About this file

This document is an attachment detailing Ordering Procedures for the Department of Veterans Affairs (VA) Healthcare Design-Build and Construction (DBnC) Multiple Award Task Order Contract (MATOC). The contract includes centralized and decentralized ordering procedures with specific guidelines for task order competitions based on project value: projects under $15M are set aside for small businesses, projects between $15M-$30M require a Request for Information (RFI) to determine small business eligibility, and projects over $30M will be competed among unrestricted awardees. The contract features both an Unrestricted and Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside component, with a focus on Fair Opportunity procedures for task order issuance.

Key technical and procedural details include Not-to-Exceed (NTE) Firm Fixed Price (FFP) fully burdened labor rates that are contractually binding, with provisions for potential rate negotiations at the task order level. Teaming arrangements require Contracting Officer approval, and task orders will be evaluated using factors such as technical management effectiveness, past performance, resource availability, and bonding capacity. The contract includes specific provisions for handling scenarios where SDVOSB awardees do not respond to solicitations, allowing for alternative pool competitions. Industry days are scheduled for August 20, 2025, and September 4, 2025, with a draft RFP comment deadline of September 12, 2025.

View the file

Other files

File Type Posted
Appendix_L_07 - Pool Breakdown 20250812.docx DOCX document
Attachment 1 - Draft DBnC Scope_20250812.docx DOCX document
Attachment_5 - On_Off_Ramping_Procedures 20250812.docx DOCX document
Virtual Industry Day Notice_CFM Healthcare Design-Build and Construction MATOC.docx DOCX document
Appendix_L_04 - Cross Reference Matrix_20250812.docx DOCX document
Attachment_4 - Section_M - Evaluation_Criteria_20250812.docx DOCX document
Appendix_L_01 - Offeror_Company_Information 20250812.docx DOCX document
Virtual Industry Day - CFM Healthcare Design-Build and Construction MATOC (36C10F26R50003) - Attendance report 9-04-25.xlsx XLSX spreadsheet
Appendix_L_02 - Choice_of_Competition 20250812.docx DOCX document
Appendix_L_03 - Work_Sample_Cover_Sheet 20250812.docx DOCX document
Attachment_3 - Section_L - Instructions_to_Offerors 20250812.docx DOCX document
DRAFT RFP - Without Attachments 36C10F26R50003.pdf PDF
Virtual Industry Day Registration Form_CFM DBnC MATOC.docx DOCX document
Past Performance Questionnaire_DBnC MATOC DRAFT.docx DOCX document
Appendix_L_10 Subcontracting Plan Template 20250812.docx DOCX document
Industry Day Presentation Virtual_VA DBnC MATOC_20250904.pptx PPTX presentation
Appendix_L_09 - Small Business Participation Commitment Document SBPCD_20250812.pdf PDF
Appendix_L_08 - Price_Labor Rates.xlsx XLSX spreadsheet
Past Performance Questionnaire_DBnC MATOC DRAFT.docx DOCX document
Attachment_5 - On_Off_Ramping_Procedures 20250812.docx DOCX document
Appendix_L_01 - Offeror_Company_Information 20250812.docx DOCX document
Virtual Industry Day Registration Form_CFM DBnC MATOC.docx DOCX document
Attachment_3 - Section_L - Instructions_to_Offerors 20250812.docx DOCX document
Appendix_L_07 - Pool Breakdown 20250812.docx DOCX document
Appendix_L_08 - Price_Labor Rates.xlsx XLSX spreadsheet
Appendix_L_03 - Work_Sample_Cover_Sheet 20250812.docx DOCX document
Appendix_L_10 Subcontracting Plan Template 20250812.docx DOCX document
Attachment_4 - Section_M - Evaluation_Criteria_20250812.docx DOCX document
Attachment_2 - DBnC_Ordering_Procedures 20250812.docx DOCX document
Appendix_L_09 - Small Business Participation Commitment Document SBPCD_20250812.pdf PDF
Appendix_L_04 - Cross Reference Matrix_20250812.docx DOCX document
DRAFT RFP - Without Attachments 36C10F26R50003.pdf PDF
Attachment 1 - Draft DBnC Scope_20250812.docx DOCX document
Virtual Industry Day Notice_CFM Healthcare Design-Build and Construction MATOC.docx DOCX document
Appendix_L_02 - Choice_of_Competition 20250812.docx DOCX document
Virtual Industry Day Registration Form_CFM DBnC MATOC.docx DOCX document
Virtual Industry Day Notice_CFM Healthcare Design-Build and Construction MATOC.docx DOCX document
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36C10F26R50003 Attachment 2 08 12 2025

DESIGN-BUILD & CONSTRUCTION (DBnC)

ORDERING PROCEDURES

1. CENTRALIZED ORDERING PROCEDURES

The Government will place task orders (TOs) in accordance with FAR 16.505(b). Each task order (TO) shall be issued in accordance with the following procedures:

(a) Task Order Request for Proposal (TORFP) – The Contracting Officer will furnish the Regional Pool associated with the location of the requirement with a written request for proposal.

(b) Projects less than $15M will be set-aside for small business awardees.

(c) For projects greater than or equal to $15M but less than $30M

i. A Request for Information (RFI) will be sent to the Regional Pool awardees for five (5) days to determine interest, capability to perform, and bonding capacity.

ii. If at least two (2) awardees are identified as interested and capable (Rule of Two), and provide proof of bonding capacity, then the task order will be set-aside.

iii. If the Rule of Two is not met, the task order will be competed amongst the F&O awardees.

iv. Any awardee who expresses interest during an RFI and does not submit a proposal will receive a warning. Three warnings may result in off-ramping.

(d) Projects greater than $30M will be competed amongst the Unrestricted awardees.

i. Pricing Structures. All task orders shall be structured in an FFP.

(e) Not-to-Exceed (NTE) FFP Fully Burdened Labor Rates. The NTE FFP fully burdened labor rates established at the basic contract level are contractually binding. The NTE FFP fully burdened labor rates are ceiling rates and shall be utilized for future single-source task orders and task order modifications; however, when competing for task orders, discounted or lower rates may be proposed. This does not preclude any awardee from utilizing or negotiating additional labor categories and their FFP fully burdened rate at the task order level.

(f) Any Government-furnished property, material, equipment, or base support to be made available for performance will be identified at the task order level.

(g) Terms and conditions of each TO, to include proposal preparation instructions and proposal due date, will be specified in the TORFP. Adequate price competition is anticipated at the TO level. If, after receipt of TO proposals, the CO determines there is insufficient data to determine price reasonableness or adequate price competition is not established and none of the exceptions in FAR 15.403-1 apply, Offerors may be required to submit additional data.

2. AWARDING ORDERS UNDER MULTIPLE AWARD CONTRACTS

(a) All multiple award contractors shall be provided a fair opportunity to be considered for each order more than the micro-purchase threshold within their Regional Pool pursuant to the procedures established unless an exception applies.

(b) The Government will place TOs based upon the TO evaluation factors identified in the TORFP, and in accordance with FAR 16.505. The TORFP will include evaluations factors as determined at the TO level. The TO evaluation criteria will include price and may include:

a. Specific Technical Management Effectiveness and Capabilities

b. Past Performance on recent and relevant work

c. Availability of Labor/Resources (capacity to perform)

d. Bond Capacity, as applicable

(c) In accordance with FAR 16.505(a)(10), a protest is not authorized in connection with the issuance or proposed issuance of a task or delivery order except for - a protest on the grounds that the order increases the scope, period, or maximum value of the contract under which the order is issued; or a protest of an order valued more than $25,000,000.

(d) For this contract, the designated task order ombudsman address is Associate Executive Director, Office of Facilities Acquisition, Office of Construction and Facilities Maintenance. The task order ombudsman is responsible for reviewing complaints from multiple award contractors and ensuring that all the contractors are afforded a fair opportunity to be considered for TOs in excess of the micro-purchase threshold, consistent with procedures in the contract.

(e) These procedures do not guarantee the contractor issuance of any TO above the minimum guarantee(s) stated in this contract.

(f) Any project competed amongst the SDVOSB awardees that does not receive offers will be made available to compete amongst an adjacent Regional Pool or the Unrestricted awardees.

a. Prior to soliciting the Unrestricted awardees, the Government shall issue a Request for Information (RFI) to the most logically adjacent Regional Pool for five (5) business days to determine interest, as well as an RFI to the awardees under the SDVOSB to determine why no offers were received.

b. If no awardees in the logically adjacent Regional Pool are interested, the Unrestricted awardees may be solicited.

c. If the Government detects a pattern of non-response from the SDVOSB awardees for particular projects, whether due to type of work, location, etc. The Government may begin issuing RFI to the Regional Pools for five (5) days to determine interest prior to soliciting future similar work.

3. TEAMING ARRANGEMENTS

(a) Contracts awarded based on a proposed teaming arrangements/partners require written Contracting Officer approval before deviating from the initial teaming arrangements/partners.

(b) Teaming partner and subcontract pricing must be supported in accordance with FAR 15.404-3. Cost and pricing data, as appropriate, shall be present in TO proposals. It is not necessary to compete teaming partners at the TO level. NTE FFP fully burdened labor rates shall be incorporated into the basic contract and teaming partners will share these labor rates with the prime contractor to be utilized for each TO and TO modification. Any teaming partner labor category proposed at the TO or TO modification level that was not awarded with this basic contract must be determined fair and reasonable prior to award. Additionally, non-labor teaming partner costs and all subcontract costs must be determined fair and reasonable and subcontracts (not teaming partners) shall be competed to the maximum extent practicable.

(c) In accordance with the proposal, the following teaming partners were evaluated during source selection and are considered to be team members:

1. TBD

2. TBD

4. DECENTRALIZED ORDERING PROCEDURES

Non-VA users may receive access to the DBnC basic contracts for the purpose of awarding, administering, and closing out their own TOs in support of the VA.

5. NOT TO EXCEED (NTE) FFP FULLY BURDENED LABOR RATES

(a) The NTE FFP fully burdened labor rates for the labor categories listed in Appendix L-08 Labor Rates Table shall be incorporated into the basic contract and will be used for future non-competitive FFP TO pricing.

(b) Except as described below, the fully burdened labor rates will not be adjusted above the NTE.

(c) Contractors may propose and/or utilize labor categories other than those whose rates were incorporated into the basic contract when additional labor categories are required to meet the need of a requirement at the TO level. The labor rates for these labor categories will then be negotiated at the TO level and may be incorporated into the basic contract via modification as an NTE FFP fully burdened rate to be used in future TO.