K - Carpentry 7.14.25.pdf
PDF 106 KB Posted
- Solicitation number
- RFP-STAR-250000002762-1
- Issued by
- Wayne County, Michigan
About this file
This document is a Scope Sheet - Bid Form for Trade Package K (Carpentry) issued by Cunningham-Limp for the Universal Academy Cafeteria Addition project located at 4833 Ogden St, Detroit, Michigan 48210. The project involves carpentry work based on FA Studio Rev1 Set dated 6/25/2025 and MLP Civil Set dated 7/9/2025, with an anticipated schedule per the contractor's instructions dated 7/14/2025. The scope of work includes providing and installing studs, densglass, drywall, insulation, drywall ceilings, suspension systems, acoustical ceiling systems, door installations, and toilet accessories.
The bid form requires contractors to provide a comprehensive proposal with a base bid, including sales tax, hoisting, and a standard one-year warranty. Extended warranties will be per individual specification sections. The document allows for potential alternates and requires bidders to submit unit costs and hourly rates. While specific pricing details are left blank, the form indicates that the bid should cover all labor, materials, overhead, and profit associated with the carpentry work for the cafeteria addition project. The bid is to be completed with a "Yes/No" on each line item and accompanied by a standard proposal form.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCOPE SHEET - BID FORM
Trade Package
K Carpentry 7/14/2025
Universal Acadmey Cafertiria Addition 4833 Ogden St, Detroit, Michigan 48210
* THIS FORM TO BE COMPETED WITH YES / NO ON EACH LINE ITEM AND ACCOMPANIED WITH YOUR STANDARD FORM OF PROPOSAL. Also provide a written proposal covering this scope and any other items necessary to further qualify your bid including voluntary alternates *
Company:
Estimator:
Office phone:
Cell phone:
Email:
Base Bid $
1. PLANS & SPECS: FA Studio Rev1 Set Dated 6/25/2025 & MLP Civil Set Dated 7/9/2025
2. ANTICIPATED SCHEDULE: Per Cunningham-Limp Instruction to Bidders & General Requirements dated 7/14/2025
3. GENERAL REQUIREMENTS: Per Cunningham-Limp Instruction to Bidders & General Requirements dated 7/14/2025
4. SALES TAX - REQUIRED
5. HOISTING - REQUIRED
6. CONTRACTOR STANDARD WARRANTY - ONE YEAR FROM SUBSTANTINAL COMPLETION OF PROJECT
7. EXTENDED WARRANTIES - PER INDIVIDUAL SPEIFICATION SECTION
8. GENERAL REQUIREMENTS PER DIVISION 1 OF PROJECT MANUAL / SPECIFICATON BOOK
9.
TRADE SCOPE:
Carpentry
The scope of work is presented to clarify certain portions of the work to be performed under the specified bid category and shall be supplied and installed unless noted otherwise. The scope of work is not to be construed as a complete itemization of work included in the bid category, nor does it relieve the subcontractor of its responsibility to deliver a complete job in accordance with plans and specifications.
Include (furnish and install uno):
1. All work performed in accordance with referenced drawings above and all applicable notes, details, & specifications related to this scope of work.
2.
3. Provide all layout necessary to complete the below scope of work.
4. Provide and install all necessary studs, densglass, drywall and insulation to complete work.
5. Provide all drywall ceilings including suspension systems where indicated.
6. Provide acoustical ceiling system as indicated
7. Install of doors provided by others
8. Install of toilet accessories. Provided by other
9.
10.
Exclude / By Others:
1.
2.
3.
TOTAL BID $ -
Alternates: (Inclusive of labor, materials, and OH&P) $ 1.
2.
3.
BID BREAKDOWN: $
1 Carpentry
Total Bid $ -
UNIT COST(S): (Inclusive of labor, materials, and OH&P) $
HOURLY RATE(S): (inclusive of OH&P) $
GENERAL / TYPICAL SCOPE OF WORK TO INCLUDE:
File details come from the government source that posted it. Updated .