A-Bid Schedule - Addendum 3.xlsm

XLSM spreadsheet 36 KB Posted

Attached to
TYS RW 5R-23L Rehab Project 1
Solicitation number
IFB-MKAA-0000000002
Issued by
Bradley County, Tennessee

About this file

The document is a detailed Bid Schedule (Addendum 3) for the Metropolitan Knoxville Airport Authority's McGhee Tyson Airport Runway 5R-23L Rehabilitation - Project 1 located in Alcoa, Tennessee. The comprehensive bid schedule includes 97 line items covering a wide range of construction and infrastructure services, including temporary erosion control measures, storm pipe installation, pavement removal, electrical work, landscaping, and traffic maintenance. The project involves extensive site preparation, including unclassified excavation (approximately 95,160 cubic yards), clearing and grubbing, tree removal, and infrastructure modifications such as installing various sizes of storm pipes (24-inch to 42-inch), electrical duct banks, and runway/taxiway guidance signs.

The bid schedule indicates a complex airport infrastructure project with multiple technical specifications and no unit pricing currently listed (all line items show $0.00). The project encompasses significant electrical infrastructure work, including cable installations, duct bank construction, junction structures, and fiber optic communication elements. Additional project components include maintenance of traffic, safety plan compliance, temporary runway closure markers, and site-specific requirements like project security, badging, and training. The scope suggests a comprehensive airport runway rehabilitation effort with extensive underground utility, electrical, and surface infrastructure upgrades, potentially funded through airport authority or federal aviation infrastructure investment programs.

View the file

Other files

File Type Posted
C-Noncollusion - Fillable.pdf PDF
J-Financial Statement - insert.pdf PDF
TYS 5R-23L Project 1 - Addendum No. 5.pdf PDF
M-Perf of Work Sub - fillable.pdf PDF
G-buy_america_certification - Fillable.pdf PDF
O-Bidders Qualification - fillable.pdf PDF
I-Identification of Principals - fillable.pdf PDF
Q&A Document 1.pdf PDF
TYS 5R-23L Project 1 - Addendum No. 7.pdf PDF
N-Subconstractor Solicitation - fillable.pdf PDF
B-Bidbond - Fillable.pdf PDF
S-Contractor License Form.pdf PDF
L-Perf of Work Contractor - fillable.pdf PDF
Q-Statement of Compliance Certificate Illegal Immigrants - fillable.pdf PDF
2025.02.12 TYS RW 5R-23L Rehab Project 1 Specs.pdf PDF
A-Bid Form Editable.pdf PDF
D-EEOStatment - fillable.pdf PDF
H-Cert of Nonsegr - fillable.pdf PDF
TYS 5R-23L Project 1 - Addendum No. 2.pdf PDF
R-Certification Against All Debarment - fillable.pdf PDF
K-Experience Record and List of Equip - fillable.pdf PDF
A-Bid Schedule Final.xlsm XLSM spreadsheet
03 TYS Advertisement for Bid Virtual Final.pdf PDF
P-Drug Free - fillable.pdf PDF
E-2DBE Program Bid Conditions - fillable.pdf PDF
2025.02.12 TYS RW 5R-23L Rehab Project 1 Plans.pdf PDF
E-1DBE Objectives and Policy Statement.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2 - ITEMIZED PROPOSAL

ITEMIZED PROPOSAL

ITEM NO.SPECIFICATIONDESCRIPTION OF ITEMUNITQUANTITYUNIT PRICETOTAL
1C-102-5.1ATEMPORARY SEEDING (UNDISTRIBUTED)KSF2,200$0.00
2C-102-5.1BTEMPORARY MULCHING (UNDISTRIBUTED)KSF2,200$0.00
3C-102-5.1CTEMPORARY FERTILIZER (UNDISTRIBUTED)KSF2,200$0.00
4C-102-5.1ESILT FENCELFT7,000$0.00
5C-102-5.1FINLET PROTECTIONEA25$0.00
6C-102-5.1GCONSTRUCTION ENTRANCE/EXITEA1$0.00
7C-102-5.1HCONCRETE WASHOUTEA1$0.00
8C-102-5.1ITIRE WASHING FACILITYEA2$0.00
9C-102-5.1JTYPE 1 SEDIMENT TRAPEA3$0.00
10C-102-5.1KTYPE 2 SEDIMENT TRAPEA3$0.00
11C-102-5.1LTYPE 3 SEDIMENT TRAPEA3$0.00
12C-102-5.1MROCK CHECK DAMLFT3$0.00
13C-102-5.1NSEDIMENT TUBES (DITCH APPLICATION)EA18$0.00
14C-102-5.1OROCK PIPE INLET PROTECTIONEA1$0.00
15C-102-5.1PFOD CONTROL MATEA5$0.00
16C-102-5.1QEROSION CONTROL BLANKETSYD10,500$0.00
17C-105MOBILIZATIONLSUM1$0.00
18701-5.1a24-INCH STORM PIPELFT346$0.00
19701-5.1b30-INCH STORM PIPELFT742$0.00
20D-701-5.1c36-INCH STORM PIPELFT1,187$0.00
21D-701-5.1d42-INCH STORM PIPELFT477$0.00
22D-701-5.3PIPE CRADLEEA1$0.00
23D-705-5.1a4-INCH NON-PERFORATED UNDERDRAIN PIPELFT200$0.00
24D-705-5.1b6 INCH NON-PERFORATED UNDERDRAIN PIPELFT300$0.00
25D-705-5.1c6 INCH NON-PERFORATED UNDERDRAIN PIPE (UNDISTRIBUTED)LFT500$0.00
26D-705-5.1d8-INCH NON-PERFORATED UNDERDRAIN PIPELFT500$0.00
27D-751-5.1aTYPE A INLETEA6$0.00
28D-751-5.1bTYPE B INLETEA3$0.00
29D-751-5.1cTYPE 1 CLEANOUTEA1$0.00
30D-751-5.1dTYPE 2 CLEANOUTEA8$0.00
31P-101-5.1PAVEMENT REMOVAL HMA (20 INCH TO 30 INCH)SYD1,700$0.00
32P-101-5.2PAVEMENT REMOVAL CONCRETE (20 INCH TO 25 INCH)SYD900$0.00
33P-101-5.3REMOVAL OF FOREIGN SUBSTANCES/CONTAMINATESSFT25,000$0.00
34P-101-5.4REMOVE STORM SEWER STRUCTUREEA18$0.00
35P-101-5.5REMOVE STORM SEWER (24 INCH DIAMETER AND UNDER)LFT1,800$0.00
36P-101-5.6REMOVE STORM SEWER (OVER 24 INCH DIAMETER)LFT2,500$0.00
37P-101-5.7REMOVE ELECTRICAL OR FIBER OPTIC MANHOLEEA15$0.00
38P-101-5.8REMOVE ELECTRICAL BASECANEA29$0.00
39P-101-5.9REMOVE ELECTRICAL CABLE FROM CONDUIT TO REMAINLFT33,000$0.00
40P-101-5.10REMOVE ELECTRICAL OR FIBER OPTIC CABLE AND CONDUITLFT11,500$0.00
41P-101-5.11REMOVE CONCRETE ENCASED ELECTRICAL DUCT BANK AND CABLELFT1,000$0.00
42P-101-5.12REMOVE DISTANCE REMAINING SIGN AND CONCRETE FOUNDATIONEA3$0.00
43P-101-5.13REMOVE OF DISTANCE REMAINING SIGNEA13$0.00
44P-101-5.14REMOVE OF AIRFIELD GUIDANCE SIGN AND SALVAGEEA1$0.00
45P-101-5.15ABANDON STRUCTUREEA1$0.00
46P-101-5.16ABANDON PIPE (24 INCH)LFT110$0.00
47P-151-4.2CLEARING AND GRUBBINGAC3$0.00
48P-151-4.3TREE REMOVALAC1$0.00
49P-152-4.1UNCLASSIFIED EXCAVATIONCYD90,160$0.00
50P-152-4.2UNCLASSIFIED EXCAVATION (UNDISTRIBUTED)CYD5,000$0.00
51P-620-5.1aSURFACE PREPARATIONSFT25,000$0.00
52P-620-5.2bMARKINGSFT25,000$0.00
53P-620-5.3cREFLECTIVE MEDIALB1,800$0.00
54T-901-5.1SEEDINGAC50$0.00
55T-904-5.1SODDINGSYD7,050$0.00
56T-905-5.1TOPSOILCYD11,436$0.00
57T-908-5.1MULCHINGAC50$0.00
58L-108-5.1NO. 6 AWG , 5 KV L824, TYPE C CABLE, INSTALLED IN TRENCH, DUCT BANK, OR CONDUITLFT5,500$0.00
59L-108-5.2NO. 8 AWG, 5 KV L824, TYPE C CABLE, INSTALLED IN TRENCH, DUCT BANK, OR CONDUITLFT20,000$0.00
60L-109-7.4INSTALLATION OF EQUIPMENT WITHIN EXISTING VAULTEA0$0.00
61L-110-5.1NON-CONCRETE ENCASED ELECTRICAL DUCT BANK, 1-WAY, 2-INCHLFT1,600$0.00
62L-110-5.2NON-CONCRETE ENCASED ELECTRICAL DUCT BANK, 2-WAY, 2-INCHLFT200$0.00
63L-110-5.8CONCRETE ENCASED ELECTRICAL DUCT BANK, 12-WAY, 2-INCH (4X3)LFT953$0.00
64L-110-5.9CONCRETE ENCASED FAA FOTS DUCT BANK, 1-WAY, 4-INCHLFT5,500$0.00
65L-115-5.2ELECTRICAL JUNCTION STRUCTURE - 12 UNIT PULLCAN PLAZAEA2$0.00
66L-115-5.3ELECTRICAL JUNCTION STRUCTURE - 8 UNIT PULLCAN PLAZAEA1$0.00
67L-115-5.4BASECAN HANDHOLEEA4$0.00
68L-115-5.5FAA FIBER OPTIC COMMUNICATION HANDHOLEEA15$0.00
69L-125-5.1L-858 RUNWAY/TAXIWAY GUIDANCE SIGN ADB, L-858 TWO MODULE DOUBLE FACE SALVAGED LED GUIDANCE SIGN WITH NEW POURED FOUNDATIONEA1$0.00
70EST-03-1CONDUIT, 1-WAY, 4-INCH DIRECTIONAL DRILLEDLFT700$0.00
71EST-03-2CONDUIT, 8-WAY, 2-INCH, DIRECTIONAL DRILLEDLFT300$0.00
72MST-02.1MAINTENANCE OF TRAFFICLSUM1$0.00
73MST-02.2SAFETY PLAN COMPLIANCE DOCUMENTLSUM1$0.00
74MST-02.3CONTROL AND WARNING DEVICESLSUM1$0.00
75MST-02.4TEMPORARY RUNWAY CLOSURE MARKERSMONTH6$0.00
76MST-02.5ACTIVE TAXIWAY CROSSING GUARDDAY220$0.00
77MST-02.6VISUAL BARRIERSLFT20,000$0.00
78MST-02.7MOWINGLSUM1$0.00
79MST-03.1CONSTRUCTION ENGINEERINGLSUM1$0.00
80MST-03.2RECORD DRAWINGSLSUM1$0.00
81MST-04.1PROJECT SECURITYLSUM1$0.00
82MST-04.2SECURITY BADGING AND TRAININGLSUM1$0.00
83MST-0616 INCH AGGREGATE BASE COURSE HAUL ROAD (TDOT 303, TYPE A, GRADING D)SYD17,900$0.00
84PST-10.1INVERTED FILTER CONSTRUCTION - SHOT ROCK (UNDISTRIBUTED)TON50$0.00
85PST-10.2INVERTED FILTER CONSTRUCTION - NO. 2 STONE (UNDISTRIBUTED)TON50$0.00
86PST-10.3INVERTED FILTER CONSTRUCTION - NO. 57 STONE (UNDISTRIBUTED)TON50$0.00
87PST-10.4INVERTED FILTER CONSTRUCTION - DENSE GRADED AGGREGATE (UNDISTRIBUTED)TON50$0.00
88PST-10.5INVERTED FILTER CONSTRUCTION - FLOWABLE FILL (UNDISTRIBUTED)CYD50$0.00
89PST-10.6INVERTED FILTER CONSTRUCTION - GEOTEXTILE FABRIC (UNDISTRIBUTED)SYD25$0.00
90PST-10.7INVERTED FILTER CONSTRUCTION - STRUCTURAL SOIL FILL (UNDISTRIBUTED)CYD100$0.00
91PST-10.8CAP AND COMPACTION GROUTING - MOBILIZATION AND DEMOBILIZATION (UNDISTRIBUTED)EA1$0.00
92PST-10.9CAP AND COMPACTION GROUTING - EROSION CONTROL (UNDISTRIBUTED)EA1$0.00
93PST-10.10CAP AND COMPACTION GROUTING - CASING INSTALLATION (UNDISTRIBUTED)LFT20$0.00
94PST-10.11CAP AND COMPACTION GROUTING - GROUT PLACEMENT (UNDISTRIBUTED)CYD50$0.00
95PST-10.12CAP AND COMPACTION GROUTING - SITE RESTORATION (UNDISTRIBUTED)EA1$0.00
96SST-01.1SUSTAINABILITY MANAGEMENT PLANLSUM1$0.00
97N-100FIBER OPTIC CABLE, 24 STRAND, SINGLE MODE, IN DUCTLFT10,400$0.00
Total =$0.00
SUBMITTED BY:
TITLE:
ADDRESS:

END OF ITEMIZED PROPOSAL

MCGHEE TYSON AIRPORT

ALCOA, TENNESSEE RUNWAY 5R-23L REHABILITATION - PROJECT 1

ADDENDUM 3 - FEBRUARY 25, 2025

BID SCHEDULE BS-&P