The document contains an email chain discussing a construction bid for a Main Server Room renovation project at the Cincinnati/Northern Kentucky International Airport (CVG Centre), involving the CVG Airport Authority. The project, based on a CMTA, Inc. study from September 2024, involves comprehensive mechanical, electrical, and plumbing (MEP) upgrades to the existing server room, including replacing HVAC systems, constructing a new partition wall, installing a clean agent fire suppression system, adding new technology racks with integrated power distribution, implementing two UPS systems with redundant power, and preparing for a future emergency generator connection. The bid is scheduled to be posted on Thursday, September 25, 2025, with discussions indicating a potential 4-week bidding period to accommodate potential subcontractor pricing.

The project scope includes detailed technical specifications such as replacing existing HVAC equipment, installing new HVAC systems, modifying ductwork and piping, updating temperature controls, implementing a new fire protection system, improving power distribution, and integrating new technology infrastructure. The communications reveal internal coordination between Brad Quatman (Project Manager), Diane Russ (Procurement), Chris Mason (IT), and Shkelzen Halili, with IT confirming their participation in the design process. The procurement will be conducted through OpenGov's e-procurement system, with a pre-bid meeting planned at the CVG Centre, and the project aims to enhance the server room's technological capabilities and operational reliability.

View the file

Other files

File Type Posted
CVG_Centre_Server_Room_Renovations_&_Improvements_(Addendum_#2_Revision).pdf PDF
CVG_Centre_Server_Room_Impvs_-_Dwgs_-_Addendum_#2_10.15.25.pdf PDF
25-057-ITB_Pre-Bid_Sign_In_Sheet.pdf PDF
25-057-ITB_Pre-Bid_Meeting_Agenda.pdf PDF
CVG_Centre_Server_Room_Renovations_&_Improvements.pdf PDF
Re__Main_Server_Room_-_Construction_Bid_-_B._Quatman.pdf PDF
25-057-ITB_CVG_Server_Room_Renovations_&_Upgrades_-_Notice_to_Bidders.pdf PDF
25-057-ITB_CVG_Server_Room_Reno_&_Upgrades_-_Exhibit_A-Proposal_Forms.pdf PDF
25-057-ITB_CVG_Server_Room_Reno_&_Upgrades_-_Exhibit_B-Contract_&_Bonds.pdf PDF
KCAB_-_RSVP_Instructional_Guide_for_OpenGov.pdf PDF
Drawings_CVG_Cenre_-_Server_Room_Improvements_-_Bid_Set.pdf PDF
Specifications_-_CVG_Centre_-_Server_Romm_Improvements_-_Bid_Set.pdf PDF
Q4_2024_-_Business_Case_-_Main_Server_Room_Relocation_and_Server_Load_Stabilization.pdf PDF
2025.08.27_Construction_Cost_Estimate.pdf PDF
Certification_of_Offeror-Bidder_Regarding_Tax_Delinquency_and_Felony_Convictions.docx DOCX document
NonSegregated_Facilities_Certification.docx DOCX document
Affirmative_Action_Certification.docx DOCX document
Buy_American_Certification-Construction_Projects.docx DOCX document
EEO_Certification.docx DOCX document
Disclosure_of_Lobbying_Activities_Certification.docx DOCX document
Buy_American_Certification-Equipment-Building_Projects.docx DOCX document
Non_Debarment_or_Suspension_Certification.docx DOCX document
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

From: Chris Mason To: Brad Quatman; Diane Russ Cc: Shkelzen Halili Subject: Re: Main Server Room - Construction Bid Date: Thursday, September 18, 2025 2:47:29 PM Attachments: image001.png image002.png image003.png C2_signature_airportauthoritylogo_4kdmode-110px_3eb8a020-030a-4b89-8952-99dc552130ee.png C2_signature_airportauthoritylogo_4kdmode-110px_3eb8a020-030a-4b89-8952-99dc552130ee.png

Hi Diane, Yes, IT has participated in the design process and review. We are good to proceed.

Chris Mason cmason@cvgairport.com 859-760-0685

From: Brad Quatman <bquatman@cvgairport.com> Sent: Thursday, September 18, 2025 12:25:53 PM To: Diane Russ <DRuss@cvgairport.com>; Chris Mason <cmason@cvgairport.com> Cc: Shkelzen Halili <shalili@cvgairport.com> Subject: Re: Main Server Room - Construction Bid

@Chris Mason - I just added you as a collaborator on the OpenGov solicitation for the Main Server Room Project. As anticipated, we are ready to post for bid next Thursday (9/25). Please review the Background and Scope of Work I drafted for this (also copied below). This includes an overview of the construction-related items for the build-out - note that we left out the physical equipment transfer to the new server room as previously discussed.

Let me know if you approve or if you would like to make any changes.

Diane/Z - do we have a date and time identified yet for the Pre-Bid Meeting?

Background

This project involves the proposed renovation of the existing Server Room at the CVG Centre, based on the findings of the CMTA, Inc. study dated September 20, 2024, and subsequent coordination meetings. The scope includes the replacement of existing HVAC systems—both branch and rooftop units—serving the current Co-locate Server Room, as well as the addition of new HVAC equipment dedicated to a newly established Server Room. A new partition wall will be constructed to separate the new Server Room from the existing space. Fire protection for the new Server Room will be provided via a Clean Agent Fire Suppression system. The design also includes new technology racks with integrated rack power distribution, two (2) UPS systems with monitoring and associated electrical distribution to provide redundant power to all rack locations, and the installation of a temporary generator connection cabinet to support future emergency power needs.

Scope of Work

The following outlines the Mechanical, Electrical, and Plumbing (MEP) Scope of Services for the proposed renovation of the server room at the CVG Centre:

a. HVAC

A. Replacement of Existing HVAC Equipment:

Replace the existing HVAC equipment currently serving the Existing Co-locate Server Room, in line with the overall project scope.

B. New HVAC Equipment:

Install new HVAC systems to support the newly established Server Room.

C. Ductwork and Piping:

Replacement and installation of new ductwork, HVAC piping systems, and air terminals to accommodate the separation between the existing and new Server Rooms.

Upsize and re-route glycol piping as identified in the drawings.

D. Temperature Controls:

Install new temperature control systems, with thermostats connected to the existing CVG central control system for seamless integration.

E.

Glycol:

mailto:cmason@cvgairport.com mailto:bquatman@cvgairport.com mailto:DRuss@cvgairport.com mailto:shalili@cvgairport.com mailto:cmason@cvgairport.com mailto:cmason@cvgairport.com

Draining and disposal of glycol from the existing system.

Purchase and re-charge of new glycol into the modified loop.

b. Fire Protection A. Modification of Existing Fire Protection System:

Modify the existing fire protection system to exclude the new Server Room from the current wet pipe fire protection system.

The Existing Co-locate Server Room will continue to be protected by the existing wet pipe sprinkler system.

B. Clean Agent Fire Suppression System:

Install a new clean agent fire suppression system for the new Server Room, ensuring protection of sensitive equipment.

c. Electrical A. Power Distribution Improvements:

Modify the power distribution systems to support the addition of two (2) UPS systems and provide redundant feeders to ensure reliable power to the technology equipment in the new Server Room.

B. Temporary Generator Docking Station:

Install a temporary generator docking station to facilitate emergency power requirements.

C. Modifications to Branch Circuits and Fire Alarm:

Modify existing branch circuits, lighting controls, and fire alarm devices to accommodate the new Server Room’s requirements.

d. Technology A. New Racks and Power Distribution Units (PDUs):

Add new racks to support network and server equipment, along with PDUs to ensure reliable power distribution.

B. Cabling and Network Integration:

Install new cabling to support the integration of new racks and network-connected UPS units.

Brad Quatman bquatman@cvgairport.com 859-760-5083

From: Diane Russ <DRuss@cvgairport.com> Sent: Thursday, September 18, 2025 12:10 PM To: Brad Quatman <bquatman@cvgairport.com> Cc: Shkelzen Halili <shalili@cvgairport.com> Subject: RE: Main Server Room - Construction Bid

Brad, LaDonna reviewed and wanted me to verify that IT has reviewed this scope and will be included in the review of the bids. Can you confirm?

Thanks, Diane

Diane Russ, CPM, CPPO DRuss@cvgairport.com 859-652-4147

New E-Procurement System!

CVG Airport uses OpenGov for all solicitations and responses.

Register for free at https://procurement.opengov.com/portal/cvgairport For questions, email us at procurement@cvgairport.com

From: Brad Quatman <bquatman@cvgairport.com> Sent: Tuesday, September 16, 2025 2:35 PM To: Diane Russ <DRuss@cvgairport.com>

Nope.

Thanks!

https://nam12.safelinks.protection.outlook.com/?url=https%3A%2F%2Fcvgairport.com%2F&data=05%7C02%7CDRuss%40cvgairport.com%7Cc66cef58ad7e40b707a608ddf6e3cfcd%7Ce88b51b645364ffaa129350653cdad28%7C0%7C0%7C638938180488812930%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=Sc20QQ5TmbXG3miNt2VU%2B%2BsSftra5VKpD2BibnLl8D4%3D&reserved=0 mailto:bquatman@cvgairport.com https://nam12.safelinks.protection.outlook.com/?url=https%3A%2F%2Fcvgairport.com%2F&data=05%7C02%7CDRuss%40cvgairport.com%7Cc66cef58ad7e40b707a608ddf6e3cfcd%7Ce88b51b645364ffaa129350653cdad28%7C0%7C0%7C638938180488827977%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=FfswtN6pq6qvqrZvvZDdv7mfMEAnOawVI38twUHWLdQ%3D&reserved=0 mailto:DRuss@cvgairport.com https://nam12.safelinks.protection.outlook.com/?url=https%3A%2F%2Fprocurement.opengov.com%2Fportal%2Fcvgairport&data=05%7C02%7CDRuss%40cvgairport.com%7Cc66cef58ad7e40b707a608ddf6e3cfcd%7Ce88b51b645364ffaa129350653cdad28%7C0%7C0%7C638938180488845079%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=muIFWyQAEwM47PafacogGw37SXiBA8LVWI4Xs%2F4ukZM%3D&reserved=0 mailto:%20procurement@cvgairport.com

Brad Quatman bquatman@cvgairport.com 859-760-5083

From: Diane Russ <DRuss@cvgairport.com> Sent: Tuesday, September 16, 2025 2:02 PM To: Brad Quatman <bquatman@cvgairport.com>

Subject: RE: Main Server Room - Construction Bid

Actually, this is the last question: does this project include existing facilities and buried cable runs that are owned, operated, and maintained by the FAA?

859-652-4147

New E-Procurement System!

CVG Airport uses OpenGov for all solicitations and responses.

Register for free at https://procurement.opengov.com/portal/cvgairport For questions, email us at procurement@cvgairport.com From: Brad Quatman <bquatman@cvgairport.com> Sent: Tuesday, September 16, 2025 12:35 PM To: Diane Russ <DRuss@cvgairport.com>

Sorry - I was out in the field all morning and am just getting thru emails now!

1. Let's put it out for the full 4 weeks. I'm anticipating a lot of sub-contracting so the extra week will help GCs get more pricing back.

2. 13-YES; 14-NO; 15-NO

3. We do not need to include the CMTA study. This was all accounted for in the drawings.

859-760-5083

Sent: Tuesday, September 16, 2025 9:56 AM To: Brad Quatman <bquatman@cvgairport.com>

One more, do we want to include the CMTA study from Sept 2024?

859-652-4147

New E-Procurement System!

CVG Airport uses OpenGov for all solicitations and responses.

Register for free at https://procurement.opengov.com/portal/cvgairport For questions, email us at procurement@cvgairport.com From: Diane Russ <DRuss@cvgairport.com> Sent: Tuesday, September 16, 2025 9:55 AM https://nam12.safelinks.protection.outlook.com/?url=https%3A%2F%2Fcvgairport.com%2F&data=05%7C02%7CDRuss%40cvgairport.com%7Cc66cef58ad7e40b707a608ddf6e3cfcd%7Ce88b51b645364ffaa129350653cdad28%7C0%7C0%7C638938180488861070%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=oE%2FQ0cJtHuKVle0YTlmm%2BYcDGM0nY0Ci1DUiEB6%2FZy4%3D&reserved=0 mailto:bquatman@cvgairport.com mailto:DRuss@cvgairport.com mailto:bquatman@cvgairport.com mailto:shalili@cvgairport.com https://nam12.safelinks.protection.outlook.com/?url=https%3A%2F%2Fcvgairport.com%2F&data=05%7C02%7CDRuss%40cvgairport.com%7Cc66cef58ad7e40b707a608ddf6e3cfcd%7Ce88b51b645364ffaa129350653cdad28%7C0%7C0%7C638938180488875950%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=49gVtKAV1McbINg3Ya9r8ytyrO%2BE69L1gOrZOpBpN%2F0%3D&reserved=0 mailto:DRuss@cvgairport.com https://nam12.safelinks.protection.outlook.com/?url=https%3A%2F%2Fprocurement.opengov.com%2Fportal%2Fcvgairport&data=05%7C02%7CDRuss%40cvgairport.com%7Cc66cef58ad7e40b707a608ddf6e3cfcd%7Ce88b51b645364ffaa129350653cdad28%7C0%7C0%7C638938180488889843%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=DYpmIRA%2Fr7JJSyl8CCaqmpMgowCCrhBJptAgoBpBIcM%3D&reserved=0 mailto:%20procurement@cvgairport.com mailto:bquatman@cvgairport.com mailto:DRuss@cvgairport.com mailto:shalili@cvgairport.com https://nam12.safelinks.protection.outlook.com/?url=https%3A%2F%2Fcvgairport.com%2F&data=05%7C02%7CDRuss%40cvgairport.com%7Cc66cef58ad7e40b707a608ddf6e3cfcd%7Ce88b51b645364ffaa129350653cdad28%7C0%7C0%7C638938180488903422%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=%2BlhdMMP0aPK6hLF5%2Fccn723UQeNLvBBbiftmKDm03%2Bc%3D&reserved=0 mailto:bquatman@cvgairport.com mailto:DRuss@cvgairport.com mailto:bquatman@cvgairport.com mailto:shalili@cvgairport.com https://nam12.safelinks.protection.outlook.com/?url=https%3A%2F%2Fcvgairport.com%2F&data=05%7C02%7CDRuss%40cvgairport.com%7Cc66cef58ad7e40b707a608ddf6e3cfcd%7Ce88b51b645364ffaa129350653cdad28%7C0%7C0%7C638938180488917085%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=nzN1M9S689%2Bd8afTdUYsK%2FMMrN3pOS1JIuUQw1SqPrE%3D&reserved=0 mailto:DRuss@cvgairport.com https://nam12.safelinks.protection.outlook.com/?url=https%3A%2F%2Fprocurement.opengov.com%2Fportal%2Fcvgairport&data=05%7C02%7CDRuss%40cvgairport.com%7Cc66cef58ad7e40b707a608ddf6e3cfcd%7Ce88b51b645364ffaa129350653cdad28%7C0%7C0%7C638938180488930500%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=JNAAwuTGCu5oHVT3aAQ%2BzWIAjZxZkV24sC0I5XGOUA8%3D&reserved=0 mailto:%20procurement@cvgairport.com mailto:DRuss@cvgairport.com

To: Brad Quatman <bquatman@cvgairport.com>

Actually, another question: Yes or No to these three questions:

859-652-4147

New E-Procurement System!

CVG Airport uses OpenGov for all solicitations and responses.

Register for free at https://procurement.opengov.com/portal/cvgairport For questions, email us at procurement@cvgairport.com From: Diane Russ Sent: Tuesday, September 16, 2025 8:54 AM To: Brad Quatman <bquatman@cvgairport.com> Cc: Shkelzen Halili <shalili@cvgairport.com> Subject: RE: Main Server Room - Construction Bid

Once last question, do you want this out for 3 weeks or 4 weeks? A lot of P&D has been doing 4 weeks lately but don’t know if this bid would require the extra week or not.

859-652-4147

New E-Procurement System!

CVG Airport uses OpenGov for all solicitations and responses.

Register for free at https://procurement.opengov.com/portal/cvgairport For questions, email us at procurement@cvgairport.com From: Brad Quatman <bquatman@cvgairport.com> Sent: Monday, September 15, 2025 8:38 AM To: Diane Russ <DRuss@cvgairport.com> Cc: Shkelzen Halili <shalili@cvgairport.com> Subject: Re: Main Server Room - Construction Bid

Sounds good.

Yes - Pre-Bid Meeting will be at the CVG Centre.

859-760-5083 mailto:bquatman@cvgairport.com mailto:shalili@cvgairport.com https://nam12.safelinks.protection.outlook.com/?url=https%3A%2F%2Fcvgairport.com%2F&data=05%7C02%7CDRuss%40cvgairport.com%7Cc66cef58ad7e40b707a608ddf6e3cfcd%7Ce88b51b645364ffaa129350653cdad28%7C0%7C0%7C638938180488944012%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=cJxk9o0Jkg5doDyU2ryhHokzXezfWcieYAkU9VbR5dY%3D&reserved=0 mailto:DRuss@cvgairport.com https://nam12.safelinks.protection.outlook.com/?url=https%3A%2F%2Fprocurement.opengov.com%2Fportal%2Fcvgairport&data=05%7C02%7CDRuss%40cvgairport.com%7Cc66cef58ad7e40b707a608ddf6e3cfcd%7Ce88b51b645364ffaa129350653cdad28%7C0%7C0%7C638938180488957282%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=n%2Blk%2BHD%2Bv9mqBiz459orQmBrol%2BbVBsNP%2BVV5wfUycU%3D&reserved=0 mailto:%20procurement@cvgairport.com mailto:bquatman@cvgairport.com mailto:shalili@cvgairport.com https://nam12.safelinks.protection.outlook.com/?url=https%3A%2F%2Fcvgairport.com%2F&data=05%7C02%7CDRuss%40cvgairport.com%7Cc66cef58ad7e40b707a608ddf6e3cfcd%7Ce88b51b645364ffaa129350653cdad28%7C0%7C0%7C638938180488970663%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=UqKeqTdAI5WSkbtngH72dExvGBlvA%2BTUdMCQUA2jCSY%3D&reserved=0 mailto:DRuss@cvgairport.com https://nam12.safelinks.protection.outlook.com/?url=https%3A%2F%2Fprocurement.opengov.com%2Fportal%2Fcvgairport&data=05%7C02%7CDRuss%40cvgairport.com%7Cc66cef58ad7e40b707a608ddf6e3cfcd%7Ce88b51b645364ffaa129350653cdad28%7C0%7C0%7C638938180488984332%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=9RpVM%2BgFPpq2mTEYoix%2BNVUVSwz0bEa4lSqxYEyMs9s%3D&reserved=0 mailto:%20procurement@cvgairport.com mailto:bquatman@cvgairport.com mailto:DRuss@cvgairport.com mailto:shalili@cvgairport.com https://nam12.safelinks.protection.outlook.com/?url=https%3A%2F%2Fcvgairport.com%2F&data=05%7C02%7CDRuss%40cvgairport.com%7Cc66cef58ad7e40b707a608ddf6e3cfcd%7Ce88b51b645364ffaa129350653cdad28%7C0%7C0%7C638938180489000137%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=4daiNW%2BTgNz7OpD0kdZgat84ntQPMB77o0h4b4bzZ8E%3D&reserved=0 mailto:bquatman@cvgairport.com

Sent: Monday, September 15, 2025 8:02 AM To: Brad Quatman <bquatman@cvgairport.com> Cc: Shkelzen Halili <shalili@cvgairport.com> Subject: RE: Main Server Room - Construction Bid

Thanks Brad! This shouldn’t be an issue. I’ll put the bid together and let you know if I have any questions.

Since I still won’t be able to drive, just an FYI, I will handle the bidding and pre-bid meeting, but Z will be in attendance so he can handle the site visit which is all at the CVG Centre, correct?

859-652-4147

New E-Procurement System!

CVG Airport uses OpenGov for all solicitations and responses.

Register for free at https://procurement.opengov.com/portal/cvgairport For questions, email us at procurement@cvgairport.com From: Brad Quatman <bquatman@cvgairport.com> Sent: Monday, September 15, 2025 7:22 AM To: Diane Russ <DRuss@cvgairport.com> Subject: Main Server Room - Construction Bid

Diane - welcome back!

I just submitted the intake form for the Main Server Room Construction Bid. We are wanting to post this for bid next Thursday (9/25) if possible.

Let me know if you would like to discuss.

CVG Airport Authority

Project Manager

Cincinnati/Northern Kentucky International Airport

M: 859-760-5083 mailto:DRuss@cvgairport.com mailto:shalili@cvgairport.com https://nam12.safelinks.protection.outlook.com/?url=https%3A%2F%2Fcvgairport.com%2F&data=05%7C02%7CDRuss%40cvgairport.com%7Cc66cef58ad7e40b707a608ddf6e3cfcd%7Ce88b51b645364ffaa129350653cdad28%7C0%7C0%7C638938180489014443%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=OCZB2rCftJzeP%2BYSc59JSH%2BmQBbkvntA6MbXv5Z75yY%3D&reserved=0 mailto:DRuss@cvgairport.com https://nam12.safelinks.protection.outlook.com/?url=https%3A%2F%2Fprocurement.opengov.com%2Fportal%2Fcvgairport&data=05%7C02%7CDRuss%40cvgairport.com%7Cc66cef58ad7e40b707a608ddf6e3cfcd%7Ce88b51b645364ffaa129350653cdad28%7C0%7C0%7C638938180489028241%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=LsbiWvfI3jwAXPSm71BUWcp3DhV0TB38zLiLJDJVJAg%3D&reserved=0 mailto:%20procurement@cvgairport.com mailto:bquatman@cvgairport.com mailto:DRuss@cvgairport.com https://nam12.safelinks.protection.outlook.com/?url=https%3A%2F%2Fcvgairport.com%2F&data=05%7C02%7CDRuss%40cvgairport.com%7Cc66cef58ad7e40b707a608ddf6e3cfcd%7Ce88b51b645364ffaa129350653cdad28%7C0%7C0%7C638938180489041638%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=jLM2KHlILZQ3xgaQ5rLoe5pG1xVJmVFhMaj0KWlUXGE%3D&reserved=0

File details come from the government source that posted it. Updated .