Q&A Document 1.pdf

PDF 4 KB Posted

Attached to
TYS RW 5R-23L Rehab Project 1
Solicitation number
IFB-MKAA-0000000002
Issued by
Bradley County, Tennessee

About this file

This document is a Questions & Answers file for the TYS RW 5R-23L Rehab Project 1, issued by the Metropolitan Knoxville Airport Authority. The document contains eight questions and answers dated 02/24/2025 and 02/26/2025, addressing technical specifications and project requirements for the runway rehabilitation project. Key topics include temporary fertilizer specifications, mulching line items, temporary paint and marking procedures, existing haul road paving details, topsoil excavation, vacuum truck requirements, and financial statement submission guidelines.

The Q&A document indicates that bidders must submit a financial statement with their bid and provides clarification on various technical aspects of the project. Specific details include that topsoil stripping is considered incidental to unclassified excavation, the contractor must provide a vacuum truck with an operator, and all temporary and permanent paint, including black paint to cover existing markings, will be paid under item P-620-5.2b. The answers reference multiple addenda (Nos. 3, 4, and 6) which contain additional project details and specifications that potential bidders should review.

View the file

Other files

File Type Posted
C-Noncollusion - Fillable.pdf PDF
J-Financial Statement - insert.pdf PDF
TYS 5R-23L Project 1 - Addendum No. 5.pdf PDF
M-Perf of Work Sub - fillable.pdf PDF
G-buy_america_certification - Fillable.pdf PDF
O-Bidders Qualification - fillable.pdf PDF
I-Identification of Principals - fillable.pdf PDF
TYS 5R-23L Project 1 - Addendum No. 7.pdf PDF
N-Subconstractor Solicitation - fillable.pdf PDF
B-Bidbond - Fillable.pdf PDF
S-Contractor License Form.pdf PDF
L-Perf of Work Contractor - fillable.pdf PDF
Q-Statement of Compliance Certificate Illegal Immigrants - fillable.pdf PDF
2025.02.12 TYS RW 5R-23L Rehab Project 1 Specs.pdf PDF
A-Bid Form Editable.pdf PDF
A-Bid Schedule - Addendum 3.xlsm XLSM spreadsheet
D-EEOStatment - fillable.pdf PDF
H-Cert of Nonsegr - fillable.pdf PDF
TYS 5R-23L Project 1 - Addendum No. 2.pdf PDF
R-Certification Against All Debarment - fillable.pdf PDF
K-Experience Record and List of Equip - fillable.pdf PDF
A-Bid Schedule Final.xlsm XLSM spreadsheet
03 TYS Advertisement for Bid Virtual Final.pdf PDF
P-Drug Free - fillable.pdf PDF
E-2DBE Program Bid Conditions - fillable.pdf PDF
2025.02.12 TYS RW 5R-23L Rehab Project 1 Plans.pdf PDF
E-1DBE Objectives and Policy Statement.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions & Answers - 1

Project IFB-MKAA-0000000002 - TYS RW 5R-23L Rehab Project 1

Buying Organization Metropolitan Knoxville Airport Authority

No Question/Answer Question Date

Q1 Question: C-102-5.1C

Can we get a spec for line item C-102-5.1C Temporary Fertilizer?

Rate / Pounds per 1000 SF?

What Type of Fertilizer?

Answer: See Addendum No. 3.

02/24/2025

Q2 Question: Mulching Line Items

Can we get a specified mulch and rate for both temporary and permanent mulching line items?

Answer: See Addendum No. 3.

02/24/2025

Q3 Question: Black Out Markings

In the safety and phasing notes state to black out taxiway centerline at start of condition, remove and repaint centerline at end of condition. How will the "Black Out" be paid, under which line item?

Answer: All temporary and permanent paint, including black paint to cover existing markings will be paid under item P-620-5.2b.

02/26/2025

Q4 Question: Existing Haul Road Paving Section

Can you please provide the asphalt paving section for the existing haul road?

Answer: Available boring logs have been included in Addendum No. 6.

02/26/2025

Q5 Question: Embankment Area Topsoil Quantities

Does the Unclassified Excavation and Topsoil quantities include stripping and replacing topsoil for the embankment area?

Answer: All costs for topsoil stripping, including at the embankment site, is considered incidental to

Item P-152, Unclassified Excavation. All cost for spreading topsoil after all excavation and embankment is complete shall be included in item T-905, Topsoil. See Addendum 6 for clarification.

02/26/2025

Q6 Question: Vacuum Truck

It was mentioned at the Pre-Bid Meeting that a vacuum truck will be required at the taxiway crossings.

Will MKAA provide the vacuum truck? If so, will the contractor be responsible for providing the truck operator?

Answer: The Contractor shall provide the vacuum truck with an operator per note 6 on drawing G4.1.9.

02/26/2025

Q7 Question: Financial Statement

Since this job will require Bid Bonds, Performance and Payment Bonds, will the bidder's Financial

Statement be required to be submitted with the bid?

Answer: Yes. The Owner request that a financial statement be submitted with the bid per the bid documents.

02/26/2025

No Question/Answer Question Date

Q8 Question: Addendum #3 - Revised Bid Schedule

Can you please provide the Addendum #3 - Revised Bid Schedule in Excel Format as originally issued?

Answer: The excel spreadsheet of the bid schedule was issued via Addendum No. 4.

02/26/2025