About this file

The file is a labor rate pricing template for a Department of Veterans Affairs (VA) Healthcare Design-Build and Construction Multiple Award Task Order Contract (MATOC). The spreadsheet provides a comprehensive bid schedule with hourly rates for 20 different professional disciplines across five potential contract periods, each spanning 12 months. The disciplines include roles such as Principal, Project Manager, Architects, Engineers (Mechanical, Electrical, Civil/Structural, Fire Protection), Industrial Hygienist, Draftsperson, Typist, Cost Estimator, Specification Writer, and Engineering Technician. The pricing template allows offerors to quote unit prices for each role during the base period and four subsequent option periods, enabling flexible pricing for potential task orders under the MATOC.

View the file

Other files

File Type Posted
Attachment_2 - DBnC_Ordering_Procedures 20250812.docx DOCX document
Appendix_L_07 - Pool Breakdown 20250812.docx DOCX document
Attachment 1 - Draft DBnC Scope_20250812.docx DOCX document
Attachment_5 - On_Off_Ramping_Procedures 20250812.docx DOCX document
Virtual Industry Day Notice_CFM Healthcare Design-Build and Construction MATOC.docx DOCX document
Appendix_L_04 - Cross Reference Matrix_20250812.docx DOCX document
Attachment_4 - Section_M - Evaluation_Criteria_20250812.docx DOCX document
Appendix_L_01 - Offeror_Company_Information 20250812.docx DOCX document
Virtual Industry Day - CFM Healthcare Design-Build and Construction MATOC (36C10F26R50003) - Attendance report 9-04-25.xlsx XLSX spreadsheet
Appendix_L_02 - Choice_of_Competition 20250812.docx DOCX document
Appendix_L_03 - Work_Sample_Cover_Sheet 20250812.docx DOCX document
Attachment_3 - Section_L - Instructions_to_Offerors 20250812.docx DOCX document
DRAFT RFP - Without Attachments 36C10F26R50003.pdf PDF
Virtual Industry Day Registration Form_CFM DBnC MATOC.docx DOCX document
Past Performance Questionnaire_DBnC MATOC DRAFT.docx DOCX document
Appendix_L_10 Subcontracting Plan Template 20250812.docx DOCX document
Industry Day Presentation Virtual_VA DBnC MATOC_20250904.pptx PPTX presentation
Appendix_L_09 - Small Business Participation Commitment Document SBPCD_20250812.pdf PDF
Past Performance Questionnaire_DBnC MATOC DRAFT.docx DOCX document
Attachment_5 - On_Off_Ramping_Procedures 20250812.docx DOCX document
Appendix_L_01 - Offeror_Company_Information 20250812.docx DOCX document
Virtual Industry Day Registration Form_CFM DBnC MATOC.docx DOCX document
Attachment_3 - Section_L - Instructions_to_Offerors 20250812.docx DOCX document
Appendix_L_07 - Pool Breakdown 20250812.docx DOCX document
Appendix_L_08 - Price_Labor Rates.xlsx XLSX spreadsheet
Appendix_L_03 - Work_Sample_Cover_Sheet 20250812.docx DOCX document
Appendix_L_10 Subcontracting Plan Template 20250812.docx DOCX document
Attachment_4 - Section_M - Evaluation_Criteria_20250812.docx DOCX document
Attachment_2 - DBnC_Ordering_Procedures 20250812.docx DOCX document
Appendix_L_09 - Small Business Participation Commitment Document SBPCD_20250812.pdf PDF
Appendix_L_04 - Cross Reference Matrix_20250812.docx DOCX document
DRAFT RFP - Without Attachments 36C10F26R50003.pdf PDF
Attachment 1 - Draft DBnC Scope_20250812.docx DOCX document
Virtual Industry Day Notice_CFM Healthcare Design-Build and Construction MATOC.docx DOCX document
Appendix_L_02 - Choice_of_Competition 20250812.docx DOCX document
Virtual Industry Day Registration Form_CFM DBnC MATOC.docx DOCX document
Virtual Industry Day Notice_CFM Healthcare Design-Build and Construction MATOC.docx DOCX document
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Schedule

BID SCHEDULE
OFFEROR'S NAME ________________________________________________________________________
BASE PERIOD (APPLICABLE TO ALL TASK ORDERS ISSUED IN THE FIRST 12 MONTH PERIOD)
DISCIPLINEUNITUNIT PRICE
PRINCIPALHR
PROJECT MANAGERHR
SCHEDULERHR
SR. ARCHITECTHR
ARCHITECTHR
SR. MECHANICAL ENGINEERHR
MECHANICAL ENGINEERHR
SR. ELECTRICAL ENGINEERHR
ELECTRICAL ENGINEERHR
SR. CIVIL/STRUCTURAL ENGINEERHR
CIVIL/STRUCTURAL ENGINEERHR
SR. FIRE PROTECTION ENGINEERHR
FIRE PROTECTION ENGINEERHR
INDUSTRIAL HYGIENISTHR
DRAFTSPERSONHR
TYPISTHR
COST ESTIMATORHR
SPECIFICATION WRITERHR
ENGINEERING TECHNICIANHR
OPTION PERIOD 1 (APPLICABLE TO ALL TASK ORDERS ISSUED IN THE SECOND 12 MONTH PERIOD)
DISCIPLINEUNITUNIT PRICE
PRINCIPALHR
PROJECT MANAGERHR
SCHEDULERHR
SR. ARCHITECTHR
ARCHITECTHR
SR. MECHANICAL ENGINEERHR
MECHANICAL ENGINEERHR
SR. ELECTRICAL ENGINEERHR
ELECTRICAL ENGINEERHR
SR. CIVIL/STRUCTURAL ENGINEERHR
CIVIL/STRUCTURAL ENGINEERHR
SR. FIRE PROTECTION ENGINEERHR
FIRE PROTECTION ENGINEERHR
INDUSTRIAL HYGIENISTHR
DRAFTSPERSONHR
TYPISTHR
COST ESTIMATORHR
SPECIFICATION WRITERHR
ENGINEERING TECHNICIANHR
OPTION PERIOD 2 (APPLICABLE TO ALL TASK ORDERS ISSUED IN THE THIRD 12 MONTH PERIOD)
DISCIPLINEUNITUNIT PRICE
PRINCIPALHR
PROJECT MANAGERHR
SCHEDULERHR
SR. ARCHITECTHR
ARCHITECTHR
SR. MECHANICAL ENGINEERHR
MECHANICAL ENGINEERHR
SR. ELECTRICAL ENGINEERHR
ELECTRICAL ENGINEERHR
SR. CIVIL/STRUCTURAL ENGINEERHR
CIVIL/STRUCTURAL ENGINEERHR
SR. FIRE PROTECTION ENGINEERHR
FIRE PROTECTION ENGINEERHR
INDUSTRIAL HYGIENISTHR
DRAFTSPERSONHR
TYPISTHR
COST ESTIMATORHR
SPECIFICATION WRITERHR
ENGINEERING TECHNICIANHR
OPTION PERIOD 3 (APPLICABLE TO ALL TASK ORDERS ISSUED IN THE FOURTH 12 MONTH PERIOD)
DISCIPLINEUNITUNIT PRICE
PRINCIPALHR
PROJECT MANAGERHR
SCHEDULERHR
SR. ARCHITECTHR
ARCHITECTHR
SR. MECHANICAL ENGINEERHR
MECHANICAL ENGINEERHR
SR. ELECTRICAL ENGINEERHR
ELECTRICAL ENGINEERHR
SR. CIVIL/STRUCTURAL ENGINEERHR
CIVIL/STRUCTURAL ENGINEERHR
SR. FIRE PROTECTION ENGINEERHR
FIRE PROTECTION ENGINEERHR
INDUSTRIAL HYGIENISTHR
DRAFTSPERSONHR
TYPISTHR
COST ESTIMATORHR
SPECIFICATION WRITERHR
ENGINEERING TECHNICIANHR
OPTION PERIOD 4 (APPLICABLE TO ALL TASK ORDERS ISSUED IN THE FIFTH 12 MONTH PERIOD)
DISCIPLINEUNITUNIT PRICE
PRINCIPALHR
PROJECT MANAGERHR
SCHEDULERHR
SR. ARCHITECTHR
ARCHITECTHR
SR. MECHANICAL ENGINEERHR
MECHANICAL ENGINEERHR
SR. ELECTRICAL ENGINEERHR
ELECTRICAL ENGINEERHR
SR. CIVIL/STRUCTURAL ENGINEERHR
CIVIL/STRUCTURAL ENGINEERHR
SR. FIRE PROTECTION ENGINEERHR
FIRE PROTECTION ENGINEERHR
INDUSTRIAL HYGIENISTHR
DRAFTSPERSONHR
TYPISTHR
COST ESTIMATORHR
SPECIFICATION WRITERHR
ENGINEERING TECHNICIANHR