About this file

Proposed Equals Form

View the file

Other files

File Type Posted
Amendment_012.pdf PDF
224923_WAMO_Amendment_No._1.pdf PDF
224923_WAMO_28_31_11_Amendment_DIGITAL,_ADDRESSABLE_FIRE-ALARM_SYSTEM.pdf PDF
P17PS00352_Amendment_011.pdf PDF
NAMA_151073_-_Amendment_10_Solicitation_Questions.pdf PDF
P17PS00352_Amendment_04_SF30.pdf PDF
P17PS00352_Amendment_010.pdf PDF
Amendment_009_P17PS00352.pdf PDF
1_NAMA_151073_AMENDMENT_8_CS0-1_-_COVER_SHEET.pdf PDF
NAMA_151073_-_Solicitation_Questions_Amendment_8.docx DOCX document
P17PS00352_Amendment_8_SF30.pdf PDF
2_NAMA_151073_AMENDMENT_8_C1.4_SITE__UTIL_II.pdf PDF
2_P17PS00352_Amendment_07_SF30.pdf PDF
1_NAMA_151073_-_Solicitation_Questions_for_Amendment_07_070717_330pm.pdf PDF
1_NAMA_151073_-_Solicitation_Questions_and_Answers_070617_1045am.pdf PDF
4_P17PS00352_Amendment_06_SF30.pdf PDF
2_NAMA_151073_CS0-1_-_COVER_SHEET_R2.pdf PDF
3_NAMA_151073_A5-1_-_ELEVATIONS_-_CURTAIN_WALL_MOCK-UP_R2.pdf PDF
4_NAMA_151073_CS0-1_-_COVER_SHEET.pdf PDF
1_NAMA_151073_-_Solicitation_Questions_and_Answers_063017_1500.pdf PDF
6_P17PS00352_Amendment_5_SF30.pdf PDF
3_Preproposal_Conference_Slides_.ppt PPT presentation
5_NAMA_151073_A5-1_-_ELEVATIONS_-_CURTAIN_WALL_MOCK-UP.pdf PDF
2_NAMA_151073_-_WAMO_PreBid_Sign_In_Sheet.pdf PDF
Amendment_3_Questions_&_Answers.docx DOCX document
Amendment_3_to_P17PS00352.pdf PDF
Experience_Form.doc DOC document
Amendment_002_P17PS00352.pdf PDF
Past_Performance_Questionnaire.doc DOC document
KeyPers.doc DOC document
GeneralReferences.doc DOC document
HazmatForm.doc DOC document
B08_Subcontracting_Plan.pdf PDF
P17PS00352Amendment_001.pdf PDF
NAMA_224923_Elevator_Full_Drawing_Set.pdf PDF
Appendix_F_-_NAMA_224923_Elevator_Machine_Test_Report.pdf PDF
NAMA_151073_VSF_Drawing_Set_pgs_30-61.pdf PDF
Solicitation_P17PS00352.pdf PDF
Wage_Determination_DBA_DC170002_06092017_DC2.pdf PDF
Appendix_D_-_NAMA_151073_Finite_Element_Analysis_of_Proposed_Excavation_Feb2017.pdf PDF
Appendix_E_-_NAMA_224923_Elevator_Operational_Integrity_Report.pdf PDF
Appendix_C_-_NAMA_151073_Subsurface_Investigation_Nov2011.pdf PDF
NAMA_151073_VSF_Drawing_Set_pgs_1-29.pdf PDF
Appendix_A_-_Washington_Monument_Subsurface_Investigation_2002_Soils.pdf PDF
NAMA_224923_Elevator_Specifications_Combined.pdf PDF
Wage_Determination_SCA_WD_78-1183_Rev_56_042517.pdf PDF
NAMA_151073_VSF_Specifications_Combined.pdf PDF
NAMA_151073_VSF_Drawing_Set_pgs_62-128.pdf PDF
Appendix_B_-_NAMA_151073_Final_Geoarch_Report_Sept2011.pdf PDF
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROPOSED EQUALS

In accordance with Provision 52.211-06 (Section L), the following products are being proposed as equals. Provide all attachments required by the provision, as applicable. Use additional sheets of paper as necessary.

Section No.
Paragraph No.
Product/Model No.
Proposed Product/Model No.

A.

By submitting the proposed equal, the contractor certifies that it:

1.

Has investigated the proposed item and determined that it is equal or superior in all respects to that specified.

2.

Will provide, as a minimum, the same warranties for the proposed item as for the item specified.

3.

Has determined that the proposed item is compatible with interfacing items.

4.

Will coordinate the installation of an approved item and make all changes required in other elements of the work because of the substitution.

5.

Waives all claims for additional expenses that may be incurred as a result of the substitution.

B. The Contractor is encouraged to submit for approval products that exceed accessibility standards, are sustainable and/or made from recycled or environmentally responsible material. Every effort will be made to approve these materials.

File details come from the government source that posted it. Updated .