P - HVAC 7.14.25.pdf
PDF 103 KB Posted
- Solicitation number
- RFP-STAR-250000002762-1
- Issued by
- Wayne County, Michigan
About this file
This document is a Scope Sheet - Bid Form for an HVAC trade package issued by Cunningham-Limp for the Universal Academy Cafeteria Addition project located at 4833 Ogden St, Detroit, Michigan 48210. The project involves furnishing and installing a complete HVAC system for a cafeteria addition, with bid documents referencing FA Studio Rev1 Set dated 6/25/2025 and MLP Civil Set dated 7/9/2025. The scope includes comprehensive HVAC work such as installing system components, new equipment, ductwork, supports, fire/smoke sealants, controls with off-site monitoring capabilities, electric heaters in vestibule areas, dampers, roof curb covers, and sound boots.
The bid form requires contractors to include all labor, materials, permits, and associated work for the HVAC trade package, with a standard one-year warranty from substantial completion. The contractor is responsible for equipment startup, testing, post-construction filter changes, and compliance with all applicable codes. While no specific pricing is filled in, the document provides a structured template for bidders to complete their total bid amount, potential alternates, unit costs, and hourly rates. The project appears to be funded through standard construction means, with the bid being part of a larger construction project for the Universal Academy facility.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCOPE SHEET - BID FORM
Trade Package
P
HVAC
7/14/2025
Universal Acadmey Cafertiria Addition 4833 Ogden St, Detroit, Michigan 48210
* THIS FORM TO BE COMPETED WITH YES / NO ON EACH LINE ITEM AND ACCOMPANIED WITH YOUR STANDARD FORM OF PROPOSAL. Also provide a written proposal covering this scope and any other items necessary to further qualify your bid including voluntary alternates *
Company:
Estimator:
Office phone:
Cell phone:
Email:
Base Bid $
1. PLANS & SPECS: FA Studio Rev1 Set Dated 6/25/2025 & MLP Civil Set Dated 7/9/2025
2. ANTICIPATED SCHEDULE: Per Cunningham-Limp Instruction to Bidders & General Requirements dated 7/14/2025
3. GENERAL REQUIREMENTS: Per Cunningham-Limp Instruction to Bidders & General Requirements dated 7/14/2025
4. SALES TAX - REQUIRED
5. HOISTING - REQUIRED
6. CONTRACTOR STANDARD WARRANTY - ONE YEAR FROM SUBSTANTINAL COMPLETION OF PROJECT
7. EXTENDED WARRANTIES - PER INDIVIDUAL SPEIFICATION SECTION
8. GENERAL REQUIREMENTS PER DIVISION 1 OF PROJECT MANUAL / SPECIFICATON BOOK
9.
TRADE SCOPE:
HVAC
The scope of work is presented to clarify certain portions of the work to be performed under the specified bid category and shall be supplied and installed unless noted otherwise. The scope of work is not to be construed as a complete itemization of work included in the bid category, nor does it relieve the subcontractor of its responsibility to deliver a complete job in accordance with plans and specifications.
Include (furnish and install uno):
1. All work performed in accordance with referenced drawings above and all applicable notes, details, & specifications related to this scope of work.
2.
3. Furnish and install all HVAC system components for complete installation in accordance with project plans.
4. Furnish and install new equipment per mechanical schedules.
5. Furnish and install all new ductwork and sheetmetal for HVAC system indicated on plans. Connect to equipment and existing ductwork as shown.
6. Include all required supports, uni-strut, threaded rods, collars, sealants, straps, etc. for equipment, duct and pipe.
7. Apply fire / smoke sealants at penetrations in rated assemblies for this scope of work.
8. Ducted returns shall be provided where required by code.
9. Contractor is responsible for all startup and testing of equipment.
10. Contractor shall provide filter change post construction.
11. Contractor shall provide a controls system that has off-site monitoring capabilities.
12. Contractor shall provide electric heaters in vestibule areas and stairwells.
13. Contractor is responsible for fire resistant duct wrapping as required by code.
14. Contractor shall provide dampers at all floor penetrations.
15. Contractor shall provide all temporary covers for roof curbs until units can be set.
16. Contractor is responsible for all lifting of their equipment.
17. Contractor shall provide sound boots at all return air grills when used in plenum returns.
18. Include new controls per plans and specifications.
19. Furnish and install all curbs, rail supports and associated kits for roof mounted equipment.
20. Include permit fees 21.
Exclude / By Others:
1.
2.
3.
TOTAL BID $ -
Alternates: (Inclusive of labor, materials, and OH&P) $ 1.
2.
3.
BID BREAKDOWN: $
1 HVAC
UNIT COST(S): (Inclusive of labor, materials, and OH&P) $
HOURLY RATE(S): (inclusive of OH&P) $
GENERAL / TYPICAL SCOPE OF WORK TO INCLUDE: