Appendix_C_-_NAMA_151073_Subsurface_Investigation_Nov2011.pdf
PDF 6 MB Posted
- Solicitation number
- P17PS00352
About this file
Appendix c Subsurface investigation
View the file
Other files
Show all 49
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Alfred H. Brand David M. Cacoilo Peter W. Deming James L. Kaufman Roderic A. Ellman, Jr.
Francis J. Arland Partners
David R. Good Walter E. Kaeck Associate Partners
Hugh S. Lacy Joel Moskowitz George J. Tamaro Peter H. Edinger Elmer A. Richards Edmund M. Burke John W. Fowler Consultants
Raymond J. Poletto Thomas R. Wendel Theodore Popoff Domenic D�’Argenzio Robert K. Radske Harro R. Streidt Ketan H. Trivedi Hiren J. Shah Alice Arana Joel L. Volterra Tony D. Canale Jan Cermak Sissy Nikolaou Senior Associates
Michael J. Chow Douglas W. Christie Dong K. Chang Anthony DeVito Frederick C. Rhyner Gregg V. Piazza Pablo V. Lopez Steven R. Lowe Sitotaw Y. Fantaye Ira A. Beer James M. Tantalla Andrew R. Tognon T. C. Michael Law Associates
Joseph N. Courtade Director of Finance and Administration
Martha J. Huguet Director of Marketing
Mueser Rutledge Consulting Engineers 14 Penn Plaza · 225 West 34th Street · New York, NY 10122 Tel: (917) 339-9300 · Fax: (917) 339-9400 www.mrce.com
Foundation Engineering Since 1910
November 21, 2011
Beyer Blinder Belle Architects & Planners LLP 3307 M Street, NW, Suite 301 Washington, DC 20007
Attention: Jill Cavanaugh
Re: Subsurface Investigation Washington Monument Security Improvements Washington, DC MRCE File 11594
Dear Ms. Cavanaugh:
In accordance with our proposal dated April 1, 2011, we summarize herein the results of our soils and foundation investigation for the Washington Monument Security Improvements.
EXHIBITS
The following exhibits are attached to illustrate our report:
Drawing No. B-1 Boring Location Plan Drawing No. GS-1 Geologic Section A-A Drawing No. GS-2 Geologic Section B-B Drawing No. GS-R Geotechnical Reference Standards Figure S-1 Site-Specific Seismic Liquefaction Screening Diagram Table No. 1 Allowable Loading Table No. 2 Allowable Excavation Appendix A Boring Logs Appendix B Finite Element Analysis of Proposed Excavation Appendix C BBB Cross Sections and Plan Alt.A.1 & A.4
AVAILABLE INFORMATION
The following items used in the preparation of our report were obtained from BBB Architects:
1. A topographic survey of the site prepared by Dewberry, dated December 6, 2010.
2. A report entitled Geotechnical Investigation, Proposed Access System, Washington
Monument, Washington DC, dated July 16, 1998, prepared by Woodward Clyde Consultants for Universal Builders Supply, Inc.
The following items were obtained from our files:
a. A report entitled Subsurface Investigation, Monument Grounds and Visitor Facility, Washington Monument, Washington, DC, dated June 2, 2002, prepared by Mueser Rutledge Consulting Engineers (MRCE) for Olin Partnership and Hartman Cox Architects. This report incorporates earlier reports by MRCE.
b. A report entitled Loading Limitations, Washington Monument Grounds, Washington, D.C., 1962, dated December 31, 1962, prepared by Edward S. Barber, Consulting Engineer, for the Department of the Interior.
c. Logs of borings made in 1930 for a study of the Washington Monument.
d. A report entitled Potomac River Basin, Modifications to Washington, DC, and
Vicinity Flood Protection Project, Washington, District of Columbia, , dated May 1992, prepared by the Department of the Army, Baltimore District, Corps of Engineers.
The following item was obtained from the Internet:
3. A report entitled Report on Flooding and Stormwater in Washington, DC , dated January 2008, prepared by the National Capital Planning Commission obtained from http://www.ncpc.gov/DocumentDepot/Publications/FloodReport2008.pdf
SITE DESCRIPTION
The Washington Monument is located on a grassy knoll on the National Mall between Constitution and Independence Avenues, between 15th and 17th Streets. The Monument was originally to have been located at the intersection of an east-west axis passing through the Capitol with a north-south axis passing through the White House. Due to poor soil conditions, the Monument site was adjusted to coincide with the highest point of ground in this vicinity.
The Monument grounds have been regraded on several occasions, the most recent being in the early 2000s. The Monument is surrounded by a plaza consisting of granite pavers. The elevation of the plaza is approximately Elev. 39 referenced to National Geodetic Vertical Datum of 1929 (NGVD 29), a mean sea level datum.
