_B_Bid_Schedule_for_Painting.pdf

PDF 114 KB Posted

Attached to
Job Order Contract for Painting (JOC 2617 and JOC 2618)
Solicitation number
2026-RFP-00103
Issued by
San Mateo County, California

About this file

Bid Schedule Summary

This is a Bid Schedule document for Job Order Contracts (JOC 2617 and 2618) for painting services. The contract encompasses work performed across multiple facility types including General Facilities, Detention Facilities, Juvenile Justice Centers, and OSHPD (Office of Statewide Health Planning and Development) Facilities. Bidders must submit Adjustment Factors that will be applied to unit prices specified in the Construction Task Catalog to determine pricing for individual job orders. The Award Criteria Figure will be calculated to four decimal places using conventional rounding methodology to identify the low bidder.

The Adjustment Factors must account for all labor, materials, equipment, supervision, overhead, profit, and incidentals necessary to complete the work. Bidders are required to submit separate Adjustment Factors for Normal Working Hours and Other Than Normal Working Hours across each facility type. Non-responsive bid rejections will occur if Other Than Normal Working Hours Adjustment Factors are less than Normal Working Hours Adjustment Factors, or if Detention Facilities and OSHPD Facilities Adjustment Factors are less than General Facilities Adjustment Factors. This tiered pricing structure reflects the increased complexity and requirements associated with work performed in secured areas, medical facilities, and outside standard operating hours.

View the file

Other files

File Type Posted
Job_Order_Contract_for_Painting_(JOC_2617_and_JOC_2618)_(Addendum_#2_Revision).pdf PDF
_H_Anti-Trust_Laws_Questionnaire_Painting.pdf PDF
Job_Order_Contract_for_Painting_(JOC_2617_and_JOC_2618)_(Addendum_#1_Revision).pdf PDF
_R_Technical_Specifications_-_Painting_-_Distribution.pdf PDF
_Q_Construction_Task_Catalog®_-_Painting_-_Distribution.pdf PDF
_P_JOC_System_License_and_Fee_Agreement_Sample.pdf PDF
_O_Payment_and_Performance_Bonds_Sample.pdf PDF
_N_Job_Order_Contact_Agreement_SAMPLE.pdf PDF
_M_Contract_Documents_General_Conditions.pdf PDF
_L_Recycling_and_Diversion_of_Debris_from_Construction_and_Demolition_Ordinance_No._4099_Chapter_4.105.pdf PDF
_K_Contractor_Employee_Jury_Service_Ordinance_No.4324_Chapter_2.85.pdf PDF
_J_Contractor's_Declaration_Form_Painting.pdf PDF
_I_Equal_Benefits_Compliance_Ordinance.pdf PDF
_H_Anti-Trust_Laws_Questionnaire_Electrical-Lighting.pdf PDF
_G_EEO_Certification_of_Compliance.pdf PDF
_F_EEO_Contractor_Report_Form_Painting.pdf PDF
_E_EEO_Questionnaire_Painting.pdf PDF
_D_EEO_Program_Supplemental_General_Conditions.pdf PDF
_C_Award_Criteria_Figure.pdf PDF
_A_Bid_Bond_JOC_2617-2618.pdf PDF
Standard_Contract_Template_-_Under_$200K_DRAFT.docx DOCX document
Standard_Contract_Template_-_Over_$200K_DRAFT.docx DOCX document
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID SCHEDULE

Job Order Contract for Painting JOC 2617 and 2618

The Adjustment Factor shall include all labor, materials, equipment, supervision, overhead, profit, and incidentals necessary to complete the Work in accordance with the Contract Documents. When submitting Job Order Price Proposals related to specific Job Orders, the Bidder shall utilize one or more of the Adjustment Factors applicable to the Work being performed. The Award Criteria Figure, carried out to four

(4) decimal places, will be used to determine the low bidder. Use conventional rounding methodology (i.e., if the number in the 5th decimal place is 0-4, the number in the 4th decimal remains unchanged; if the number in the 5th decimal place is 5-9, the number in the 4th decimal is rounded upward).

BID SCHEDULE:

General Facilities Normal Working Hours: Work performed during Normal Working Hours, in General Facilities, in the quantities specified in individual Job Orders for the Unit Price sum specified in the Construction Task Catalog® multiplied by the Adjustment Factor of:

General Facilities Other than Normal Working Hours*: Work performed during Other Than Normal Working Hours, in General Facilities, in the quantities specified in individual Job Orders for the Unit Price sum specified in the Construction Task Catalog® multiplied by the Adjustment Factor of:

Detention Facilities** Normal Working Hours: Work performed during Normal Working Hours, in Detention Facilities, in the quantities specified in individual Job Orders for the Unit Price sum specified in the Construction Task Catalog® multiplied by the Adjustment Factor of:

Detention Facilities Other than Normal Working Hours*: Work performed during Other Than Normal Working Hours, in Detention Facilities, in the quantities specified in individual Job Orders for the Unit Price sum specified in the Construction Task Catalog® multiplied by the Adjustment Factor of:

(cont’d on page 2)

OSHPD Facilities** Normal Working Hours: Work performed during Normal Working Hours, in OSHPD Facilities, in the quantities specified in individual Job Orders for the Unit Price sum specified in the Construction Task Catalog® multiplied by the Adjustment Factor of:

OSHPD Facilities Other than Normal Working Hours*: Work performed during Other Than Normal Working Hours, in OSHPD Facilities, in the quantities specified in individual Job Orders for the Unit Price sum specified in the Construction Task Catalog® multiplied by the Adjustment Factor of:

* Bids will be rejected, as non-responsive if the ‘Other than Normal Working Hours’ Adjustment Factors are not equal to or greater than the ‘Normal Working Hours’ Adjustment Factors.

** Bids will be rejected as non-responsive if the Detention Facilities and OSHPD Facilities Adjustment Factors are not equal to or greater than the General Facilities Adjustment Factors. Detention Facilities Adjustment Factors apply when Work is performed within a secured area Detention Facilities and Juvenile Justice Centers. OSHPD Facilities Adjustment Factors apply when Work is performed within a hospital and/or In-Patient Medical Facility. General Facilities Adjustment Factors apply for all other locations.

File details come from the government source that posted it. Updated .