Construction Task Catalog - County of San Mateo, Painting

This is a Construction Task Catalog (CTC) for painting services prepared by The Gordian Group, Inc. for the County of San Mateo, California, effective October 2025. The catalog is designed to support Job Order Contracts (JOC) for painting work and provides comprehensive unit pricing for labor, materials, and equipment across CSI Divisions 01-09. The Department of Public Works seeks up to two (2) painting contractors through separate JOC agreements, each with an aggregate fiscal obligation not to exceed $1,000,000 and a maximum individual term of one (1) year. Work is anticipated within a designated County area, though the Owner reserves the right to require contractors to work at any County location or facility. Services encompass all labor, materials, tools, appurtenances, and equipment required to complete painting and related finishes work as directed by the Director of Public Works or designee.

The CTC includes detailed unit pricing for prevailing wage labor rates, equipment usage, material costs, and adjustment factors. Labor rates are specified for various trades including painters (ordinary and structural steel), laborers, and specialized personnel, with provisions for foreperson and apprentice rate adjustments. Equipment costs include aerial lifts, pressure washers, scaffolding, generators, and specialized tools, with mobilization included for most equipment except large machinery. Material costs encompass paint, coatings, protective coverings, and related supplies, including allowances for waste and delivery within 15 miles. Pricing is calculated using the formula: Published Unit Price × Installation Quantity × Appropriate Adjustment Factor. Adjustment factors account for overhead, profit, insurance, bonds, taxes, and other business costs not included in base unit prices. The contractor must provide all necessary certifications, comply with OSHA requirements, and follow established safety protocols. The apparent lowest, responsive, and responsible bidder will be selected for each JOC, with the successful contractor excluded from consideration for successive contracts.

View the file

Other files

File Type Posted
Job_Order_Contract_for_Painting_(JOC_2617_and_JOC_2618)_(Addendum_#2_Revision).pdf PDF
_H_Anti-Trust_Laws_Questionnaire_Painting.pdf PDF
Job_Order_Contract_for_Painting_(JOC_2617_and_JOC_2618)_(Addendum_#1_Revision).pdf PDF
_R_Technical_Specifications_-_Painting_-_Distribution.pdf PDF
_P_JOC_System_License_and_Fee_Agreement_Sample.pdf PDF
_O_Payment_and_Performance_Bonds_Sample.pdf PDF
_N_Job_Order_Contact_Agreement_SAMPLE.pdf PDF
_M_Contract_Documents_General_Conditions.pdf PDF
_L_Recycling_and_Diversion_of_Debris_from_Construction_and_Demolition_Ordinance_No._4099_Chapter_4.105.pdf PDF
_K_Contractor_Employee_Jury_Service_Ordinance_No.4324_Chapter_2.85.pdf PDF
_J_Contractor's_Declaration_Form_Painting.pdf PDF
_I_Equal_Benefits_Compliance_Ordinance.pdf PDF
_H_Anti-Trust_Laws_Questionnaire_Electrical-Lighting.pdf PDF
_G_EEO_Certification_of_Compliance.pdf PDF
_F_EEO_Contractor_Report_Form_Painting.pdf PDF
_E_EEO_Questionnaire_Painting.pdf PDF
_D_EEO_Program_Supplemental_General_Conditions.pdf PDF
_C_Award_Criteria_Figure.pdf PDF
_B_Bid_Schedule_for_Painting.pdf PDF
_A_Bid_Bond_JOC_2617-2618.pdf PDF
Standard_Contract_Template_-_Under_$200K_DRAFT.docx DOCX document
Standard_Contract_Template_-_Over_$200K_DRAFT.docx DOCX document
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Job Order Contract Construction Task Catalog® CSI Divisions 01-09 October 2025

County of San Mateo, Painting

This Page Intentionally Left Blank

Table of Contents

October 2025 copyright © 2025 The Gordian Group, Inc.

County of San Mateo, Painting Page TOC - 1

00 Using The Construction Task Catalog® 1

01 General Requirements 1 01 10 Summary

01 11 Summary Of Work 01 20 Price and Payment Procedures

01 22 Unit Prices 01 30 Administrative Requirements

01 31 Project Management and Coordination 01 35 Special Procedures

01 40 Quality Requirements 01 41 Regulatory Requirements 01 42 References 01 45 Quality Control

01 50 Temporary Facilities and Controls 01 51 Temporary Utilities 01 52 Construction Facilities 01 53 Temporary Construction 01 54 Construction Aids 01 56 Temporary Barriers and Enclosures 01 57 Temporary Controls 01 58 Project Identification

01 60 Product Requirements 01 66 Product Storage and Handling Requirements

01 70 Execution and Closeout Requirements 01 71 Examination and Preparation 01 74 Cleaning and Waste Management

02 Existing Conditions 1 02 20 Assessment

02 25 Existing Material Assessment 02 60 Contaminated Site Material Removal

02 61 Removal and Disposal of Contaminated Soils 02 80 Facility Remediation

02 81 Transportation and Disposal of Hazardous Materials 02 82 Asbestos Remediation 02 83 Lead Remediation 02 84 Polychlorinated Biphenyl Remediation 02 87 Bio-Hazard Material Remediation 02 89 Hazmat Ancillary Tasks and Support

02 90 Disaster Recovery 02 90 50 Cleaning and Disaster Cleanup 02 90 55 Emergency Clean-up

09 Finishes 1 09 01 Maintenance of Finishes

09 01 20 Maintenance of Plaster and Gypsum Board 09 01 30 Maintenance of Tiling 09 01 50 Maintenance of Ceilings 09 01 60 Maintenance of Flooring 09 01 80 Maintenance of Acoustic Treatment 09 01 90 Maintenance of Painting and Coating

09 20 Plaster and Gypsum Board 09 22 Supports for Plaster and Gypsum Board 09 29 Gypsum Board

09 50 Ceilings 09 51 Acoustical Ceilings 09 53 Acoustical Ceiling Suspension Assemblies 09 54 Specialty Ceilings 09 57 Special Function Ceilings

09 90 Painting and Coating 09 91 Painting 09 93 Staining and Transparent Finishing

Table of Contents copyright © 2025 The Gordian Group, Inc. October 2025 Page TOC - 2 County of San Mateo, Painting

09 96 High-Performance Coatings 09 97 Special Coatings

Using The Construction Task Catalog®

County of San Mateo, Painting Page 00 - 1

CTC Information:

This Construction Task Catalog® was developed and customized by The Gordian Group, Inc.

specifically for County of San Mateo, priced locally using current labor, material and equipment costs, and published in October 2025.

The Gordian Group, Inc. licenses the use of this CTC and other proprietary information and software for the sole purpose of providing Job Order Contracting services to County of San Mateo. Use of The Gordian Group’s CTC and other proprietary information and software for any other purpose or any other entity is expressly prohibited without the express written consent of The Gordian Group, Inc.

MasterFormat™

The tasks in this Construction Task Catalog are organized using CSI’s MasterFormat.

The Unit Prices Include:

LABOR COSTS:

Labor costs include unloading equipment, materials, and tools, and transporting the same up or down 2 stories and 125' to reach the project site; layout;

measuring and cutting to fit; performing the task;

disposal of excess material; and time for lunch and breaks.

Labor costs include direct labor through the working foreperson level at straight-time prevailing wage rates including fringe benefits and an allowance for Social Security and Medicare taxes, worker's compensation, unemployment insurance and employee benefits.

Labor costs are based on workers familiar with and skilled in the performance of the task following OSHA requirements.

EQUIPMENT COSTS:

Equipment costs include all equipment required to accomplish the task.

Mobilization is included for all equipment except large equipment (e.g. cranes, pile drivers, bulldozers, excavators, backhoes, bobcats etc.), which exclude mobilization.

Equipment costs include all operating expenses such as fuel, electricity, lubricants, etc.

MATERIAL COSTS:

Material costs include the cost of the material, delivery, and all incidentals and accessories integral to the installation.

Material costs include manufacturer's and/or fabricator's shop drawings.

Material costs for roofing, drywall, VCT, carpet, wall covering, ceiling tile, pipe, conduit, concrete, etc.

include an allowance for waste. This list is not intended to be all inclusive, but descriptive of the types of construction materials that are typically sold in standard lengths, sizes and weights.

Complete and In-Place Construction:

Unit prices are for complete and in-place construction and include all labor, equipment and material required to complete the task as described in the CTC.

If the Contractor uses a crane or other lifting equipment (except a truck mounted boom lift or other equipment as part of the delivery process) to lift material onto a roof, even if that roof is less than 2 stories, the contractor will be paid for such crane or lifting equipment as a separate task.

Page 00 - 2 County of San Mateo, Painting

Unit prices for imported materials (e.g. aggregate, sand, soil, etc.) include delivery up to 15 miles from the closest approved source.

Unit prices include all fasteners such as anchor bolts, lag bolts, screws, adhesive, wedge anchors, expansion bolts, roofing clips (excluding hurricane clips) that are required. Fasteners listed separately in the CTC are for use with Owner furnished material and equipment or relocating or reinstalling existing material and equipment.

Unit prices exclude more substantial mounting material such as threaded rod or angle iron unless the task description states otherwise.

Unit prices for doors and windows, duct work, plumbing fixtures, seamless floors, countertops, flashing, pitch pockets, skylights, curbs, roofing, etc.

include sealant and caulking.

Unit prices include testing, calibration, balancing and the like required to ensure proper installation, construction and performance (e.g. compaction test for backfill, balancing of heating ventilation and air conditioning, pneumatic or hydrostatic testing, soaping of joints, disinfection and flushing, others as required). Use of owner supplied materials, equipment or tying into existing equipment/piping may justify testing, balancing, etc.

Demolition:

Unit prices for demolition include all labor, equipment and material required for the complete removal of the items; clean-up of the area; and transporting the demolished items up or down 2 stories into a truck, dumpster, or to an owner designated area, located within 125' of the project site.

Unit prices for demolition exclude costs for hauling (See 01741900), dump fees (See 01741900), dumpsters (See 01741900), and trash chutes (See 01741900).

If the item being demolished is attached to another item being removed and can be removed as one item, then that item shall not be priced as a separate demolition task, unless the component alone must be demolished to accomplish the task (e.g. demolition of pipe includes pipe fittings unless the fitting must be demolished separately to accomplish the task; demolition of a wood door includes hinges, hardware, closures, kick plates, etc.).

The description "replace" includes the demolition of the existing item and the installation of the new item.

The descriptions "remove and relocate" or "remove and reinstall" includes the removal, cleaning of item and installation of the existing item in either the same location or another location.

The description "reinstall" includes the cleaning and installation of the existing item.

Salvageable materials remain the property of the Owner and shall be turned over as directed when specified in the Job Order.

The Adjustment Factors Include:

BUSINESS COSTS:

Overhead costs, including, unless specifically excluded in the Contract Documents, but not limited to;

• home office overhead

• insurance, bonds, and indemnification

• project meetings, training, management and supervision

• mobilization and close-out for the contract and each Job Order and

• project office staff and equipment.

Profit.

Subcontractor's overhead and profit.

All taxes for which a waiver is not available including material sales tax and equipment rental.

Employee or Subcontractor’s wage rates that exceed the prevailing wage rates.

County of San Mateo, Painting Page 00 - 3

Fringe benefits, payroll taxes, worker’s compensation, insurance costs and any other payment mandated by law in connection with labor that exceeds the labor rate allowances.

Cost of financing the work.

Business risks such as the risk of a lower than expected volume of work, smaller than anticipated Job Orders, poor Subcontractor performance, and inflation or material cost fluctuations.

CONSTRUCTION RELATED COSTS:

Services required to obtain filings and permits.

Preparation and modification of proposals, sketches, drawings, submittals, as-built drawings, CADD drawings, microfilm, and other project records.

Incidental engineering and architectural services.

Office trailer and portable toilets for Contractor’s use.

Construction vehicles such as pick-up trucks, utility trucks, vans, flat bed trucks, tractors, trailers, etc.

Storage devices or items such as gang boxes and containers for Contractor's tools, equipment and materials.

Basic safety and warning signage, minor barricades (e.g., construction tape, etc.) and personnel safety equipment (e.g., hard hats, safety harnesses with lifeline or cabling, protective clothing, safety glasses, face shields, etc.).

Meeting Owner security requirements.

Excess waste including roofing, drywall, VCT, carpet, wall covering, ceiling tile, pipe, conduit, siding, concrete, etc. This list is not intended to be all inclusive, but descriptive of the types of construction materials that are typically sold in standard lengths, sizes and weights.

Removing and returning Owner's furniture and furnishings (e.g. chairs, tables, pictures, etc. but excluding modular furniture, wall or ceiling attached or fastened devices or furnishings, safes or other furniture requiring disassembly).

Sealing, windows, and openings with plastic to contain construction dust and debris within the work area.

Daily clean-up.

Final professional project clean-up.

Working in extreme temperatures (below or above normal) or adverse conditions such as excessive rain, wind, sleet or snow.

Costs resulting from inadequate supply of building materials, fuel, electricity, or skilled labor.

Costs resulting from productivity loss.

Differences in project size; complexity and location.

All costs for other than discreet items of work specifically required to complete a particular Job Order.

PRICE VARIATIONS:

Contractors may find differences in labor, equipment and material costs due to certain economic factors. Variations in labor cost can also result from labor efficiency, labor restrictions, working conditions and local work rules. Variations in material costs can also result from the quantity of material purchased, the existing relationship with suppliers, and because the materials have been discontinued or have become obsolete.

While diligent effort is made to provide accurate and reliable up-to-date pricing, it is the responsibility of the Contractor to review and analyze the unit prices, and to calculate their Adjustment Factors accordingly, prior to bidding.

Contractors may experience differences in decimal rounding on unit prices that may vary from unit prices set forth in the CTC.

GENERAL COSTS:

This list is not exhaustive and is intended to provide general examples of cost items to be included in the Contractor's Adjustment Factor as defined in the Contract.

Page 00 - 4 County of San Mateo, Painting

The only compensation to be paid to a Contractor for the unit price tasks will be:

Published Unit Price

X Installation (or Demolition)

Quantity

X Appropriate Adjustment

Factor

No additional payments of any kind whatsoever will be made. All costs not included in the unit prices must be part of the Adjustment Factors.

General Interpretations:

WORKING HEIGHT:

Typical working height for work other than masonry is up to 14' above the finished floor or stationary working surface. The Contractor will not be paid for scaffolding, lifts, or similar equipment for work below 14'.

Typical working height for masonry work is up to 4' above the finished floor or stationary working surface. The Contractor will not be paid for scaffolding, lifts, or similar equipment for masonry work below 4'.

FIELD ENGINEERING:

Surveying tasks shall be used only when the Owner requests the Contractor to perform topographic surveys, property line surveys or to establish horizontal and vertical controls.

ASSEMBLIES:

Assembly unit prices take precedence over individual component pricing.

TESTING:

Contractor will be paid for testing existing material, as required by the technical specifications and as directed by the Owner (record tests) at the unit price for the appropriate task. The cost of process quality control testing routinely performed by the Contractor is included in the unit prices for the individual tasks.

MISCELLANEOUS:

For the purpose of calculating the quantity of a task, quantities are calculated on a per project basis. The quantity so determined shall be used for the task and all appropriate modifiers, unless the task states otherwise.

Whenever there are alternative tasks that may be selected to complete work the Contractor shall select the most practical and economical tasks available (e.g. rental of equipment by weeks or months rather than days or painting by roller or spray rather than brush).

Restricted Working Space is defined as any area with less than 3' vertical or horizontal clearance and includes areas such as crawl spaces, ceiling plenums where the grid is not removed, narrow piping tunnels, and equipment rooms where the space to install the new work is congested as a result of equipment and piping placement that meet these dimensional restrictions. A Restricted Working Space modifier is available for certain mechanical piping and piping accessories tasks and for certain electrical conduit and conduit accessories tasks. Only those tasks with a modifier for Restricted Working Space are eligible for a price adjustment, and then only if the modifier applies to the contemplated tasks. A non pre-priced task will not be allowed because of Restricted Working Space for any CTC task.

Confined Working Space is defined according to the OSHA definition 29 CFR 1926.21(b)(6)(i): "Any space having limited means of egress, which is subject to accumulation of toxic or flammable contaminants or has an oxygen deficient atmosphere, including, but not limited to, storage tanks, process vessels, bins, boilers, ventilation and exhaust duct, sewers, underground vaults, tunnels, pipelines and open top spaces more than 4 feet in depth such as pits and tubs." The Contractor shall conform to all OSHA and Owner requirements for working in Confined Working Spaces. Required

County of San Mateo, Painting Page 00 - 5 ventilation and air monitoring equipment tasks shall be priced from the CTC.

Whenever a material, article or piece of equipment is identified in the CTC or in the specifications by reference to manufacturers’ or vendors’ names, trade names, catalogue numbers, or make, the identification is intended to establish a standard.

Any material, article or equipment of another manufacturer or vendor which performs satisfactorily the duties imposed by the general design may be considered equally acceptable provided that, in the opinion of the Owner, the material, article or equipment so proposed is of equal quality, substance and function. The Contractor shall not provide, furnish or install any proposed material, article or equipment without the prior written approval of the Owner. The burden of proof and all costs related thereto concerning the "or equal" nature of the substitute item, whether approved or disapproved, shall be borne by the Contractor.

