Installation Questions - (PO 26) SP-POL-CMP-INSPECT-FY25-NVL.pdf

PDF 520 KB Posted

Attached to
Fort Novosel, AL Tank Inspection
Solicitation number
PANNWD-25-P-0000-003355
Issued by

About this file

This is an installation questionnaire document detailing the requirements and logistics for tank inspections at Fort Novosel, AL. The document covers two separate inspection tasks: an API 653 Internal Inspection for FAC 25647 Tank 2, and STI External inspections with strapping charts for Tanks 900, 901, and 908.

The document provides detailed facility information including access requirements (CAC cards acceptable but contractors cannot escort subcontractors), tank locations, utility availability (electricity and water within 200-300 feet), manway specifications, and environmental requirements. Key operational notes include that one diesel tank must remain operational for emergency vehicles at all times, with the capability to take down one diesel tank and the Mogas tank simultaneously. The contractor is responsible for fuel transfer and storage of up to 3,000 gallons of F-24 fuel for one tank and 1,500 gallons of Mogas fuel for another. The installation requires 6 weeks advance notice prior to contractor arrival, and since the last inspection in 2016, the tank configuration has changed from 1 diesel/2 Mogas tanks to 2 diesel/1 Mogas tank.

View the file

Other files

File Type Posted
Response to contractor questions.pdf PDF
Attachment J4 - DIESEL TANK 908 (NOW D-2) INSPECTION_10 MAY 2016.pdf PDF
Attachment F - SP-POL-CMP-INSPECT-FY25- NVL API Internal Inspection Template.docx DOCX document
Attachment C - SP-POL-CMP-INSPECT-FY25-NVL Tank Data Sheet.pdf PDF
Service Contract Act WD 2015-4631 dated 23Dec24.pdf PDF
Attachment 1 CLIN Schedule.pdf PDF
Attachment G - SP-POL-CMP-INSPECT-FY25-NVL Return To Service Letter.docx DOCX document
Diesel Tank Side View.pdf PDF
Attachment J1 - API 653_Molinelli Tank 2_18 Feb 2015.pdf PDF
MOGAS Tank Front View.pdf PDF
Attachment J3 - MOGAS TANK 901 (NOW M-1) INSPECTION_10 MAY 2016.pdf PDF
Tank 1_25649_Tank 2_25647_Molinelli.pdf PDF
Attachment B - SP-POL-CMP-INSPECT-FY25-NVL.pdf PDF
MOGAS Tank Side View.pdf PDF
Combined Synopsis Solicitation.pdf PDF
Attachment J2 - DIESEL TANK 900 (NOW D-1) INSPECTION_10 MAY 2016.pdf PDF
Attachment H - SP-POL-CMP-INSPECT-FY25-NVL STI External Inspection Template.docx DOCX document
Attachment A - SP-POL-CMP-INSPECT-FY25-NVL General Installation Security Requirements.pdf PDF
Attachment E - SP-POL-CMP-INSPECT-FY25- NVL Inspection Telecon Briefing Template.docx DOCX document
Attachment 2 PerformanceWork Statement.pdf PDF
Attachment D - SP-POL-CMP-INSPECT-FY25-NVL.xlsx XLSX spreadsheet
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PO 26 SP-POL-CMP-INSPECT-FY25-NVL

Type of Inspection Type of Inspection - API 653 Internal Inspection STI External with Strapping Charts Installation POC: Miguel Morales (334-685-2424) FAC 25647 Tank 2 Tank 900, Tank 901, and Tank 908

Installation Remarks Installation Remarks

1. Above/Below Ground tanks? [If below stop here & let PgM, SCP, DLA know] Above Above

2. Currently In-Service? [If not, date went out] Yes Yes

3. Can you send pictures of the tank? (Ensure you are looking in OD47 for previous tank inspections as there are already photos on these reports.) See attached See separate attachments

4. Is there roof access? Ladder? Walkway? On site Man-lift? [if Man-Lift needed is operator avail?] Yes/ Steps on side of tank 24" manway with an individual ladder and small access platform

5. If contractors have CAC are those acceptable for base access? Yes Yes

6. Can contractors escort the subcontractors?

NO, They need to go through the visitors' center at one of the main gates.

NO, They need to go through the visitors' center at one of the main gates.

7. What is the Tank location on base [general area]?

Tanks are located approximately 25 minutes off the installation

Tanks are located at the intersections of Nighthawk, M and N streets on the installation.

8. Are photographs ok to take for the reports? Are there any restrictions? Yes/Restricted to the tank farm Yes. Restricted to the Service Station

9. Is electricity and water available and if so, how far away from tank? [cleaning purposes] Yes. Aprox. 200-300 feet

Electricity at the Service Station. Water is located approximately 300 feet from the service station.

a. Does the contractor need to pay for utilities used during inspection (water/electricity)? No NO

10. How many and what sizes are the manways? Two, 36" manways One 24" manway on each tank

11. Need Base Emergency info and Onsite Base POCs contact info:

For Emergency dial, 911. POC: Mr. Morales, 334-685-2424, Email: miguel.a.morales17.civ@army.mil For Emergency dial, 911. POC: Mr. Morales, 334-685-2424, Email: miguel.a.morales17.civ@army.mil

12. Base Environmental requirements – POC Information, waste manifest required?

Travis Farmer, Cell: 334-790-8433, Email:

travis.a.farmeri.civ@army.mil Travis Farmer, Cell: 334-790-8433, Email:

travis.a.farmeri.civ@army.mil

13. Will the installation set the legs to the maintnance (high) position for for this Out-of-Service (OOS) internal inspection?

Contractor is responsible for setting the legs to maintenance level and returning to operational level after inspection

N/A

15. (OOS) (Internal Inspections): When was the last time the wiper seal was replaced? Would the stakeholders like it replaced now? We ask so we aren’t committing the government to anything without authorization.

Wiper seal will be replaced Manway seals will be replaced

16. Base GPS address: LAT: N- 31° 28' 43.25" LONG: W- 85° 50' 42" LAT: N- 31° 19' 27.421" LONG: W- 85° 42' 21.907"

17. (OOS) One Tank at a time or can all three tank be out of service at the same time? (standard is phased): NA

One diesel tank and the Mogas tank can be taken down at the same time. 1 Diesel tank needs to be operational for emergency vehicles. Once the first diesel tank is completed, we have the capability of transferring the remaining diesel fuel from one tank to another.

NOTE 1: SINCE LAST INSPECTION (2016), WE CHANGED FROM

1 DIESEL TANK AND 2 MOGAS TANKS, TO 2 DIESEL TANKS AND

1 MOGAS TANK. NOTE 2: WE WILL NEED AT LEAST 6 WEEKS

ADVANCE NOTICE PRIOR TO CONTRACTOR'S ARRIVAL DATE

Information provided by installation

Contractor is responsible for providing storage, transfering, and returning up to 3,000 gallons of F-24 fuel.

14. Fuel transfer & storage

For the 2 diesel STI tanks: once the first diesel tank is completed, Installation has the capability of transferring the remaining diesel fuel from one tank to another. For the 1 mogas STI tank: Contractor is responsible for providing storage, transfering, and returning up to 1,500 gallons of mogas fuel.