About this file

Past Performance Form

View the file

Other files

File Type Posted
Amendment_012.pdf PDF
224923_WAMO_Amendment_No._1.pdf PDF
224923_WAMO_28_31_11_Amendment_DIGITAL,_ADDRESSABLE_FIRE-ALARM_SYSTEM.pdf PDF
P17PS00352_Amendment_011.pdf PDF
NAMA_151073_-_Amendment_10_Solicitation_Questions.pdf PDF
P17PS00352_Amendment_04_SF30.pdf PDF
P17PS00352_Amendment_010.pdf PDF
Amendment_009_P17PS00352.pdf PDF
1_NAMA_151073_AMENDMENT_8_CS0-1_-_COVER_SHEET.pdf PDF
NAMA_151073_-_Solicitation_Questions_Amendment_8.docx DOCX document
P17PS00352_Amendment_8_SF30.pdf PDF
2_NAMA_151073_AMENDMENT_8_C1.4_SITE__UTIL_II.pdf PDF
2_P17PS00352_Amendment_07_SF30.pdf PDF
1_NAMA_151073_-_Solicitation_Questions_for_Amendment_07_070717_330pm.pdf PDF
1_NAMA_151073_-_Solicitation_Questions_and_Answers_070617_1045am.pdf PDF
4_P17PS00352_Amendment_06_SF30.pdf PDF
2_NAMA_151073_CS0-1_-_COVER_SHEET_R2.pdf PDF
3_NAMA_151073_A5-1_-_ELEVATIONS_-_CURTAIN_WALL_MOCK-UP_R2.pdf PDF
4_NAMA_151073_CS0-1_-_COVER_SHEET.pdf PDF
1_NAMA_151073_-_Solicitation_Questions_and_Answers_063017_1500.pdf PDF
6_P17PS00352_Amendment_5_SF30.pdf PDF
3_Preproposal_Conference_Slides_.ppt PPT presentation
5_NAMA_151073_A5-1_-_ELEVATIONS_-_CURTAIN_WALL_MOCK-UP.pdf PDF
2_NAMA_151073_-_WAMO_PreBid_Sign_In_Sheet.pdf PDF
Amendment_3_Questions_&_Answers.docx DOCX document
Amendment_3_to_P17PS00352.pdf PDF
Experience_Form.doc DOC document
Amendment_002_P17PS00352.pdf PDF
KeyPers.doc DOC document
GeneralReferences.doc DOC document
ProposedEquals.doc DOC document
HazmatForm.doc DOC document
B08_Subcontracting_Plan.pdf PDF
P17PS00352Amendment_001.pdf PDF
NAMA_224923_Elevator_Full_Drawing_Set.pdf PDF
Appendix_F_-_NAMA_224923_Elevator_Machine_Test_Report.pdf PDF
NAMA_151073_VSF_Drawing_Set_pgs_30-61.pdf PDF
Solicitation_P17PS00352.pdf PDF
Wage_Determination_DBA_DC170002_06092017_DC2.pdf PDF
Appendix_D_-_NAMA_151073_Finite_Element_Analysis_of_Proposed_Excavation_Feb2017.pdf PDF
Appendix_E_-_NAMA_224923_Elevator_Operational_Integrity_Report.pdf PDF
Appendix_C_-_NAMA_151073_Subsurface_Investigation_Nov2011.pdf PDF
NAMA_151073_VSF_Drawing_Set_pgs_1-29.pdf PDF
Appendix_A_-_Washington_Monument_Subsurface_Investigation_2002_Soils.pdf PDF
NAMA_224923_Elevator_Specifications_Combined.pdf PDF
Wage_Determination_SCA_WD_78-1183_Rev_56_042517.pdf PDF
NAMA_151073_VSF_Specifications_Combined.pdf PDF
NAMA_151073_VSF_Drawing_Set_pgs_62-128.pdf PDF
Appendix_B_-_NAMA_151073_Final_Geoarch_Report_Sept2011.pdf PDF
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PAST PERFORMANCE QUESTIONNAIRE

(COMPLETE SECTIONS I AND II AND SUBMIT WITH THE TECHNICAL PROPOSAL)

I. CONTRACT IDENTIFICATION

CONTRACTOR NAME:
CONTRACT NO:

CONTRACTOR ADDRESS:

CONTRACT TYPE:

FORMCHECKBOX

FIRM-FIXED-PRICE

FORMCHECKBOX

COST REIMBURSEMENT

FORMCHECKBOX

OTHER: (specify)

FORMCHECKBOX

ACTIVE

FORMCHECKBOX

COMPLETED

FORMCHECKBOX

ROUTINE

FORMCHECKBOX

COMPLEX

DATES OF PERFORMANCE:

AWARD AMOUNT: $

TOTAL WITH MODS

PROJECT DESCRIPTION:

II. AGENCY (CUSTOMER) IDENTIFICATION

AGENCY (CUSTOMER) NAME:

POC NAME/TITLE/PHONE:

III. PAST PERFORMANCE RATING

Rating Scale:

E = Excellent. Considerably surpassed requirements/expectations.

G = Good. Surpassed requirements/expectations.

S = Satisfactory. Met requirements/expectations

M = Marginal. Met some requirements/expectations

U = Unsatisfactory. Did not meet requirements/expectations

1. QUALITY:
(Circle applicable rating)
a. Conformance with contract requirements
E G S M U
b. Quality of workmanship (including subcontractors)
E G S M U
c. General oversight by project manager and superintendent
E G S M U
d. Coordination with and control of subcontractors
E G S M U
e. Compliance with Davis-Bacon wage rate and labor usage requirements
E G S M U
f. Avoidance of accidents/safety violations
E G S M U

2. TIMELINESS:

a. Adherence to project delivery schedules
E G S M U
b. Submission of change proposals
E G S M U
c. Response to technical direction and change orders
E G S M U
d. Response to correction of identified problems
E G S M U
e. Submission of timely/accurate/complete billings
E G S M U
f. Submission of materials/other submittals
E G S M U

3. BUSINESS RELATIONS:

a. Flexibility and cooperativeness in resolving problems
E G S M U
b. Tenacity and innovativeness in resolving problems
E G S M U
c. Relationships with subcontractors, including prompt payment
E G S M U
d. End user was satisfied with services performed
E G S M U

IV. COMMENTS

Required for ratings of E (Considerably Surpassed Requirements) or U (Did Not Meet Requirements)

Item No.
Comment
Technical Evaluation Panel Member:
Date:

Page 1 of 2 STLI 195544 Past Performance Questionnaire