Dignity Clause.docx

DOCX document 21 KB Posted

Attached to
Willamette National Cemetery Grounds Maintenance Services
Solicitation number
36C78626Q50019
Issued by

About this file

The document is a Dignity Clause outlining specific behavioral and operational requirements for contractors working in national cemeteries. The clause mandates that all contractor personnel must perform work with utmost care, reverence, and respect, recognizing the sacred nature of the cemetery as a final resting place for veterans and service members.

Key operational restrictions include: prohibiting personnel from walking, standing, leaning, sitting, or driving on headstones and markers; preventing tools or equipment from being placed on markers; avoiding any scratching or damage to markers; and requiring contractors to replace damaged headstones, markers, and turf. If remains or burial containers are accidentally exposed or damaged, contractors must immediately contact the Contracting Officer's Representative (COR), Director/Assistant Director, or Contracting Officer (CO) for guidance. Additionally, contractors must discuss these guidelines with all employees, have each employee sign a compliance statement, and submit these signed statements to the COR before beginning work.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DIGNITY CLAUSE

Respect for Headstones and Markers in National Cemeteries, Handling of Markers and Headstones

1. Every action by contractor personnel at a national cemetery must be performed with the special care, reverence, dignity, and respect that acknowledges the cemetery as the final resting place that commemorates the service and sacrifice that service members, Veterans and their families made for our Nation. Critically important is the awareness required of the Contractor employees of the remains buried in the grounds where the work is performed. The utmost care must be given to these remains and the headstones and flat grave markers that mark those gravesites and memorialize the service of individuals.

a. Contractors cannot walk, stand, lean, sit or jump on headstones or markers. Nor can they drive over them.

b. No tools, equipment or other items will be placed or leaned on headstones or markers.

c. Use care not to scratch or damage markers in any manner.

d. Contractor shall be responsible for replacing damaged headstones and markers and for restoring turf damaged during performance of this work.

e. Additionally, should any activity result in the exposure and/or damage to any remains, container for remains (e.g., casket or urn), or outer burial container, the contractor must contact the COR, Director/Assistant Director, or Contracting Officer (CO) for guidance.

2. Any doubts as to proper procedures shall be brought to the attention of the COR, Director/Assistant Director, or CO for guidance or resolution.

3. The contractor is required to discuss the guidance with employees and/or subcontractors and have each employee sign a statement of compliance and deliver the signed statement to the COR before work may begin.

(END)

File details come from the government source that posted it. Updated .