PWS Attachment F - Example T-2 Document Sections.pdf

PDF 119 KB Posted

Attached to
Solicitation: Full and Open CLS Sustainment services for the AEWS AN/FPS-117 Radar System
Solicitation number
FA821725RB004
Issued by

About this file

The document is a table of contents for an Example T-2 Documentation Sections template, which outlines a comprehensive structure for documenting technical modifications to a system. The template includes 14 main sections covering critical aspects of system modification, such as background, installation procedures, supply data, drawings, maintenance, system safety, configuration control, and cybersecurity considerations. Key subsections include modification installation details (parts, labor hours, EMI/EMC testing), operational checkout procedures, maintenance requirements, hazard analysis, environmental qualifications, and cybersecurity impact evaluations. The document provides a systematic approach to documenting technical changes, with appendices for removal and installation procedures and definitions.

View the file

Other files

File Type Posted
Attachment 3 - Section L Instructions Conditions and Notices to Offerors_v2.pdf PDF
Attachment 8 - Past Performance Information Sheet.docx DOCX document
Attachment 9 - Past Performance Relevancy Baseline.docx DOCX document
Attachment 10 - Past Performance Questionnaire.docx DOCX document
PWS Attachment A - AN_FPS-117 Site Locations.pdf PDF
PWS Attachment E - Example Comment Resolution Matrix (CRM).xlsx XLSX spreadsheet
PWS Attachment G - GFP Listing.xlsx XLSX spreadsheet
Attachment 1 - Basic Contract PWS.pdf PDF
Attachment 2 - CDRLs.pdf PDF
Attachment 4 - Evaluation Factors for Award.pdf PDF
PWS Attachment D - Customer Support Request - Third Party Support Request Form.pdf PDF
Offeror_RFP_Question_Template.xlsx XLSX spreadsheet
Solicitation - FA821725RB004.pdf PDF
Attachment 3 - Instructions Conditions and Notices to Offerors.pdf PDF
Attachment 5 - Cross Reference Matrix.xlsx XLSX spreadsheet
Attachment 7 - Pre-Award Survey of Prospective Contractor.pdf PDF
PWS Attachment C - PACAF Regional Support Center Site Arrival Request (SAR).pdf PDF
Attachment 6 - Pricing Matrix Worksheet.xlsx XLSX spreadsheet
Attachment 11 - Awardable Task Order PWS.pdf PDF
PWS Attachment B - Memorandum for Alaska Radar System Support.pdf PDF
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Example T-2 Documentation Sections

Table of Contents

1. Background And Purpose Of Modification

2. Effectivity

3. Reference Documents

4. Modification Installation

4.1 Installation To Be Performed By

4.2. Supply Data

4.2.1. Parts And Material

4.2.2. Disposition Of Removed Items

4.3. Drawings

4.4. Special Tools And Support Equipment

4.5. Configuration Prerequisites

4.6. Labor Hours Estimate

4.7. Pre-Installation EMI/EMC Testing

4.8. Installation Procedures

4.8.1. Preparation

4.8.2. Modification/Installation

4.9. Modification Identification

4.10. Operational Checkout Concept Performed By

4.11. Operational Checkout Procedures

4.12. Disturbed Systems Operational Checkout

4.13. Post-Installation EMI/EMC Testing

5. System Block Diagrams

6. System Wiring Diagrams

7. Maintenance Of Modified System

7.1. Maintenance Concept

7.2. Periodic Inspection/Maintenance Requirements

7.3. Maintenance & Operation Procedures

8. System Safety

8.1. Hazard Analysis/Safety Assessment

9. Analysis Or Justification For No Analysis

9.1. Environmental Qualification

9.2. Electrical Loads Analysis

10. Other Specific Subjects

10.1. Programmatic Environment, Safety, And Occupational Health Evaluation (Peshe)

10.2. Cybersecurity Certification And Accreditation/Pit (Platform Information Technology)

10.3. Is This Modification “Cybersecurity Relevant”? Yes/No

10.4. Cybersecurity Impact Evaluation Recommendation

10.5. Interim Authority To Test (IATT)

10.6. Program Protection

11. Configuration Control And Data Management

11.1. Certifications

11.2. Test Plan

11.3. Test Report

12. Modification Removal

13. Acronym List

14. Appendices And Attachments Appendix A: Removal And Installation Procedures Appendix B: Definitions

Example T-2 Documentation Sections

File details come from the government source that posted it. Updated .