National Mall and Memorial Parks Washington Monument
NAMA-151073 and 224923 Visitor Screening Facility & Elevator Modernization
Request for Proposals No. P17PS00352 Preproposal Conference/ Site Visit Wednesday, June 28, 2017
Request for Proposals No.1443N5010070901
OPENING
| Introductions |
| Attendee’s List |
| Purpose of the Preproposal Conference/Site Visit |
| Description of Work |
The Contracting Officer is Victoria Nosal The Project Managers are Andrea Lind and Mike Morelli Introduce Park Staff The purpose of this conference To provide information as stated in the Solicitation To either answer or gather any questions you may have Either method the official response will become an amendment to the solicitation To visit the work site
Constitution Ave. N.W.
Independence Ave.
Fifteenth St. N.W.
Seventeenth St. N.W.
Staging
Sylvan Theatre
VSF
Project location: between Constitution Avenue NW and Independence Avenue NW and between 15th Street NW and 17th Street NW. The project site is located on the east side of the monument.
Project description:
| demolition of exist. Facility (east side) |
| construction of a new vsf |
| repair, upgrade, and modernization of existing elevator |
Staging area/limited access/security requirements:
| safe construction access/tourists/pedestrian safety |
| contractor staging at Sylvan Theater |
| installation of K-12 barrier |
| fenced/gated site |
| park police guard station check point and canine truck delivery inspection |
| regular workers will have badges |
| working hours 6 am to 10 pm; can grant permission for extended work hours/week-ends/holidays – they have to be pre-approved |
| potential for temporary work stoppages |
Refer to spec 01 1100 - Summary of Work
PREPROPOSAL CONFERENCE QUESTIONS
Direct Questions to Victoria Nosal, Andrea Lind or Michael Morelli
Responses to questions do not change the solicitation document
Changes to the solicitation document shall be made by formal written amendment only
Preproposal Conference/Site Visit meeting notes, questions, and answers will be issued by a formal written amendment to the solicitation for information only
Victoria
QUESTIONS AFTER PREPROPOSAL CONFERENCE
Direct all questions to both Victoria Nosal, Contracting Officer, and Timothy Burger, Contracting Specialist.
Questions directed to any other Government team member will be redirected to Ms. Nosal or Mr. Burger. No answers will be provided by any other team member. All questions and answers will be provided to all prospective offerors by amendment to the solicitation
Request for Proposal (Solicitation Document) shall only be changed by formal amendment issued by the Contracting Officer at the website – www.fbo.gov
AWARD OF A CONTRACT
| Full and Open Competition |
| Best Value -- Trade-off Negotiated Acquisition |
Alternate Proposals shall not be accepted or evaluated
Solicitation No. P17PS00352 Contract Line Items Section B – Contract Price Schedule
| CLIN 1 Visitor Screening Facility (VSF) |
| CLIN 2 VSF HVAC and Geothermal Wells |
| CLIN 3 VSF Security Equipment |
| CLIN 4 VSF Construction Site Security/Contractor Staging Area |
| CLIN 5 Washington Monument Elevator Modernization |
| CLIN 6 VSF Permits |
| CLIN 7 Option A One Year Elevator Service Maintenance Period |
| CLIN 8 Option B Washington Monument Fire Alarm Control Panel and System Upgrade |
| CLIN 9 Option C Extended Warranty/Service Period for VSF Glazing System |
| CLIN 10 Option D Turf Restoration and Irrigation |
| CLIN 11 Option E Hyphen Exterior Lighting |
| CLIN 12 Option F Restroom Interior Fit-out and Fixtures |
Permits – actual cost
Section F Clauses
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than January 31, 2019. The time stated for completion shall include final cleanup of the premises.
The completion date is based on the assumption that the successful offeror will receive the notice to proceed by September 8, 2017. The completion date will be extended by the number of calendar days after the above date that the Contractor receives the notice to proceed, except to the extent that the delay in issuance of the notice to proceed results from the failure of the Contractor to execute the contract and give the required performance and payment bonds within the time specified in the offer.
Contract Clauses
52.211-12 LIQUIDATED DAMAGES—CONSTRUCTION
(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $1,400.00 for each calendar day of delay until the work is completed or accepted.
(b) If the Government terminates the Contractor’s right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
Section H Clauses Special Clause 1: Key Personnel
(a) The Contractor shall assign to this contract the following key personnel
| Project Manager |
| Superintendent |
| Quality Control Manager |
| CPM Scheduler |
| Elevator Superintendent/Foreman |
Prospective Contractor shall not be allowed to change Key Personnel during the first 90 days of performance
Section H Special Clause 2: Small Business Participation
The contractor shall ensure a minimum 30% of the total contract value is performed by Small Business. …
Failure to meet the minimum required small business participation shall be reflected in the Government’s evaluation of the contractor’s performance upon contract completion.
At the same time this is helping Large Business with your small business subcontracting goals, that I’ll touch on later
Section H - Liability Insurance Requirements
Contractor shall provide and maintain required insurance
Contractor shall insert this requirement in all subcontracts
Proof of insurance shall be provided by Contractor and Subcontractors before they are allowed access to work at the construction site
Minimum amounts page X of solicitation Employer’s Liability $ General Liability $ Construction $ Per person $ $ in property damage $ per occurrence
52.225-11 Buy American –Construction Materials Under Trade Agreements (1)(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(4) of this clause shall include adequate information for Government evaluation of the request, including—
(A) A description of the foreign and domestic construction materials;
(B) Unit of measure;
(C) Quantity;
(D) Price;
(E) Time of delivery or availability;
(F) Location of the construction project;
(G) Name and address of the proposed supplier; and
(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.
(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.
(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).
(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.
Request for Proposals No. P11PS00071SOLICITATION DOCUMENT AND PROPOSAL REQUIREMENTS
One Year Elevator Service Maintenance Period during the warranty period.
Service Contract Clauses are applicable upon award of CLIN 7, Option A.
523211- Liquidated Damages – Supplies, Services, or Research and Development.
(a) If the Contractor fails to deliver the supplies or perform the services within the time specified in this contract, the Contractor shall, in place of actual damages, pay to the Government liquidated damages of $1,400.00 per calendar day of delay.
Starts at substantial completion of entire job
Proposals Due July 13, 2017, 1500 MT.
| Volume I – Technical Proposal |
| (Original plus 5 Copies) |
| Volume II – Business and Price Proposal |
| (Original plus 1 Copy) |
Section L Instructions for the Submission of Offers
Section L Instructions for Submission of Offers
| Alternate Proposals SHALL NOT be considered |
| Government may award without discussions |
| Electronic Proposals to both Timothy_Burger@nps.gov and Victoria_Nosal@nps.gov |
| Hardcopy proposals to Victoria Nosal at address listed |
| Identify outside of package with Solicitation No. P17PS00352 |
EVALUATION FACTORS
(Sections L& M)
The evaluation factors and subfactors are correlated to the proposal preparation instructions.
| Technical Factors are listed in descending order of importance |
| Within Factor I, Subfactors 1a through 1c are of equal importance |
| Within Factor II, Subfactors 2a and 2b are of equal importance |
All evaluation factors other than cost or price, when combined, are approximately equal to cost or price
Section L what is required Section M how that material will be evaluation.
Volume I – Technical Proposal
Evaluation Factor I -- Technical Approach and Plan for Constructing a Visitor Security Screening Facility and Modernizing the Washington Monument Elevator Systems on a Confined Site and within a Highly Visible Historic Structure.
Subfactor 1a: The Offeror shall describe its proposed technical approach and plan for the removal of existing structure and then construct a new visitor security screening facility with specialty glazing; ballistic glazing; and blast walls, doors, and windows; heavy foundations; heavy steel; architectural finish steel; and security systems.
Comprehensiveness & realism of proposed technical approach for construction the new visitor security screening facility all aspects (2 of the subfactors) 1) 1) approach for demo & construction of VSF; 2) logistics, methods, sequencing and phasing; 3) comprehensive plan for the repair, rehab & modernization of the elevator and
Evaluation Factor I – Subfactor 1b
The proposal shall include a detailed description of the logistics, methods, sequencing and phasing for constructing the glass façade and roof components, the details of the submittal approvals process, the testing to meet security requirements, mock-up procedures, factory manufacturing and accounting for potential long lead items. The proposal shall also include proposed equipment to perform the work.
Comprehensiveness & realism of proposed technical approach for construction the new visitor security screening facility all aspects (2 of the subfactors) 1) 1) approach for demo & construction of VSF; 2) logistics, methods, sequencing and phasing; 3) comprehensive plan for the repair, rehab & modernization of the elevator
Evaluation Factor I – Subfactor 1c
The Offeror shall explain its proposed technical approach and plan for the repair, rehabilitation, and modernization of the existing elevator, specifically, replacement/upgrade of elevator control systems, passenger cab upgrades, remote- control systems, elevator cab phone communications, compensation and hoist ropes, sheaves, elevator system electrical, wiring, and connection replacement, as well as the methodology for allowing the simultaneous elevator work effort while other work is progressing.
Comprehensiveness & realism of proposed technical approach for construction the new visitor security screening facility all aspects (2 of the subfactors) 1) 1) approach for demo & construction of VSF; 2) logistics, methods, sequencing and phasing; 3) comprehensive plan for the repair, rehab & modernization of the elevator
Evaluation Factor II Qualifications, Experience and Capability
Subfactor 2(a) Key Personnel The proposal shall address the qualifications, prior experience, capabilities, and roles and responsibilities of the proposal Key personnel. The proposal shall identify the individuals proposed for the Key Personnel positions identified below and include the authority of the individual to actor for and on behalf of the Offeror and the proposed percentage of time assigned to the project. The Offeror shall submit a plan describing each of the key personnel’s authorities on the proposed contract coupled with the qualifications and experience to include problem solving and coordinating with prime and subcontractor personnel.
Key people
What projects have you done that are similar in scope, scale and complexity? Has your team worked together before. If they haven’t how will they work together.
Evaluation Factor II - Subfactor 2(b) Prior Experience
The proposal shall identify the respective role of each firm and the work element that the firm will perform under the project, reflecting evidence of prior experience of the Offeror and Key Subcontractors. For Key Subcontractors, submit a signed letter of commitment its role in the project, its resources, and its intent to enter into a subcontract with the Offeror. In addition, the proposal shall describe prior project experience working together, and how the proposed project team will enhance and ensure a well-coordinated and successful outcome for this project. The Offeror shall describe prior experience that addresses the following:
| Projects of similar size and technical complexity including custom security facilities & upgrades to one of a kind elevator system |
| Work performed on properties of similar high visibility and national significance |
| Project constructed at similarly restricted work sites in dense urban environment. |
Key people
What projects have you done that are similar in scope, scale and complexity? Has your team worked together before. If they haven’t how will they work together.
Evaluation Factor III Proposed Project Schedule
The Offeror shall submit a realistic and comprehensive proposed project schedule in a Gantt chart format, utilizing CPM. The Offerors proposed schedule shall include at a minimum the following:
| Completion Date of January 31, 2019 |
| For purposes of schedule, use contract award date of August 18, 2017 |
| For purposes of schedule, use notice to proceed date of September 8, 2017 |
| The Offeror’s schedule shall be detailed and have no activities (except for procurement of materials) longer than 30 days in length without explanation. |
| The Offeror’s schedule shall incorporate a schedule which indicates the required time for the procurement of all materials or products including their lead-time |
| The Offeror’s schedule shall reflect options exercised at 120 days after award. |
Realistic and comprehensive schedule.
Have to be done no later than January 31, 2019.
Are you able to beat the end the end date?
Evaluation Factor IV Past Performance
| Complete and submit form entitled “Past Performance Questionnaire” (Offeror and key subcontractors) |
| Amendment 3 Allows Offerors to submit other Government project assessments in lieu of a new Past Performance Questionaire. |
Disclose any instances that may be considered by others to be less than fully satisfactory and describe remedial action taken
Government may contact references on past performance questionnaire or use automated retrieval systems or other sources
We are looking at the past performance of the offeror and it proposed subcontractors on projects similar in scope and complexity will be evaluation in the areas of quality, timeliness, subcontract plan execution and business relations.
VOLUME II – BUSINESS/PRICE PROPOSAL
Complete and Submit (Original + 1)
SF-1442 – Solicitation, Offer and Award Acknowledgement of Amendments SF-24 – Bid Bond (20% or $3M) Section B – Contract Price Schedule Section K – Representations, Certifications and Other Statements of Offerors General References Safety Overview Hazardous Material Form Proposed Equals Form Subcontracting Plan
Amendments
NPS goals are
SB 44.5%
SDB 5%
WOSB 5%
HubZone 3%
SDVOSB 3%
SCOPE OF WORK
General Items of Work – Visitor Screening Facility
Demolish existing temporary VSF (roughly 450 SF) Construct a new visitor screening facility (roughly 1,000 SF) Resource protection for both interior and exterior work Highly significant, visible and prominent site Custom glazed exterior envelope, with ballistic/blast protections Heavy steel construction and concrete foundation work, with a small basement level mechanical room (roughly 600 SF) Geothermal (ground source) heat pump system
Andrea
General Items of Work - Elevator
Repair, upgrade and modernize Elevator Remove of out-of-date system components Install new system components
| Components include items such as: | |||||||
| Control system, cab door equipment and operators, | buffer switch and leveling unit indicator, cab top | lighting, remote control system at 0-foot level, | compensation and hoist ropes, elevator inspection key | switch, machine room ventilation, cab ventilation, | elevator/cab phone/communications, elevator/cab operator | options, and elevator machine room access/ladder. |
Mike
General Items of Work – Elevator cont.
Elevator emergency landings in the stairway Power distribution system upgrade from below-grade bunker to elevator machine room, includes all cable, wiring and connections Replace existing fire alarm system in the Monument, including appliances, and interface w/ new Visitor Screening Facility One-Year Elevator Maintenance/Service period, from substantial completion date of VSF (concurrent w/ warranty period)
Existing floor plan Exit Entry Stanchion & turnstile 28’-7” 16’-4”
USPP
35’-4” 30’ Entry Emergency only exit Secure area
USPP
Employee restroom Exit
The temporary structure is made up of three walls and roof. The fourth wall is the exterior of the Washington Monument, and there is no floor or foundation. In addition, modifications were made for security, which includes ballistic glass windows (non-operable), steel plate walls, and various partition walls to facilitate the visitor screening process. There is no insulation in the building.
The proposed facility is 7 feet longer and 13 feet wider than the existing facility, but it accommodates queuing for a full elevator load (15-18 people inside), with doors closed. Employee restroom. Thick gray walls indicate the secure area that can withstand blast loads.
Plan - basement mechanical room Section – basement mechanical room Monument Monument
Plan - utilities Plan – remove/replace pavers Plan – geothermal (north of plaza;
within triangular walk area)
Utilities include electric, telecom, fire alarm, ground heat supply and return lines, water, storm, and sanitary.
18 wells at 20 foot spacing; 6 inch diameter by 406 feet deep
Elevator
Elevator Machine Room Proposed Elevator Machine Room Access Existing Access
REGULATORY REQUIREMENTS AND PERMITS
Applicable Regulatory Requirements/Permits
Department of Consumer and Regulatory Affairs (DCRA) Building permit is # BCIV1700049 This permit is required for applications for other permits, such as DOEE DCRA coversheet includes soil boring permit number Well construction building permit, including well construction work plan
Department of Energy and Environment (DOEE), SWM & ESC Contractor responsible for construction permit SWM/ESC and arrange for pre-con and inspections with DOEE inspector
District Department of Transportation (DDOT) Traffic control plan if city jurisdiction street closures are required (i.e. at construction entrance) 15th St. SW at Monument is NPS jurisdiction
DC Water and Sewer Authority DC Water & Sewer Temporary Discharge Authorization
The contractor should acquire permits in a timely manner to avoid delays in the construction schedule.
DCRA is clearing house for all other permits
We have approved SWM/ESC control plans we can provide. Everything is in your set, but we do have a separate approval set for your use.
This list is our best guess based on our experience.
CLOSE OF PRESENTATION
QUESTIONS?
Thank you for your time and interest in this project!
Mike – go over site visit rules/parking/logistics