PWS Attachments.pdf
PDF 1 MB Posted
- Solicitation number
- 36C78626Q50019
About this file
These documents are attachments for a grounds maintenance contract at the Willamette National Cemetery, detailing operational requirements and guidelines. The attachments include daily, weekly, monthly, and annual maintenance checklists covering areas such as turf management, safety protocols, pest control, and general cemetery maintenance. Key requirements include keeping visually prominent areas free of trash, addressing sunken graves within 30 calendar days, maintaining turf at recommended heights, removing debris promptly, and ensuring safety measures are consistently followed.
Additional attachments provide specific operational policies, such as a detailed floral policy that regulates flower placement, prohibited items, and a weekly mow/flower pick-up schedule for different cemetery sections. The contract also includes a Contractor's Employee Statement of Compliance, requiring employees to understand and respect the sacred nature of the national cemetery, with strict guidelines about handling gravesites, headstones, and remains. Pest management and pesticide application are addressed through standardized inspection and tracking sheets, ensuring comprehensive and documented maintenance of the cemetery grounds.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C78626Q50019 0004 RFQ Amendment.docx | DOCX document | |
| 36C78626Q50019 Amend 0004 Continuation page.doc | DOC document | |
| 36C78626Q50019 Amend 0003 Continuation page.doc | DOC document | |
| 36C78626Q50019 0003 RFQ Amendment.docx | DOCX document | |
| 36C78626Q50019 0002 RFQ Amendment.docx | DOCX document | |
| Amend 0002 Clarifications.docx | DOCX document | |
| Amend 0001 36C78626Q50019 Questions Answers UPDATED.docx | DOCX document | |
| Amend 0001 36C78626Q50019 Questions Answers.docx | DOCX document | |
| 36C78626Q50019 0001.pdf | ||
| Amend 0001 SITE VISIT SIGN IN SHEET.pdf | ||
| RFQ_Addendum_Submission Instructions_ Evaluation.docx | DOCX document | |
| Administative Guidance for Offerors.docx | DOCX document | |
| Dignity Clause.docx | DOCX document | |
| Performance Work Statement WNC Grounds Mx.docx | DOCX document | |
| Past Performance Questionnaire.docx | DOCX document | |
| Contract Guaranteed Minimum and Maximum Value.docx | DOCX document | |
| 36C78626Q50019 WIllamette National Cemetery Grounds Maintenance.pdf |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT A
DATE: ______________
MEASURE DESCRIPTION OK
NEEDS
ATTENTION NOT APPLICABLE COMMENTS
Number
Identified
Completed and/or TURF / NON-TURF (Circle One)
GM-2.3b/2.9b Visually Prominent Areas are free of trash.
GM-2.4b/2.9d Sunken graves are identified and measures taken to re-establish ground level and cover within 30 calendar days of the date identified.
GM-2.8
Turf damage due to grounds maintenance tasks is identified and corrective action initiaited by close of business the same day
GM-2.9h Grave reopeners are raked and groomed to return the grave to its original state within the same workday (non-turf areas only).
GENERAL MAINTENANCE
GM-6.2a Debris, equipment, tools and supplies are removed from turf areas at the conclusion or each task or at the end of the workday.
GM-6.2b All roads, walkways, shelters, etc are free of grounds maintenance debris at the end of the workday.
SAFETY
OS-3.1a Necessary personal protective equipment and safety measures are adhered to at all times during Grounds Maintenance operations.
OS-3.2a Safety hazards (holes, sunken graves, pest, etc.) identified and corrective action initiated to ensure safety with the same workday.
OS-3.3a
Roads, sidewalks, paths and parking lots open to the public or for cemetery operations during adverse conditions are safe and accessible (e.g. clear of ice and snow or storm debris).
GROUNDS MAINTENANCE CHECKLIST - DAILY
Area/Section Inspected:
Completed by: Title
DATE:
NEEDS
ATTENTION
NOT
APPLICABLE COMMENTS
TURF / NON-TURF (Circle One)
GM-2.1c Turf in Visually Prominent Areas is maintained within one inch of the recommended height.
GM-2.3a/2.9a Turf areas are cleared of leaves and other natural debris as needed or weekly.
GM-2.5/2.9e Visually Prominent Areas have no standing water.
GM-2.6a Turf surrounding headstones is trimmed to its recommended mowing height.
GM-2.6b Turf is edged vertically even with marker and marker is free of trimming debris.
GM-2.6c Other features on cemetery grounds are trimmed or edged within appropriate limits.
GM-2.9f Headstones and markers with sand or gravel surrounding them are generally weed free (non-turf areas only).
GM-2.9g Burial areas appear raked and groomed (non-turf areas only).
PLANTING BEDS
GM-4.1b Planting beds are weed free.
GM-4.1c Plants in planting beds are healthy, vigourous, and free of pests and disease and are maintained in accordance with the CGMP.
GROUNDS MAINTENANCE CHECKLIST - WEEKLY
Completed by: Title
NEEDS
ATTENTION NOT APPLICABLE COMMENTS
Number Identified
Number Completed
TURF / NON-TURF (Circle One)
GM-2.1a Visually prominent area is generally weed free.
GM-2.1b Visually prominent area is generally free of bare areas.
GM-2.7a Grave reopeners during the growing season show healthy turf re-established within 60 days of the interment.
GM-2.7b Winter grave reopeners show healthy turf re-established within 60 days of the start of the growing season.
TREES AND SHRUBS
GM-3.2
Trees and shrubs are healthy, vigorous, free of pests and disease and/or are maintained in accordance with the Cemetery Grounds Management Plan.
GENERAL MAINTENANCE
GM-6.4a Containers for floral vases are well marked, clean, neat and in good repair.
GM-6.4b Floral vases are clean and in good repair
Completed by: Title
GROUNDS MAINTENANCE CHECKLIST - MONTHLY
MEASURE DESCRIPTION OK NEEDS
ATTENTION NOT APPLICABLE COMMENTS Number
Identified Number Completed
TURF / NON-TURF (Circle One)
GM-1.1a Grounds Management Plan is current and includes a cemetery site plan and all maintenance activities and schedules.
GM-1.1b Grounds Management Plan has been reviewed and updated.
GM-1.1c Activities in the Grounds Management Plan are being accomplished
GM-2.2 Turf is compatible with the geographic region.
TREES AND SHRUBS
GM-3.1 Trees and shrubs are compatible with the geographic region.
PLANTING BEDS
GM-4.1a Planting beds contain only material that is compatible with the geographic region.
WASTE MANAGEMENT
GM-5.2a Cemetery has a centralized trash collection point established in a location that is screened from the public.
GM-5.3
Cemetery spoils areas are located, concealed or maintained to minimize public visibility.
GENERAL MAINTENANCE
GM-6.3 Floral regulations are posted in visually prominents areas.
Title
GROUNDS MAINTENANCE CHECKLIST - ANNUAL
Completed by:
A T T A C H M E N T B
P E S T I C I D E A P P L I C A T I O N D A T A S H E E T
Date: Applicator:
APPLICATION SITE
Location:
Size of Treatment Area: Plant Age and Condition:
Description (Turf, Bed etc.): Soil Conditions:
Surrounding Sensitive Areas:
Previous Pesticides Used:
PEST PROBLEM Primary Pest: Damage Observed:
Other Pests Present: Location of Damage:
Beneficials Present:
Severity of Pest Problem:
PESTICIDE(S) USED Pesticide(s): Formulation:
(1)
Rate: Total Amount Used:
(2) (3) Adjuvants Type: Amount: Total Gallons of Diluted Spray
Used:
Surfactant Type: Amount:
APPLICATION Date(s) of Application: Weather Conditions
Temperature:
Equipment used: Cloud Cover:
Wind Speed:
Equipment Calibrated By: Wind Direction:
Rain:
Travel Speed:
Total Hours for Application:
Persons Notified or Spoken to Regarding Application:
(1) (2) (3)
FOLLOW UP Effectiveness of Application:
Beneficials Present: Pest Resurgence Noted:
Injury to Non-Target Plants or Surfaces:
COMMENTS
Signature & Date
ATTACHMENT C
VERTEBRATE PEST INSPECTION SHEET
Gophers, Voles, Moles, Ground Squirrels, Raccoons, Skunks, Geese, Turkeys, Pigs, Snakes, Etc.
Location of Service: __________________ National Cemetery
Date of Service: ______________________
NO. CEMETERY
SECTION
ID# OF NEAREST
HEADSTONE
ANIMAL
PEST TYPE
OLD OR NEW
DAMAGE?
DATE OF
DISCOVERY
CHEMICAL OR
TRAP
TREATMENT
DATE OF
TREATMENT
DATE OF
TURF
REPAIR
CONTRACTOR
SIGNATURE COMMENTS
ATTACHMENT D
CONTRACTOR’S EMPLOYEE STATEMENT OF COMPLIANCE
EMPLOYEE NAME: ______________________________
POSITION/TITLE: ______________________________
DATE: ______________________________
Please check the appropriate blank.
____ New Employee, New Contractor
____ Annual Confirmation for current Employees or Contractor(s) (Due on Nov. 1 of each Contract year or immediately after NTP.)
FOR ALL EMPLOYEES
I have been briefed and understand the following guidance:
INITIALS
_________ The National Cemetery Administration honors veterans with a final resting place and lasting memorial that commemorate their service to our Nation. National Cemeteries are National Shrines. Therefore, the standards for management, maintenance, appearance and operational procedures have been established by the National Cemetery Administration to reflect this Nations’ concern and respect for those interred there. For this reason, my strict adherence to the Performance Work Statement, Performance Work Requirements Summary and Guidance Specifications must be required and must be essential.
_________ I will remain aware of the remains buried in the grounds where work is being performed.
The utmost care must be given to these remains and the headstones and flat grave markers that mark those gravesites and memorialize the service of individuals.
_________ I will not walk, stand, lean, sit or jump on headstones, markers, or monuments. Nor will I drive over them.
_________ I will not place or lean tools, equipment, or other items on headstones, markers, or monuments at any time.
_________ I have been briefed on the approved methods and tools to remove headstones and markers from their sockets in accordance with the Contract Specifications. I will use the tools and methods approved by the Contracting Officer Representative (COR) to lift headstones and markers out of the ground in order to avoid damage; pick axes are not an acceptable tool.
_________ I will not place headstones or markers on dirt piles or mud once they are removed from their sockets; in order to show appropriate respect towards the families visiting the gravesites and the remains that are buried, I will ensure headstones and markers are carefully stored on each associated gravesite and protected from damage or soiling, in accordance with Contract Specifications.
_________ I understand that the Contractor must be responsible for replacing damaged headstones and markers and for restoring turf damaged during performance of this work.
_________ Should any on-site activity, incident, emergency, or disaster result in exposure and/or damage to any remains, container for remains (i.e., casket or urn), or outer burial container, I will IMMEDIATELY notify the Cemetery Director, the COR and/or the Contracting Officer; I will take immediate steps to protect and render safe any exposed remains; and stop any further work until the Cemetery Director provides the Contractor ‘s Supervisor guidance regarding disposition of the remains and permission to proceed.
SIGNATURE BLOCK
Signature
Printed Name
Date
IF THIS STATEMENT IS THE EMPLOYEE’S ANNUAL COMPLIANCE STATEMENT, THIS COMPLIANCE
STATEMENT MUST BE RETURNED TO THE COR BY NOVEMBER 1 OR AFTER NTP.
AS TO STATEMENTS OR COMMITMENTS OF FUTURE ACTIONS, THIS COMPLIANCE STATEMENT COVERS THE PERIOD FROM OCTOBER 1 OF THE CALENDAR YEAR DURING WHICH THIS COMPIANCE STATEMENT
IS DUE THROUGH SEPTEMBER 30 OF THE NEXT CALENDAR YEAR.
Attachment E
Monday Wednesday FridayTuesday Thursday
Flower Pick-up / Mow Schedule
GMC
CEMHavayJ Highlight
CEMHavayJ Highlight
CEMHavayJ Highlight
MOW
TRIM
COMMITTAL
B
BLDGS
I
_L
I
MMITT
HELTER
N C")
Attachment F
CEMHavayJ Highlight
| ATTACHMENT A - GROUNDS MAINTENANCE CHECKLISTS |
| ATTACHMENT B - PESTICIDE APPLICATION DATA SHEET |
| ATTACHMENT C - VERTEBRATE PEST INSPECTION SHEET |
| ATTACHMENT D - CONTRACTORS EMPLOYEE STATEMENT OF COMPLIANCE |
| ATTACHMENT D |
| CONTRACTOR’S EMPLOYEE STATEMENT OF COMPLIANCE |
| ATTACHMENT E- FLORAL POLICY AND MOW MAP |
| WNC FLORAL POLICY (2) |
| Push Mow Sections Schedule |
| Slide Number 1 |
| ATTACHMENT F- MOW AND TRIM MAP |
| Slide Number 1 |
File details come from the government source that posted it. Updated .