SPECIFICATIONS:

Specifications for tasks shall be interpreted as follows: All labor, material, equipment, spare parts, services, and work required by a specification shall be considered part of the unit price, unless the task description or technical specifications state otherwise.

Useful Information:

UNIT OF MEASURE DEFINITIONS:

ACR – Acre, BAG – Bag, BBL – Barrel, BCY - Bank (In-place) Cubic Yards, BF - Board Foot, BOX - Box (each), BTU - British Thermal Unit, C - One Hundred, CCF - One Hundred Cubic Feet, CCY - Compacted Cubic Yards, CF - Cubic Foot, CFM - Cubic Feet Per Minute, CI – Cubic Inch, CLF - One Hundred Linear Feet, CSF - One Hundred Square Feet, CSY - Hundred Square Yards, CWT - Hundred Weight, CY - Cubic

Yard, CYM - Cubic Yard Mile, DAY – Day, DRM - Drum (each), EA – Each, FLR - Floor (Per Floor), FT – Foot, GAL – Gallon, GSF - Ground Square Foot, HR – Hour, HWT - Hundred Carton Weight, HYR – Half Year, IN – Inch, JOB – Job, LAN – Lane, LB – Pound, LCY - Loose (Excavated) Cubic Yards, LF - Linear Foot, LFD

- Linear Feet Per Day, LIT – Liter, LOT – Lot, MBF - One Thousand Board Feet, MBH - One Thousand British Thermal Units, MCF – One Thousand Cubic Feet, MF3 - One Thousand Cubic Feet Per Minute, MGL – One Thousand Gallons, MI – Mile, MLF - One Thousand Linear Feet, MO – Month, MSF - One Thousand Square Feet, MSY - One Thousand Square Yards, MT – Metric Ton, MTK – Metric Ton Kilometer, M2 – Square Meter, M3K – Cubic Meter Kilometer, NTE

– Note, OPN – Opening, OUT - Outlet or Output (each), OZ – Ounce, PKG – Package, PNT – Point, PR – Pair, QT – Quart, ROL - Roll (each), ROM – Room, ROW – Row, RSR - Riser (Per Rise), SEA – Seat, SET – Set, SF - Square Foot, SHT – Sheet, SI - Square Inch, STP - Stop (each), SQ - Square or One Hundred Square Feet, SY - Square Yard, SYI – Inches per Square Yard, TNM

- Tons per Mile, TON – Ton, TRK – Truck Load, UI - United Inch, UNT – Unit, VLF - Vertical Linear Foot, WK

– Week, YD – Yard, YR – Year

MATERIAL WEIGHTS:

EARTHEN MATERIAL

The following engineering values for establishing shrink/swell factors shall be used unless otherwise directed by the Owner.

Material Weight (Lbs Per CY)

Material In-place (Bank)

Loose (Excavated Materials) Compacted

Earth, Common (Average)

3170 2536 3520

Sand 2880 2590 3240 Earth, Rock Mix.

(75% E/ 25% R)

3380 2370 3720

Earth, Rock Mix.

(50% E/50% R)

3750 2710 4000

Earth, Rock 4120 3140 3680

Page 00 - 6 County of San Mateo, Painting

Mix.

(25% E/ 75% R) Gravel (Average)

3280 2730 3570

Limestone 4380 2690 3220 Riprap Rock (Average)

4500 2610 3150

Granite 4540 2640 3170 Basalt 4950 3020 3640 Clay 3220 2150 3570 Gneiss 4550 2720 3180

BULK FACTORS FOR DEMOLITION:

The following bulk factors shall be used to calculate the volume of demolished material to be transported from the project site.

• Asphalt = 1.25

• Concrete = 1.40

CONVERSIONS:

1 Acre = 43,560 Square Feet = 4046.8 Square Meters

1 Board Foot = 12” x 12” x 1” = 144 Cubic Inches

1 Centimeter = 0.3937 Inches = 0.0328 Feet

1 Cubic Foot = 0.03704 Cubic Yards = 0.02832 Cubic Meters

1 Cubic Meter = 1.3080 Cubic Yards = 35.3147 Cubic Feet

1 Cubic Yard = 27 Cubic Feet = 0.7646 Cubic Meters

1 Foot = 12 Inches = 0.3048 Meters

1 Inch = 2.54 Centimeters = 0.0254 Meters

1 Kilogram = 2.2046 Pounds

1 Kilometer = 0.6214 Miles = 3280 Feet

1 Meter = 100 Centimeters = 3.2808 Feet

1 Mile = 5280 Feet = 1.6093 Kilometers

1 Pound = 0.4536 Kilograms

1 Square Foot = 144 Square Inches = .0929 Square Meters

1 Square Meter = 1.1960 Square Yards = 10.7639 Square Feet

1 Square Yard = 9 Square Feet = 0.8361 Square Meters

1 Ton = 2000 Pounds = 907.185 Kilograms

1 Yard = 3 Feet = 0.9144 Meters

Sheet Metal Thickness (inches) Gage No.

Steel Sheet

Galvanized Steel Sheet

Stainless Steel Sheet

Aluminum Sheet

10 .135 .138 .141 11 .120 .123 .125 12 .105 .108 .109 13 .090 .093 .094 .072 14 .075 .079 .078 .064 15 .067 .071 .070 .057 16 .060 .064 .063 .051 17 .054 .058 .056 .045 18 .048 .052 .050 .040 19 .042 .046 .044 .036 20 .036 .040 .038 .032 21 .033 .037 .034 .028 22 .030 .034 .031 .025 23 .027 .031 .028 .023 24 .024 .028 .025 .020 25 .021 .025 .022 .018 26 .018 .022 .019 .017

STANDARD GEOMETRY:

Circle

• Circumference = 2 π radius = π diameter

• Area = π radius2 = π (diameter2 / 4)

Cylinder

• Volume = (π radius2)height

• Surface Area = 2 π radius2+(2 π radius)height

Sphere

• Volume = (4 π radius3) / 3

• Surface Area = 4 π radius2 π = 3.14159

United Inch

County of San Mateo, Painting Page 00 - 7

• The industry standard for measuring windows is the United Inch or UI. The UI is determined by adding the width and the height in inches.

TRADEMARKS

Gordian JOC Solution, JOC Complete Solution, JOC Complete Solution Plus, PROGEN, eGordian, ezIQC, Construction Task Catalog, Catalog of Construction Tasks, DMAP, The Standard for Job Order Contracting and 6 Phase Development and Implementation Process are either registered trademarks or trademarks of The Gordian Group, Inc. The names of actual companies and products mentioned herein may be the trademarks of their respective owners

Page 00 - 8 County of San Mateo, Painting

THIS PAGE INTENTIONALLY LEFT BLANK

General Requirements 01

Summary 01 10 Summary Of Work 01 11

MINOR TOTAL DIRECT DEMOLITION

CSI UOM DESCRIPTION UNIT COST UNIT COST

October 2025 copyright 2025 The Gordian Group, Inc.

County of San Mateo, Painting Page 01 - 1

01 General Requirements

01 10 Summary (01)

01 11 Summary Of Work (01 10)

01 11 13 Work Covered by Contract Documents (01 11)

Note: For specification publishing. Review specifications for requirements.

01 11 13 00-0001 NTE Work Covered by Contract Documents .................................................................................................................................. 0.00 Note: For specification publishing. Review specifications for requirements.

XXXXXXX

01 20 Price and Payment Procedures (01)

01 22 Unit Prices (01 20)

Note: Provide digital copies of photographs.

01 22 16 Unit Price Payment (01 22)

01 22 16 00-0001 Reimbursable Fees (01 22 16)

Note: Reimbursable fees include but are not limited to permits, special inspections, special insurance, additional warranties, tolls, expedited shipping costs, etc, which are not included in a task or an Adjustment Factor as explained in the Contract or The Construction Task Catalog®.

01 22 16 00-0002 EA Reimbursable Fees ................................................................................................................................................................. 1.00

Note: Reimbursable Fees will be paid to the contractor for eligible costs as directed by Owner. Insert the appropriate quantity to adjust the base cost to the actual Reimbursable Fee. If there are multiple Reimbursable Fees, list each one separately and add a comment in the "note" block to identify the Reimbursable Fee (e.g.

sidewalk closure, road cut, various permits, extended warranty, expedited shipping costs, etc.). A copy of each receipt, invoice, or proof of payment shall be submitted with the Price Proposal.

XXXXXXX

01 22 16 00-0003 Negotiated Travel Costs (01 22 16)

Note: To be used only at the request of authorized personal for non-commuting travel costs.

01 22 16 00-0004 EA Negotiated Travel Costs ......................................................................................................................................................... 1.00 Note: Supporting documentation must be included with each Work Order.

XXXXXXX

01 22 20 Wage Rates (01 22)

01 22 20 00-0001 Local Labor/Wage Rates (01 22 20)

Note: Welders receive the rate prescribed for the craft performing the operation to which the welding is incidental.

01 22 20 00-0002 HR Asbestos Removal Worker ................................................................................................................................................... 98.97 Note: For tasks not included in the Construction Task Catalog® and as directed by owner only.

For Foreperson, Add 4.95 For Apprentice, Deduct -19.79

01 22 20 00-0003 HR Insulator .............................................................................................................................................................................. 156.93

Note: For tasks not included in the Construction Task Catalog® and as directed by owner only.

For Foreperson, Add 7.85 For Apprentice, Deduct -31.39

01 22 20 00-0004 HR Boilermaker......................................................................................................................................................................... 131.50

Note: For tasks not included in the Construction Task Catalog® and as directed by owner only.

For Foreperson, Add 6.58 For Apprentice, Deduct -26.30

01 22 20 00-0005 HR Brick Layer .......................................................................................................................................................................... 119.03

Note: For tasks not included in the Construction Task Catalog® and as directed by owner only.

For Foreperson, Add 5.95 For Apprentice, Deduct -23.81

01 22 20 00-0006 HR Carpenter ............................................................................................................................................................................ 145.78

Note: For tasks not included in the Construction Task Catalog® and as directed by owner only.

For Foreperson, Add 7.29 For Apprentice, Deduct -29.16

01 22 20 00-0007 HR Carpet, Linoleum ................................................................................................................................................................ 137.36

Note: For tasks not included in the Construction Task Catalog® and as directed by owner only.

For Foreperson, Add 6.87 For Apprentice, Deduct -27.47

01 22 20 00-0008 HR Cement Mason ................................................................................................................................................................... 101.77

Note: For tasks not included in the Construction Task Catalog® and as directed by owner only.

For Foreperson, Add 5.09 For Apprentice, Deduct -20.35

01 22 20 00-0009 HR Drywall Finisher .................................................................................................................................................................. 137.49

Note: For tasks not included in the Construction Task Catalog® and as directed by owner only.

For Foreperson, Add 6.87 For Apprentice, Deduct -27.50

01 22 20 00-0010 HR Electrician, Inside Wireman ................................................................................................................................................ 172.89

Note: For tasks not included in the Construction Task Catalog® and as directed by owner only.

For Foreperson, Add 8.64 For Apprentice, Deduct -34.58

01 22 20 00-0011 HR Equipment Operator, Crane, Group 1-A ............................................................................................................................. 131.51

Note: For tasks not included in the Construction Task Catalog® and as directed by owner only.

01 22 20 00-0012 HR Equipment Operator, Crane, Group 2-A ............................................................................................................................. 129.04 Note: For tasks not included in the Construction Task Catalog® and as directed by owner only.

For Foreperson, Add 6.45

01 20 Price and Payment Procedures 01 22 Unit Prices copyright 2025 The Gordian Group, Inc. October 2025 Page 01 - 2 County of San Mateo, Painting

01 22 20 00-0013 HR Equipment Operator, Crane, Group 3-A ............................................................................................................................. 126.65

Note: For tasks not included in the Construction Task Catalog® and as directed by owner only.

