Diesel Tank Side View.pdf

PDF 181 KB Posted

Attached to
Fort Novosel, AL Tank Inspection
Solicitation number
PANNWD-25-P-0000-003355
Issued by

About this file

This is a side view image of a large white cylindrical diesel storage tank located at what appears to be Fort Novosel, AL. The tank appears to be industrial grade with safety railings on top, multiple access ports, and connecting piping/equipment visible on one end. The tank capacity marking indicates 18,900 gallons. The tank is mounted horizontally on concrete supports and appears to be properly installed with standard safety and access features. Based on the timestamp shown, the image was taken on November 07, 2024 at 1:14 PM. This appears to be one of the tanks (potentially Tank 901, 902, or 908) referenced in the contract opportunity that requires STI inspection and strapping chart development.

View the file

Other files

File Type Posted
Response to contractor questions.pdf PDF
Attachment J4 - DIESEL TANK 908 (NOW D-2) INSPECTION_10 MAY 2016.pdf PDF
Attachment F - SP-POL-CMP-INSPECT-FY25- NVL API Internal Inspection Template.docx DOCX document
Attachment C - SP-POL-CMP-INSPECT-FY25-NVL Tank Data Sheet.pdf PDF
Service Contract Act WD 2015-4631 dated 23Dec24.pdf PDF
Attachment 1 CLIN Schedule.pdf PDF
Attachment G - SP-POL-CMP-INSPECT-FY25-NVL Return To Service Letter.docx DOCX document
Installation Questions - (PO 26) SP-POL-CMP-INSPECT-FY25-NVL.pdf PDF
Attachment J1 - API 653_Molinelli Tank 2_18 Feb 2015.pdf PDF
MOGAS Tank Front View.pdf PDF
Attachment J3 - MOGAS TANK 901 (NOW M-1) INSPECTION_10 MAY 2016.pdf PDF
Tank 1_25649_Tank 2_25647_Molinelli.pdf PDF
Attachment B - SP-POL-CMP-INSPECT-FY25-NVL.pdf PDF
MOGAS Tank Side View.pdf PDF
Combined Synopsis Solicitation.pdf PDF
Attachment J2 - DIESEL TANK 900 (NOW D-1) INSPECTION_10 MAY 2016.pdf PDF
Attachment H - SP-POL-CMP-INSPECT-FY25-NVL STI External Inspection Template.docx DOCX document
Attachment A - SP-POL-CMP-INSPECT-FY25-NVL General Installation Security Requirements.pdf PDF
Attachment E - SP-POL-CMP-INSPECT-FY25- NVL Inspection Telecon Briefing Template.docx DOCX document
Attachment 2 PerformanceWork Statement.pdf PDF
Attachment D - SP-POL-CMP-INSPECT-FY25-NVL.xlsx XLSX spreadsheet
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .