This document contains a set of questions for industry contractors regarding the P-1062 Dry Dock #3 Modernization project at the Norfolk Naval Shipyard in Virginia. The questions cover the contractors' top concerns with the project, the achievability of the construction schedule, issues with the draft design and environmental requirements, the impact of material procurement challenges due to the Buy America Act, and the potential effects of a fixed-price contract with an award-fee. The document is meant to solicit feedback from industry on these key aspects of the project in preparation for the upcoming P1062 Industry Engagement Day event.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions for Industry Day Contractors – June 26, 2024; P-1062 Dry Dock #3 Modernization

1. Based upon the project presentation and your review of the draft plans and specifications, What are your top 3 overall project concerns? (draft plans and specs will be included via addendum at a later date).

2. Based on the construction time frame presented in the schedule milestones,

a. Is the planned schedule achievable?

b. What do you consider to be the most critical or at risk elements of the planned project schedule?

3. What elements of the draft design and related construction concern you the most?

4. Do you have any recommendations that would increase the likelihood of meeting the planned project schedule within budget?

5. What elements of the project environmental requirements concern you most?

6. Given current pricing volatility, how much value does an Economic Price Adjustment provide? Would it have a positive impact on your assessment of project risk and interest in the project?

7. Do you anticipate that adherence to the Buy America Act may significantly impact procurement of materials (specifically cost and lead time due to limited availability of US manufacturers) for this project such as large sluice gates and valves?. If so, what items do you think would be impacted and what are the generally expected lead times and increased cost as a percentage compared to a foreign supplier?

8. Any recent examples of extreme lead times for procurement of unique materials/equipment (generally mechanical and electrical) that are readily available in the

US but have recently had longer than historically typical lead times? If so, what items do you think would be impacted and what are the generally expected lead times?

9. Would a fixed price contract to include an award-fee affect your interest in the project.? If so, please provide the rationale to support this contract type.