01 22 20 00-0014 HR Equipment Operator, Medium, Group 3 .............................................................................................................................. 126.11 Note: For tasks not included in the Construction Task Catalog® and as directed by owner only.

For Foreperson, Add 6.31 For Apprentice, Deduct -25.22

01 22 20 00-0015 HR Equipment Operator, Medium, Group 4 .............................................................................................................................. 124.17

Note: For tasks not included in the Construction Task Catalog® and as directed by owner only.

01 22 20 00-0016 HR Equipment Operator, Medium, Group 5 .............................................................................................................................. 122.41 Note: For tasks not included in the Construction Task Catalog® and as directed by owner only.

01 22 20 00-0017 HR Equipment Operator, Light, Group 6 ................................................................................................................................... 120.55

Note: For tasks not included in the Construction Task Catalog® and as directed by owner only.

For Foreperson, Add 6.03 For Apprentice, Deduct -24.11

01 22 20 00-0018 HR Equipment Operator, Light, Group 7 ................................................................................................................................... 118.97

Note: For tasks not included in the Construction Task Catalog® and as directed by owner only.

01 22 20 00-0019 HR Equipment Operator, Light, Group 8 ................................................................................................................................... 117.39 Note: For tasks not included in the Construction Task Catalog® and as directed by owner only.

01 22 20 00-0020 HR Glazier ................................................................................................................................................................................ 124.80

Note: For tasks not included in the Construction Task Catalog® and as directed by owner only.

For Foreperson, Add 6.24 For Apprentice, Deduct -24.96

01 22 20 00-0021 HR Laborer ................................................................................................................................................................................. 94.26

Note: For tasks not included in the Construction Task Catalog® and as directed by owner only.

01 22 20 00-0022 HR Lather.................................................................................................................................................................................. 135.98 Note: For tasks not included in the Construction Task Catalog® and as directed by owner only.

For Foreperson, Add 6.80 For Apprentice, Deduct -27.20

01 22 20 00-0023 HR Marble Setter ...................................................................................................................................................................... 128.88

Note: For tasks not included in the Construction Task Catalog® and as directed by owner only.

For Foreperson, Add 6.44 For Apprentice, Deduct -25.78

01 22 20 00-0024 HR Millwright ............................................................................................................................................................................. 137.30

Note: For tasks not included in the Construction Task Catalog® and as directed by owner only.

For Foreperson, Add 6.87 For Apprentice, Deduct -27.46

01 22 20 00-0025 HR Mold Removal Worker .......................................................................................................................................................... 96.82

Note: For tasks not included in the Construction Task Catalog® and as directed by owner only.

For Foreperson, Add 4.84 For Apprentice, Deduct -19.36

01 22 20 00-0026 HR Painter, Ordinary ................................................................................................................................................................. 113.12

Note: For tasks not included in the Construction Task Catalog® and as directed by owner only.

For Foreperson, Add 5.66 For Apprentice, Deduct -22.62

01 22 20 00-0027 HR Painter, Structural Steel ...................................................................................................................................................... 117.68

Note: For tasks not included in the Construction Task Catalog® and as directed by owner only.

For Foreperson, Add 5.88 For Apprentice, Deduct -23.54

01 22 20 00-0028 HR Paperhanger ....................................................................................................................................................................... 113.15

Note: For tasks not included in the Construction Task Catalog® and as directed by owner only.

For Foreperson, Add 5.66 For Apprentice, Deduct -22.63

01 22 20 00-0029 HR Pile Drivers ......................................................................................................................................................................... 146.10

Note: For tasks not included in the Construction Task Catalog® and as directed by owner only.

For Foreperson, Add 7.31 For Apprentice, Deduct -29.22

01 22 20 00-0030 HR Plasterer ............................................................................................................................................................................. 125.97

Note: For tasks not included in the Construction Task Catalog® and as directed by owner only.

For Foreperson, Add 6.30 For Apprentice, Deduct -25.19

01 22 20 00-0031 HR Plumber .............................................................................................................................................................................. 171.11

Note: For tasks not included in the Construction Task Catalog® and as directed by owner only.

For Foreperson, Add 8.56 For Apprentice, Deduct -34.22

01 22 20 00-0032 HR Powderman ........................................................................................................................................................................... 98.58

Note: For tasks not included in the Construction Task Catalog® and as directed by owner only.

For Foreperson, Add 4.93 For Apprentice, Deduct -19.72

01 22 20 00-0033 HR Rodman (Reinforcing)/Ornamental Steel Worker ............................................................................................................... 116.75

Note: For tasks not included in the Construction Task Catalog® and as directed by owner only.

For Foreperson, Add 5.84 For Apprentice, Deduct -23.35

01 22 20 00-0034 HR Roofer, Composite .............................................................................................................................................................. 141.15

Note: For tasks not included in the Construction Task Catalog® and as directed by owner only.

For Foreperson, Add 7.06 For Apprentice, Deduct -28.23

01 22 20 00-0035 HR Roofer, Metal ...................................................................................................................................................................... 152.46

Note: For tasks not included in the Construction Task Catalog® and as directed by owner only.

For Foreperson, Add 7.62 For Apprentice, Deduct -30.49

01 22 20 00-0036 HR Roofer, Tile/Slate ................................................................................................................................................................ 136.96

Note: For tasks not included in the Construction Task Catalog® and as directed by owner only.

For Foreperson, Add 6.85 For Apprentice, Deduct -27.39

Price and Payment Procedures 01 20 Unit Prices 01 22

October 2025 copyright 2025 The Gordian Group, Inc.

County of San Mateo, Painting Page 01 - 3

01 22 20 00-0037 HR Sheet Metal Worker ............................................................................................................................................................ 182.73

Note: For tasks not included in the Construction Task Catalog® and as directed by owner only.

For Foreperson, Add 9.14 For Apprentice, Deduct -36.55

01 22 20 00-0038 HR Sprinkler Installer ................................................................................................................................................................ 158.91

Note: For tasks not included in the Construction Task Catalog® and as directed by owner only.

For Foreperson, Add 7.95 For Apprentice, Deduct -31.78

01 22 20 00-0039 HR Steam / Pipe Fitter .............................................................................................................................................................. 171.11

Note: For tasks not included in the Construction Task Catalog® and as directed by owner only.

For Foreperson, Add 8.56 For Apprentice, Deduct -34.22

01 22 20 00-0040 HR Stone Mason....................................................................................................................................................................... 119.03

Note: For tasks not included in the Construction Task Catalog® and as directed by owner only.

For Foreperson, Add 5.95 For Apprentice, Deduct -23.81

01 22 20 00-0041 HR Iron Worker, Structural ........................................................................................................................................................ 120.43

Note: For tasks not included in the Construction Task Catalog® and as directed by owner only.

For Foreperson, Add 6.02 For Apprentice, Deduct -24.09

01 22 20 00-0042 HR Tile Layer ............................................................................................................................................................................ 112.11

Note: For tasks not included in the Construction Task Catalog® and as directed by owner only.

For Foreperson, Add 5.61 For Apprentice, Deduct -22.42

01 22 20 00-0043 HR Terrazzo Worker ................................................................................................................................................................. 120.99

Note: For tasks not included in the Construction Task Catalog® and as directed by owner only.

For Foreperson, Add 6.05 For Apprentice, Deduct -24.20

01 22 20 00-0044 HR Truck Driver, Light, Group 1.................................................................................................................................................. 99.89

Note: For tasks not included in the Construction Task Catalog® and as directed by owner only.

For Foreperson, Add 4.99 For Apprentice, Deduct -19.98

01 22 20 00-0045 HR Truck Driver, Medium, Group 2 ........................................................................................................................................... 100.34

Note: For tasks not included in the Construction Task Catalog® and as directed by owner only.

01 22 20 00-0046 HR Truck Driver, Heavy, Group 3 ............................................................................................................................................. 100.79 Note: For tasks not included in the Construction Task Catalog® and as directed by owner only.

For Foreperson, Add 5.04 For Apprentice, Deduct -20.16

01 22 20 00-0047 HR Truck Driver, Heavy, Group 4 ............................................................................................................................................. 101.31

Note: For tasks not included in the Construction Task Catalog® and as directed by owner only.

XXXXXXX

01 22 20 00-0048 Rates For Services (01 22 20)

01 22 20 00-0049 HR Watch/Guard Person, Unarmed ............................................................................................................................................ 40.14

Note: For tasks not included in the Construction Task Catalog® and as directed by owner only.

01 22 20 00-0050 HR Watch/Guard Person, Armed ................................................................................................................................................ 49.24 Note: For tasks not included in the Construction Task Catalog® and as directed by owner only.

01 22 20 00-0051 HR On-Site Certified Materials Testing Technician ................................................................................................................... 102.75

Note: For tasks not included in the Construction Task Catalog® and as directed by owner only.

01 22 20 00-0052 HR Certified Industrial Hygienist ............................................................................................................................................... 140.68 Note: For tasks not included in the Construction Task Catalog® and as directed by owner only.

01 22 20 00-0053 MI Mileage For Professional Services (Engineering, Surveying, etc.) ......................................................................................... 0.70

Note: For use only when the Owner directs the contractor to use personnel whose base of operations is more than 100 miles from the site. Quantity shall be miles that exceed 100.

XXXXXXX

01 22 23 Equipment Usage (01 22)

Note: Includes fuel costs unless otherwise stated. These tasks shall be used for owned, leased or rented equipment. Excludes mobilization unless otherwise stated. See CSI section 01 71 13 00-0000 for equipment delivery, pickup, mobilization and demobilization.

01 22 23 00-0001 Aerial Equipment (01 22 23)

01 22 23 00-0002 Man Lifts (01 22 23 00-0001)

Note: Excludes operator, delivery, set-up, and removal.

01 22 23 00-0003 Telescoping Boom Man Lifts With Platform (01 22 23 00-0002)

01 22 23 00-0004 Engine Powered, Telescoping Boom Man Lifts With Platform (01 22 23 00-0003)

Note: Diesel or dual fuel (gasoline or liquid propane gas). Two-wheel drive. For use on unpaved or paved surfaces.

01 22 23 00-0005 DAY 40' Engine Powered, Telescoping Boom Man Lift With Platform ........................................................................................ 437.72

For Four-Wheel Drive, Add 98.49

01 22 23 00-0006 WK 40' Engine Powered, Telescoping Boom Man Lift With Platform ..................................................................................... 1,101.36 For Four-Wheel Drive, Add 247.81

01 22 23 00-0007 MO 40' Engine Powered, Telescoping Boom Man Lift With Platform ..................................................................................... 2,471.00

For Four-Wheel Drive, Add 555.98

01 22 23 00-0008 DAY 60' Engine Powered, Telescoping Boom Man Lift With Platform ........................................................................................ 642.46 For Four-Wheel Drive, Add 144.55

01 22 23 00-0009 WK 60' Engine Powered, Telescoping Boom Man Lift With Platform ..................................................................................... 1,532.02

For Four-Wheel Drive, Add 344.70

01 22 23 00-0010 MO 60' Engine Powered, Telescoping Boom Man Lift With Platform ..................................................................................... 3,353.50 For Four-Wheel Drive, Add 754.54

01 22 23 00-0011 DAY 80' Engine Powered, Telescoping Boom Man Lift With Platform ..................................................................................... 1,249.62

For Four-Wheel Drive, Add 281.16 copyright 2025 The Gordian Group, Inc. October 2025 Page 01 - 4 County of San Mateo, Painting

01 22 23 00-0012 WK 80' Engine Powered, Telescoping Boom Man Lift With Platform ..................................................................................... 3,028.74

