Tank 1_25649_Tank 2_25647_Molinelli.pdf

PDF 1 MB Posted

Attached to
Fort Novosel, AL Tank Inspection
Solicitation number
PANNWD-25-P-0000-003355
Issued by

About this file

This file contains a series of dated inspection photographs showing two storage tanks (Tank 1 #25649 and Tank 2 #25647) at what appears to be a military facility. The images, taken on September 24, 2024, provide front, side, rear side, and rear views of both tanks, which are large white cylindrical structures with safety railings and access stairs mounted on concrete containment pads.

The documentation indicates Tank 1 (#25649) has an API 653 inspection date of May 2, 2024, while Tank 2 (#25647) has an API 653 inspection date of February 18, 2015. Both tanks appear to be well-maintained industrial storage vessels with associated piping, valves, and safety equipment visible in the photographs. The images provide visual documentation of the tanks' current condition and configuration from multiple angles, likely for inspection and maintenance planning purposes.

View the file

Other files

File Type Posted
Response to contractor questions.pdf PDF
Attachment J4 - DIESEL TANK 908 (NOW D-2) INSPECTION_10 MAY 2016.pdf PDF
Attachment F - SP-POL-CMP-INSPECT-FY25- NVL API Internal Inspection Template.docx DOCX document
Attachment C - SP-POL-CMP-INSPECT-FY25-NVL Tank Data Sheet.pdf PDF
Service Contract Act WD 2015-4631 dated 23Dec24.pdf PDF
Attachment 1 CLIN Schedule.pdf PDF
Attachment G - SP-POL-CMP-INSPECT-FY25-NVL Return To Service Letter.docx DOCX document
Diesel Tank Side View.pdf PDF
Installation Questions - (PO 26) SP-POL-CMP-INSPECT-FY25-NVL.pdf PDF
Attachment J1 - API 653_Molinelli Tank 2_18 Feb 2015.pdf PDF
MOGAS Tank Front View.pdf PDF
Attachment J3 - MOGAS TANK 901 (NOW M-1) INSPECTION_10 MAY 2016.pdf PDF
Attachment B - SP-POL-CMP-INSPECT-FY25-NVL.pdf PDF
MOGAS Tank Side View.pdf PDF
Combined Synopsis Solicitation.pdf PDF
Attachment J2 - DIESEL TANK 900 (NOW D-1) INSPECTION_10 MAY 2016.pdf PDF
Attachment H - SP-POL-CMP-INSPECT-FY25-NVL STI External Inspection Template.docx DOCX document
Attachment A - SP-POL-CMP-INSPECT-FY25-NVL General Installation Security Requirements.pdf PDF
Attachment E - SP-POL-CMP-INSPECT-FY25- NVL Inspection Telecon Briefing Template.docx DOCX document
Attachment 2 PerformanceWork Statement.pdf PDF
Attachment D - SP-POL-CMP-INSPECT-FY25-NVL.xlsx XLSX spreadsheet
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

25649/TANK 1 API 653 ON

2 MAY 2024

25647/TANK 2 API 653 ON

18 FEB 2015

FRONT VIEW

25647/TANK 2 API 653 ON

25649/TANK 1 API 653 ON

FRONT VIEW

25649/TANK 1 API 653 ON

SIDE VIEW

REAR SIDE VIEW

25649/TANK 1 API 653 ON

REAR VIEW

SIDE VIEW

File details come from the government source that posted it. Updated .