R - Fire Suppression 7.14.25.pdf
PDF 120 KB Posted
- Solicitation number
- RFP-STAR-250000002762-1
- Issued by
- Wayne County, Michigan
About this file
This is a Scope Sheet - Bid Form for a Fire Suppression trade package issued by Cunningham-Limp for the Universal Academy Cafeteria Addition project located at 4833 Ogden St, Detroit, Michigan 48210, dated 7/14/2025. The document outlines the requirements for a fire suppression system installation, including design, permitting, and installation of a complete fire suppression system that extends from the existing system. The project involves furnishing and installing all necessary components such as piping, valves, alarm devices, supports, FDC's, and heads, with the contractor required to provide CAD drawings and an engineering stamp, conduct flow and pressure testing, and ensure code compliance.
The bid form requires contractors to submit a comprehensive proposal with a base bid, potential alternates, and unit costs. The project specifications reference FA Studio Rev1 Set dated 6/25/2025 and MLP Civil Set dated 7/9/2025, with a standard one-year warranty from substantial completion. Contractors must follow Cunningham-Limp's Instructions to Bidders and General Requirements, include sales tax and hoisting, and coordinate with local municipalities for flow and pressure testing. The scope emphasizes a design-build approach, with the expectation that the selected contractor will provide a complete, code-compliant fire suppression system for the cafeteria addition.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCOPE SHEET - BID FORM
Trade Package
R Fire Suppression
7/14/2025
Universal Acadmey Cafertiria Addition 4833 Ogden St, Detroit, Michigan 48210
* THIS FORM TO BE COMPETED WITH YES / NO ON EACH LINE ITEM AND ACCOMPANIED WITH YOUR STANDARD FORM OF PROPOSAL. Also provide a written proposal covering this scope and any other items necessary to further qualify your bid including voluntary alternates *
Company:
Estimator:
Office phone:
Cell phone:
Email:
Base Bid $
1. PLANS & SPECS: FA Studio Rev1 Set Dated 6/25/2025 & MLP Civil Set Dated 7/9/2025
2. ANTICIPATED SCHEDULE: Per Cunningham-Limp Instruction to Bidders & General Requirements dated 7/14/2025
3. GENERAL REQUIREMENTS: Per Cunningham-Limp Instruction to Bidders & General Requirements dated 7/14/2025
4. SALES TAX - REQUIRED
5. HOISTING - REQUIRED
6. CONTRACTOR STANDARD WARRANTY - ONE YEAR FROM SUBSTANTINAL COMPLETION OF PROJECT
7. EXTENDED WARRANTIES - PER INDIVIDUAL SPEIFICATION SECTION
8. GENERAL REQUIREMENTS PER DIVISION 1 OF PROJECT MANUAL / SPECIFICATON BOOK
9.
TRADE SCOPE:
Fire Suppression
The scope of work is presented to clarify certain portions of the work to be performed under the specified bid category and shall be supplied and installed unless noted otherwise. The scope of work is not to be construed as a complete itemization of work included in the bid category, nor does it relieve the subcontractor of its responsibility to deliver a complete job in accordance with plans and specifications.
Include (furnish and install uno):
1. All work performed in accordance with referenced drawings above and all applicable notes, details, & specifications related to this scope of work.
2.
3. Contractor to extend from the existing fire suppression system
4. Include all design, permitting, inspection coordination and installation for fire suppression system in accordance with applicable regulatory agencies.
5. Include all piping, valves, alarm devices, supports, FDC's, heads, etc. for a complete system installation.
6. Contractor shall supply a design build proposal complete with CAD drawings and engineering stamp.
7. Contractor shall research flow and pressure as required per code.
8. Contractor shall coordinate all flow and pressure testing with the local municipality.
9. Include modification of existing system to be code compliant.
10.
11.
Exclude / By Others:
1.
2.
3.
TOTAL BID $ -
Alternates: (Inclusive of labor, materials, and OH&P) $ 1.
2.
3.
BID BREAKDOWN: $
1 Fire Suppression
Total Bid $ -
UNIT COST(S): (Inclusive of labor, materials, and OH&P) $
HOURLY RATE(S): (inclusive of OH&P) $
GENERAL / TYPICAL SCOPE OF WORK TO INCLUDE:
File details come from the government source that posted it. Updated .