPLETE ANY PART OF THE SYSTEMS IN A SUBSTANTIAL
MANNER, IN COMPLIANCE WITH THE REQUIREMENTS STATED, IMPLIED OR INTENDED IN THE
PLANS AND SPECIFICATIONS, SHALL BE INCLUDED IN THE BID AS PART OF THE CONTRACT.
5. THE ENGINEER DOES NOT DEFINE THE SCOPE OF INDIVIDUAL TRADES, SUBCONTRACTORS,
MATERIAL SUPPLIERS AND VENDORS. ANY SHEET NUMBERING OR SPECIFICATION NUMBERING
SYSTEM USED WHICH IDENTIFIES DISCIPLINES IS SOLELY FOR THE ENGINEER'S CONVENIENCE
AND IS NOT INTENDED TO DEFINE A SUBCONTRACTOR'S SCOPE OF WORK. INFORMATION
REGARDING INDIVIDUAL TRADES, SUBCONTRACTORS, MATERIAL SUPPLIERS AND VENDORS MAY
BE DETAILED, DESCRIBED AND INDICATED AT DIFFERENT LOCATIONS THROUGHOUT THE
CONTRACT DOCUMENTS. NO CONSIDERATION WILL BE GIVEN TO REQUESTS FOR CHANGE
ORDERS FOR FAILURE TO OBTAIN AND REVIEW THE COMPLETE SET OF CONTRACT DOCUMENTS
WHEN PREPARING BIDS, PRICES AND QUOTATIONS. UNLESS STATED OTHERWISE, THE
SUBDIVISION AND ASSIGNMENT OF WORK UNDER THE VARIOUS SECTIONS SHALL BE THE
RESPONSIBILITY OF THE CONTRACTOR HOLDING THE PRIME CONTRACT.
6. IT IS THE INTENTION OF THE CONTRACT DOCUMENTS TO CALL FOR A COMPLETE AND
OPERATIONAL SYSTEM, INCLUDING ALL COMPONENTS, ACCESSORIES, FINISH WORK, ETC
NECESSARY FOR TROUBLE FREE OPERATION; TESTED AND READY FOR OPERATION. ANYTHING
THAT MAY BE REQUIRED, IMPLIED, OR INFERRED BY THE CONTRACT DOCUMENTS SHALL BE
PROVIDED AND INCLUDED AS PART OF THE BID.
7. ALL CONTRACTORS AND VENDORS PROVIDING A BID FOR THIS PROJECT SHALL REVIEW THE
PLANS AND SPECIFICATIONS AND DETERMINE ANY MODIFICATIONS AND/OR ADJUSTMENTS
NECESSARY RELATIVE TO THE PROPOSED EQUIPMENT AND MATERIALS WITH SPECIFIC
MANUFACTURER'S INSTALLATION REQUIREMENTS. INCLUDE IN THE BID ANY NECESSARY
METHODS, FEATURES, OPTIONS, ACCESSORIES, ETC. NECESSARY TO INSTALL THE PROPOSED
EQUIPMENT AND MATERIALS, REGARDLESS OF WHETHER USED AS BASIS OF DESIGN OR BEING
OFFERED AS A SUBSTITUTION, IN ACCORDANCE WITH THE SPECIFIC MANUFACTURER'S
INSTALLATION REQUIREMENTS, WHETHER SPECIFICALLY DETAILED OR NOT, WITHIN THE PLANS
AND SPECIFICATIONS.
8. THE BIDDER/PROPOSER SHALL COMPLETELY REVIEW THE CONTRACT DOCUMENTS. ANY
INTERPRETATION AS TO DESIGN INTENT OR SCOPE SHALL BE PROVIDED BY THE ENGINEER.
SHOULD ANY INTERPRETATION BE REQUIRED, THE BIDDER/PROPOSER SHALL REQUEST A
CLARIFICATION NOT LESS THAN TEN (10) DAYS PRIOR TO THE SUBMISSION OF THE BID SO
THAT THE CONDITION MAY BE CLARIFIED BY ADDENDUM. IN THE EVENT OF ANY CONFLICT,
DISCREPANCY, OR INCONSISTENCY DEVELOPS; THE INTERPRETATION OF THE ENGINEER SHALL
BE FINAL.
9. THE CONTRACTOR SHALL PROVIDE LAYOUT CONFIRMATION OF EQUIPMENT LOCATIONS TO
VERIFY THAT ALL COMPONENTS WILL FIT IN THE PROPOSED SPACE AND HAVE ADEQUATE
CLEARANCE FOR SERVICES. COORDINATE THE LOCATION OF DRAINS, CONNECTIONS, ETC.
PRIOR TO COMMENCING INSTALLATION. WORK NOT SO COORDINATED SHALL BE REMOVED AND
PROPERLY INSTALLED AT THE EXPENSE OF THE RESPONSIBLE CONTRACTOR(S).
10. EQUIPMENT AND MATERIALS SUBSTITUTIONS OR DEVIATIONS SHALL COMPLY WITH "GENERAL
PROVISIONS - MECHANICAL PART 6." ANY VENDOR WISHING TO OBTAIN AN EQUIPMENT
SUBSTITUTION SHALL REQUEST A CLARIFICATION NOT LESS THAN TEN (10) DAYS PRIOR TO THE
SUBMISSION OF THE PROPOSAL SO THAT IT MAY BE CONSIDERED AND POTENTIALLY INCLUDED
BY ADDENDUM. REQUESTS MADE AFTER THIS PERIOD WILL BE REJECTED.
11. CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLIANCE REGARDLESS IF CONTRACTOR IS
IGNORANT OF CODES, RULES, REGULATIONS, LAWS, ETC. THE CONTRACTOR SHALL ALSO BE
VERSED IN ALL CODES, RULES, REGULATIONS, LAWS, ETC. PERTINENT TO THEIR PART OF THE
WORK PRIOR TO SUBMISSION OF THE PROPOSAL.
12. ALL WARRANTIES SHALL BEGIN STARTING AT THE PROJECT'S SUBSTANTIAL COMPLETION DATE.
ALL EQUIPMENT, MATERIAL AND LABOR WARRANTIES SHALL BE FURNISHED BY THE EQUIPMENT
SUPPLIER/VENDOR.
13. WHEREVER WORK PENETRATES ROOFING, IT SHALL BE DONE IN A MANNER THAT WILL NOT
DIMINISH OR VOID THE ROOFING GUARANTEE OR WARRANTY IN ANY WAY. COORDINATE ALL
SUCH WORK WITH THE ROOFING INSTALLER.
14. DUCTWORK, PIPING AND EQUIPMENT SHALL BE KEPT CLEAN AT ALL TIMES. DUCTWORK STORED
ON THE JOB SITE SHALL BE PLACED A MINIMUM OF 4" ABOVE THE FLOOR AND BE COMPLETELY
COVERED IN PLASTIC. INSTALLED DUCTWORK SHALL BE PROTECTED WITH PLASTIC. DO NOT
INSTALL THE DUCTWORK OR INSULATION (PIPE OR DUCT) IF THE BUILDING IS NOT "DRIED-IN".
IF THIS IS REQUIRED, THE ENTIRE LENGTHS SHALL BE COVERED IN PLASTIC TO PROTECT. THE
OWNER/ENGINEER SHALL PERIODICALLY INSPECT THAT THESE PROCEDURES ARE FOLLOWED. IF
DEEMED UNACCEPTABLE, THE CONTRACTOR SHALL BE REQUIRED TO CLEAN THE DUCT SYSTEM
UTILIZING A NADCA CERTIFIED CONTRACTOR.
15. THE PERMANENT SYSTEMS, WHEN INSTALLED, MAY BE USED FOR TEMPORARY SERVICES WITH
THE CONSENT OF THE ENGINEER AND IN STRICT ACCORDANCE WITH "GENERAL PROVISIONS -
MECHANICAL - TEMPORARY USE OF EQUIPMENT."
16. THE CONTRACTOR AND THEIR SUBCONTRACTORS SHALL INCLUDE IN THE BID TO PROVIDE
EQUIPMENT AND CONTROLS STARTUP AND VERIFICATION FOR ALL MECHANICAL SYSTEMS
SPECIFIED FOR THIS PROJECT AND IN STRICT ACCORDANCE WITH "GENERAL PROVISIONS -
MECHANICAL - EQUIPMENT/CONTROLS STARTUP & VERIFICATION."
17. THE CONTRACTOR SHALL DETERMINE FROM THE CONTRACT DOCUMENTS, THE DATE OF
COMPLETION FOR THE PROJECT AND INSURE THAT EQUIPMENT DELIVERY SCHEDULES CAN BE
MET SO AS TO ALLOW THIS COMPLETION TO BE MET.
18. THROUGH COORDINATION WITH OTHER CONTRACTORS, VENDORS, AND SUPPLIERS ASSOCIATED
WITH THIS PROJECT, THIS CONTRACTOR SHALL INSURE, 100% FUNCTIONAL, TESTED,
INSPECTED AND APPROVED SYSTEMS. CLAIMS FOR ADDITIONAL COST OR CHANGE ORDERS
WILL BE REJECTED.
19. PRIOR TO ORDERING ANY MATERIALS OR ROUGH-IN OF ANY KIND, THE MECHANICAL
CONTRACTOR SHALL BE RESPONSIBLE FOR FINAL COORDINATION OF ALL ELECTRICAL
REQUIREMENTS (I.E. VOLTAGE, PHASE, CIRCUIT BREAKER, WIRE SIZING, ETC.) WITH THE
ELECTRICAL CONTRACTOR. THERE WILL BE NO CHANGE IN THE CONTRACT AMOUNT FOR ANY
DISCREPANCIES.
20. ALL OFFSETS, TURNS, FITTINGS, TRIM, DETAIL, ETC., MAY NOT BE INDICATED, BUT SHALL BE
PROVIDED AS REQUIRED. ADDITIONAL ALLOWANCES SHALL BE INCLUDED FOR SAME AT EACH
PROPOSERS' DISCRETION.
21. DO NOT SCALE FROM DRAWINGS, PRINTING DISTORTS SCALE. WORK SHALL BE LAID OUT FROM
CONTRACTOR GENERATED DIMENSIONED DRAWINGS.
22. THE CONTRACTOR SHALL ENSURE PROPER COORDINATION BETWEEN ALL TRADES SUCH THAT
CONDUITS, PIPING, DUCTWORK, ETC, DOES NOT BLOCK ACCESS TO VALVES, EQUIPMENT, DUCT
ACCESS DOORS, ETC. ITEMS THAT HAVE BEEN INSTALLED WHERE ACCESS IS COMPROMISED
SHALL BE RELOCATED AT THE CONTRACTOR'S EXPENSE.
23. THESE DRAWINGS ARE ACCURATE TO THE BEST OF OUR KNOWLEDGE, HOWEVER LOCATIONS
AND SIZES WERE TAKEN FROM DIFFERENT SOURCES AND ARE SUBJECT TO DEVIATION. THE
CONTRACTOR SHALL ASSUME SOME DEVIATIONS AND INCLUDE OFFSETS, ADDITIONAL PIPING,
ETC. AT THE TIME OF BID.
24. THIS CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING AND PATCHING REQUIRED FOR
THEIR WORK. ALL CUTTING AND PATCHING SHALL MATCH ADJACENT SURFACES AND
PERFORMED BY SKILLED WORKERS OF THE TRADE. REFER TO SPECIFICATION SECTION
"SLEEVING, CUTTING, PATCHING, REPAIRING, ETC." AND ARCHITECTURAL DRAWINGS FOR
ADDITIONAL INFORMATION.
25. ALL SUPPORTS FOR EQUIPMENT, DEVICES OR FIXTURES SHALL BE UNIQUE, FROM THE BUILDING
STRUCTURE. DO NOT SUPPORT WORK FROM OTHER TRADES, EQUIPMENT OR SUPPORTS
WITHOUT WRITTEN PERMISSION FROM THE ENGINEER AND CONSENT OF THE OTHER TRADE, IN
WRITING.
26. PRIOR TO PURCHASE OR FABRICATION OF PIPING, THE CONTRACTOR SHALL COORDINATE
INSTALLATION WITH ACTUAL CONDITIONS AND INSTALL ACCORDINGLY.
27. VALVES, BALANCING DAMPERS OR ANY MECHANICAL/ELECTRICAL ITEM SHALL NOT BE LOCATED
ABOVE A HARD CEILING. IF THIS IS NOT POSSIBLE, THEN AN APPROPRIATELY SIZED ACCESS
DOOR SHALL BE PLACED AT NO ADDITIONAL COST UNDER THE ITEM WHETHER SHOWN OR NOT
ON THE PLANS TO ALLOW ACCESS AND ADJUSTMENT.
28. THE CONTRACTOR SHALL VISIT THE SITE FOR EXACT LOCATIONS OF ALL WALL AND CEILING
DEVICES. THIS SHALL INCLUDE PLUMBING FIXTURES, CEILING GRILLES AND DIFFUSERS, ETC.
29. CONTRACTOR SHALL CLEAN UP CONSTRUCTION DEBRIS AT ALL TIMES DURING CONSTRUCTION.
TAGGED NOTE DESIGNATOR
GENERAL SYMBOLS
X REVISION TRIANGLE
ROOM NAME
RM # ROOM TAG
AFF ABOVE FINISHED FLOOR
AFR ABOVE FINISHED ROOF
ADJ ADJUSTABLE
APD AIR PRESSURE DROP
HVAC LEGEND
SUPPLY AIR DIFFUSER
TRANSFER AIR GRILLE W/ SOUND ATTENUATING BOOT
POINT OF CONNECTION / CONNECT TO EXISTING
POINT OF DEMOLITION
SIDEWALL DIFFUSER/GRILLE
RETURN AIR GRILLE
EXHAUST AIR DIFFUSER
MECHANICAL PIPING LEGEND
AIR DEVICE TAG (REGISTER, GRILLE, DIFFUSER,LOUVER)
AIRFLOW
TAG
SA AIR DUCT TURNING UP
SA AIR DUCT TURNING DOWN
SUPPLY AIR DUCT
RETURN AIR DUCT
EXHAUST AIR DUCT
OUTSIDE AIR DUCT
TRANSFER AIR DUCT
COMBUSTION AIR EXHAUST DUCT
COMBUSTION AIR INTAKE DUCT
RA AIR DUCT TURNING UP
RA AIR DUCT TURNING DOWN
EA AIR DUCT TURNING UP
EA AIR DUCT TURNING DOWN
DUCT TO BE DEMOLISHED - (XXX) DENOTES SYSTEM
EXISTING DUCT - (XXX) DENOTES SYSTEM
RA
SA
EA
OA
TA
CAE
CAI
SA
SA
RA
RA
EA
EA
D(XXX)
E(XXX)
DUCT TO BE ABANDONED IN PLACE - (XXX) DENOTES SYSTEMA(XXX)
RECTANGULAR DUCT
ROUND/SPIRAL DUCT
FLAT OVAL DUCT
#ø
##x##
PIPE ELBOW TURNING DOWN
PIPE ELBOW TURNING UP
PIPE TEE; CONNECTION ON BOTTOM
PIPE TEE; CONNECTION ON TOP
EXISTING PIPING - (XXX) DENOTES SYSTEM
PIPING TO BE DEMOLISHED - (XXX) DENOTES SYSTEMD(XXX)
E(XXX)
CONDENSATE DRAINCD
CHILLED WATER SUPPLY/RETURNCHWS/R
GLYCOL WATER SUPPLY/RETURN
HEAT PUMP WATER SUPPLY/RETURN
GS/R
HPS/R
CONDENSER WATER SUPPLY/RETURN
DUAL TEMP. WATER SUPPLY/RETURN
CWS/R
DTS/R
HIGH PRESSURE STEAM CONDENSATEHPC
HIGH PRESSURE STEAM; (#) DENOTES PRESSUREHPS(#)
LOW PRESSURE STEAM; (#) DENOTES PRESSURE
LOW PRESSURE STEAM CONDENSATE
LPS(#)
LPC
HEATING WATER SUPPLY/RETURNHWS/R
MPS(#) MEDIUM PRESSURE STEAM; (#) DENOTES PRESSURE
MEDIUM PRESSURE STEAM RETURNMPC
HEAT RECOVERY SUPPLY/RETURN PIPINGHRS/R
MAKEUP WATERMW
PIPE CAP
FLEXIBLE DUCT
THERMOSTAT
TS
T
C
TEMPERATURE SENSOR
CARBON DIOXIDE SENSOR
TC TEMPERATURE & CARBON DIOXIDE SENSOR
MANUAL BALANCING/VOLUME DAMPER
MOTORIZED DAMPER
H HUMIDITY SENSOR
VERT. HORIZ.
VERT. HORIZ.
MITERED ELBOW WITH TURNING VANES
EQUIPMENT TAG
BAS BUILDING AUTOMATION SYSTEM
AVG AVERAGE
BHP BREAK HORSEPOWER
CAV CONSTANT AIR VOLUME
BTU BRITISH THERMAL UNIT
CFM CUBIC FEET PER MINUTE
CO CARBON MONOXIDE
CO2 CARBON DIOXIDE
DB DRY BULB
ABBREVIATIONS (CONTINUED)
FIRE PROTECTION CONTRACTORFPC
FEET PER MINUTEFPM
FEET PER SECONDFPS
GALLON (-S)GAL
GENERAL CONTRACTORGC
GALLONS PER MINUTEGPM
GRAINSGR
HEADHD
H (-ORSEPOWER, -EAT PUMP)HP
KILOWATTkW
LEAVING AIR TEMPERATURELAT
LEAVING WATER TEMPERATURELWT
BTU PER HOUR [THOUSANDS]MBH
MINIMUM CIRCUIT AMPSMCA
MANUFACTURERMFG
MAXIMUM OVERCURRENT PROTECTION [AMPS]MOCP
ID I (-DENTIFICATION, -NSIDE DIAMETER, -NSIDE DIMENSION)
FIRE DAMPERFD
FULL LOAD AMPSFLA
NOISE CRITERIA OR NORMALLY CLOSEDNC
NORMALLY OPEN OR NUMBERNO
NOT TO SCALENTS
OUTSIDE DI (-AMETER, -MENSION)OD
OWNER FURNISHED, CONTRACTOR INSTALLEDOFCI
OWNER FURNISHED, OWNER INSTALLEDOFOI
PLUMBING CONTRACTORPC
PHASE [ELECTRICAL]PH
PARTS PER MILLIONPPM
PRESSURE DROPPD
PRESSURE REDUCING STATIONPRS
PRESSURE REDUCING VALVE (STEAM, WATER, GAS)PRV
POUNDS PER SQUARE INCHPSI
POUNDS PER SQUARE FOOTPSF
PSI GAUGEPSIG
RELATIVE HUMIDITY [%]RH
REVOLUTIONS PER MINUTERPM
SMOKE DAMPERSD
STATIC PRESSURESP
SQUARE FEET OR FOOTSQ FT
TYPICALTYP
UNLESS NOTED OTHERWISEUNO
TOTAL STATIC PRESSURETSP
VOLT (-AGE, -S)V
VARI (-ABLE, -IES)VAR
VARIABLE AIR VOLUMEVAV
VELOCITYVEL
VARIABLE FEQUENCY DRIVEVFD
WATT (-AGE, -S)W
WET BULBWB
WATER PRESSURE DROPWPD
DIFFERENTIAL PRESSUREΔP
TEMPERATURE DIFFERENCEΔT
℄ CENTERLINE
NOTE: NOT ALL SYMBOLS AND ABBREVIATIONS MAY BE USED ON THIS PROJECT
DDC DIRECT DIGITAL CONTROLS
DN DOWN
EAT ENTERING AIR TEMPERATURE
EC ELECTRICAL CONTRACTOR
EWT ENTERING WATER TEMPERATURE
ESP EXTERNAL STATIC PRESSURE
ETR EXISTING TO REMAIN
FREE AREAFA
GENERAL NOTES - DEMOLITION
A. THE CONTRACTOR SHALL REFER TO THE ARCHITECTURAL PLANS FOR AREAS IN WHICH THE
CEILING IS REMAINING. THE CONTRACTOR IS RESPONSIBLE FOR REMOVING THE EXISTING
CEILING AS REQUIRED AND REINSTALLATION. TEMPORARILY SUPPORT LIGHTS, DIFFUSERS,
CEILING ETC. REPLACE BROKEN CEILING TILES WITH NEW AT NO ADDITIONAL COST TO OWNER.
FIELED VERIFY EXACT REQUIREMENTS.
B. ALL OUTAGES SHALL BE SCHEDULED THROUGH THE PROJECT REPRESENTATIVE FOR PROPER
COORDINATION. A REQUEST FOR AN OUTAGE SHALL BE SUBMITTED IN WRITING A MINIMUM OF
TWO WEEKS IN ADVANCE.
C. DURING SPRINKLER SYSTEM OUTAGES THE CONTRACTORS SHALL PROVIDE FIRE WATCH OF
AREAS WITH OUTAGES.
D. ALL WALLS AND FLOOR SLABS SHALL BE REPAIRED TO MATCH EXISTING AND TO A LIKE NEW
CONDITION. ALL RATED WALLS AND FLOOR SLABS SHALL BE PATCHED AND REPAIRED TO
MAINTAIN RATING.
E. ALL EXISTING BUILDING FINISHES SHALL BE PROTECTED DURING THE DEMOLITION PHASE.
F. HEAVY DASHED LINES INDICATE ITEMS FOR REMOVAL (U.O.N) AND LIGHT SOLID LINES INDICATE
EXISTING ITEMS TO REMAIN.
G. COORDINATE DISPOSAL OF ALL FIXTURES, DEVICES, ETC. (INDICATED FOR DEMOLITION) WITH
THE OWNER.
PHASING NOTES
A. THIS PROJECT INTERFACES EXTENSIVELY WITH EXISTING BUILDING SERVICES. IT SHALL BE
THE CONTRACTOR'S RESPONSIBILITY TO COORDINATE AND PHASE ALL TIE-INS AND
INTERRUPTIONS OF EXISTING SERVICES TO MINIMIZE OR ELIMINATE DOWNTIME. AS AN
EXAMPLE, MAIN GAS SERVICE, WATER SERVICE, ELECTRICAL SERVICE, HVAC SERVICES, STEAM
GENERATION, ETC., WILL BE AFFECTED AND REPLACED OR MOVED DURING THIS PROJECT. THE
CONTRACTOR SHALL INSTALL ALL NEW SERVICES AND EQUIPMENT AND HAVE THEM TESTED
AND FULLY AND RELIABLY FUNCTIONAL PRIOR TO INTERRUPTING, RELOCATING OR REMOVING
ANY EXISTING SERVICES. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO BARE ANY
AND ALL COSTS ASSOCIATED WITH THIS PHASING, INCLUDING TEMPORARY SERVICES,
TEMPORARY RELOCATION, PREMIUM TIME WORK, ETC. CONTRACTOR SHALL COORDINATE ALL
SAID WORK WITH THE OWNER AND APPLICABLE UTILITIES PER THE CONTRACT DOCUMENTS.
HAZARDOUS MATERIALS NOTES
A. THE CONTRACTOR IT IS HEREBY ADVISED THAT IS POSSIBLE THAT ASBESTOS AND/OR OTHER
HAZARDOUS MATERIALS ARE OR WERE PRESENT IN THIS BUILDING(S). ANY WORKER,
OCCUPANT, VISITOR, ETC., WHO ENCOUNTERS ANY MATERIAL OF WHOSE CONTENT THEY ARE
NOT CERTAIN SHALL PROMPTLY REPORT THE EXISTENCE AND LOCATION OF THAT MATERIAL
TO THE OWNER. FURTHERMORE, THE CONTRACTOR SHALL INSURE THAT NO ONE COMES
NEAR TO OR IN CONTACT WITH ANY SUCH MATERIAL OR FUMES THEREFROM UNTIL ITS
CONTENT CAN BE ASCERTAINED TO BE NON-HAZARDOUS.
B. CMTA, INC. HAS NO EXPERTISE IN THE DETERMINATION OF THE PRESENCE OF ANY
HAZARDOUS MATERIAL. THEREFORE, NO ATTEMPT HAS BEEN MADE BY CMTA TO IDENTIFY
THE EXISTENCE OR LOCATION OF ANY SUCH HAZARDOUS MATERIAL. FURTHERMORE, CMTA
NOR ANY AFFILIATE HEREOF WILL NOT OFFER OR MAKE ANY RECOMMENDATIONS RELATIVE
TO THE REMOVAL, HANDLING OR DISPOSAL OF SUCH MATERIAL.
C. IF THE WORK WHICH IS TO BE PERFORMED INTERFACES, CONNECTS OR RELATES IN ANY
PHYSICAL WAY WITH OR TO EXISTING COMPONENTS WHICH CONTAIN OR BEAR ANY
HAZARDOUS MATERIAL, ASBESTOS BEING ONE, THEN IT SHALL BE THE CONTRACTOR'S SOLE
RESPONSIBILITY TO CONTACT THE OWNER AND SO ADVISE HIM/HER IMMEDIATELY.
D. THE CONTRACTOR BY EXECUTION OF THE CONTRACT FOR ANY WORK AND/OR BY THE
ACCOMPLISHMENT OF ANY WORK THEREBY AGREE TO BRING NO CLAIM RELATIVE TO
HAZARDOUS MATERIALS FOR NEGLIGENCE, BREACH OF CONTRACT, INDEMNITY, OR ANY
OTHER SUCH ITEM AGAINST CMTA, ITS PRINCIPALS, EMPLOYEES, AGENTS OR CONSULTANTS.
ALSO, THE CONTRACTOR FURTHER AGREES TO DEFEND, INDEMNIFY AND HOLD CMTA, ITS
PRINCIPALS, EMPLOYEES, AGENTS AND CONSULTANTS HARMLESS FROM ANY SUCH RELATED
CLAIMS WHICH MAY BE BROUGHT BY ANY SUBCONTRACTORS, SUPPLIERS OR ANY OTHER
THIRD PARTIES.
E. THE CONTRACTOR IS DIRECTED TO THE SPECIFICATIONS FOR FURTHER INFORMATION.
XXX-X
FSD FIRE SMOKE DAMPER
CHECKED:
DATE:
DRAWN:
F
IL
E N A M E
P L O T
T
IM
E
2429 Members Way
Lexington, KY 40504
T: 859 253.0892 F: 859 231.8357
CLIENT/CMTA JOB #:
C
U se rs \C
M cC o n n e ll\
D o cu m e n ts
\O C V G
-0
M
E P R C M cC o n n e ll4
L .r v t
/1
/2
:1 :4
P
M
M-000
9/25/25
C.MCCONNELL
T.ANDERSON
C V G
C E N
T R
E S
E R
V E R R
O O
M I
M P R
O V E M
E N
T S
C
IN
C
IN
N A T I
N
O R
T H
E R
N K
E N
T U
C K Y I
N T E R N
A T
IO
N A L A
IR
P O
R T
C
O M
A
IR
B L D
E R L A N
G E R K Y
M E C H
A N
IC
A L L
E G
E N
D
OCVG25-03
REVISIONS
1 30% REVIEW 6/13/25
2 60% REVIEW 7/18/25
AREA B
(LOWER LEVEL)
AREA A
(LOWER LEVEL)
ROOFTOP
EQUIPMENT
(FIRST LEVEL)
CHECKED:
DATE:
DRAWN:
F
IL
E N A M E
P L O T
T
IM
E
2429 Members Way
Lexington, KY 40504
T: 859 253.0892 F: 859 231.8357
CLIENT/CMTA JOB #:
C
U se rs \C
M cC o n n e ll\
D o cu m e n ts
\O C V G
-0
M
E P R C M cC o n n e ll4
L .r v t
/1
/2
:1 :4
P
M
M-001
9/25/25
C.MCCONNELL
T.ANDERSON
C V G
C E N
T R
E S
E R
V E R R
O O
M I
M P R
O V E M
E N
T S
C
IN
C
IN
N A T I
N
O R
T H
E R
N K
E N
T U
C K Y I
N T E R N
A T
IO
N A L A
IR
P O
R T
C
O M
A
IR
B L D
E R L A N
G E R
M E C H
A N
IC
A L A
R E A S O
F W
O R
K
OCVG25-03
REVISIONS
1 30% REVIEW 6/13/25
2 60% REVIEW 7/18/25
3 90% REVIEW 8/22/25
4 BIDDING 9/25/25
1/16" = 1'-0"M-001
FIRST FLOOR AREAS OF WORK1
1/16" = 1'-0"M-001
ROOFTOP AREAS OF WORK2
xxx
485.94 sf
I.T. Data Room xxx
485.94 sf
STAIRS
EXISTING
CO-LOCATESERVER
ROOM
CVGSERVER
ROOM
AREA NOT IN SCOPE
AREA NOT IN SCOPE
AREA NOT IN SCOPE
AREA NOT IN SCOPE
IT OFFICE
MDF ROOM
RM 001
RM 015
RM 014
RM 013
AC-4
(EX.)
AC-3
(EX.)
2 1/2" E(GS)
2 1/2" E(GR)
1/2" E(MW)
6" E
(H W
R
6" E
(H W
S
8" E
(C H
W R
8" E
(C H
W S
4" E(GR)
4" E(GS)
AC-1
(EX)
AC-2
(EX)
3/4" CD 3/4" CD
1/
2" G
R
1/
2" G
S 1/
2" M
W
2 1/2" GS
2 1/2" GR
1/2" MW
M4
1 1/2" E(GS)
1 1/2" E(GR)
1 1/2" E(GS)
1 1/2" E(GR)
M6
M6
AREA A
(LOWER LEVEL)
CHECKED:
DATE:
DRAWN:
F
IL
E N A M E
P
LO
T
TI
M E
CLIENT/CMTA JOB #:
C
U se rs \C
M cC o n n e ll\
D o cu m e n ts
\O C V G
-0
M
E P R C M cC o n n e ll4
L .r v t
/1
/2
:1 :4
P
M
M-100
9/25/25
C.MCCONNELL
T.ANDERSON
C V G
C E N
T R
E S
E R
V E R R
O O
M I
M P R
O V E M
E N
T S
C
IN
C
IN
N A T I
N
O R
T H
E R
N K
E N
T U
C K Y I
N T E R N
A T
IO
N A L A
IR
P O
R T
C
O M
A
IR
B L D
E R L A N
G E R
A R
E A A
M E C H
A N
IC
A L D
E M
O L
IT
IO
N
P L A N
OCVG25-03
REVISIONS
1 30% REVIEW 6/13/25
2 60% REVIEW 7/18/25
3 90% REVIEW 8/22/25
4 BIDDING 9/25/25
TAGGED NOTES
M4 IN BID ALTERNATE, THIS GLYCOL PIPING MAIN IS TO BE
DEMOLISHED IN ITS TOTALITY AND REPLACED WITH THE NEW
PIPING. THE EXISTING BRANCH PIPING SERVING AC-1 AND
AC-2 SHALL BE REUSED AND RECONNECTED TO THE NEW
PIPING MAIN.
M6 DEMOLISH EXISTING AIR CONDITIONING UNITS. THIS SHALL
INCLUDE ALL ELECTRICAL AND WIRING CONNECTIONS AND
RAISED FLOOR SUPPORTS. ALL PIPING TO BE DEMOLISHED
BACK TO THE POINT OF DEMOLITION SHOWN.
1/4" = 1'-0"M-100
AREA A MECHANICAL DEMOLITION1
CAFE
CONFERENCE
ROOM
STAIRS
SYSTEM OPERATIONS
CONTROL CENTER
ELEVATOR
EXERCISE ROOM
4" E(GR)
4" E(GS)
4" GR UP4" GS UP
ALL WORK HAPPENING BEYOND THIS
POINT IN TENET SPACE MUST BE
COORDINATED WITH TENET IN ADVANCE
AND COMPLETED WITH ESCORT.
M4
M7
AREA B
(LOWER LEVEL)
CHECKED:
DATE:
DRAWN:
F
IL
E N A M E
P L O T
T
IM
E
CLIENT/CMTA JOB #:
C
U se rs \C
M cC o n n e ll\
D o cu m e n ts
\O C V G
-0
M
E P R C M cC o n n e ll4
L .r v t
/1
/2
:1 :4
P
M
M-101
9/25/25
C.MCCONNELL
T.ANDERSON
C V G
C E N
T R
E S
E R
V E R R
O O
M I
M P R
O V E M
E N
T S
C
IN
C
IN
N A T I
N
O R
T H
E R
N K
E N
T U
C K Y I
N T E R N
A T
IO
N A L A
IR
P O
R T
C
O M
A
IR
B L D
E R L A N
G E R
A R
E A B
M E C H
A N
IC
A L D
E M
O L
IT
IO
N
P L A N
OCVG25-03
TAGGED NOTES
M4 IN BID ALTERNATE, THIS GLYCOL PIPING MAIN IS TO BE
DEMOLISHED IN ITS TOTALITY AND REPLACED WITH THE NEW
PIPING. THE EXISTING BRANCH PIPING SERVING AC-1 AND
AC-2 SHALL BE REUSED AND RECONNECTED TO THE NEW
PIPING MAIN.
M7 ALL PIPING AND SUPPORTS ABOVE TENET SPACE TO BE
DEMOLISHED FROM THE POINT SHOWN TO THE EQUIPMENT
ON THE ROOF. ALL DEMOLITION WORK IS TO BE
COORDINATED WITH THE TENET TO ENSURE THAT CRITICAL
OPERATIONS ARE NOT DISRUPTED.
REVISIONS
1 30% REVIEW 6/13/25
2 60% REVIEW 7/18/25
DC-1
(EX)
DC-2
(EX)
P-1 (EX) 4" GR DN
4" GS DN
M8
ROOFTOP
(FIRST LEVEL)
CHECKED:
DATE:
DRAWN:
F
IL
E N A M E
P L O T
T
IM
E
CLIENT/CMTA JOB #:
C
U se rs \C
M cC o n n e ll\
D o cu m e n ts
\O C V G
-0
M
E P R C M cC o n n e ll4
L .r v t
/1
/2
:1 :4
P
M
M-102
9/25/25
C.MCCONNELL
T.ANDERSON
C V G
C E N
T R
E S
E R
V E R R
O O
M I
M P R
O V E M
E N
T S
C
IN
C
IN
N A T I
N
O R
T H
E R
N K
E N
T U
C K Y I
N T E R N
A T
IO
N A L A
IR
P O
R T
C
O M
A
IR
B L D
E R L A N
G E R
R O
O F M
E C H
A N
IC
A L D
E M
O L
IT
IO
N
P L A N
OCVG25-03
TAGGED NOTES
M8 THE EXISTING EQUIPMENT ON ROOF ASSOCIATED WITH THE
GLYCOL COOLING SYSTEM TO BE DEMOLISHED AND
REMOVED. THIS SHALL INCLUDE ALL ELECTRICAL
CONNECTIONS, WIRING, AND SUPPORTS. THE EXISTING
PIPING CURB THROUGH ROOF TO BE SEALED WITH AN
INSULATED CAP THAT IS WATERTIGHT.
REVISIONS
1 30% REVIEW 6/13/25
2 60% REVIEW 7/18/25
3 90% REVIEW 8/22/25
4 BIDDING 9/25/25
1/4" = 1'-0"M-102
ROOF MECHANICAL DEMOLITION1
xxx
485.94 sf
I.T. Data Room xxx
485.94 sf
STAIRS
EXISTING
CO-LOCATESERVER
ROOM
CVGSERVER
ROOM
AREA NOT IN SCOPE
AREA NOT IN SCOPE
AREA NOT IN SCOPE
AREA NOT IN SCOPE
IT OFFICE
RM 001
RM 015
AC-3 AC-4 AC-5 AC-6
4" GS
4" GR
8" CHWS
8" CHWR
6" HWS
6" HWR
AC-1
(EX)
AC-2
(EX)
3/4" CD 3/4" CD 3/4" CD
1/2" E(MW)
RM 014
3" GS
3" GR
3" GS
3" GR
2 1/2" GS
2 1/2" GR
1/2" MW1/2" MW
1/2" MW
4" E(GR)
4" E(GS)
M4
1 1/2" E(GS)
1 1/2" E(GR)
1 1/2" E(GR)
1 1/2" E(GS)
REPLACE DEMOLISHED AIR
CONDITIONING UNITS WITH RAISED
FLOOR SYSTEM IN THIS LOCATION
REPLACE DEMOLISHED AIR
CONDITIONING UNITS WITH RAISED
FLOOR SYSTEM IN THIS LOCATION
AREA A
(LOWER LEVEL)
CHECKED:
DATE:
DRAWN:
F
IL
E N A M E
P
LO
T
TI
M E
CLIENT/CMTA JOB #:
C
U se rs \C
M cC o n n e ll\
D o cu m e n ts
\O C V G
-0
M
E P R C M cC o n n e ll4
L .r v t
/1
/2
:1 :4
P
M
M-200
9/25/25
C.MCCONNELL
T.ANDERSON
C V G
C E N
T R
E S
E R
V E R R
O O
M I
M P R
O V E M
E N
T S
C
IN
C
IN
N A T I
N
O R
T H
E R
N K
E N
T U
C K Y I
N T E R N
A T
IO
N A L A
IR
P O
R T
C
O M
A
IR
B L D
E R L A N
G E R
A R
E A A
M E C H
A N
IC
A L P
L A N
OCVG25-03
TAGGED NOTES
M4 IN BID ALTERNATE, THIS GLYCOL PIPING MAIN IS TO BE
DEMOLISHED IN ITS TOTALITY AND REPLACED WITH THE NEW
PIPING. THE EXISTING BRANCH PIPING SERVING AC-1 AND
AC-2 SHALL BE REUSED AND RECONNECTED TO THE NEW
PIPING MAIN.
REVISIONS
1 30% REVIEW 6/13/25
2 60% REVIEW 7/18/25
3 90% REVIEW 8/22/25
4 BIDDING 9/25/25
1/4" = 1'-0"M-200
FIRST FLOOR AREA A MECHANICAL PLAN1
CAFE
CONFERENCE
ROOM
STAIRS
SYSTEM OPERATIONS
CONTROL CENTER
ELEVATOR
EXERCISE ROOM
4" GS UP 4" GR UP
INCLUDE A DRIP TRAY BENEATH ALL
PIPING IN TENET SPACE.
W
WATER SENSOR
M3
M4
AREA B
(LOWER LEVEL)
CHECKED:
DATE:
DRAWN:
F
IL
E N A M E
P L O T
T
IM
E
CLIENT/CMTA JOB #:
C
U se rs \C
M cC o n n e ll\
D o cu m e n ts
\O C V G
-0
M
E P R C M cC o n n e ll4
L .r v t
/1
/2
:1 :4
P
M
M-201
9/25/25
C.MCCONNELL
T.ANDERSON
C V G
C E N
T R
E S
E R
V E R R
O O
M I
M P R
O V E M
E N
T S
C
IN
C
IN
N A T I
N
O R
T H
E R
N K
E N
T U
C K Y I
N T E R N
A T
IO
N A L A
IR
P O
R T
C
O M
A
IR
B L D
E R L A N
G E R
A R
E A B
M E C H
A N
IC
A L P
L A N
OCVG25-03
TAGGED NOTES
M3 INSTALL DRIP TRAY BENEATH ALL PIPING ABOVE TENET
SPACE. DRIP TRAY TO HAVE SLOPE OF 1/8" PER FOOT IN THE
DIRECTION OF WATER SENSOR.
M4 IN BID ALTERNATE, THIS GLYCOL PIPING MAIN IS TO BE
DEMOLISHED IN ITS TOTALITY AND REPLACED WITH THE NEW
PIPING. THE EXISTING BRANCH PIPING SERVING AC-1 AND
AC-2 SHALL BE REUSED AND RECONNECTED TO THE NEW
PIPING MAIN.
REVISIONS
1 30% REVIEW 6/13/25
2 60% REVIEW 7/18/25
DC-2
DC-1
P1
M1
G R
G S
M2
P2
ROOFTOP
(FIRST LEVEL)
CHECKED:
DATE:
DRAWN:
F
IL
E N A M E
P L O T
T
IM
E
CLIENT/CMTA JOB #:
C
U se rs \C
M cC o n n e ll\
D o cu m e n ts
\O C V G
-0
M
E P R C M cC o n n e ll4
L .r v t
/1
/2
:1 :5
P
M
M-202
9/25/25
C.MCCONNELL
T.ANDERSON
C V G
C E N
T R
E S
E R
V E R R
O O
M I
M P R
O V E M
E N
T S
C
IN
C
IN
N A T I
N
O R
T H
E R
N K
E N
T U
C K Y I
N T E R N
A T
IO
N A L A
IR
P O
R T
C
O M
A
IR
B L D
E R L A N
G E R
R O
O F M
E C H
A N
IC
A L P
L A N
OCVG25-03
TAGGED NOTES
M1 PROVIDE PIPING DOGHOUSE IN THIS LOCATION FOR GLYCOL
PIPING. REFER TO DETAIL ON SHEET M300.
M2 PROVIDE PIPE SUPPORTS AS NECESSARY FOR GLYCOL
PIPING.
1/4" = 1'-0"M-202
ROOF MECHANICAL PLAN1
REVISIONS
1 30% REVIEW 6/13/25
2 60% REVIEW 7/18/25
TYPICAL INSULATED CURB OPENING,
THYCURB TC-1, OR EQUAL. CURB
SHALL BE 18'' TALL.
SPACE ALLOWED FOR ROOFING
MATERIAL UNDER PORTAL
CONVENIENCE OUTLET (CAULK ALL
PENETRATIONS)
13X13 PORTAL TO BE
16 GAUGE ALUMINUM
CONSTRUCTION
UNISTRUT BACKING CHANNEL
INSIDE
WELDED CORNERS
(MICRO SEALED)
FASTENERS
(TYPICAL)
REMOVABLE WATERTIGHT
COVER.
GLUE 1/2" ARMAFLEX INSULATION
TO THE INSIDE OF THE PORTAL.
1" LIP
ROOF PRODUCTS, INC. MODEL
RPPC-90 OR APPROVED EQUAL.
HOLE SAW PIPE PENETRATIONS
ACCOUNT FOR INSULATION IF
APPLICABLE. CAULK OPENING AFTER
CONDUIT INSTALLATION.
SUPPORT PIPE WITH UNISTRUT
ATTACHED TO ROOF CURB WITH
HYDRAZORB CLAMPS.
* GALVANIZED STEEL IS NOT
ACCEPTABLE.
AV ZONE
AO CLG SP
CRAC UNIT
RUN CONDITIONS - SCHEDULED:
THE UNIT SHALL RUN UNDER ITS OWN CONTROLS. THE BAS SHALL MONITOR THE ROOM
TEMPERATURE AND LISTED POINTS AVAILABLE ON THE BACNET INTERFACE. ADDITIONAL POINTS
ARE AVAILABLE AND MAY BE MONITORED BY THE BAS.
ALARMS SHALL BE PROVIDED AS FOLLOWS:
• TEMPERATURE ALARM: IF THE ZONE TEMPERATURE IS GREATER THAN THE COOLING
SETPOINT BY A USER DEFINABLE AMOUNT (ADJ.).
• HUMIDITY ALARM: IF THE ZONE HUMIDITY IS OUTSIDE OF ITS SETPOINTS BY A USER
DEFINABLE AMOUNT (ADJ.)
• EQUIPMENT FAULT: IF ANY OF THE EQUIPMENT REPORTS A FAULT CONDITION
UNITS AC 3 AND AC 4 ARE REDUNDANT AND SHALL ALTERNATE OPERATION EVERY 7 DAYS. IF
THERE IS A FAULT IN ONE UNIT, IT SHALL SWITCH TO THE OTHER UNIT.
UNITS AC 5 AND AC 6 ARE REDUNDANT AND SHALL ALTERNATE OPERATION EVERY 7 DAYS. IF
THERE IS A FAULT IN ONE UNIT, IT SHALL SWITCH TO THE OTHER UNIT.
IF LEAK IS DETECTED IN CONDENSATE OVERFLOW SENSOR IN THE CRAC UNIT, THE UNIT SHALL
SHUT DOWN AND THE OTHER PAIRED UNIT SHALL ACTIVATE UNTIL RESET.
BACnet I-FACE
COORDINATE WITH
UNIT MANUFACTURER
FOR AVAILABLE
POINTS LIST.
(TYPICAL)
DV CLG ON
DV DEHUM
AV %CAP
DV STAT
AV HUM
AO HUM SP
DV FILT
DV T ALM
DV H ALM
POINTS SHOWN HERE ARE FOR EXAMPLE.
INCLUDE ALL AVAILABLE POINTS APPLICABLE
TO THE EQUIPMENT
DUAL PUMP
PACKAGE
(P1 & P2)
GLYCOL DRY COOLER
(DC-1)
DI PAST
DI PBST
DI PA FLT
DI PB FLT
DV FAULT
DI DCST
DI DC FLT
AI DC ENT
AI DC LVG
AC-2
(EXISTING)
(ROOM 014)
AC-1
(EXISTING)
(ROOM 014)AC-6
(EXISTING SERVER ROOM 001)
AC-5
(EXISTING SERVER ROOM 001)
AC-3
(SERVER ROOM
002)
AC-4
(SERVER ROOM
002)
PIPE ROOF CURB
(SEE DETAIL)
2" GS 2" GS 2-1/2" GS 2-1/2" GS
4" GS
4" GS
4" GR
(EXISTING)
1-1/2" GS
(EXISTING)
1-1/2" GS
3/4" CD3/4" CD 3/4" CD 3/4" CD
3" GS
3" GR
2" GR 2" GR 2-1/2" GR 2-1/2" GR
2-1/2" GS
2-1/2" GR
4" GR
(EXISTING)
1-1/2" GR
(EXISTING)
1-1/2" GR
CAP FOR FUTURE
EXPANSION
CAP FOR
FUTURE
EXPANSION
3" GS
3" GR
4" GS
4" GR
DI DCST
DI DC FLT
AI DC ENT
AI DC LVG
1/2" MW
25-GALLON EXPANSION TANK
PROVIDED BY DRY COOLER
MANUFACTURER
GLYCOL DRY COOLER
(DC-2)
1/2" MW
1/2" MW
1/2" MW
(EXISTING)
1/2" MW
(EXISTING)
1/2" MW
HOSE CONNECTION
FOR WATER/GLYCOL
REFILL
FS
3/4" DRAIN HOSE
CONNECTION
P P
4" GS
4" GR
3/4" DRAIN HOSE
CONNECTION
NOTE: INITITALLY CHARGE SYSTEM WITH 40%
PROPYLENE GLYCOL SOLUTION BY VOLUME
DI CNDOF
3-WAY VALVE
INTEGRAL TO
EQUIPMENT
(TYPICAL)
AUTOMATIC
BALANCING VALVE
AUTOMATIC
BALANCING VALVE
AUTOMATIC
BALANCING VALVE
AUTOMATIC
BALANCING VALVE
SPRING ISOLATORS
BY HVAC
CONTRACOTR
(TYPICAL)
AV RH
DV SATO
DV SATU
DV F ALM
DV SMK
DV AF ALM
DO ON/OFF
AV SAT
TS
FS
PS
TWO-WAY CONTROL VALVE
THREE-WAY CONTROL VALVE
AUTOMATIC AIR VENT (AAV)
AUTOMATIC BALANCING VALVE (BV)
BALL VALVE
BUTTERFLY VALVE
CHECK VALVE
FLEXIBLE PIPE CONNECTION
FLOW METER (VENTURI)
FLOW SWITCH
PRESSURE SWTICH
TAMPER SWITCH
THERMOMETER
DOUBLE CHECK VALVE ASSEMBLY
PIPING UNION
PETE'S PLUG; TEMPERATURE/PRESSURE PORT
MANUAL AIR VENT (MAV)
TRIPLE DUTY VALVE (TDV)
MANUAL ISOLATION VALVE
GLOBE VALVE
OS&Y (GATE) VALVE
AUTO-FLOW CONTROL VALVE
STRAINER
PRESSURE REDUCING VALVE (STEAM, GAS, WATER, ETC.)
PIPING ACCESSORY LEGEND
DO XXXX
DI XXXX
AI XXXX
AO XXXX
DV XXXX
AV XXXX ANALOG VALUE
DIGITAL OUTPUT
DIGITAL INPUT
DIGITAL VALUE
ANALOG INPUT
ANALOG OUTPUT
AFMS AIR FLOW MEASURING STATION
TEMPERATURE SENSOR
HUMIDITY SENSOR
CARBON DIOXIDE SENSOR
STATIC PRESSURE SENSOR
LOW LIMIT THERMOSTAT (FREEZESTAT)
HIGH LIMIT STATIC PRESSURE STAT
LOW LIMIT STATIC PRESSURE STAT
DIFFERENTIAL PRESSURE SWITCH
SMOKE DETECTOR
MOTORIZED DAMPER
DIFFERENTIAL PRESSURE SENSOR
M
C
DPS
LL
SP
DSP-HL
SD
H
Ts
DP
DSP-LL
CONTROLS LEGEND
VFD VARIABLE FREQUENCY DRIVE
BACnet I-FACE BACnet INTERFACE INTEGRATION
FLOW METERF
CURRENT TRANSMITTERCT
CURRENT STATUS SWITCHCS
PRESSURE SENSORP
CONTROLS LEGEND (CONT.)
ZONE
CLG SP
CLG ON
DEHUM
% CAP
STAT
HUM
HUM SP
FILT
T ALM
H ALM
FAULT
CONDENSATE OVERFLOW
PAST
PA FLT
PBST
PB FLT
CNDOF
DC FLT
DC ENT
DC LVG
DCST
FAULT
HUMIDITY ALARM
TEMPERATURE ALARM
FILTER STATUS
HUMIDITY SETPOINT
HUMIDIFICATION ON/OFF
SYSTEM STATUS
% CAPACITY
DEHUMIFICATION ON/OFF
COOLING ON/OFF
COOLING TEMPERATURE SETPOINT
ZONE TEMPERATURE
PUMP A STATUS
PUMP A FAULT
PUMP B STATUS
PUMP B FAULT
DRY COOLER STATUS
DRY COOLER FAULT
DRY COOLER ENTERING WATER TEMPERATURE
DRY COOLER LEAVING WATER TEMPERATURE
RH RETURN AIR RELATIVE HUMIDITY
SATO
SATU
F ALM
SMK
AF ALM
SYSTEM ON/OFF CONTROLON/OFF
LOSS OF AIRFLOW
SMOKE DETECTED
FAN ISSUE
SUPPLY AIR UNDER TEMPERATURE
SUPPLY AIR OVER TEMPERATURE
SAT SUPPLY AIR TEMPERATURE
CHECKED:
DATE:
DRAWN:
F
IL
E N A M E
P L O T
T
IM
E
CLIENT/CMTA JOB #:
C
U se rs \C
M cC o n n e ll\
D o cu m e n ts
\O C V G
-0
M
E P R C M cC o n n e ll4
L .r v t
/1
/2
:2 :0
P
M
M-300
9/25/25
C.MCCONNELL
T.ANDERSON
C V G
C E N
T R
E S
E R
V E R R
O O
M I
M P R
O V E M
E N
T S
C
IN
C
IN
N A T I
N
O R
T H
E R
N K
E N
T U
C K Y I
N T E R N
A T
IO
N A L A
IR
P O
R T
C
O M
A
IR
B L D
E R L A N
G E R
M E C H
A N
IC
A L S
C H
E D
U L E S
D E T A
IL
S
OCVG25-03
REVISIONS
1 30% REVIEW 6/13/25
2 60% REVIEW 7/18/25
3 90% REVIEW 8/22/25
4 BIDDING 9/25/25
DATA ROOM COOLING UNIT SCHEDULE
MARK MANUFACTURER MODEL #
DIMENSIONS (IN.)
WEIGHT (LBS)
SENSIBLE
CAPACITY
(BTUH)
TOTAL
CAPACITY
(BTUH)
REHEAT
CAPACITY
(KW)
AIRFLOW
RATE (CFM)
ENTERING WATER
TEMPERATURE (°F)
WATER FLOW
RATE (GPM)
PRESSURE
DROP (FT)
HUMIDIFIER
TYPE
HUMIDIFIER
CAPACITY (LBS/HR)
ELECTRICAL
REMARKS LENGTH WIDTH HEIGHT VOLTAGE PHASE FLA MOCP
AC-3 LIEBERT PX029DG1AD 34 33 78 810 81,900 96,200 12 3,900 104°F 26.4 50.4 INFRARED 7.7 460 3 34.8 50 1
AC-4 LIEBERT PX029DG1AD 34 33 78 810 91,900 96,200 12 3,900 104°F 26.4 50.4 INFRARED 7.7 460 3 34.8 50 1
AC-5 LIEBERT DS042KDAEI 34 85 78 1930 122,000 127,000 15 5,500 104°F 39.9 37 INFRARED 11 460 3 37.7 50 1
AC-6 LIEBERT DS042KDAEI 34 85 78 1930 122,000 127,000 15 5,500 104°F 39.9 37 INFRARED 11 460 3 37.7 50 1
DRY COOLER SCHEDULE
MARK MANUFACTURER MODEL #
DIMENSIONS (IN.)
WEIGHT
(LBS)
TOTAL
COOLING
(KBTU) EWT LWT
ELECTRICAL
REMARKS LENGTH WIDTH HEIGHT VOLTAGE PHASE FLA MOCP
DC-1 LIEBERT DDNT498A64 164 87 44 2430 365000.0 115°F 104°F 460 3 7 A 15 1
DC-2 LIEBERT DDNT498A64 164 87 44 2430 365000.0 115°F 104°F 460 3 7 A 15 1
GLYCOL PUMP SCHEDULE
MARK MANUFACTURER MODEL #
DIMENSIONS (IN.)
WEIGHT
(LBS)
HEAT
PRESSURE
(FT)
ELECTRICAL
REMARKS LENGTH WIDTH HEIGHT VOLTAGE PHASE FLA
MOC
P
P1 LEIBERT D7.5ANT 42 33 20 276 125.0 460 3 11 A 15
P2 LEIBERT D7.5ANT 42 33 20 276 125.0 460 3 11 A 15
NO SCALE
PIPE ROOF CURB DETAIL
REMARKS:
1. UNITS TO BE DESIGNED FOR A 40% PROPYLENE GLYCOL MIXTURE
REMARKS:
1. UNITS TO BE DESIGNED FOR A 40% PROPYLENE GLYCOL MIXTURE
NO SCALE
GLYCOL SYSTEM SCHEMATIC
DRIP PAN
DI
WATER SENSOR IN DRIP PAN
A. DRIP PAN WATER SENSORS
1. BAS CONTRACTOR SHALL INSTALL FLOOR MOUNTED WATER
SENSORS IN DRIP TRAY ABOVE TENET SPACE IN LOCATION
SHOWN ON M-201 THAT WILL ALARM THE BAS IF WATER IS
DETECTED.
a. WATER (DI)
C
SD
UON
EM
CFOI
OFOI
CFCI
OFCI
J
DESCRIPTION
S
S
S 3
S D
SK
PC
SOS
OS
GROUND FAULT PROTECTED DUPLEX WITH
WEATHER-PROOF "WHILE IN USE" TYPE DIE-CAST
METAL COVERPLATE WITH LOCKABLE
ENCLOSURE AT OUTLET - SEE SPECIFICATIONS
WP
DUPLEX FOR ELECTRIC WATER COOLER: PROVIDE
REMOTE, READILY ACCESSIBLE GFI DEVICE AT 48"
ADJACENT TO WATER COOLER, COORDINATE EXACT
LOCATION WITH PLUMBING CONTRACTOR TO
CONCEAL OUTLET BEHIND COOLER
EWC
DOOR RELEASE CARD READER STATION. PROVIDE
ANY ADDITIONAL ROUGH-IN FOR ''EMERGENCY
RELEASE'' OPERATOR STATIONS AS REQUIRED.
FLOORBOX, COMBINATION POWER AND LOW
VOLTAGE, REFER TO FLOORBOX SCHEDULE
CDCARBON MONOXIDE DUCT DETECTOR
POWER SUPPLY/CONTROL FOR AUDIO/VISUAL DEVICES
SLASH THROUGH ANY DEVICE INDICATES MOUNTING
ABOVE COUNTERTOP 2" ABOVE BACKSPLASH, OR AT
48" WHERE NO COUNTER IS PRESENT
OVERHEAD PROJECTOR: PROVIDE DUPLEX
RECEPTACLE, ONE DATA, HDMI, 3.5mm AUDIO, AND VGA OUTLET ON (3) PLATES
SVS
VS
LV
FILLED CENTER BAR INDICATES INTEGRAL GROUND
FAULT PROTECTION (GFCI)
NON-REVERSING MOTOR STARTER SNAP SWITCH
CONTRACTOR FURNISHED OWNER INSTALLED
CONTRACTOR FURNISHED CONTRACTOR INSTALLED
OWNER FURNISHED OWNER INSTALLED
OWNER FURNISHED CONTRACTOR INSTALLED
CONNECTION TO SPRINKLER TAMPER
SWITCH WITH ADDRESSABLE MODULE
PHOTO-ELECTRIC SMOKE DETECTOR
MAIN CONTROL PANEL CENTRAL PROCESSING
UNIT (CPU)
ELECTRONIC LOCKS
LIGHT SWITCH:GENERAL PURPOSE
AS NOTED
AS NOTED
6'-6'' TO
TOP
46" TO
LEVERPULL STATION : DOUBLE ACTION
AUDIO-ONLY NOTIFICATION APPLIANCE
VISUAL-ONLY NOTIFICATION APPLIANCE
AUDIO/VISUAL NOTIFICATION APPLIANCE
HEAT DETECTOR
DOOR HOLDER : WALL TYPE
DOOR HOLDER : CLOSURE TYPE
DUCT SMOKE DETECTOR
REMOTE L.C.D. FIRE ALARM ANNUNCIATOR
ISOLATION MODULE
H.V.A.C. SMOKE DAMPER CONNECTION
UNLESS OTHERWISE NOTED
INDICATES EMERGENCY POWER
SPECIAL OUTLETS
HD
ABV CLG
DH
ABV DOOR DH
ABV CLG DD
FS
46"
I
ZONE ADDRESSABLE MODULE Z
SM
ABBREVIATIONS
STRIP FIXTURE
CROSS-HATCHING INDICATES LIGHT IS POWERED
FROM THE EMERGENCY-CRITICAL BRANCH
PARALLEL-HATCHING INDICATES LIGHT IS
POWERED FROM THE EMERGENCY-LIFE SAFETY
BRANCH
POWER OUTLETS
SIMPLEX RECEPTACLE
DUPLEX RECEPTACLE-SAFETY TYPE,
TAMPER-RESISTANT
DUPLEX RECEPTACLE
QUADRUPLEX RECEPTACLE
JUNCTION BOX, CEILING OR WALL
VOLTAGE/1PH RECEPTACLE, AS NOTED
VOLTAGE/3PH RECEPTACLE, AS NOTED
DIMMER SWITCH
THREE-WAY SWITCH
KEYED SWITCH
OCCUPANCY OR VACANCY SENSOR SWITCH
OCCUPANCY OR VACANCY SENSOR, CEILING MOUNT
LOW VOLTAGE SWITCH
PHOTO-CELL AS NOTED
EXIT LIGHT (CEILING, END, WALL MOUNT)
LIGHTING
SECURITY ACCESS CONTROL
DOOR
FRAME
WALL, CLG
CLG
CLG
54"
46"
46"
46"
46"
46"
46"
1'-6"
1'-6"
1'-6"
1'-6"
1'-6"
1'-6"
2'-2"
CLG
AS NOTED
46''
CLG
FLOOR
S S M
M O
U N
TI
N
G H
EI
G
H T
(T O
C
EN
TE
R
O F
B O
X)
D R
A W
IN
G
SY
M B
O L
SURFACE OR SUSPENDED CEILING FIXTURE (SLASH
INDICATES RECESSED)
POLE MOUNTED AREA LIGHT
WALL MOUNT FIXTURE ,
FLOODLIGHT
V
A
F
F
INDICATES VANDAL-PROOF POLYCARBONATE COVER,
VANDAL PROOF COVERS SHALL BE UL LISTED FOR USE
WITH THE SPECIFIC DEVICE THEY ARE PROTECTING
PC
WALL
WALL
ADDRESSABLE RELAY MODULE R
FLOORBOX, POWER ONLY, AS SCHEDULED FLOOR
FIRE RATED POKE THOUGH FLOOR BOX, COORDINATE
EXACT COVER REQUIREMENTS WITH ARCHITECTURAL
FINISHES, DEVICES AS SCHEDULED
WP
WGWIREGUARD - PROVIDE MANUFACTURER'S
SPECIFIC GUARD FOR DEVICE NOTED
CONDUIT CONCEALED IN WALLS OR IN CEILING
SPACE: ARROW(S) INDICATE(S) HOME RUN & #
OF CIRCUITS: HASHMARKS INDICATE # OF
CONDUCTORS. DASHED LINE INDICATES
CONDUIT BELOW FLOOR.
PANELBOARD, SURFACE OR FLUSH MOUNTED,
HATCHING INDICATES EMERGENCY
EQUIPMENT TAG, REFER TO EQUIPMENT SCHEDULE
MECHANICAL EQUIPMENT DESIGNATOR
(SEE MECH. SCHEDULES)
EQUIPMENT HARDWIRE CONNECTION (SEE DETAIL)
AS NOTED
AS SHOWN
MISCELLANEOUS
DISCONNECT SWITCH
MAGNETIC STARTER
MAGNETIC COMBINATION STARTER
ENCLOSED FLUSH MTD. CIRCUIT BREAKER
WEATHERPROOF - NEMA-3R, WET LOCATION LISTED.
PROVIDE COVERS, RATINGS, ETC, AS SUITABLE FOR
OUTDOORS.
PUSHBUTTON STATION
FLEXIBLE CONDUIT
TRANSFORMER
TAGGED NOTE
REVISION TAG
WIRE BASKET CABLE TRAY, SIZE AS NOTED
LOW VOLTAGE CABLE PATH
5'-0"
5'-0"
5'-0"
5'-0"
46"
6'-6'' TO TOP
GENERATOR ANNUNCIATOR PANEL - SEE
SPECIFICATIONS
46''
THERMOSTAT PROVIDED BY MECHANICAL
CONTRACTOR, ELECTRICAL CONTRACTOR SHALL
PROVIDE BACK-BOX CONDUIT STUB-UP, REFER TO
MECHANICAL DRAWINGS FOR LOCATIONS
SWITCHES
TIMER SWITCH S T46"
FIRE ALARM
E,EMINDICATES EMERGENCY POWER
GEN-A
J
NAC
EL
CR
FAA
FACP
T
AS SHOWNLADDER CABLE TRAY, SIZE AS NOTED
AS SHOWNSOLID BOTTOM CABLE TRAY, SIZE AS NOTED
EQUIP-1
GROUND
NEUTRAL
PHASE
WALL, CLG
WALL, CLG V
A
F, INDICATES CHIME AUDIBLE NOTIFACTION CH
DEVICE USED FOR ELEVATOR CONTROL EL
FIRE ALARM CONTROL EXTENDER EXT
TRANSPONDER CABINET 46" TRAN
BE , BRPROJECTED BEAM SMOKE DETECTOR; EMITTER
(BE) AND RECEIVER (BR)
FLOOR
AV
AUDIO/VISUAL SYSTEM OUTLET WITH DUPLEX
RECEPTACLE, REFER TO ASSOCIATED DETAIL FOR
ADDITIONAL INFORMATION
1'-6"
COMBINATION POWER AND DATA OUTLET LOCATION,
REFER TO ASSOCIATED DETAIL FOR ADDITIONAL
INFORMATION
1'-6"
COMBINATION POWER AND DATA OUTLET LOCATION,
GFCI DUPLEX RECEPTACLE, REFER TO ASSOCIATED
DETAIL FOR ADDITIONAL INFORMATION
1'-6"
FILLED OUTER BARS INDICATES INTEGRAL INTEGRAL
USB OUTLETS IN ADDITION TO POWER RECEPTACLES 1'-6"
, J
VARIABLE FREQUENCY DRIVE 5'-0"
MOTOR CONNECTION, REFER TO EQUIPMENT
CONNECTION SCHEDULE
DUPLEX RECEPTACLE, CEILING MOUNTED CLG
#D/#V
#D
INTERMEDIATE DISTRIBUTION FRAME - REFERENCE
DATA SYSTEM SCHEMATICS AND DETAILS FOR
ADDITIONAL REQUIREMENTS
MAIN DISTRIBUTION FRAME - REFERENCE DATA
SYSTEM SCHEMATICS AND DETAILS FOR ADDITIONAL
REQUIREMENTS
WIRELESS ACCESS POINT WITH PROVISIONS FOR (1
DATA OUTLET FOR ANTENNA. PROVIDE A COMPLETE
DATA OUTLET WITH FACEPLATE ABOVE CEILING,
MOUNTED AT AN ACCESSIBLE HEIGHT NO MORE THAN
24" ABOVE CEILING. AT EACH OUTLET, PROVIDE A 20'
COIL OF CABLE AHEAD OF THE OUTLET FOR
ADJUSTMENT OF FINAL OUTLET LOCATION. THE
CONTRACTOR SHALL COORDINATE EXACT LOCATIONS
WITH THE OWNER AND ADJUST OUTLET LOCATIONS AT
SUBSTANTIAL COMPLETION TO ACCOMMODATE
OWNER'S WAP LOCATIONS. WAP'S ARE OWNER-
FURNISHED, OWNER-INSTALLED
WAP
DATA OUTLET : NUMBER BESIDE OUTLET
INDICATES NUMBER OF DATA JACKS
VOICE OUTLET : NUMBER BESIDE OUTLET
INDICATES NUMBER OF VOICE JACKS
COMBINATION OUTLET : NUMBER BESIDE OUTLET
INDICATES NUMBER OF DATA/VOICE JACKS
DATA / VOICE
1'-6"
1'-6"
1'-6"
#V
MDF
IDF
CONDUIT UP
CONDUIT DOWN
GROUND BUS BAR ON INSULATED STANDOFFS 2'-0''
DESCRIPTION M
O
U N
TI
N
G H
EI
G
H T
(T O
C
EN
TE
R
O F
B O
X)
D R
A W
B
O L
REFER TO LUMINAIRE SCHEDULE FOR EXACT FIXTURE
SPECIFICATIONS, MOUNTING HEIGHTS, ETC.
DESCRIPTION M
O
U N
TI
N
G H
EI
G
H T
(T O
C
EN
TE
R
O F
B O
X)
D R
A W
B
O L
LV#S,
C
AB
LI
N
G
C O
N D
U C
TO
R
S
- O
F O
I
C
AB
LI
N
G
C O
N D
U C
TO
R
S
- O
F C
I
C O
N D
U
IT
R
O U
G H
-IN
O F
O I
IT
EM
U
SE
D O
N P
R O
JE
C
T
D
EV
IC
ES
O
F C
I
D
EV
IC
ES
C
F C
I
SYSTEM D
EV
IC
ES
O
F O
I
SECURITY: ACCESS CONTROL
SECURITY: CCTV
SYSTEM
RESPONSIBILITY
MATRIX
FIRE ALARM
A.
B.
C.
D.
E.
F.
G.
SYSTEM RESPONSIBILITY GENERAL NOTES:
CMTA IS NOT RESPONSIBILE FOR ASSIGNING SCOPE(S) OR WORK. THE INTENT OF
CONTRACTOR IN THIS MATRIX IS TO SEPERATE OWNER PROVIDED ITEMS FROM THE
GENERAL CONTRACTOR / CONSTRUCTION MANAGER. THE GC OR CM SHALL BE
RESPONSIBLE FOR A COMPLETE SCOPE OF WORK.
REFER TO VENDOR DRAWINGS FOR COMPLETE SCOPE OF WORK RELATING TO
VENDOR-FURNISHED EQUIPMENT. ALL WORK INDICATED ON VENDOR DRAWINGS SHALL
BE INCLUDED BY THE CONTRACTOR.
REFER TO ARCHITECTURAL DOOR HARDWARE SPECIFICATIONS FOR ACCESS CONTROL
DEVICE SPECIFICATIONS AND FURTHER REQUIREMENTS.
PROVIDE BACKBOXES AND CONDUIT WITH PULL-STRINGS FOR ALL SYSTEMS.
CONTRACTOR SHALL VERIFY BACKBOX SIZES, CONDUIT, ETC. AND EXACT
INSTALLATION LOCATIONS/REQUIREMENTS WITH SUCCESSFUL VENDORS OF ALL
SYSTEMS PRIOR TO CONSTRUCTION.
AT ALL SYSTEMS EQUIPMENT CABINET/TERMINAL BOARD LOCATIONS, CONTRACTOR
SHALL PROVIDE SIZE AND NUMBER OF CONDUIT STUB-OUTS TO CABLE PATHS AS
REQUIRED BY SYSTEM VENDORS, TERMINATE CONDUITS AT CABINETS/ON
BACKBOARDS AS REQUIRED. COORDINATE EXACT REQUIREMENTS WITH APPROPRIATE
VENDORS PRIOR TO CONSTRUCTION.
REFER TO SPECIFICATIONS FOR REQUIREMENTS APPLICABLE TO ALL SYSTEMS
INCLUDING CABLING, CABLE MANAGEMENT, INSTALLATION, GROUNDING, TESTING,
LABELING, ETC.
WHERE INDICATED AS CFCI, THE CONTRACTOR SHALL PROVIDE THE SYSTEM
COMPLETE, INCLUDING ALL ROUGH-INS, CABLING, DEVICES, POWER, ETC. THE
CONTRACTOR SHALL CONTACT THE LISTED VENDOR FOR PRICING PRIOR TO BID. ALL
SYSTEMS SHALL MATCH EXISTING FACILITY STANDARDS AND BE FULLY COMPATIBLE
WITH ANY EXISTING SYSTEMS. ALL SYSTEM VENDORS SHALL COORDINATE EXACT
SYSTEM REQUIREMENTS WITH OWNER PRIOR TO BID. NEW COMPONENTS SHALL BE
INTERCONNECTED WITH EXISTING SYSTEMS WHERE POSSIBLE. ALL NEW SYSTEM
DESIGNS AND PROGRAMMING SHALL BE COORDINATED WITH THE OWNER PRIOR TO
ORDERING. ALL PROGRAMMING SHALL BE INCLUDED AS REQUIRED BY THE OWNER.
PROVIDE 4 HOURS OF TRAINING FOR EACH SYSTEM.
DESCRIPTION
W H
IT
E
DEVICE
FIRE ALARM DEVICES - WALL
WALL SWITCHES
VOICE / DATA DEVICES
DEVICE COLOR
MATRIX
RECEPTACLE
CEILING OCCUPANCY SENSORS
DEVICE COVERPLATES
THERMOSTATS (COORDINATE WITH HVAC TYPICALLY NO
COLOR OPTIONS)
DEVICE COLOR GENERAL NOTES:
A. DEVICE PLATE TO MATCH DEVICE UNLESS NOTED OTHERWISE.
B. NOT ALL DEVICES MAYBE USED THAT ARE SHOWN.
C. IF DEVICE COLOR NOT DEFINED REFER TO SPECIFICATIONS.
DESCRIPTION
IV
O
R Y
R
ED
BL
AC
K
BL
U
E
YE
LL
O W
C U
ST
O
M
ST
AI
N
LE
SS
S
TE
EL
LEGEND
INDICATES SELECTED COLOR
INDICATES COLOR NOT AVAILABLE
INDICATES COLOR NOT SELECTED
LEGEND
INDICATES SELECTED SYSTEM
INDICATES NOT AVAILALBE
INDICATES NOT SELECTED
C O
N D
U
IT
R
O U
G H
-IN
O F
C I
C O
N D
U
IT
R
O U
G H
-IN
C F
C I
C
AB
LI
N
G
C O
N D
U C
TO
R
S
- C
F C
I
PR
O
G R
AM
M
IN
G
SE
TU
P
- O F
O I
PR
O
G R
AM
M
IN
G
SE
TU
P
- O F
C I
PR
O
G R
AM
M
IN
G
SE
TU
P
- C F
C I
STRUCTURED CABLING
DATA RACKS, PATCH PANELS
IT EQUIPMENT
FIRE ALARM DEVICES - CEILING
CHECKED:
DATE:
DRAWN:
FI
LE
N
AM
E:
PL
O T
TI
M E:
CLIENT/CMTA JOB #:
C:
\U se rs
\B Ub er ti\
Do cu m en ts \R ev it
Co pi es \O
CV
G2
5-
_M
EP
_R
_B Ub er ti.
rv t
9/
/2
:4 8:
P
M
E-000
9/25/25
B.UBERTI
J.MESSNER
CV
G
CE
NT
RE
S
ER
VE
R
RO
OM
IM
PR
OV
EM
EN
TS
CI
NC
IN
NA
TI
N
OR
TH
ER
N
KE
NT
UC
KY
IN
TE
RN
AT
IO
NA
L
AI
RP
OR
T
C
OM
AI
R
BL
D, E
RL
AN
GE
R, K Y
EL
EC
TR
IC
AL
L
EG
EN
D
OCVG25-03
ELECTRICAL GENERAL NOTES:
A.
B.
C.
D.
E.
F.
G.
H.
I.
J.
K.
L.
M.
N.
O.
P.
Q.
R.
S.
T.
U.
V.
W.
X.
Y.
Z.
AA.
AB.
AC.
AD.
AE.
AF.
AG.
AH.
AI.
AJ.
AK.
AL.
AM.
AN.
AO.
AP.
AQ.
AR.
AS.
AT.
AU.
EACH CONTRACTOR, PROPOSER, SUPPLIER AND/OR MANUFACTURER SHALL REFER TO ALL DOCUMENTS PERTAINING TO THIS PROJECT AND COORDINATE ACCORDINGLY SO AS TO ENSURE ADEQUACY OF FIT, COMPLIANCE WITH SPECIFICATIONS, PROPER VOLTAGE AND CURRENT CHARACTERISTICS TO AVOID
CONFLICT WITH ANY OTHER BUILDINGS SYSTEMS. VERIFY SAME WITH SHOP DRAWINGS.
ADDITIONAL ELECTRICAL REQUIREMENTS MAY BE SHOWN ON PLANS FROM OTHER DISCIPLINES IN THIS SET.
IT IS THE CONTRACTOR’S RESPONSIBILITY TO REVIEW ALL PLANS AND SPECIFICATIONS FOR A COMPLETE
UNDERSTANDING OF THE PROJECT REQUIREMENTS.
WORK SHALL BE IN ACCORDANCE WITH THE LATEST EDITION OF ALL LOCAL, STATE, AND NATIONAL CODES.
INCLUDING BUT NOT LIMITED TO NFPA 70 (NEC), NFPA 72, INTERNATIONAL…