Performance Work Statement (PWS) UPH Appliance Repair Removal and Installation Service Final.docx

DOCX document 154 KB Posted

Attached to
UPH Appliance- Repair, Removal and Installation Service
Solicitation number
W912CN26QA027
Issued by

About this file

This is a Performance Work Statement (PWS) for Unaccompanied Personnel Housing (UPH) Appliance Repair, Removal, and Installation Service at U.S. Army installations on the island of Oahu, Hawaii. The contract is a non-personal services contract with a one-year base period (October 1, 2026 – September 30, 2027) plus three one-year option periods extending through September 30, 2030. The contractor must provide all labor, equipment, tools, supplies, and materials necessary to inspect, diagnose, repair, remove, and install Government-owned appliances including microwaves, ranges, refrigerators, washers, and dryers across multiple barracks facilities and transport items to and from the Furnishings Management Office warehouse at Schofield Barracks.

Key service requirements include acknowledging work orders within one business day, conducting on-site assessments within two business days to diagnose malfunctions and complete basic repairs, completing pre-priced repairs on the initial visit or next available day if parts must be obtained, providing detailed quotes for non-routine repairs within specified timelines, and replacing unserviceable appliances within two business days. The contractor must maintain a Quality Control Plan, Safety Plan, and contingency plans for labor disputes; obtain required EPA Section 608 certifications for refrigerant work and Hawaii contractor licenses (C-18 Electrical Maintenance); comply with installation access and security protocols including the Automated Installation Entry (AIE) Program; complete AT Level I and iWATCH training within 30 days; and submit monthly service reports and invoices by the fifth business day of each month. Performance standards include 5–10% acceptable quality levels (AQLs) for various service categories, with non-conforming services resulting in non-conforming reports and potential negative CPARS ratings. The contractor is responsible for disposal of unserviceable parts and provides a 90-day warranty on all repairs and replacement parts.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Performance Work Statement (PWS)

Unaccompanied Personnel Housing (UPH) Appliance Repair, Removal and Installation Service

Final

Annex A (Overarching Base Operations PWS) to OPORD 24-015 IMCOM Enterprise Base Operations (BASOPS) Performance Work Statement (PWS) (U)

Annex A (Overarching Base Operations PWS) to OPORD 24-015 IMCOM Enterprise Base Operations (BASOPS) Performance Work Statement (PWS) (U)

Table of Contents 1.0

1.1Background1
1.2Objectives1
1.3Climatic Conditions1
1.4Facility Access1
1.5Traffic Flow1
1.6Drainage2
1.7Restoration of Landscape Damage2
1.8Dust Suppression2
2.0Requirements2
2.1Description of Services2
2.1.1Non-Personal Services2
2.1.2General Information.2
2.1.3Place of Performance and Hours of Operation.2
2.1.4Federal Holidays2
2.1.5Travel/Temporary Duty3
2.1.6Emergency Services3
2.1.7Contract Administration and management.3
2.1.8COR/ACOR Functions5
2.1.9Quality Control (QC)5
2.1.10Subcontract Management.5
2.1.11Contractor Employees Certifications5
2.1.12Business Relations7
2.2Work Management.7
2.2.1Coordination7
2.2.2General Fund Enterprise Business System (GFEBS).7
2.3As-Builts and Geospatial Information System (GIS).7
2.3.1Maintain As-Builts7
2.3.2Real Property Records Updates7
2.3.3GIS7
2.3.4GIS Support Services8
2.3.5GIS Files8
2.3.6Other Documents8
2.4Historic Property or Archaeological Site8
2.4.1Repair and Replacement8
2.5.1Security.8
2.5.2 Security Training.13
2.5.3 Safety14
2.5.4 Training, Physical Requirements, or other Expertise Required.14
2.5.5Environmental Requirements.14
2.5.6 Contingency Plans.15
2.6 Job Order Contract (JOC) Quality Assurance (QA)/Inspection Support.16
2.6.1 Project Support. N/A16
3.0Performance Requirements and Standards.16
3.1 High Level Objectives (HLO).16
3.1.1Performance Task Requirements, Standards and Acceptable Quality Levels16

(AQLs).

3.2Transition Plan (Phase In/Phase Out).16
4.0Performance Requirements Summary (PRS) Matrix.17
4.1Quality Assurance18
4.2Quality Control Plan (QCP)18
5.0Common Levels of Service (CLS)19
6.0Deliverables19
7.0Related Documents.19
7.1Definitions and Acronyms19
7.1.1Definitions19
7.1.2Acronyms29
7.2Applicable Directives, Publications.31
7.3 Technical Exhibit (TE).39
7.4 Government-Furnished Material (GFM)/Property (GFP)/Equipment (GFE) N/A40
7.4.1Utilities40
7.3Contractor-Furnished Material (CFM)/Property (CFP)/Equipment (CFE)40
7.5.1 Contractor-Furnished Material and Responsibilities40
7.5.2 Contractor-Furnished Items40
7.5.3.Contractor Facilities40
7.6U.S. Department of Labor (DOL) Wage Determination (WD)40
8.0 Specific Tasks41
8.1 Basic Services.41
8.1.1General Repair / Replace. The contractor shall perform all actions41
required to return appliances to proper working conditions.41
8.2 Tasks.41

1.0 This is a non-personal services contract for Unaccompanied Personnel Housing (UPH) Appliance Repair, Removal, and Installation Service in accordance with the manufacture’s recommendations and specifications. The Government will not exercise any supervision or control over the contract service providers. The Contractor shall perform to the standards specified in this Performance Work Statement (PWS). Contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government. The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary as defined in this PWS.

Background . This service contract is to provide Unaccompanied Personnel Housing (UPH) Appliance Repair, Removal, and Installation Service to barrack facilities at various Army installations on the Island of Oahu, Hawaii.

Objectives . The Contractor shall ensure all work accomplished in the performance of this PWS meets all applicable Federal, State, and local laws, regulations, and directives. Appliances may be in multistory barracks or detached building units with no elevator. The contractor shall transport most items between the reporting barracks, and the Furnishings Management Office (FMO) warehouse located at Bldg. 1901, 1479 McMahon Rd, Schofield Barracks. The Government reserves the right to decrease or increase the number of barracks and inventory during this contract period. A service order consists of an assessment of the appliance, repair, request to order parts as needed, request to cannibalize parts from a non-serviceable appliance, request to remove an appliance when needed, transportation of the old appliance to the warehouse, pick-up of a new appliance from the warehouse, proper installation of an appliance and submittal of Barracks Manager Representative (BMR) signed service order to the Contract Officer Representative (COR) validating repair services have been satisfactorily performed; performance shall be in accordance with manufacturer recommendations, Federal, State, and local policies and procedures.

1.2.1 The Contractor shall compile historical data, prepare required reports, and submit all information as specified by the Deliverables presented in the contract. The Contractor shall ensure all work in support of mission requirements tendered to the Government for acceptance conform to the measurable performance standards of quality, timeliness, and quantity specified in the PWS of this contract.

The intent is to establish work requirements that are performance-based and results-oriented. The Contractor shall determine the best and most cost-effective ways to fulfill appliance repair, installation, and removal and their component needs, emphasizing innovation and commercial best practices.

Climatic Conditions . N/A

1.4 Facility Access. N/A

1.5 Traffic Flow. T N/A

1.6 Drainage. N/A

1.7 Restoration of Landscape Damage. N/A

1.8 Dust Suppression. N/A

2.0 Requirements.

2.1 Description of Services. See Para 8.0 Specific Tasks

2.1.1 Non-Personal Services. The personnel rendering the services are not subject either by the contract’s terms or by the manner of its administration, to the supervision and control usually prevailing in relationships between the Government and its employees. Non-personal service contracts are authorized by the Government in accordance with (IAW) Federal Acquisition Regulation (FAR) Subpart 37.104, under general contracting authority, and do not require specific statutory authorization.

2.1.2 General Information.

2.1.2.1 Period of Performance (POP). The POP consists of one (1) base year and three (3) option periods. The POP is as follows:

Base Period1 October 2026 – 30 September 2027
Option Period I1 October 2027 – 30 September 2028
Option Period II1 October 2028 – 30 September 2029
Option Period III1 October 2029 – 30 September 2030

2.1.3 Place of Performance and Hours of Operation.

2.1.3.1 Place of Performance. Work will be performed in the barracks at all U.S. Army installations on the island of Oahu, as well as at our warehouse located on Schofield Barracks. The Government will specify for installations, building number, and machine identification number on each installation service order (EXHIBIT 1 Inventory & Locations).

2.1.3.2 Hours of Operation. The Government's regular (normal) hours are from 0700 – 1600 hours, except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. The Contractor shall conduct business during regular hours.

2.1.4 Federal Holidays

. The Contractor’s performance shall not be required on the Federal public holidays are listed below. Holidays occurring on weekends will be observed as directed by the Federal calendar (5 U.S.C. 6103).

New Year’s DayLabor Day
Martin Luther King Jr.’s BirthdayColumbus Day
President’s DayVeteran’s Day
Memorial DayThanksgiving Day
Independence DayChristmas Day
Juneteenth National Independence Day

2.1.4.1 The Contractor shall provide personnel support within two (2) hours of notification outside the normal hours of operation as required, including holidays, to support the UPH mission. Prior to performance of services outside the locally established hours of operation, the Contractor shall request and obtain, in writing, approval from the KO. The Program Manager shall be available after normal hours to serve as the central point of contact for Contractor operations. Contractor personnel shall not be scheduled for overtime work.

2.1.4.2 Installation Closures. When an unforeseen installation closure occurs on a regularly scheduled day of work, the Contractor shall:

a. Reschedule the work to be performed the following day unless the following day is a Saturday, Sunday, a legal public holiday, and when routine work is not scheduled for that day; or

b. Reschedule the work on any day mutually satisfactory.

2.1.4.3 Inclement Weather Delay. If the Contractor determines unsafe weather conditions for continued operations, then the Contractor shall notify the KO if inclement weather suspends operations within 1 hour. The Contractor shall resume operations with KO approval.

2.1.5 Travel/Temporary Duty. N/A

2.1.6 Emergency Services.

2.1.6.1 The Contractor or their employees shall immediately notify their supervisor of any accident requiring emergency medical treatment. The Contractor shall notify the KO or COR/ACOR immediately, not later than (NLT) two (2) hours of the incident.

2.1.6.2 The Contractor shall be responsible for the emergency medical treatment services for Contractor personnel.

2.1.7 Contract Administration and management.

2.1.7.1 Post Award Conference/Performance Evaluation Meetings. The Contractor shall attend the post award conference convened by the contracting activity or contract administration office IAW FAR Subpart 42.5. The KO and COR/ACOR will meet quarterly with the Contractor to review the Contractor's performance. Written minutes of meetings will be recorded by the Government and signed by both the Program Manager and the KO. The written minutes will be distributed within five (5) workdays after the meeting. If the Contractor does not concur with any portion of the minutes, recorded by the Government, the non-concurrence shall be provided in writing to the KO within two (2) calendar days following receipt of the minutes.

2.1.7.2 Notwithstanding the Contractor’s responsibility for total management during the performance of this contract, the administration of the contract requires maximum coordination and cooperation between the Government and the Contractor.

2.1.7.3 The following provides the roles and their respective authority during the performance of the contract:

2.1.7.3.1 Contracting Officer (KO). The KO is the only person authorized to direct changes in any of the requirements under this contract, and, notwithstanding any provisions contained elsewhere in this contract, said authority remains solely with the KO. In the event the Contractor makes any change at the direction of any person other than the KO, the change shall be considered to have been made without authority and solely at the risk of the Contractor. All contract administration will be affected by the KO. Communications pertaining to contractual administrative matters shall be addressed to the KO. No changes in, or deviation from the terms and conditions shall be affected, without a written modification to the contract, executed by the KO authorizing such changes. The KO will approve all submittals and plans required in this PWS.

2.1.7.3.2 Contracting Officer’s Representative (COR). The KO will appoint a COR during the performance of this contract. Additional Government personnel may be assigned to assist in contract oversight IAW AR 70-13, Management and Oversight of Service Acquisitions. Other surveillance personnel may be designated as COR or ACOR, and shall be trained and appointed IAW DoDI 5000.72, DoD Standard for Contracting Officer’s Representative (COR) Certification and DFARS 201.602-2. The ACOR will serve as on-site representatives of the COR in performance of actual contract surveillance, if they meet all COR training, experience requirements, and are appointed by the KO as an ACOR. The COR/ACOR will provide assistance in identification and resolution of problems, conflicts in priority, subtask requirement definitions, and other operations type problems. The COR/ACOR will perform IAW the responsibilities and duties identified in the appointment letter.

2.1.7.3.2.1COR Authority. A letter of designation will be issued to the COR/ACOR by the KO. A copy of the letter will be sent to the Contractor. The letter of designation states the responsibilities and limitations of the COR/ACOR, especially with regard to changes in cost, price estimates, or changes in delivery dates. The COR/ACOR is not authorized to change any of the terms and conditions with regard to cost, quantity, or schedule of the resulting order.
2.1.7.3.3.The Contractor shall not in any way represent the United States (U.S.) Government, or that it has the authority to contract or procure supplies for the account of the United States of America (USA).
2.1.8COR/ACOR Functions. The COR/ACOR monitors all technical aspects of the contract and assists in contract administration. The COR/ACOR is authorized to perform the following functions: assure the Contractor performs the technical requirements of the contract; perform inspections necessary in connection with contract performance; maintain written and oral communications with the Contractor concerning technical aspects of the contract; issue written interpretations of technical requirements; monitor, document, and report Contractor's performance and notify both the KO and Contractor of any deficiencies; coordinate availability of Government-Furnished Property, and coordinate site entry of Contractor personnel.
2.1.9Quality Control (QC). Quality Control is the responsibility of the Contractor. The Contractor shall provide a Quality Control Plan (QCP) within 30 calendar days after contract award. The Contractor shall provide and maintain a QCP that is acceptable to the KO. Changes to the Contractor’s QCP shall be submitted to the KO for review and approval within five (5) business days prior to implementation.

2.1.10 Subcontract Management. The Contractor shall submit a Subcontract Management Plan if they are going to use a Subcontractor for this contract at the time of solicitation.

2.1.11 Contractor Employees Certifications. The Contractor shall employ technicians which will work on any appliances containing refrigerant to hold a valid EPA Section 608 certification (Type I or universal).

2.1.11.1 Key Personnel.

2.1.11.1.1 Project Manager (PM). The Contractor shall provide a PM who is responsible for the performance of the work and administrative duties. The PM shall have full authority to act for the Contractor on all contract matters relating to daily operation of the contract. The name of the PM shall be provided by the Contractor to the KO. In the circumstances when the PM is not available, the Contractor shall designate an alternate who can perform the same duties during the absence of the PM. The name and contact information of this person and an alternate who shall act for the Contractor when the manager is absent shall be designated in writing to the contracting officer at the start of the contract. The PM shall be available between 0700 - 1600 hours, Monday through Friday except Federal holidays or when the Government facility is closed for administrative reasons. The PM performing the work under this contract shall have and maintain installation access at time of the contract start date and for the life of the contract. The PM and any individuals designated as key personnel shall be able to understand, speak, read, and write the English language.

2.1.11.1.2 N/A

2.1.11.1.3 All Contractor employees shall be legal U.S. residents. The Contractor shall immediately remove any employee that is not a legal U.S. resident. The Contractor personnel shall be able to communicate clearly in the English language.

2.1.11.1.4 Qualification Standards. The Contractor shall possess a Hawaii Contractor License (C-18 Electrical Maintenance and Repair). Hawaiʻi regulates professional and vocational licenses at the state level through the Department of Commerce and Consumer Affairs (DCCA), and any legally required trade license must come from that agency. The Contractor technicians shall have licenses/certifications to work on appliance(s) which involve refrigerants or specialized electrical work.

· EPA Section 608 Certification for any work involving refrigerants

· Hawaiʻi electrician license -Journey Worker Electrician (EJ) or Specialty Electrician (ES) for any hard‑wired appliance work

The Contractor shall inspect, repair, remove, and install appliances. Examples of these appliances are washers, dryers, refrigerators, stoves, and stovetops. This is just an example list and may include other small appliances. The contractor will repair appliances and components associated with listed in real property records as required throughout this contract utilizing properly trained, skilled, and qualified employees or subcontractor personnel. The Contractor shall provide objective evidence of key personnel qualifications and years of experience to the KO for review and acceptance.

2.1.11.1.5 Contractor Identification. The Contractor shall ensure all personnel be identified as a Contractor to distinguish themselves (e.g., badge, company logo, or uniform) from Government employees. The Contractor shall ensure all correspondence and reports produced are marked as Contractor products or that Contractor participation is disclosed.

2.1.11.1.6 Standards of Conduct. Contractor personnel’s conduct shall not reflect discredit upon the Government. The Contractor shall ensure all personnel present a professional appearance while working on the Government installation. The Contractor’s employees shall observe and comply with all local policies and procedures concerning fire, safety, environmental protection, sanitation, security, and possession of firearms or other lethal or illegal weapons or substance. The Contractor shall ensure all Contractor employees, providing services under this contract, conduct themselves and perform services in a professional, safe, and responsible manner. The Contractor shall remove, from the job site, any employee for reasons of misconduct or security. The Contractor shall ensure employee conduct complies with 41 USC 423, Procurement Integrity. The Contractor shall also ensure that no Contractor employees conduct political related activities or events on the installation.

2.1.11.1.7 Contractor Hiring Restrictions. The Contractor shall not hire or sub-contract with off duty or former Government employees whose employment would result in a conflict with AR 600-50, Standards of Conduct.

2.1.11.1.8 Organizational Conflict of Interest (OCI). N/A

2.1.12 Business Relations

. The Contractor shall successfully integrate and coordinate all activity needed to execute the requirement of this PWS. The Contractor shall manage the timeliness, completeness, and quality of problem identification to a degree acceptable to the Government. The Contractor shall provide the COR/ACOR corrective action plans, timely identification of issues, and effective management of subcontractors within ten (10) days or at a mutually agreed upon date. The Contractor shall ensure customer satisfaction and professional and ethical behavior of all Contractor personnel.

2.2 Work Management. N/A

2.2.1 Coordination. The Contractor shall schedule and coordinate with the COR/ACOR to minimize disruptions to the facility mission.

2.2.2 General Fund Enterprise Business System (GFEBS). N/A

2.2.2.1 GFEBS Certification. N/A

2.2.2.2 Preventive Maintenance Orders (PMO). N/A

2.2.2.3 Operations Work Orders (OWO). N/A

2.2.2.4 GFEBS Support. N/A

2.2.2.4.1 Database Tasks/Requirements. N/A

2.3 As-Builts and Geospatial Information System (GIS). N/A

2.3.1 Maintain As-Builts. N/A

2.3.1.1 Support. N/A

2.3.1.2 Training. N/A

2.3.2 Real Property Records Updates. N/A

2.3.3 GIS. N/A

2.3.4 GIS Support Services. N/A

2.3.5 GIS Files. N/A

2.3.6 Other Documents. N/A

2.4 Historic Property or Archaeological Site. N/A

2.4.1 Repair and Replacement. N/A

2.5 Special Requirements

2.5.1 Security.

2.5.1.1 Access and General Protection/Security Policy and Procedures. The Contractor and all associated subcontractors’ employees shall comply with applicable installation, facility, and local security policies and procedures. The Contractor workforce shall comply with all personal identity verification (PIV) requirements as directed by Department of Defense (DOD), Headquarters Department of the Army (HQDA), and local policy. The COR/ACOR will request changes in Contractor security matters or processes if the Force Protection Condition (FPCON) at any individual facility or installation changes.

2.5.1.2 Motor Vehicle Operators. Contractor’s personnel, whose tasks involve operation of any vehicles, shall possess a valid driver’s license, certificates, and permits applicable for the type and class of vehicle being operated.

2.5.1.3 Contractor Vehicle Registration

. The Contractor shall register all Contractor-owned or operated vehicles and trailers operating on the installation within five (5) working days of contract start date. The Contractor shall complete all applications with the Provost Marshal Vehicle Registration section located in Building 6505. Evidence of vehicle ownership and vehicle liability insurance must be presented upon application of vehicle registration.

2.5.1.3.1 Contractor and Vendor Access. All privately owned vehicles or motorcycles or Contractor or vendor furnished vehicles, and equipment must enter the Installation through the designated secure access control points (ACP). Under the present Installation FPCON, vehicle and equipment operators and passengers must possess identification documents as required by USAG Hawaii Directorate of Emergency Services (DES) to access the Installation. Vehicle and equipment operators must also possess and be ready to show a valid state and/or commercial driver's license, current vehicle registration, and proof of state required minimum liability insurance. As determined by the Installation FPCON, an elevated FPCON may require additional security screening and/or limited Installation access. All vehicles must be registered IAW current Hawaii state requirements in which they are registered.

2.5.1.3.2 All Contractor personnel, not possessing a Common Access Card (CAC), requesting access to USAG Hawaii installations will enter through the designated Visitor Control Center (VCC). All Contractor personnel will be required to present a United States National or State issued identification that is capable of being scanned for valid entry. Contractor personnel will receive a visitor’s badge at the VCC with the length of access allowed. The maximum access length for visitor badging is one (1) year. Once issued a valid visitor’s badge Contractor personnel may enter any Manned Access Control Point/Gate. All Contractor personnel and their vehicles, equipment, and packages are subject to inspection or examination (search) at entry/exit of all Army installations on the island of Oahu and Pohakuloa Training Area (PTA) on the Island of Hawaii. Contractor and all associated sub‐contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC‐III) and Terrorist Screening Database (Army Directive 2014‐05/AR 190‐13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative); or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.

2.5.1.3.3 ACCESS TO ARMY INSTALLATIONS – PERSONNEL AND VEHICLES.

The Government recognizes the important roles companies like you play in our day-to-day operations. That is why USAG Hawaii is enhancing the current access control solution called the Automated Installation Entry (AIE) Program. This program supports the security requirements while offering a streamlined access procedure for vendors, contractors, sub-contractors, suppliers and service providers. This program is available to new and existing personnel who require access to USAG Hawaii and are not authorized to receive a Department of Defense CAC and desire a streamlined entry into the installation. Sponsorship and participation at each USAG Hawaii location (e.g., Schofield Barracks, Wheeler Army Airfield, Fort Shafter, Tripler Army Medical Center, Pililaau Army Recreation Center and Pohakuloa Training Area) is required.

AIE Credential holders may access the installation through any of the USAG Hawaii Gates that size allows and will only be subject to random inspections.

Companies that choose not to participate in the AIE Program will have limited access through the Schofield Barracks Lyman gate, Fort Shafter’s Buckner Gate and Tripler Army Medical Center Main Gate. All employees will be required to go through the inspection area and will be subject to the standard access control procedures, security screenings, and/or vehicle inspections.

*Access control changes can occur at any time due to security requirements

Companies that service USAG Hawaii facilities may initiate enrollment in the AIE Program by contacting the Contracting Officer’s Representative (COR).

If you have questions regarding the AIE Program at USAG Hawaii, please contact Security Branch Operations, at 808-656-0232.

· AIE Program Enrollment Process for Background Check and Process to obtain AIE Badge

Enroll your company by contacting the COR who will be the Sponsor. The COR will provide the excel spreadsheet for the list of contractor employee information. The following information is required from the contractor: last name, first name, date of birth, status, social security number, company name, and contract number. The COR will complete the Sponsor information and provide the list to the Directorate of Emergency Services (DES) Access Control Division. The DES will conduct a background check to vet personnel prior to arrival to pick up their AIE Badge and will ensure a more efficient process while saving time.

The AIE Program performs background screening and credentialing.

DES will contact the COR (Sponsor) once the background checks have been validated to schedule a time for the contractor employees to go to one of the registration locations and complete the process to obtain the AIE Badge.

Contractor employees should bring an acceptable form of identification (see List A and List B) to the appointment. Upon arrival, a photo will be taken to complete the process. Employees will be issued their AIE Badge, which they will use for access to the installation.

Forms of Acceptable Identification for picking up your credential:

List A - One (1) needed

U.S. Passport (unexpired)

Permanent Resident Card or Alien Registration Receipt Card (Form I-551)

Unexpired foreign passport, with I-551 stamp or attached Form I-94 indicating unexpired employment authorization

Unexpired Employment Authorization Document that contains a photograph (Form I-766, I-688, I688A, I-688B)

List B – Two (2) needed

Driver’s license or ID card issued by a state

ID Card issued by federal, state or local government agencies or entities

School ID card with a photograph

Voter’s registration card

U.S. Military card or draft record

Military Dependent’s ID card

U.S. Coast Guard Merchant Mariner Card

Native American tribal document

Driver’s license issued by a Canadian government authority

U.S. Social Security card issued by the Social Security Administration

Certification of Birth Abroad issued by the Department of State (Form FS-545 or Form DS-1350)

Original or certified copy of a birth certificate issued by a state, county, municipal authority or outlying possession of the United States bearing an official seal

U.S. Citizen ID Card (Form I-197)

ID Card for use of Resident Citizen in the United States (Form I-179)

Unexpired employment authorization document issued by DHS (other than those listed under List A)

2.5.1.4 Physical Security. N/A

2.5.1.5 Secure Area Access. N/A

2.5.1.6 Employee Terminations. When an employee is terminated from employment on the contract for any reason, the Contractor shall have an out-processing checklist that identifies the Government issued Installation Access Badge/Pass has been turned into the COR and property items accounted for and back in proper custody. A signature shall be required on the checklist from the appropriate person acknowledging receipt of the items. Checklists shall be retained for the duration of the contract.

2.5.1.7 Departing Employees. The Contractor shall ensure Contractor employees return security photographic identification cards, permits, CAC, GFP, keys, photo passes, range passes, sensor access (slide) cards and that access to the LAN email has been canceled. All out-processing Contractor employee CACs must be returned to the COR no later than close of business on the last workday. A formal termination or departing memo must be submitted to the COR and security office with the requested items stating they have been collected.

2.5.1.8 Key Control. N/A

2.5.2 Anti-Terrorism/Operation Security Requirements.

2.5.2.1 AT Level I training.

This standard language is for contractor employees with an area of performance within an Army controlled installation, facility or area. All contractor employees, including subcontractor employees, requiring access to Army installations, facilities and controlled access areas shall complete AT Level I Awareness training within thirty (30) calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer, if a COR is not assigned, within five (5) calendar days after completion of training by all employees and subcontractor personnel. AT level I Awareness training is available at the following website: http://jko.jten.mil.

2.5.2.2 Access and general protection/security policy and procedures.

This standard language is for contractor employees with an area of performance within Army controlled installation, facility, or area. Contractor and all associated subcontractor employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.

2.5.2.3 For contractors that do not require CAC but require access to a DoD facility installation.

Contractor and all associated sub-contractors’ employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative); or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.

2.5.2.4 iWATCH Training. This standard language is for contractor employees with an area of performance within an Army controlled installation, facility or area. The contractor and all associated sub-contractors shall brief all employees on the local iWATCH Army program (training standards provided by the requiring activity ATO). This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within thirty (30) calendar days of contract award and within five (5) calendar days of new employees commencing performance with the results reported to the COR NLT thirty (30) days after contract award.

2.5.2.5 For contracts that require a formal OPSEC program.

The contractor shall develop an OPSEC Standing Operating Procedure (SOP)/Plan within ninety (90) calendar days of contract award, to be reviewed and approved by the responsible Government OPSEC officer. This plan will include a process to identify critical information, where it is located, who is responsible for it, how to protect it and why it needs to be protected. The contractor shall implement OPSEC measures as ordered by the commander. In addition, the contractor shall have an identified certified Level II OPSEC coordinator per AR 530-1.

2.5.2.5.1 For contracts that require OPSEC Training.

Per AR 530-1, Operations Security, the contractor employees must complete Level I OPSEC Awareness training. New employees must be trained within thirty (30) calendar days of their reporting for duty and annually thereafter.

2.5.2.6 Controlled Unclassified Information (CUI).

Include DFARS clause 252.204-7012, which requires the contractor to comply with NIST 800-171. Also include DFARS provision 252.204-2019 into solicitations. Acquisition officials should follow procedures outlined in DFARS 204.73 and verify vendors have an adequate NIST SP 800-171 summary assessment score within the Supplier Performance Risk System (within PIEE). If the score doesn’t show a medium- or high-level assessment with a score of 110 or better (as described in the “NIST SP 800-171 DoD Assessment Methodology”), include clause 252.204-7020 and obtain the vendor’s “system security plan” and “plan of action” for NIST SP 800-171 verification and assurance by Army security officials.

2.5.2.7 Threat Awareness Reporting Program.

For all contractors with security clearances. Per AR 381-12 Threat Awareness and Reporting Program (TARP), contractor employees must receive annual TARP training by a CI agent or other trainer as specified in 2-4b.

Performance Standard:

STD: The Contractor shall submit completed training certificates within five (5) calendar days of start of contract and new employees commencing performance.

AQL: 0%

Deliverable A004 Training Completion Certificates

2.5.3 Safety. The Contractor shall safeguard and maintain all Government and Contractor property, as well as provide for the safety and well-being of personnel employed under this contract. The Contractor shall comply with AR 385-10, The Army Safety Program.

2.5.3.1 Safety Plan. The Contractor shall develop and implement a safety program for its employees. The Contractor shall submit the Safety Plan to the KO for review and acceptance within ten (10) days of commencement of work. Revisions shall be submitted five (5) calendar days prior to the effective date of change.

Deliverable A002 Safety Plan

2.5.3.2 Occupational Safety and Health. The Contractor shall comply with the Occupational Safety and Health Administration (OSHA) standards. The Contractor shall comply with all applicable Federal, State, and local laws, regulations, and directives.

2.5.4 Training, Physical Requirements, or other Expertise Required.

2.5.4.1 The Contractor shall ensure all Contractor’s employees and associated subcontractors are certified or licensed in the specific areas required by the State of Hawaii. The Contractor shall ensure employees are certified or licensed in the appropriate Environmental Protection Agency (EPA) areas required. The Contractor shall ensure all required documentation of certification or licensure for Contractor personnel are filed with the COR/ACOR within twenty-four (24) hours prior to employees commencing performance.

2.5.5 Environmental Requirements.

2.5.5.1 Green Procurement. Section 6002 of the Resource Conservation and Recovery Act of 1976 (RCRA) requires the use of recycled and recovered products identified in the EPA’s Comprehensive Procurement Guidelines.

2.5.5.2 The Contractor shall use these recycled or recovered products unless they cannot be procured within a reasonable period of time not to exceed seven (7) calendar days; at prices not to exceed five (5) percent of prevailing rates; or the product(s) does not meet technical or performance standards. EPA Guidelines are the minimum requirement. The Contractor shall use materials and products commonly used in industry. The Contractor shall maintain records and submit an annual report to the COR/ACOR, along with the annual certification required by FAR 52.223-9 (Certification and Estimate of Percentage of Recovered Material Content for EPA Designated Items), upon completion of the base year and each option year.

2.5.5.3 Environmental Compliance. The Contractor shall comply with all Federal, State, local, and installation environmental laws, rules, plans, and policies. The Contractor shall use and store all materials, chemicals, and equipment used in the performance of services on the installation IAW with industry standards, local, State and Federal laws, and according to manufactures' recommendations. The Contractor shall be financially responsible for all fines and associated costs for hazardous waste management, transportation, and disposal of waste due to the Contractor's non-compliance. The Contractor shall submit Safety Data Sheets (SDS) for approval on all materials, five (5) days before delivery of the material, to the COR/ACOR. The Contractor shall provide upon request from the COR/ACOR all required data to meet environmental-mandated reporting requirements (e.g., air emission data, hazardous material storage/usage, herbicide/pesticide usage, solid/hazardous waste generation). The Contractor shall provide data to meet reporting deadlines and during compliance inspections upon request from the COR/ACOR.

2.5.5.4 Spill Plan. N/A

2.5.6 Contingency Plans.

2.5.6.1 General. The Contractor shall establish, maintain, and implement contingency plans for mobilization, disaster, and labor dispute contingencies. The plans shall assume no Government support to the Contractor workforce. The Contractor shall, within thirty (30) days of contract award, designate in writing a single contact Designated Contingency Coordinator (DCC) within the Contractor’s organization. The DCC shall participate and coordinate with the installation contingency and mobilization planning activities. The DCC shall participate in the installation mobilization planning and execution conferences; and shall modify and maintain appropriate Contractor contingency plans to compliment or enhance corresponding installation plans. The Contractor shall submit all plans to the KO for approval.

2.5.6.2 Mobilization Contingency Plan. N/A

2.5.6.3 Disaster Contingency Plan. N/A

2.5.6.4 Dispute Contingency Plan. This plan shall establish procedures and identify responsible personnel to provide the services below, with no interruption in the event of a labor dispute:

a. Identify and address critical Preventive Maintenance and inspection tasks,

b. Maintain electrical emergency generators, and

c. Process and execute emergency and urgent service and work orders.

The plan shall establish procedures and time frame to secure replacement personnel in the event of a strike; and shall also record the Contractor’s experience with and establish Contractor procedures for collective bargaining. The Contractor shall submit a Labor Contingency Plan NLT contract start date.

Deliverable A008 Contingency Plan

2.5.6.5 Plan Updates. The Contractor shall update these plans as changes occur and shall submit a copy of the proposed plan to the KO for approval at least thirty (30) days prior to the proposed effective date of the updated plan.

2.6 Job Order Contract (JOC) Quality Assurance (QA)/Inspection Support. N/A

2.6.1 Project Support. N/A

3.0 Performance Requirements and Standards.

3.1 High Level Objectives (HLO).

3.1.1 Performance Task Requirements, Standards and Acceptable Quality Levels (AQLs).

3.1.1.1 Damage Caused by Contractor. Damages caused by Contractor employees shall be repaired at no cost to the Government. The Contractor shall notify the COR/ACOR and return the damaged area to its previous condition. The Contractor shall furnish all labor, materials, and equipment to perform the repair work including cultivating and applying seed, sprigging, or placing sod. The Contractor shall maintain all turf repair work to ensure successful growth.

3.1.1.1.2 Damage Report. The Contractor shall submit a monthly damage report to the COR/ACOR that annotates the damage, corrective action, and date corrected.

3.2 Transition Plan (Phase In/Phase Out).

Phase-In (New Contractor): The Contractor shall submit a transition plan within ten (10) calendar days of contract award. The transition period shall not exceed thirty (30) calendar days from contract start. During this period, the Contractor shall: obtain all required licenses and permits; register personnel for installation access under the AIE Program; submit the Quality Control Plan, Safety Plan, and Spill Plan for COR approval; and confirm the first work order acknowledgment schedule. The Contractor shall be fully operational by day one (1) of the performance period.

Phase-Out: Thirty (30) calendar days prior to contract expiration or termination, the Contractor shall return all Government-issued access badges and visitor passes to the COR, provide the successor contractor with copies of all approved plans and standing pickup schedules, and cooperate with site visit access for prospective offerors if requested by the CO.

Deliverable A001 Transition Plan

4.0 Performance Requirements Summary (PRS) Matrix.

Required Services /Performance Object

PWS Paragraph Number
Performance Standard
Maximum Allowable Degree of Deviation from Requirement (AQL Level)
Incentive/ Disincentive
Work Requests
8.2.1
a) STD: The Contractor shall acknowledge receipt of the work order request by submitting an email to the COR or AI within one (1) business day.
AQL: 5%

Non-conforming services will result in Non-Conforming Reports issued to Contractor and potential negative CPARS report.

Routine Service Calls/Assessments
8.3
a) STD: The Contractor shall conduct an on-site assessment within two (2) business days of DMO acknowledgement to diagnose the reported malfunction. During this visit, the Contractor shall also perform any basic corrective actions that can be completed without requiring new parts.
AQL: 5%
Non-conforming services will result in Non-Conforming Reports issued to Contractor and potential negative CPARS report.
Pre-Priced Repairs identified during Routine Service Calls & Assessments.
8.4
a) STD: The Contractor shall complete repairs during the initial visit if parts are available; otherwise, repairs shall be completed on the next available day coordinated with the unit point of contact (POC).
AQL: 10%
Non-conforming services will result in Non-Conforming Reports issued to Contractor and potential negative CPARS report.
Quoted Task Order Repairs identified during Routine Service Calls/Assessments
8.5
a) STD: The Contractor shall submit a complete and detailed quote for all Quoted Task Order Repairs (i.e., repairs that are not pre-priced) identified during assessment. Following the award of a task order, the repair must be completed no later than two (2) working days after all necessary parts are received.
AQL: 10%
Non-conforming services will result in Non-Conforming Reports issued to Contractor and potential negative CPARS report.
Unserviceable Appliance Replacement and Disposal
8.6
a) STD: The Contractor shall perform the complete appliance turnover, including passing a full operational test of the new unit, within two (2) business days of the condemnation assessment or as scheduled based on the Government POC's availability. This requirement is fulfilled only upon the successful operational test and the documented return of the condemned appliance to the designated DPW Housing warehouse.
AQL: 5%
Non-conforming services will result in Non-Conforming Reports issued to Contractor and potential negative CPARS report.
Monthly Service Report/Invoice
8.7
a) STD: The Contractor shall submit accurate monthly service reports by the fifth (5th) business day and all required invoices by the fifth (5th) of each month, in accordance with PWS requirements.
AQL: 10%
Non-conforming services will result in Non-Conforming Reports issued to Contractor and potential negative CPARS report.

4.1 Quality Assurance

. The Government will evaluate the Contractor’s performance under the contract IAW the Government’s Quality Assurance Surveillance Plan (QASP). QASPs are considered to be "living documents," dynamic, adaptable, and subject to modification based on Contractor performance surveillance results. The QASP is not part of the PWS and will not be issued with the solicitation. The QASP focuses on the procedures and processes the Government will implement to assure the Contractor is performing IAW the performance standards within the PWS. The Government plan defines the criteria for how the Contractor’s performance will be evaluated, the frequency of surveillance, and the items to be inspected. Although the Government will develop a QASP, Government surveillance of Contractor performance is not limited to the QASP, or the performance objectives, outlined in the Performance Requirements Summary (PRS). The Government retains the right to evaluate all services required by the contract. The Government will perform inspections and tests in a manner that will not unduly delay the work. If any of the services performed do not conform to contract requirements, the Contractor shall perform the services again at no additional cost to the Government.

4.2 Quality Control Plan (QCP)

. Quality control is the responsibility of the Contractor.

The Contractor shall develop, implement, and maintain an effective quality control program which shall be documented in a QCP to ensure services are performed IAW this PWS. The Contractor shall develop and implement procedures to identify and prevent the recurrence of defective services. The Contractor’s QCP is the means by which they assure themselves that the work conforms to contract requirements. The basic principle of the plan is that the Contractor is responsible for quality control. The QCP shall be constructed in such a manner that each CLS service can be extracted and used for that function only and not contain extraneous information. The Contractor's QCP shall include a separate section, which addresses the Contractor's method of managing quality of work. The QCP shall include a description of the inspection system to address services listed in this PWS, and a description of the methods to be used for identifying and preventing defects in the quality of services performed. The plan shall include a description of the Contractor’s inspection system to include specifics as to areas to be inspected on a scheduled and unscheduled basis, frequency of inspections, and the title and organizational placement of the Contractor’s inspectors. No lead person or first line supervisor shall be considered a Quality Control Inspector. The Contractor shall develop, maintain, and submit a QCP to the KO for acceptance within thirty (30) calendar days after the contract is awarded. The Contractor shall submit any proposed changes in the QCP to the KO for written approval five (5) working days prior to implementation.

Deliverable A003 Quality Control Plan

5.0 Common Levels of Service (CLS)

. N/A

6.0 Deliverables

A001 Transition Plan A002 Safety Plan A003 Quality Control Plan A004 Training Completion Certificates A005 Monthly Service Report (EXHIBIT 2 Status Report)

7.0 Related Documents.

7.1 Definitions and Acronyms

7.1.1 Definitions.

7.1.1.1 Acceptable Quality Level (AQL). To ensure high performance standards, the Acceptable Quality Level (AQL) is the maximum percent defective (or number of defects per hundred units) permitted for work to be deemed satisfactory. A lower AQL reflects a stricter standard and a narrower margin for error. For the purposes of sampling inspection, any identified defect over the threshold will result in non-acceptance. For instance, an AQL of 5% requires the Contractor to maintain at least a 95% compliance rate.

7.1.1.2 Alternate Contracting Officer’s Representative (ACOR). An employee of the U.S. Government provided by the RA and appointed by the KO to provide support to CORs in monitoring and documenting the Contractor’s performance. These alternate surveillance support personnel will serve as on-site representatives of the COR in performance of actual contract surveillance if they meet all COR training, experience requirements, and are appointed by the KO as an ACOR.

7.1.1.3 Ashes. The residue from burned wood, coal, coke, and other combustible material.

7.1.1.4 Bulk Waste. Large items of solid waste such as household appliances, furniture, auto parts, pallets, shelving, piping, stone, concrete rubble, brick, lumber, toys, and other wastes; the size or weight of which precludes or complicates the handling by normal collection, processing, or disposal methods.

7.1.1.5 Bulky Waste. The waste placed at the collection point or curbside that doesn't fit or is too heavy to be placed in the routine collection container. These wastes include but are not limited to lumber, scrap metals, bricks, blocks, concrete rubble, stones, toys, furniture, appliances, logs, limbs, televisions, cabinets, automotive components, power equipment, crates, wheels, de-rimmed tires, electronics and their components, etc.

7.1.1.6 Cannibalize. Remove parts from…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .