N - Painting 7.14.25.pdf
PDF 108 KB Posted
- Solicitation number
- RFP-STAR-250000002762-1
- Issued by
- Wayne County, Michigan
About this file
This document is a Scope Sheet - Bid Form for a Painting Trade Package (Trade Package N) issued by Cunningham-Limp for the Universal Academy Cafeteria Addition project located at 4833 Ogden St, Detroit, Michigan 48210. The project involves painting work for a new cafeteria addition, with bid specifications referencing FA Studio Rev1 Set dated 6/25/2025 and MLP Civil Set dated 7/9/2025. The scope of work includes priming and painting new exposed gypsum board surfaces, walls, soffits, bulkheads, ceilings, and column wraps, as well as painting CMU walls, exposed structural steel, decking, hollow metal doors and frames, and sealing masonry block.
The bid form requires contractors to provide a comprehensive proposal with a base bid, including all necessary materials, labor, and equipment to complete the painting work. The project includes standard warranty provisions of one year from substantial completion, with potential extended warranties per individual specification sections. Contractors are expected to provide unit costs, hourly rates, and potentially alternate pricing options. The document is structured to allow bidders to detail their proposed pricing, scope understanding, and qualifications for the painting trade package of this educational facility construction project.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCOPE SHEET - BID FORM
Trade Package
N Painting 7/14/2025
Universal Acadmey Cafertiria Addition 4833 Ogden St, Detroit, Michigan 48210
* THIS FORM TO BE COMPETED WITH YES / NO ON EACH LINE ITEM AND ACCOMPANIED WITH YOUR STANDARD FORM OF PROPOSAL. Also provide a written proposal covering this scope and any other items necessary to further qualify your bid including voluntary alternates *
Company:
Estimator:
Office phone:
Cell phone:
Email:
Base Bid $
1. PLANS & SPECS: FA Studio Rev1 Set Dated 6/25/2025 & MLP Civil Set Dated 7/9/2025
2. ANTICIPATED SCHEDULE: Per Cunningham-Limp Instruction to Bidders & General Requirements dated 7/14/2025
3. GENERAL REQUIREMENTS: Per Cunningham-Limp Instruction to Bidders & General Requirements dated 7/14/2025
4. SALES TAX - REQUIRED
5. HOISTING - REQUIRED
6. CONTRACTOR STANDARD WARRANTY - ONE YEAR FROM SUBSTANTINAL COMPLETION OF PROJECT
7. EXTENDED WARRANTIES - PER INDIVIDUAL SPEIFICATION SECTION
8. GENERAL REQUIREMENTS PER DIVISION 1 OF PROJECT MANUAL / SPECIFICATON BOOK
9.
TRADE SCOPE:
Painting
The scope of work is presented to clarify certain portions of the work to be performed under the specified bid category and shall be supplied and installed unless noted otherwise. The scope of work is not to be construed as a complete itemization of work included in the bid category, nor does it relieve the subcontractor of its responsibility to deliver a complete job in accordance with plans and specifications.
Include (furnish and install uno):
1. All work performed in accordance with referenced drawings above and all applicable notes, details, & specifications related to this scope of work.
2.
3. Prime and paint all new exposed gypsum board surfaces including walls, soffits, bulkheads, ceilings, column wraps, etc. as applicable.
4. Supply all paints, stains, varnishes and sealers.
5. Paint all gypsum walls and ceilings (1 coat prime / 2 coats finish).
6. Touch up, prep and paint all CMU walls (new and existing).
7. Paint all exposed structural steel and decking where applicable.
8. Contractor shall roll exterior and spray interior hollow metal doors and frames.
9. Contractor shall seal all masonry block.
10. Provide all lifts and equipment required to perform work.
11.
12.
Exclude / By Others:
1.
2.
3.
TOTAL BID $ -
Alternates: (Inclusive of labor, materials, and OH&P) $ 1.
2.
3.
BID BREAKDOWN: $
1 Painting
Total Bid $ -
UNIT COST(S): (Inclusive of labor, materials, and OH&P) $
HOURLY RATE(S): (inclusive of OH&P) $
GENERAL / TYPICAL SCOPE OF WORK TO INCLUDE:
File details come from the government source that posted it. Updated .