For Four-Wheel Drive, Add 681.47

01 22 23 00-0013 MO 80' Engine Powered, Telescoping Boom Man Lift With Platform ..................................................................................... 6,354.00 For Four-Wheel Drive, Add 1,429.65

01 22 23 00-0014 DAY 110' Engine Powered, Telescoping Boom Man Lift With Platform ................................................................................... 1,779.12

For Four-Wheel Drive, Add 400.30

01 22 23 00-0015 WK 110' Engine Powered, Telescoping Boom Man Lift With Platform ................................................................................... 4,284.01 For Four-Wheel Drive, Add 963.90

01 22 23 00-0016 MO 110' Engine Powered, Telescoping Boom Man Lift With Platform ................................................................................. 10,674.72

For Four-Wheel Drive, Add 2,401.81

01 22 23 00-0017 DAY 120' Engine Powered, Telescoping Boom Man Lift With Platform ................................................................................... 2,167.42 For Four-Wheel Drive, Add 487.67

01 22 23 00-0018 WK 120' Engine Powered, Telescoping Boom Man Lift With Platform ................................................................................... 5,527.98

For Four-Wheel Drive, Add 1,243.80

01 22 23 00-0019 MO 120' Engine Powered, Telescoping Boom Man Lift With Platform ................................................................................. 12,566.80 For Four-Wheel Drive, Add 2,827.53

XXXXXXX

01 22 23 00-0020 Articulating (Up/Over) Boom Man Lifts With Platform (01 22 23 00-0002)

01 22 23 00-0021 Engine Powered, Articulating (Up/Over) Boom Man Lifts With Platform (01 22 23

00-0020) Note: Diesel or dual fuel (gasoline or liquid propane gas). Four-wheel drive. For use on unpaved or paved surfaces.

01 22 23 00-0022 DAY 34' Engine Powered, Articulating (Up/Over) Boom Man Lift With Platform ......................................................................... 431.31

01 22 23 00-0023 WK 34' Engine Powered, Articulating (Up/Over) Boom Man Lift With Platform ...................................................................... 1,082.20

01 22 23 00-0024 MO 34' Engine Powered, Articulating (Up/Over) Boom Man Lift With Platform ...................................................................... 2,603.54

01 22 23 00-0025 DAY 45' Engine Powered, Articulating (Up/Over) Boom Man Lift With Platform ......................................................................... 548.94

01 22 23 00-0026 WK 45' Engine Powered, Articulating (Up/Over) Boom Man Lift With Platform ...................................................................... 1,199.83

01 22 23 00-0027 MO 45' Engine Powered, Articulating (Up/Over) Boom Man Lift With Platform ...................................................................... 2,978.39

01 22 23 00-0028 DAY 60' Engine Powered, Articulating (Up/Over) Boom Man Lift With Platform ......................................................................... 705.78

01 22 23 00-0029 WK 60' Engine Powered, Articulating (Up/Over) Boom Man Lift With Platform ...................................................................... 1,631.14

01 22 23 00-0030 MO 60' Engine Powered, Articulating (Up/Over) Boom Man Lift With Platform ...................................................................... 3,646.53

01 22 23 00-0031 DAY 80' Engine Powered, Articulating (Up/Over) Boom Man Lift With Platform ...................................................................... 1,231.19

01 22 23 00-0032 WK 80' Engine Powered, Articulating (Up/Over) Boom Man Lift With Platform ...................................................................... 2,901.54

01 22 23 00-0033 MO 80' Engine Powered, Articulating (Up/Over) Boom Man Lift With Platform ...................................................................... 7,056.23

01 22 23 00-0034 DAY 125' Engine Powered, Articulating (Up/Over) Boom Man Lift With Platform .................................................................... 2,391.81

01 22 23 00-0035 WK 125' Engine Powered, Articulating (Up/Over) Boom Man Lift With Platform .................................................................... 5,646.24

01 22 23 00-0036 MO 125' Engine Powered, Articulating (Up/Over) Boom Man Lift With Platform .................................................................. 13,801.92

XXXXXXX

01 22 23 00-0037 Electric, Articulating (Up/Over) Boom Man Lifts With Platform (01 22 23 00-0020)

Note: For use on paved surfaces.

01 22 23 00-0038 DAY 30' Electric, Articulating (Up/Over) Boom Man Lift With Platform........................................................................................ 431.31

01 22 23 00-0039 WK 30' Electric, Articulating (Up/Over) Boom Man Lift With Platform..................................................................................... 1,082.20

01 22 23 00-0040 MO 30' Electric, Articulating (Up/Over) Boom Man Lift With Platform..................................................................................... 2,603.54

01 22 23 00-0041 DAY 35' Electric, Articulating (Up/Over) Boom Man Lift With Platform........................................................................................ 431.31

01 22 23 00-0042 WK 35' Electric, Articulating (Up/Over) Boom Man Lift With Platform..................................................................................... 1,082.20

01 22 23 00-0043 MO 35' Electric, Articulating (Up/Over) Boom Man Lift With Platform..................................................................................... 2,603.54

01 22 23 00-0044 DAY 40' Electric, Articulating (Up/Over) Boom Man Lift With Platform........................................................................................ 533.26

01 22 23 00-0045 WK 40' Electric, Articulating (Up/Over) Boom Man Lift With Platform..................................................................................... 1,152.77

01 22 23 00-0046 MO 40' Electric, Articulating (Up/Over) Boom Man Lift With Platform..................................................................................... 2,862.33

01 22 23 00-0047 DAY 45' Electric, Articulating (Up/Over) Boom Man Lift With Platform........................................................................................ 533.26

01 22 23 00-0048 WK 45' Electric, Articulating (Up/Over) Boom Man Lift With Platform..................................................................................... 1,152.77

01 22 23 00-0049 MO 45' Electric, Articulating (Up/Over) Boom Man Lift With Platform................................................

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .