Price Schedule.pdf
PDF 229 KB Posted
- Solicitation number
- W912EF26QA059
About this file
Summary
This document is an IDIQ (Indefinite Delivery, Indefinite Quantity) Unit Price Schedule for underwater dive services procured by the U.S. Army Corps of Engineers (USACE) for the Walla Walla and Portland Districts. The contract, designated NWW-NWP-FY26-31, provides diver-directed emergency and time-critical underwater services with a base year and four option years. The contract serves two geographic regions: the Walla Walla District (covering seven dam sites including Dworshak, Lower Granite, Little Goose, Lower Monumental, Ice Harbor, McNary, and Lucky Peak) and the Portland District (covering multiple sites in Oregon including Bonneville, The Dalles, John Day, and various Willamette River Basin facilities).
The pricing schedule specifies unit prices for various dive services organized by crew configuration, depth, and equipment requirements. Services include basic dive days using surface-supplied air with five-person crews (standard depths to 50 feet, or per-foot pricing for depths from 51-200 feet), additional qualified divers, six and eight-person crew configurations with NITROX/mixed gas systems, penetration dives into confined spaces, remote-operated vehicle (ROV) operations, dive boat rentals, modular float mobilization and demobilization, pilebuck crews, and various overtime rates for specialized personnel. Support services include welding supplies, ROV pilot/operator crews, equipment rental fees, and additional equipment markup percentages. Travel costs follow Joint Travel Regulations for air transportation (economy/coach), auto mileage reimbursement, and per diem allowances, applicable only to multi-day assignments. Each task order includes one mobilization and demobilization charge regardless of duration.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Base Year OY1 OY2 OY3 OY4 Line Item Description Unit of Measure Unit Price Unit Price Unit Price Unit Price Unit Price
Basic Dive Day (8 hrs): Using surface supplied air (SSA), employing a 5 person dive team comprised of: (1) non-diving dive supervisor, (2) divers, (1) standby diver, (1) tender, . Include all associated dive equipment and tools, dual lock dive chamber, camera/monitoring with DVD recording capability. (Standard length of individual dive shift per calendar day is (4) four hours, maximum of three four-hour dive shifts per 12-hour work day allowed.)
0001AA Standard dive up to 50 feet deep Per Day
0001AB 51 – 100 feet deep Per Foot
0001AC 101 – 150 feet deep Per Foot
0001AD 151 - 200 feet deep Per Foot
Additional Qualified Diver added to the 5 person dive team for a basic 8 hour work day.
0002AA Standard dive up to 50 feet deep Per Day
0002AB 51 – 100 feet deep Per Foot
0002AC 101 – 150 feet deep Per Foot
0002AD 151 - 200 feet deep Per Foot
Mobilization and demobilization for equipment, divers, dive chamber, and other necessary equipment to the dive site. Note: Time required to do this does not constitute part of the dive day.
0003AA
Mobilization and demobilization for equipment, divers, dive chamber, and other necessary equipment to the Dworshak dive site.
*1 per each task order
0003AB
Mobilization and demobilization for equipment, divers, dive chamber, and other necessary equipment to the Lower Granite dive site.
*1 per each task order
0003AC
Mobilization and demobilization for equipment, divers, dive chamber, and other necessary equipment to the Little Goose dive site.
*1 per each task order
0003AD
Mobilization and demobilization for equipment, divers, dive chamber, and other necessary equipment to the Lower Monumental dive site.
*1 per each task order
0003AE
Mobilization and demobilization for equipment, divers, dive chamber, and other necessary equipment to the Ice Harbor dive site.
*1 per each task order
0003AF
Mobilization and demobilization for equipment, divers, dive chamber, and other necessary equipment to the McNary dive site.
*1 per each task order
0003AG
Mobilization and demobilization for equipment, divers, dive chamber, and other necessary equipment to the Lucky Peak dive site.
*1 per each task order
PRICE SCHEDULE FOR WALLA WALLA, WASHINGTON
NWW-NWP-FY26-31 UNDERWATER DIVE SERVICES
IDIQ UNIT PRICE SCHEDULE
Note: It is estimated that all jobs performed under this contract will require a minimum 5-person crew as described in item 0001.
Most jobs will require dive depths of less than 100 feet and will be 1 to 2 days in duration.
The intent of this contract is to provide diver-directed emergency/time critical underwater services as required for the Walla Walla and Portland District for the period of base year of this contract. There are four option years.
Mobilization and demobilization of workboat (dive boat) to USACE Walla Walla District Dams
0004AA
Mobilization and demobilization of workboat (dive boat) to USACE Walla Walla District Dam, Dworshak dive site.
*1 per each task order
0004AB
Mobilization and demobilization of workboat (dive boat) to USACE Walla Walla District Dam, Lower Granite dive site.
*1 per each task order
0004AC
Mobilization and demobilization of workboat (dive boat) to USACE Walla Walla District Dam, Little Goose dive site.
*1 per each task order
0004AD
Mobilization and demobilization of workboat (dive boat) to USACE Walla Walla District Dam, Lower Monumental dive site.
*1 per each task order
0004AE
Mobilization and demobilization of workboat (dive boat) to USACE Walla Walla District Dam, Ice Harbor dive site.
*1 per each task order
0004AF
Mobilization and demobilization of workboat (dive boat) to USACE Walla Walla District Dam, McNary dive site.
*1 per each task order
0004AG
Mobilization and demobilization of workboat (dive boat) to USACE Walla Walla District Dam, Lucky Peak dive site.
*1 per each task order
Dive Boat capable of accommodating dive crew, 2 Corps of Engineers personnel and all necessary equipment. Boat must have sufficient freeboard and horsepower to navigate the Snake River. Per Day
0006 Welding supplies and consumables Per Hour
0007 Overtime pay rate-Dive supervisor. Per Hour
0008 Overtime pay rate-Diver Per Hour
0009 Overtime pay rate-Tender Per Hour
0010 Overtime pay rate for standby diver Per Hour
0011 Overtime pay rate for ROV Pilot/Operator Per Hour
0012 Overtime pay rate for Pilebuck Per Hour
Remote Operated Vehicle Crew: includes ROV pilot and operator, 8 hours per day, truck, fuel and per diems. Per Day
Remote Operated Vehicle: A Class II or III, HD ROV Package Refer to section 3 CONTRACTOR PROVIDED SPECIAL UNDERWATER EQUIPMENT Per Day
Additional Equipment Required based on an individual task order requirement:
The Mark up percentage to be added %
Mobilization and Demobilization of Modular Floats & Skiff to dive site.
0016AA
Mobilization and Demobilization of Modular Floats & Skiff to Dowrshak dive site.
*1 per each task order
0016AB
Mobilization and Demobilization of Modular Floats & Skiff to Lower Granite dive site.
*1 per each task order
0016AC
Mobilization and Demobilization of Modular Floats & Skiff to Little Goose dive site.
*1 per each task order
0016AD
Mobilization and Demobilization of Modular Floats & Skiff to Lower Monumental dive site.
*1 per each task order
0016AE
Mobilization and Demobilization of Modular Floats & Skiff to Ice Harbor dive site.
*1 per each task order
0016AF
Mobilization and Demobilization of Modular Floats & Skiff to McNary dive site.
*1 per each task order
0016AG
Mobilization and Demobilization of Modular Floats & Skiff to Lucky Peak dive site.
*1 per each task order
Pilebuck Crew: includes 8-hour Pilebuck (4-man) crew to set up and assemble the floats and to place equipment onto floats.
Per Day
Modular Floats 13’ x 30’ : includes floats to accommodate dive spread and skiff with outboard
Per Day
Modular Floats 32’ x 30’ : includes floats to accommodate dive spread and recompression chamber and skiff with outboard.
Per Day
Basic Dive Day (8 hrs): Using surface supplied air (SSA-NITROX/Mixed Gas), employing a six-person dive team comprised of (1) non-diving dive supervisor, (3) diver, (1) standby diver, (1) tender, . Include all associated dive equipment and tools, dual lock dive chamber, camera/monitoring with DVD recording capability.
0020AA Standard dive up to 50 feet deep Per Day
0020AB 51 – 100 feet deep Per Foot
0020AC 101 – 150 feet deep Per Foot
0020AD 151 - 200 feet deep Per Foot
Basic Dive Day (8 hrs): Using surface supplied air (SSA-NITROX/Mixed Gas), employing a eight- person dive team comprised of (1) non-diving dive supervisor, (4) diver, (1) standby diver, (2) tender. Include all associated dive equipment and tools, dual lock dive chamber, camera/monitoring with DVD recording capability.
0021AA Standard dive up to 50 feet deep Per Day
0021AB 51 – 100 feet deep Per Foot
0021AC 101 – 150 feet deep Per Foot
0021AD 151 - 200 feet deep Per Foot
0022 Penetration Dives (dives into confined spaces) 26 feet and beyond Per Foot
Basic Dive Day (8 hrs): Using surface supplied air (SSA), employing a 5 person dive team comprised of: (1) non-diving dive supervisor, (2) diver, (1) standby diver, (1) tender. Include all associated dive equipment and tools, dual lock dive chamber, camera/monitoring with DVD recording capability. (Standard length of individual dive shift per calendar day is (4) four hours, maximum of three four-hour dive shifts per 12-hour work day allowed.)
0025AA Standard dive up to 50 feet deep Per Day
Total Walla Walla District
PRICE SCHEDULE FOR PORTLAND, OREGON
0025AB 51 – 100 feet deep Per Foot
0025AC 101 – 150 feet deep Per Foot
0025AD 151 - 200 feet deep Per Foot
Additional qualified diver, added to 5 person dive team for basic 8-hour work day.
0026AA Standard dive up to 50 feet deep Per Day
0026AB 51 – 100 feet deep Per Foot
0026AC 101 – 150 feet deep Per Foot
0026AD 151 - 200 feet deep Per Foot
Mobilization and demobilization for equipment, divers, dive chamber, and other necessary equipment to the dive site.
0027AA
Mobilization and demobilization for equipment, divers, dive chamber, and other necessary equipment to the Bonniville dive site.
*1 per each task order
0027AB
Mobilization and demobilization for equipment, divers, dive chamber, and other necessary equipment to The Dalles dive site.
*1 per each task order
0027AC
Mobilization and demobilization for equipment, divers, dive chamber, and other necessary equipment to John Day dive site.
*1 per each task order
0027AD
Mobilization and demobilization for equipment, divers, dive chamber, and other necessary equipment to Astoria OR, Columbia River dive site
*1 per each task order
0027AE
Mobilization and demobilization for equipment, divers, dive chamber, and other necessary equipment to Jess Dam, Rogue River, dive site.
*1 per each task order
0027AF
Mobilization and demobilization for equipment, divers, dive chamber, and other necessary equipment to John Day dive site.
*1 per each task order
0027AG
Mobilization and demobilization for equipment, divers, dive chamber, and other necessary equipment to Big Cliff Dam, Willamette River Basin, dive site.
*1 per each task order
0027AH
Mobilization and demobilization for equipment, divers, dive chamber, and other necessary equipment to Cougar Dam, Willamette River Basin, dive site.
*1 per each task order
0027AJ
Mobilization and demobilization for equipment, divers, dive chamber, and other necessary equipment to Detroit Dam, Willamette River Basin, dive site.
*1 per each task order
0027AK
Mobilization and demobilization for equipment, divers, dive chamber, and other necessary equipment to Dexter Dam, Willamette River Basin, dive site.
*1 per each task order
0027AL
Mobilization and demobilization for equipment, divers, dive chamber, and other necessary equipment to Foster Dam, Willamette River Basin, dive site.
*1 per each task order
0027AM
Mobilization and demobilization for equipment, divers, dive chamber, and other necessary equipment to Green Peter Dam, Willamette River Basin, dive site.
*1 per each task order
0027AN
Mobilization and demobilization for equipment, divers, dive chamber, and other necessary equipment to Hills Creek Dam, Willamette River Basin, dive site.
*1 per each task order
0027AP
Mobilization and demobilization for equipment, divers, dive chamber, and other necessary equipment to Lookout Point Dam, Willamette River Basin, dive site.
Note: Time required to do this does not constitute part of the dive day. All Portland District public access facilities including John Day, The Dalles, Bonneville, Willamette and Rogue River Projects as well as work sites, facilities and vessels under the direction of Channel and Harbors Branches.
Mobilization and demobilization of workboat (dive boat) to USACE Portland District public access facilities and work sites, facilities and vessels under the direction of Channel and Harbors Branches
0028AA
Mobilization and demobilization of workboat (dive boat) to USACE Portland District public access facilities and work sites, facilities and vessels under the direction of Channel and Harbors Branches Portland Oregon, Columbia River
*1 per each task order
0028AB
Mobilization and demobilization of workboat (dive boat) to USACE Portland District Dam, Bonneville dive site.
*1 per each task order
0028AC
Mobilization and demobilization of workboat (dive boat) to USACE Portland District Dam, The Dalles dive site.
*1 per each task order
0028AD
Mobilization and demobilization of workboat (dive boat) to USACE Portland District Dam, John Day dive site.
*1 per each task order
0028AE
Mobilization and demobilization of workboat (dive boat) to USACE Portland District Astoria, OR Columbia River dive site.
*1 per each task order
0028AF
Mobilization and demobilization of workboat (dive boat) to USACE Portland District Jess Dam, Rogue River Basin, dive site.
*1 per each task order
0028AG
Mobilization and demobilization of workboat (dive boat) to USACE Portland District Big Cliff Dam, Willamette River Basin, dive site.
*1 per each task order
0028AH
Mobilization and demobilization of workboat (dive boat) to USACE Portland District Cougar Dam, Willamette River Basin, dive site.
*1 per each task order
0028AJ
Mobilization and demobilization of workboat (dive boat) to USACE Portland District Detroit Dam, Willamette River Basin, dive site.
*1 per each task order
0028AK
Mobilization and demobilization of workboat (dive boat) to USACE Portland District Dexter Dam, Willamette River Basin, dive site.
*1 per each task order
0028AL
Mobilization and demobilization of workboat (dive boat) to USACE Portland District Foster Dam, Willamette River Basin, dive site.
*1 per each task order
0028AM
Mobilization and demobilization of workboat (dive boat) to USACE Portland District Green Peter Dam, Willamette River Basin, dive site.
*1 per each task order
0028AN
Mobilization and demobilization of workboat (dive boat) to USACE Portland District Hills Creek Dam, Willamette River Basin, dive site.
*1 per each task order
0028AP
Mobilization and demobilization of workboat (dive boat) to USACE Portland District Lookout Point Dam, Willamette River Basin, dive site.
Dive Boat capable of accommodating dive crew, 2 Corps of Engineers personnel and all necessary equipment. Boat must have sufficient freeboard and horsepower to navigate the Columbia River Per Day
0030 Welding supplies and consumables Per Hour
0031 Overtime pay rate-Dive supervisor. Per Hour
0032 Overtime pay rate-Diver Per Hour
0033 Overtime pay rate-Tender Per Hour
0034 Overtime pay rate for standby diver Per Hour
0035 Overtime pay rate for ROV Pilot/Operator Per Hour
0036 Overtime pay rate for Pilebuck Per Hour
Remote Operated Vehicle Crew: includes ROV pilot and operator, 8 hours per day, truck, fuel and per diems.
Per Day
Remote Operated Vehicle: includes ROV (Deep Ocean Engineering Phantom XTL or equal) with maximum 500’ umbilical, generator, monitor and recorder.
Per Day
Additional Equipment Required based on an individual task order requirement:
The Mark up percentage to be added
Mobilization and Demobilization of Modular Floats & Skiff
*Each
0040AA
Mobilization and demobilization to USACE Portland District public access facilities and work sites, facilities and vessels under the direction of Channel and Harbors Branches Portland Oregon, Columbia River
*1 per each task order
0040AB
Mobilization and demobilization of Modular Floats and Skiff to USACE Portland District Dam, Bonneville dive site.
*1 per each task order
0040AC
Mobilization and demobilization of Modular Floats and Skiff to USACE Portland District Dam, John Day dive site.
*1 per each task order
0040AD
Mobilization and demobilization of Modular Floats and Skiff to USACE Portland District Dam, The Dales dive site.
*1 per each task order
0040AE
Mobilization and demobilization of Modular Floats and Skiff to USACE Portland District Columbia River, Astoria, OR
*1 per each task order
0040AF
Mobilization and demobilization of Modular Floats and Skiff to USACE Portland District, Jess Dam, Rogue River Basin
*1 per each task order
0040AG
Mobilization and demobilization of Modular Floats and Skiff to USACE Portland District, Big Cliff Dam, Willamette River Basin
*1 per each task order
0040AH
Mobilization and demobilization of Modular Floats and Skiff to USACE Portland District, Cougar Dam, Willamette River Basin
*1 per each task order
0040AJ
Mobilization and demobilization of Modular Floats and Skiff to USACE Portland District, Detriot Dam, Willamette River Basin
0040AK
Mobilization and demobilization of Modular Floats and Skiff to USACE Portland District, Dexter Dam, Willamette River Basin
*1 per each task order
0040AL
Mobilization and demobilization of Modular Floats and Skiff to USACE Portland District, Foster Dam, Willamette River Basin
*1 per each task order
0040AM
Mobilization and demobilization of Modular Floats and Skiff to USACE Portland District, Green Peter Dam, Willamette River Basin
*1 per each task order
0040AN
Mobilization and demobilization of Modular Floats and Skiff to USACE Portland District, Hills Creek Dam, Willamette River Basin
*1 per each task order
0040AP
Mobilization and demobilization of Modular Floats and Skiff to USACE Portland District, Lookout Point Dam, Willamette River Basin
*1 per each task order
Pilebuck Crew: includes 8-hour Pilebuck (4-man) crew to set up and assemble the floats and to place equipment onto floats.
Per Day
Modular Floats 13’ x 30’ : includes floats to accommodate dive spread and skiff with outboard
Per Day
Modular Floats 32’ x 30’ : includes floats to accommodate dive spread and recompression chamber and skiff with outboard.
Per Day
Basic Dive Day (8 hrs): Using surface supplied air (SSA-NITROX/Mixed Gas), employing a six-person dive team comprised of (1) non-diving dive supervisor, (3) diver, (1) standby diver, (1) tender. Include all associated dive equipment and tools, dual lock dive chamber, camera/monitoring with DVD recording capability.
0045AA Standard dive up to 50 feet deep Per Day
0045AB 51 – 100 feet deep Per Foot
0045AC 101 – 150 feet deep Per Foot
0045AD 151 - 200 feet deep Per Foot
Basic Dive Day (8 hrs): Using surface supplied air (SSA-NITROX/Mixed Gas), employing a 8 person dive team comprised of (1) non-diving dive supervisor, (4) diver, (1) standby diver, (2) tender. Include all associated dive equipment and tools, dual lock dive chamber, camera/monitoring with DVD recording capability.
0046AA Standard dive up to 50 feet deep Per Day
0046AB 51 – 100 feet deep Per Foot
0046AC 101 – 150 feet deep Per Foot
0046AD 151 - 200 feet deep Per Foot
0047 Penetration Dives (dives into confined spaces) 26 feet and beyond Per Foot
*Each task order will have only one mob/demobilization charge whether it runs one or several days.
Total /Year Total Base and Option Years
Total Unit Portland District
As prescribed at FAR 31.205-46, travel costs incurred for travel in the Continental United States, Alaska, Hawaii, The Commonwealth of Puerto Rico, and territories and possessions of the United States, shall not exceed on a daily basis the maximum per diem rates in effect at the time of travel as set forth in the Joint Travel Regulations, Volume 2, DoD Civilian Personnel, Appendix A, prescribed by the Department of Defense. Lodging and per diem apply to jobs that run more than one day. Each task order will allow for these costs based on number of days over the first day and be part of the task order pricing proposal.
Air Travel (Economy/Coach)
Joint Travel Regulation https://www.gsa.gov/travel/plan-book/transportation-airfare-rates-pov-rates-etc
Auto Mileage
Joint Travel Regulation https://www.gsa.gov/travel/plan-book/transportation-airfare-rates-pov-rates-etc
Per Diem
Joint Travel Regulation https://www.gsa.gov/travel/plan-book/per-diem-rates
Regulations applied to this IDIQ are subject to change.
File details come from the government source that posted it. Updated .