SITE HISTORY
The history of the construction of the Monument is well-documented in a number of works and there is no need to repeat it here. In brief, the foundations were constructed in 1848 and the shaft was begun at the end of 1848. Construction halted in 1854 and resumed in 1878 with underpinning of the original foundations. The underpinning was carried to about Elev. +2.
The remainder of the Monument was constructed between 1878 and 1884. Settlement has been monitored throughout its history, but available records date back to 1878. They indicate that total settlement between 1879 and 1992 was about 7 inches, due to the compression of the T1(D) clay. During the 7-year completion of the Monument, 4.5 inches of this settlement occurred.
During the subsequent 106 years (1886-1992) settlement was less than 2.5 inches.
PROJECT DESCRIPTION
The current project is to provide security improvements to the Monument in the form of a visitor screening facility. Multiple alternatives are being considered for the security improvements, all of which involve the construction of a screening facility on the Monument grounds and a means of conducting the screened visitors to the Monument in a secure fashion.
Some of the alternatives involve creating a below-grade entrance to the Monument accessed by a ramp or ramps down from the plaza level. Others combine a below-grade entrance with regrading of the Monument grounds. Still others involve construction of a security facility atop the plaza or at a remote location on the grounds.
SUBSURFACE INVESTIGATION
The goal of the subsurface investigation was to develop information and provide general foundation recommendations appropriate to all of the alternatives under consideration. In an effort to address foundation conditions at all locations under consideration, we planned a boring program consisting of 10 test borings to 50 feet. After discussion with representatives of NPS and BBB, it was decided not to drill borings through the plaza surrounding the Monument because of the difficulty in removing and replacing the granite pavers without damage.
Consequently eight of the borings were spaced relatively evenly outside the limits of the plaza, and the remaining two borings were placed at a greater distance from the plaza in areas where excavation or other earthwork may be performed.
FIELD EXPLORATION
Field work began on August 4, 2011 and finished on August 17, 2011. Ten borings numbered B- 101 through B-110P were made outside the perimeter of the Monument plaza.
Borings were made by GeoServices Corporation of Forestville, MD. All field work was performed under the inspection of our Mr. William Hobson. Boring locations and elevations were determined in the field by Mr. Hobson. Elevations are referenced to the National Geodetic Vertical Datum, a mean sea level datum.
Representative soil samples were recovered from the borings with a two-inch split spoon sampler driven with a 140-pound hammer free-falling 30 inches. The number of blows required to advance the sampler through each of three six-inch intervals was recorded. The Standard Penetration Test (SPT) resistance, an index of the density of the material sampled, is calculated by summing the blows from the second and third intervals.
Borings were advanced and stabilized using weighted drilling fluid and temporary casing, and extended to depths of 50 feet. Piezometers were installed in three of the completed borings to determine present groundwater levels.
After completion of the borings, the samples were shipped to our office. Samples were reexamined in our laboratory and field descriptions were verified or revised as necessary. All soil samples are described in accordance with the system shown on Drawing No. GS-R.
Groundwater levels were recorded in the three piezometers during and after the field work.
Readings are shown on the appropriate piezometer record sheets.
SUBSURFACE CONDITIONS
The results of the boring program are shown on the boring logs attached as Appendix A. The logs include sample number, depth, blow count, individual soil descriptions for each sample and descriptions of drilling operations. Our interpretation of subsurface conditions is illustrated on Geologic Sections A-A and B-B, shown on Drawings Nos. GS-1 and GS-2. Generalized descriptions of the soil strata encountered in the borings are summarized below in order of their occurrence with increasing depth:
Stratum F - Fill
The uppermost material encountered in all of the recent borings is fill ranging in thickness from 9 to 18 feet. Stratum F consists of loose to very compact brown silty fine to medium sand grading to fine to coarse sand, some silt with fine sandy silt, trace to some gravel, trace brick, cinders, glass, clay, vegetation, shells.
Stratum T1(A) - Sandy Silt
This stratum was encountered beneath Stratum F in 5 of the recent borings and beneath Stratum T2 in three borings. Measured thicknesses ranged from 5 to 14.5 feet. Stratum T2 was interlensed with Stratum T1(A) in three of the recent borings. Stratum T1(A) consists of loose to medium compact brown fine sandy silt, trace clay, clay pockets, gravel, lignite or stiff brown clayey silt to silty clay, trace to some fine sand, trace gravel, lensed with silty fine sand, and fine sandy clay.
Stratum T2 - Silty Sand
Stratum T2 was encountered beneath Stratum F in five of the recent borings and ranged in thickness from 8.5 to 24.5 feet in thickness. Stratum T2 was also encountered below Stratum T1(A) in eight of the recent borings and ranged in thickness from 5 to 20.5 feet. Stratum T2 consists of loose to medium compact brown silty fine to medium sand, trace clay, gravel, grading to fine to medium sand, some silt, trace clay, gravel.
