About this file

This document is an industry engagement flyer for a federal contract opportunity related to the P1062 Military Construction Project (MILCON) for the Dry Dock 3 Modernization at the Norfolk Naval Shipyard in Portsmouth, Virginia.

The key details are:

  • NAVFAC LANT is hosting a virtual industry engagement event on June 25, 2024 to provide an overview of the project, which includes rebuilding the caisson seats, refurbishing the dock floor and walls, constructing a wet well and pump house, rerouting utilities, and replacing the rail systems.
  • One-on-one meetings with NAVFAC LANT will be held virtually or in-person from July 31 to August 1, 2024. Contractors must register by June 14, 2024 to participate and indicate if they want a one-on-one meeting.
  • The project is estimated to cost over $500 million and the anticipated award is in Q2/Q3 FY26.
  • Contractors are invited to submit comments and questions by July 15, 2024, and provide feedback on the draft drawings and specifications by the same date.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

P1062 Industry Day Event Dry Dock 3 Modernization

Norfolk Naval Shipyard, Portsmouth Virginia

When: June 25, One-on-One meeting date July 31 through August 01

• Virtual Industry Engagement, Project Introduction and Overview – Tuesday, June 25, 2024

(0830-1200)

• One on One Meetings with NAVFAC LANT – July 31-August 01 (Location virtual or at LRA) What: Naval Facilities Engineering Systems Command, Atlantic (NAVFAC LANT) invites contractors to receive updates, learn, ask questions, and provide feedback in a general meeting (virtual) as well as breakout sessions regarding the proposed Military Construction Project (MILCON) P1062 Design-Bid- Build, Dry Dock 3 Modernization, Norfolk Naval Shipyard (NNSY), Portsmouth, Virginia.

Who: Construction contractors (general and specialty) with appropriate experience with Waterfront construction.

Where: Virtual Meeting

Registration is required to participate and access the meeting. Please follow the instructions provided below under Registration Information.

A web link to access the virtual industry event will be emailed to contractors whose registration information is received no later than 14 June 2024. The invitation for the virtual industry engagement event will be provided to those whose registration was received no later than 20 June 2024.

Project Scope: The Dry Dock 3 modernization project includes the following major components: rebuilding the caisson seats with deep foundations, refurbishing the dock floor and walls, pinning the concrete floor, constructing a wet well and pump house to replace the existing pumpwell, rerouting all utilities into a new utility trench around the dock perimeter, and replacing the dry dock’s surrounding rail systems.

1. Cofferdam A temporary cofferdam at the entrance to Dry Dock 3 will be constructed to allow the contractor to perform demolition and construction under dry working conditions. The cofferdam consists of a continuous steel pipe pile wall (SPP Wall) driven side-by-side to form a continuous wall. The wall will support approximately 40 feet of water on the riverside. The cofferdam will be constructed approximately 8 feet east of the dry dock entrance (in the river), beyond the existing timber pile supported apron. In the space between the dry dock entrance and the cofferdam, riverbed soils will be dredged and replaced with a tremie concrete slab to seal off upward water flow.

In addition, composite sheet pile/concrete closure walls will be constructed on either side of the dock entrance, connecting the SPP Wall to the dock proper and therefore closing off the entrance.

2. Dry Dock The floors and walls of the dry dock will be reconstructed by initially removing all the dry dock’s existing granite blocks (ranging from 15 inches thick along the floor and up to 50 inches thick along the altars) and a minimum of 12 inches of existing concrete beneath the granite. The coping/floodwall elevation will be the entrance, will have a tie-down system to resist increased uplift demands due to higher flood events. The dry dock’s walls and floor will be reconstructed with reinforced concrete to provide improved capacity accommodating the increased “superflood” load condition and reestablishing the 2009 FCR design blocking loads.

3. Wet Well Selective demolition of the existing below grade Pumpwell is required to accommodate the discharge piping for the Wet Well and Pump House. This includes the removal of the existing ladders, catwalks, platforms, stairs, concrete walls/slabs and fiberglass grating as required by structural work.

Project Cost Range: Over $500,000,000

Anticipated Project Award: Q2/Q3 FY26

Agenda:

brandi.upton Highlight brandi.upton Highlight

• June 25: General Presentation, to include but not limited to:

Project Overview Dry Dock 3 Site Overview and Project Scope of Work Acquisition Overview Existing Conditions and Proposed Conditions

• July 31 - August 01: One-on-one Breakout Sessions – Please specify with your registration if a one-on-one session is requested and if you prefer to attend in person or virtually. In person attendance will be limited to a maximum of four (4) personnel.

45-60 -minute one-on-one conference call sessions with the NAVFAC team to provide feedback on the project.

Discussions held during one-on-one meetings will be private

Priority for one-on-one meetings will be given to prime contractors with similar project experience in terms of size and scope..

Contractors will be notified of their designated time slot by 23 July 2024, if selected.

Meetings are being offered both virtually and in-person. If virtual, attendees must have access to video. NAVFAC will coordinate meeting preferences with selected attendees at this time.

Registration Information:

Registration for the general meeting and the breakout sessions is required. Provide company name, physical address, email address(es), POC, and telephone number(s) to Brandi Upton (brandi.j.upton.civ@us.navy.mil), Contract Specialist and Rebecca Douglas (rebecca.v.douglas.civ@us.navy.mil), Contracting Officer, no later than 14 June 2024. Please identify whether your firm is a prime contractor. Please indicate within your registration if you are requesting a one-on-one session.

Comment Submission:

• Contractors are invited to submit questions and/or comments via email to Brandi Upton, Contract Specialist, at brandi.j.upton.civ@us.navy.mil. Please submit your questions no later than 15 July 2024.

General questions and answers will be posted as an addendum to this announcement no later than 24 July 2024.

• Please review the attached industry day questions and provide general answers via email to Brandi Upton, Contract Specialist, at brandi.j.upton.civ@us.navy.mil no later than 09 July 2024. These answers will provide the Government an initial agenda for the one-on one meetings.

Draft drawings and specifications are attached to this notice. In addition to the draft drawings and specs, a drawings and specs feedback sheet is included as an attachment to this notice. Please review drawings and specifications and provide feedback utilizing the attached excel spreadsheet no later than 15 July 2024.

NAVFAC Atlantic intends to reach out to those contractors that expressed interest in one-on-one meetings via email. At that time, contractors will be advised whether they have been selected for the one-one-one meetings.

Individuals who submit a response to this notice will not be contacted directly with event details. Any updates or modifications to this notice will be posted to https://sam.gov. It is your firm’s sole responsibility to obtain the information from the SAM website.

https://sam.gov/ brandi.upton Highlight brandi.upton Highlight brandi.upton Highlight brandi.upton Highlight brandi.upton Highlight brandi.upton Highlight brandi.upton Highlight brandi.upton Highlight brandi.upton Highlight brandi.upton Highlight

NOTE: THE GOVERNMENT RESERVES THE RIGHT TO CANCEL THIS P1062 INDUSTRY DAY EVENT AT

ANY TIME. THE GOVERNMENT IS NOT RESPONSIBLE FOR ANY COSTS INCURRED IN ORDER TO

PARTICIPATE IN THIS PROCESS. THIS P1062 INDUSTRY DAY EVENT IS IN SUPPORT OF ON-GOING

MARKET RESEARCH AND ALL INFORMATION, RECOMMENDATIONS OR SUGGESTIONS PROVIDED BY

ATTENDEES MAY BE UTILIZED WITHOUT ANY RESTRICTIONS WHATSOEVER OR COST TO THE

GOVERNMENT AND MAY BE INCLUDED IN FUTURE STATEMENTS OF WORK. NOTE: NAVFAC intends to post the project briefing as an addendum to this announcement no later than 15 July 2024. Please monitor https://sam.gov.

NOTE: Revision 2 - If you have already registered for industry engagement day, you do not have to re-register. You will be included on the invitation for the virtual industry engagement on 25 June 2024 in lieu of the originally scheduled date

Revision 3- Registration is closed for industry engagement day.