Stratum T3 - Sand and Gravel
Stratum T3 was encountered beneath Stratum T2 in all ten borings and ranged in thickness from 6 to 18 feet. Stratum T3 consists of compact to very compact brown fine to coarse sandy gravel, trace to some silt, grading to gravelly fine to coarse sand, some silt, with occasional boulders and cobbles.
Stratum T1(D) - Plastic Clay
Stratum T1(D) was encountered beneath Stratum T3 in Boring B-107 at a depth of 43 feet and continued to the bottom of the boring at 50 feet. Stratum T1(D) typically consists of soft to stiff gray plastic clay to silty clay, trace to some fine sand, trace fine sand layers and pockets, gravel.
The two samples recovered during this investigation consist of soft to stiff gray silty fine sand, trace clay and gravel, and are presumably from a sand layer or pocket within the clay.
Stratum D - Decomposed Rock
Stratum D was encountered below Strata T1(D) or T3 in two borings in our 2001 investigation, at depths of about 85 feet. Stratum D consists of very compact gray micaceous fine to medium sand, some silt, trace to some rock fragments.
Groundwater
Groundwater was measured in three permanent piezometers installed during the field work.
Groundwater levels corresponded to Elev. -2.5 to -5.0
EXISTING FOUNDATIONS
The Monument foundations bear on Stratum T3 which in turn bears on Stratum T1(D). Stratum T3 is a sandy gravel. Settlements due to application of new loads on granular soils typically occur almost immediately. Stratum T1(D) is a relatively compressible plastic clay to silty clay.
Settlements due to application of new load on fine-grained soils typically occur over long time periods.
FINITE ELEMENT ANALYSIS
BBB provided information regarding various alternative schemes for the security improvements.
They requested us to consider Alternatives A.1 and A.4 as those having the greatest volume of excavation which could affect the Monument. We considered the area and estimated depth of excavation for these two alternatives and determined that Alternative A.1 would have a larger impact on the Monument because the excavation is closer to the Monument.
Alternative A.1 consists of 13 ft wide ramps located east of the existing Monument plaza. The entrance to the top of the ramps is from east of the Monument. The ramps lead both north and south following the curvature of the plaza to a point about 7 ft below grade; turning 180 degrees and the leading in the opposite direction to a depth of 14 ft to the entrance to the security screening facility below the edge of the plaza. West of the security screening facility will be a tunnel extending into the Monument leading to the elevator which will be lowered to receive passengers at this level. Refer to Appendix C for a plan and sections showing this Alternative.
We considered an east-west section through the Monument and grounds. We performed a three dimensional numerical analysis to assess the deformations and differential settlement of the Washington Monument due to the proposed excavation. We used the monument loads provided by Silman Associates and the excavation due to the proposed A1 scheme by BBB. Deformations such as heaving or settlement at the edges of the Monument foundation were monitored and the differential settlement along the east-west direction of the Monument was calculated. Results of our analysis indicate that engineered design solutions will be required to minimize movement of the foundation. These solutions will involve balancing any change in weight loading on the east side of the foundation with an equal change on the west side. This may be accomplished by replacing existing fill on the west side with lighter fill material. A memorandum describing the numerical modeling and summarizing the results of the three dimensional numerical analysis is included as Appendix B of this report.
EVALUATION OF LIQUEFACTION POTENTIAL
We performed liquefaction potential evaluation using the state-of-practice as presented in the ASCE summary report of the 1996 and 1998 NCEER workshops (Youd et al. 2001, the “NCEER procedure”). Key parameters that influence liquefaction potential assessment are the design earthquake magnitude (Mw), Peak Ground Acceleration (PGA), and the groundwater level.
Taking into account the historic importance and prominence of the Washington Monument, we chose a conservative approach in assessing the liquefaction potential at the site. We chose a conservative design earthquake event with moment magnitude (Mw) of 6 and used a PGA of 0.1 g, equivalent to a 2,500-yr return period earthquake event and consistent with a stiff soil site (Site Class D). The SPT N-values were corrected using an energy correction CE of 1.1, to account for the higher energy transfer efficiency of the automatic hammers. Based on stabilized piezometer readings, we have taken the ground water table at Elevation -3, approximately 39 ft below the existing ground surface. Lastly, we conservatively assumed the subsurface soils were relatively clean with fines content equal to 0%.
CONCLUSIONS
Based on the results of our field exploration and analyses, we conclude the following:
1. Figure S-1 shows the result of the SPT liquefaction analysis. A total of 10 borings from the
MRCE investigation were screened. The figure presents the limiting field SPT N-values required to provide a factor of safety (FS) of 1.4 for clean cohesionless soils. SPT N-values plotting to the right of the curve indicate that liquefaction for that soil layer is unlikely, while N-values plotting to the left of the curve indicate that liquefaction is probable during the design earthquake event.
All of the SPT N-values plot to the right of the limiting curve. This means that the FS is greater than 1.4 for all samples retrieved below the ground water elevation and that liquefaction is unlikely during the design earthquake event
2. Soil stratigraphy is as presented in earlier MRCE reports.
3. Water is at approximately Elev. –2.5 to -5.
4. As the deepest alternatives are expected to require excavations to about 20 feet below plaza level, corresponding to Elev. +19, no dewatering will be required to construct the proposed facilities.
5. As no dewatering is anticipated, there will be no drying of Stratum T1(D), the clay layer which indirectly supports the Monument.
6. The analysis performed for Alternative A.1 indicates that engineered solutions will be required to minimize movement of the foundation. These solutions will involve balancing any change in weight loading on the east side of the foundation with an equal change on the west side. This may be accomplished by replacing existing fill on the west side with lighter fill material.
The analysis performed for the tunnel only portion of Alternative A.1 indicates that this construction has a minimal impact on the Monument. However, Alternative A.4 will include this tunnel plus an additional length of tunnel further from the Monument. Based on this, Alternative A.4 will also require an engineered solution to minimize movement of the foundation.
7. Prior to the start of construction of any alternatives, we recommend a monitoring system be installed on the Monument to provide data on any movements of the Monument.
8. Above-grade security improvement alternatives would be founded below the plaza level.
The plaza consists of pavers over reinforced concrete over gravel, which is in turn supported by fill overlying the Monument foundations. Normally a permanent structure requires footings extending below the frost line, which in Washington, DC is 2.5 ft below grade.
Very light structures could be designed to be unaffected by differential movement resulting from minor movement from freezing and thawing. Provided that an above-grade structure imposes relatively light loads similar to the existing screening facility, this would not require any weight loading modifications around the foundations. Additional analyses may be required for a heavily loaded structure on the plaza to determine its impact on the Monument.
Foundations for structures would be constructed below the frost line, which would require penetrating the plaza. These foundations would bear on the fill. Allowable bearing pressures on the fill are 0.5 tsf. Footing subgrades should be inspected by an experienced geotechnical engineer. Any loose or soft fill materials should be removed and replaced with compacted granular fill or lean concrete.
9. Below-grade security improvement alternatives would bear in the deeper fill or on soils of
Stratum T1(A). We anticipate that the new loads imposed by the foundations will generally not exceed the weight of the soil removed. Allowable bearing pressures in the deeper fill are 1.0 tsf and in Stratum T1(A) 1.5 tsf. Footing subgrades should be inspected and remedial measures followed as described above.
10. Braced below-grade walls will be entirely above the water table. They should be designed for lateral pressures of 75 psf per foot of depth below grade plus surcharge loading. Braced walls would include those for any tunnel. Tunnel roof slabs should be designed for 130 pcf per foot of cover, plus the weight of the slab. A surcharge live load should be added to the above design numbers in the event that maintenance vehicles are operated near or above the structure, or that a large event on the Mall could cause crowds to gather near or above the structure.
11. Large unbalanced mass excavations could cause significant differential movements of the
Monument foundations, resulting in unacceptable tilting of the Monument. Tables 1 and 2 illustrate dimensions of allowable loading and excavation at varying distances from the Monument. As stated in our 1973 report, “… a settlement of the edge of the foundation of about 0.2 inches…. would cause a tilt of the shaft from plumb of about 0.8 inches. While this represents an extremely small angle change, less than one part in six thousand, or an angle change of less than one minute of arc, and is probably less than that caused by the heat of the sun on one side of the Monument, it is suggested that this be considered the maximum tolerable tilt movement caused by any new construction.” The engineered solution is intended to balance the loads so as not to cause measurable movement.
12. Subgrade conditions for support of flexible and rigid pavements, including sidewalks, are generally good. In the current borings, the shallow fill consisted of loose to compact sand and sandy silt, soft to stiff clayey silt, and soft clay. These borings represent conditions at 10 discrete locations on the Monument grounds. Much of the shallow fill was placed or graded as controlled fill when the grounds were improved in the early 2000s and was presumably compacted when placed. Foot traffic and maintenance vehicle traffic have further compacted the ground to its present state. Areas of soft or loose soils which are exposed during pavement construction will require recompaction or excavation and replacement with granular fill.
13. The floor of the existing elevator pit may have to be lowered four to six feet to accommodate the new lower position of the elevator following construction of the below grade entrance into the Monument. Excavation for this pit should have minimal impact on the 126.5 ft wide Monument base. However, it may be prudent to perform some form of ground stabilization below the existing elevator pit before beginning this excavation. A concept plan for safely making a horizontal penetration through the original Monument foundation was developed in 2002. The key to making this plan successful is to make the opening as small as is practical and to provide positive support to the opening as the tunneling is progressed.
14. To determine flood implications, we reviewed the 1992 Army Corps of Engineers flood study and the NCPC 2008 flood study. Both documents indicate that the 100-year flood level on the Mall is El. 15.6 relative to NGVD. As noted above, anticipated construction for the Security Improvements project will extend no deeper than approximately El. 19. This will result in all construction occurring above the 100-year flood level. For the 100-year storm, the risk of flooding is minimal and there is no need for tiedown anchors.
15. As changes in groundwater levels tend to lag changes in surface water levels, and the
Monument sits on high ground when compared to the surrounding grades, groundwater under flood conditions is not expected to pose a threat to the existing or proposed structures.
This is because any rise in surface water due to flooding is expected to be a short-term event and is not expected to last long enough to cause the groundwater on the Monument grounds to rise.
16. Where new below-grade structures are planned, we recommend that the slabs be underlain by a 12-inch layer of crushed stone atop a separation geotextile. The stone should be separated from the concrete slab by a polyethylene vapor barrier. This combination will provide a drainage layer which will help prevent moisture from wicking up through the slab.
The drainage system would lead to a gravity drain or a sump pump.
17. Fill placed to support structures should consist of granular soils with less than 15 percent by weight passing a No. 200 sieve. Fill should be placed in lifts not exceeding 12 inches in loose thickness and compacted by several passes of a heavy vibratory roller. Compaction should meet or exceed 95 percent of maximum dry density as determined by ASTM D 1557 (modified Proctor).
Soils to be excavated from the Monument grounds may be reused as compacted fill provided that they can be compacted to the standard specified above. It may be difficult to achieve this level of compaction with finer-grained soils, particularly during periods of wet or cold weather when drying of the soils is not practical.
Excavation and fill placement should be subject to the limits specified in our 2002 report.
We have included the tabulated recommendations for convenience as Tables 1 and 2.
Please contact us if you have any questions concerning this report.
Very truly yours, MUESER RUTLEDGE CONSULTING ENGINEERS
By:________________________________________ Hugh S. Lacy, PE
By: ________________________________________ Douglas W. Christie, PE
DWC:HSL:FJA:F:\115\11594\Report.docx
EXHIBITS
GRAPHIC SCALE
FIELD SPT N-VALUE : blows/foot
0 5 10 15 20 25 30
D E
P
TH
B E
LO
W
G R
O U
N D
S U
R
FA
C E fe et
B-101 B-102P B-103 B-104 B-105 B-106P B-107 B-108 B-109 B-110P
FS
.4
GWT
WASHINGTON MONUMENT
Washington District of Columbia
MUESER RUTLEDGE CONSULTING ENGINEERS
14 PENN PLAZA – 225 W 34TH STREET, NEW YORK NY 10122
SCALE MADE BY: CZB DATE: 09-23-11 FILE No.
N/A CH'KD BY: JG DATE: 09-23-11 11594
SITE-SPECIFIC SEISMIC
LIQUEFACTION SCREENING DIAGRAM
FIGURE No.
S-1
NOTES:
1. Liquefaction potential evaluation is based on Youd et
al. 2001, the “NCEER Procedure.”
2. Design earthquake event: Mw = 6 and PGA = 0.1 g, equivalent to a 2,500-yr return period earthquake event & consistent with a stiff soil site (Site Class D).
3. FS = Factor of Safety
4. Design Ground Water Table (GWT) is approximately 39 ft below ground surface.
5. Soil above the GWT is not liquefiable.
TABLE 1
ALLOWABLE LOADING
Distance from Monument center
Allowable permanent net increase
Allowable permanent net decrease
Remarks up to 63 feet 500 psf 500 psf Minimize lateral extent 500 psf may be relaxed for small footprint after study
63 to 150 feet 1000 psf 1500 psf asymmetrically 2000 psf symmetrically
150 to 200 feet 1500 psf 2000 psf limits for asymmetric loading with lateral dimensions of more than 150 feet
200 feet or more unspecified unspecified
Loading is subject to analysis in every case to determine its effects on the subsoils.
TABLE 2
ALLOWABLE EXCAVATION
Distance from Monument center
Allowable excavation Remarks up to 115 feet No deeper than Elev. 16 Maximum width open at any time is 45 feet 115 to 150 feet Following a line from
Elev. 16 at 1V:2.6H Maximum width open at any time is between 45 and about 100 feet, proportional to distance from Monument center
150 feet or more No deeper than Elev. 0 Maximum width open at any time is about 100 feet
Excavation is subject to notes 1 and 2 below.
1. Excavation or a widespread structure symmetrically placed which would approach the limitation on maximum load removal must be carried out with great caution.
Specifications should require a program of excavation in which load removal on opposite sides of the Monument would be reasonably will balanced at all stages of the operation.
2. In general, it would be preferable to stabilize the sides of excavations near the Monument by cutting on sloped banks rather than by driving sheet piling of soldier piles for a cofferdam. Where vertical-wall cofferdams are absolutely necessary these could be formed by soldier piles placed in pre-augered holes.
APPENDIX A
APPENDIX B
Mueser Rutledge Consulting Engineers 14 Penn Plaza · 225 West 34th Street · New York, NY 10122 Tel: (917) 339-9300 · Fax: (917) 339-9400 www.mrce.com
MEMORANDUM
jg:ML:DWC:HSL:FJA: F:\115\11594\Excavation_Analysis\11594_WAMO_FEA.doc
To: Jill Cavanaugh, Beyer Blinder Belle Architects & Planners LLP From: James Go and Michael Law Re: Finite Element Analysis of Proposed Excavation
Washington Monument Security Improvements Washington, DC
File: MRCE File No. 11594 Date: November 18, 2011
In accordance with our proposal dated April 1, 2011, Mueser Rutledge Consulting Engineers (MRCE) performed an engineering study to evaluate the impact of the proposed excavation (Alternative A1) near the Washington Monument (the “Monument”). This memorandum summarizes our assumptions, methodology, and results of our study.
PROJECT BACKGROUND
The current project aims to provide security improvements to the Monument in the form of a visitor screening facility. Multiple alternatives are being considered for the security improvements, all of which involve the construction of a screening facility on the Monument grounds and a means for screened visitors to access the Monument in a secure fashion.
Beyer Blinder Belle Architects & Planners LLP (BBB) provided us information regarding the various alternatives for the security improvements and requested us to consider Alternatives A1 and A4.
Both alternatives, A1 and A4, include a below grade screening facility and excavation/regrading east of the Monument. Based on the close proximity of the excavation to the Monument and the larger volume of proposed excavation, we judged that Alternative A1 would have a more significant impact on the Monument than Alternative A4 and was therefore selected for this study.
AVAILABLE INFORMATION
We reviewed available geotechnical data and foundation details to perform our study. The following reports, survey data, and structural calculations were specifically used in our study:
A topographic survey of the site prepared by Dewberry, dated December 6, 2010
A report titled Subsurface Investigation, Monument Grounds and Visitor Facility, Washington Monument, Washington, DC, dated June 2, 2002, prepared by Mueser Rutledge Consulting Engineers for Olin Partnership and Hartman Cox Architects. This report incorporates earlier reports by MRCE
A paper titled The Washington Monument Case History dated August 28, 2009 written by J.
Briaud, B. Smith, K. Rhee, H. Lacy, and J. Nicks and published by the International Journal of Geoengineering Case Histories Volume 1, Issue 3, pp 170-188
An undated load takedown spreadsheet provided to us by Silman Associates on September 19,2011
November 18, 2011
Finite Element Analysis of Proposed Excavation Washington Monument Security Improvements
The complete list of available information is summarized in our subsurface investigation report
(MRCE, 2011).
SITE DESCRIPTION & SUBSURFACE CONDITIONS
The Washington Monument is located on a grassy knoll on the National Mall between Constitution and Independence Avenues, between 15th and 17th Streets. The Monument grounds have been regraded on several occasions, the most recent being in the early 2000s. The Monument is surrounded by a plaza consisting of granite pavers. The elevation of the plaza is approximately Elev. 39 referenced to National Geodetic Vertical Datum of 1929 (NGVD 29), a mean sea level datum. In general, grades tend to be sloped one foot or less within 150 feet of the Monument, and sloped one to two feet within 150 to 200 feet from the Monument. A detailed discussion of the subsurface conditions, as well as boring logs and laboratory tests can be found in the 2002 and 2011 MRCE Subsurface Investigation Reports.
WASHINGTON MONUMENT DETAILS
Completed in 1884, the Monument is an obelisk standing 555.5 ft tall and is made of marble, granite, and bluestone gneiss. Construction of the Monument started in 1843 and by 1854, the shaft had reached a height of 152 ft above the top of the foundations. The original foundation was built in pyramidal shape with stepped sides, made of blue gneiss blocks set in a mortar of hydraulic cement, stone, lime, and sand. The pyramidal foundation was 23 ft high and 80 feet square at its base. From 1854 to 1878, construction of the Monument did not progress much and by 1876, the Corps of Engineer investigating board concluded that the proposed height of the structure must be reduced due to excessive pressures on the existing foundation. Upon the advice of a second board, an underpinning operation was carried out between late 1879 and June 1880 which involved placing concrete pads 13.5 ft thick and required excavation of over 70 percent of the original base area of the pyramidal foundations. The concrete underpinning was extended 23 ft beyond the original base on all sides and provides a bearing area of 16,000 sq. ft. From 1880 to 1881, fill was placed around the Monument to form a terrace to bring the ground level up to the top of the foundation. Construction of the shaft then resumed until completion in 1884. A detailed description of the site history including measured settlements can be found in the 2002 MRCE Subsurface Investigation Report.
PROPOSED ALTERNATIVE A1
Figure 1a shows the conceptual drawing of Alternative A1 by BBB. This alternative includes a recessed east entry below the plaza and a tunnel approximately 12 to 24 ft wide x 150 ft long x 15 ft deep leading to the Monument. The recessed entry would require a semi-circular asymmetric excavation from 120 ft to 150 ft east of the Monument. The recessed entry is composed of mirror-image 13-ft wide ramps starting at existing grade east of the excavation, dropping down approximately 6 ft to the north and south, and then make a 180-degree turn and dropping down another 8 ft to the tunnel entrance (see Figure 1b).
FINITE ELEMENT ANALYSIS
To evaluate the impact of the proposed excavation on the Monument, we performed a numerical study using the three-dimensional finite element (FE) program PLAXIS 3D Foundation. The program allows for 3D deformation analysis of foundation structures and allows for simulation of stresses and strains experienced by the subsurface soils to the phased construction of the Monument and excavation for the recessed entry. We also performed a preliminary two-dimensional FE analysis using PLAXIS 2D assuming plain strain conditions. However, due to the 3D nature of the excavation, we judged that a 3D analysis is more appropriate and thus presented in this memorandum.
Finite Element Model Figure 2 shows the idealized 3D FE model and an east-west section of the Monument foundation and the surrounding Monument grounds. Fifteen node quadratic wedge elements were used to model both the subsurface soils and Monument foundation with finer elements in the vicinity of the Monument foundation. With the Monument at the center, the model extends approximately 1,000 ft wide, 1,000 ft long, and 118 ft deep to minimize boundary effects. Vertical boundaries were restrained along the horizontal normal to the boundary, while the bottom of the model was restrained in all directions (x, y, and z). The pyramidal Monument foundation is modeled explicitly using quadrilateral elements, while above ground portion of the Monument is represented as a distributed load acting on the top of the foundation based on the dead load provided by Silman Associates.
The uppermost fill varies in thickness from 12 ft to 25 ft forming a mound at the Monument. The ground surface elevations in the model generally follow the 2010 topographic survey. The underlying strata considered in our analysis were of uniform thickness consisting of 13.5 ft of Stratum T2/T1(A), 24 ft of Stratum T3, 40 ft of T1(D), and 15 ft of Stratum D. The groundwater table was conservatively taken to be at Elev.0. The Monument foundation is supported directly on Stratum T3 and is underlain by Strata T1(D) and D.
Material Properties To describe the soil and rock behaviors, we used the linear elastic model for Strata F, T1(A)/T2, and D and the Monument foundation, and the Hardening Soil (HS) model for Strata T3 and T1(D). The HS model features a stress-dependent stiffness and an unload/reload response for more realistic estimates of Strata T3 and T1(D) material response. Tables 1 and 2 summarize the material properties assumed in our analysis. We selected the material properties based on the in-house and published geotechnical data, laboratory test results, and empirical correlations. Since most of the settlement/swelling response would come from Stratum T1(D), we calibrated our HS model using laboratory consolidation tests data. We first corrected the laboratory test data using the Schmertmann (1955) graphical procedure to account for sample disturbance. The corrected consolidation parameters (CC and CS) were then used to calibrate the Stratum T1(D) HS model in PLAXIS. Figure 3 shows the actual laboratory test data, Schmertmann corrected data, and calibrated PLAXIS HS model.
Initial Stresses and Calculation Phases Phased analyses were performed to simulate an in-situ stress state of the FE model. Figure 4 shows the initial phase of our FE model which consists of Strata T2/T1(A), T3, T1(D), and D. The model was first brought to equilibrium under geostatic Ko conditions. To simulate the overconsolidated nature of Stratum T1(D), we applied a uniform aerial load of 7.5 ksf at the surface (see Figure 5) and then removed the load to simulate an OCR profile of 2 to 3 for Stratum T1(D) as measured in our previous subsurface investigation (see Figure 6).
The next several phases consisted of constructing and loading the original foundation (see Figure 7), underpinning of the original foundation (see Figure 8), building of the mound and increasing the load to the current level (see Figure 9). The calculation phases followed the actual sequence of the Monument as described in the previous section. Figure 10 shows the current in-situ vertical effective stress ( ’v) used in our analysis (before excavation). To keep track of the induced deformations due to the proposed excavation, displacements were reset to zero prior to simulation of excavation.
Calculation Results As the design is still in the conceptual stage, the depth and geometry for the excavation were approximated in this study. The excavated volume takes into account the net reduction of loads due to the excavated soil, the weight of the structure, and backfilled soil at the end of construction.
Deformations such as heaving or settlement at the edges of the base of the Monument (see Figure 11) were monitored in the model and the differential settlement along the east-west direction of the Monument was calculated. Excavation was performed in stages, first excavating the tunnel, and then the recessed entry.
Figure 12 shows the excavation for the tunnel. Figure 13 shows the vertical displacements due to the excavation for the tunnel. Results of our analysis indicate that the edge of the monument foundation closest to the excavation (Point A) will heave on the order of 0.2 inch (upward) while the edge of the monument foundation furthest from the excavation (Point B) will have negligible movement.
Differential settlement due to this stage of excavation along the base of the foundation is on the order of 0.01% (0.01/100).
Figure 14 shows the excavation for the tunnel and recessed entrance for Alternative A1. Figure 15 shows the vertical displacements due to the excavation for the tunnel and recessed entrance for the assumed soil profile. Results of our analysis indicate that the edge of the monument foundation closest to the excavation (Point A) will heave on the order of 0.4 inch (upward) while the edge of the monument foundation furthest from the excavation (Point B) will settle on the order of 0.1 inch (downward). Differential settlement along the base of the foundation is on the order of 0.03% (0.03/100). We expect 90% of the movements to occur during the relatively short duration of construction.
We note that the settlement and heave estimates are based upon a uniform subsurface profile, average soil parameters obtained from a limited number of laboratory tests, and an excavation geometry based on a conceptual scheme. We recommend that the settlement and heave estimates be revised once the final scheme is selected and that parametric studies be performed to determine sensitivity to soil parameters and stratification.
Figure 1. a) Conceptual drawing of Alternative A1 by BBB
b) Cross section along direction of ramps.
Monument
Tunnel opening
(a)
(b)
Figure 2. Finite Element Model: a) 3D Model, b) section along east-west direction.
Table 1. Summary of Linear Elastic Material Properties – Strata F, T2, D, and Monument Foundation.
Stratum (lb/ft3) E (ksf)
Fill 130 0.30 380
Stratum T2 130 0.30 515
Stratum D 150 0.20 60,000
Masonry 150 0.20 570,000 : Unit weight : Poisson’s Ratio
E: Young’s Modulus
Table 2. Summary of Hardening Soil Material Properties – Strata T1(D) and T3.
Stratum (lb/ft3)
E50ref (ksf)
Eoedref (ksf)
Eurref (ksf) c' (ksf) (°) (°) ur power (m)
Stratum T1(D) 130 18 15 62 0 28 0 0.20 1.0
Stratum T3 130 550 370 1,650 0 36 0 0.20 0.5
: Unit weight ur: Poisson’s Ratio
E50ref, Eoedref, Eurref, m: PLAXIS HS Parameters c’: Effective cohesion
: Effective friction angle
Figure 3. Calibration of PLAXIS Stratum T1(D) HS model.
Figure 4. Initial FE Model
Figure 5. 7.5 ksf initial load.
Figure 6. Simulated OCR for Stratum T1(D).
Figure 7. Construct original foundation: a) 3D view; b) section along east-west of Monument.
Figure 8. Underpinning of Monument foundation: a) 3D view; b) section along east-west of Monument.
Figure 9. Construction of mound: a) 3D view; b) section along east-west of Monument.
Figure 10. In-situ vertical effective stress: a) 3D model; b) Section A-A*; c) Section B-B*.
(c)
PLAN
SECTION
Figure 11. Points monitored during excavation
Figure 12. Excavation for Alternative A1: tunnel.
N
Towards Proposed Excavation
Point A
Point A
Point B
Point B
Figure 13. Vertical displacements due to tunnel excavation: a) 3D view; b) section along east-west of Monument.
Figure 14. Excavation for Alternative A1: tunnel and recessed entrance.
Figure 15. Vertical displacements due to tunnel and recessed entrance excavation: a) 3D view;
b) section along east-west of Monument.
APPENDIX C
08/09/2011
CROSS SECTIONS GRAPHIC SCALE
jgo
Ramps
Revised by MRCE 11/14/2011
Alternative A1
08/09/2011
CROSS SECTIONS GRAPHIC SCALE
Alternative A4
File details come from the government source that posted it. Updated .