olym115-1_plans_IFB.pdf

PDF 27 MB Posted

Attached to
WA NP OLYM 115(1), Repair Storm Damage on Mora Road
Solicitation number
69056725B000015
Issued by

About this file

This document is an Invitation for Bid (IFB) for a National Park Service project to repair storm damage on Mora Road located at Olympic National Park. The project involves bank stabilization and engineered logjams, with design considerations for anticipated average daily traffic (ADT) in 2025 and 2045. The project is associated with NPS PMIS No. 273171 and involves specific engineering and construction work at the Quillayute Airport and James Pond area. The solicitation (Number 69056725B000015) is being administered by the Department of Transportation Federal Highway Administration, indicating a multi-agency collaboration for infrastructure repair and restoration.

View the file

Other files

Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

J. DAVIS

PROJECT MANAGER

C :\U

SE

R

S\

AL

EX

A.

D

EE

P\ D

ES

KT

O P\

M O

R A

R D

\A .1

-A .2

C

O

VE

R

SH

EE

T.

D W

G

PL

O T

D

ET

AI

LS

: D

EE

P, A

LE

XA

A ug us t 2 7, :4

PM

TT

-B O

TH

-M

AI

N

-M O

N O

.C

TB

A.1

NPS PMIS NO. 273171 NPS DRWG NO. 149/195665

NATIONAL

PARK

SERVICE

PROJECT LOCATION

N

Quillayute Airport

James Pond

U. S. DEPARTMENT OF THE INTERIOR

NATIONAL PARK SERVICE

OLYMPIC NATIONAL PARK

REPAIR STORM DAMAGE ON MORA ROAD

TYPE OF CONSTRUCTION:

Bank Stabilization, Engineered Logjams

DESIGN DESIGNATION:

ADT (2025)

ADT (2045)

V e (max)

<500 <600

25 MPH

0.06

SPECIFICATION:

Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-24

FOR

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

WESTERN FEDERAL LANDS HIGHWAY DIVISION

VANCOUVER, WASHINGTON

LENGTH 0.12 MILES

PLANS FOR PROPOSED PROJECT

CLALLAM COUNTY

WASHINGTON

Q ui lla yu te R d

Quill ayu te Rd

M in a S m ith R d

Mora Rd

Mora Rd

Quillayute River

So l D uc R iv er

Bo ga ch ie l R iv er

Quillayute River

Quileute StreetLa Push Rd

La Push Rd

La P us h

Rd

D ic ke y

R iv er

Dick ey

Rive r

Lonesome Creek

See Sheet A.4

OLYMPIC

NATIONAL

PARK

Scale in miles

1 0 1 2 3

PACIFIC

OCEAN

Park B oundary

APPROVED:

Chief of Engineering, Western Federal Lands Highway Division

Park Superintendent Olympic National Park

PLANS PREPARED BY

WA NP OLYM 115(1)

NPS PMIS NO. 273171

A. GENERAL INFORMATION

B. SUMMARY OF QUANTITIES

C. TYPICAL SECTIONS

D. ACCESS AND STAGING

E. BANK STABILIZATION

F. SOIL EROSION AND SEDIMENT CONTROL

G. PLANTINGS

H. TEMPORARY TRAFFIC CONTROL PLAN

S E C T I O N I N D E X

NORTH

CASCADES

NATIONAL

PARK

un d o S t e guP

P A

C

IF

IC

O

C A

E N tS ra it of Juan de F uca

OC LUM BIA R IV E R

A

SN KE R V ERI

M

COLU B

IA

V

RI

ER

Banks Lakes

Moses Lakes

Potholes Reservoir

OLYMPIC

NATIONAL

PARK

MOUNT

RAINIER

N.P.

MOUNT

ST. HELENS

NAT'L VOLC.

MON.

BELLINGHAM

Forks

Aberdeen

Chehalis

Longview

OLYMPIA

TACOMA

SEATTLE

EVERETT

Wenatchee Moses Lake

SPOKANE

Pullman

Pasco

RICHLAND

Kennewick Walla Walla

PORT

ANGELES

Port Townsend

Mt.

Vernon

VANCOUVER

WASHINGTON KEY MAP

YAKIMA

BRITISH COLUMBIA

ID

A H

O

OREGON

CANADA

UNITED STATES

SHEET

NUMBER

PROJECT

WA NP OLYM 115(1)

Quileute Natural Resources

See Sheet A.2 for complete Sheet Index

/S/ Sula Jacobs 7/12/2025

BRENT L COE Digitally signed by BRENT L COE Date: 2025.09.03 12:00:43 -07'00'

RACHEL.SEIDNER

Sticky Note Cancelled set by RACHEL.SEIDNER

NPS PMIS No. 273171 NPS Drwg No. 149/195665

Sheet and Description

Section D Section E Section F Section G Section H

Access and Staging

Bank Stabilization

Soil Erosion and Sediment Control

Plantings Temporary

Traffic Control Plan

Allowance Bid Schedule

A0020 15101-0000 MOBILIZATION LPSM ALL

A0040 15201-0000 CONSTRUCTION SURVEY AND STAKING LPSM ALL

A0060 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL

A0080 15401-0000 CONTRACTOR TESTING LPSM ALL

A0100 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL

A0120 15705-0100 SOIL EROSION CONTROL, SILT FENCE LNFT 3,560 360 3,920

A0140 15705-1400 SOIL EROSION CONTROL, FIBER ROLL LNFT 75 8 83

A0160 15705-2000 SOIL EROSION CONTROL, FLOATING TURBIDITY CURTAIN LNFT 765 77 842

A0180 15706-1600 SOIL EROSION CONTROL, STABILIZED CONSTRUCTION EXIT EACH 3 3

A0200 20101-0000 CLEARING AND GRUBBING ACRE 1.40 0.14 1.54

A0220 25101-0500 PLACED RIPRAP, CLASS 5 CUYD 8,000 800 8,800

A0240 25101-0500 PLACED RIPRAP, CLASS 5 (VEGETATED) CUYD 2,640 264 2,904

A0260 62501-0000 TURF ESTABLISHMENT (ZONE 1) ACRE 0.20 0.02 0.22

A0280 62602-0000 PLANTINGS (ZONE 2) ACRE 0.80 0.08 0.88

A0300 62602-0000 PLANTINGS (ZONE 3) ACRE 0.10 0.01 0.11

A0320 62801-0000 TEMPORARY STREAM DIVERSION LPSM ALL

A0340 62901-0000 ROLLED EROSION CONTROL PRODUCT SQYD 2,990 299 3,289

A0360 63308-1000 OBJECT MARKER, TYPE 1 (ALUMINUM) EACH 10 10

A0380 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3 EACH 2 2

A0400 63502-1700 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE C EACH 4 4

A0420 63502-2000 TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN EACH 1 1

A0440 63502-3900 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN EACH 6 6

A0460 64703-4000 ENVIRONMENTAL DESIGN, LOG BARRIER (MEDIUM LOG) EACH 63 63

A0480 64703-4000 ENVIRONMENTAL DESIGN, LOG BARRIER (RACKING MATERIAL) EACH 300 30 330

A0500 64703-4000 ENVIRONMENTAL DESIGN, LOG BARRIER (SLASH) EACH 5,800 580 6,380

A0520 64703-5000 ENVIRONMENTAL DESIGN, ROOT WAD (LARGE LOG OPTIONAL ROOT WAD) EACH 79 79

A0540 64703-5000 ENVIRONMENTAL DESIGN, ROOT WAD (LARGE LOG WITH ROOT WAD, 25 FT MIN.) EACH 69 69

A0560 64703-5000 ENVIRONMENTAL DESIGN, ROOT WAD (LARGE LOG WITH ROOT WAD, 45 FT MIN.) EACH 64 7 71

A0580 64703-6000 ENVIRONMENTAL DESIGN, FISH PASSAGE BOULDER (3 FT DIA.) EACH 213 21 234

A0600 64703-6000 ENVIRONMENTAL DESIGN, FISH PASSAGE BOULDER (4 FT DIA.) EACH 144 14 158

A0620 64703-8000 ENVIRONMENTAL DESIGN, BANK STABILIZATION (UNTREATED TIMBER PILE) EACH 78 8 86

A0640 64704-1000 ENVIRONMENTAL DESIGN, STREAMBED MATERIAL (CONSERVED) CUYD 4,260 426 4,686

A0660 64704-1000 ENVIRONMENTAL DESIGN, STREAMBED MATERIAL (SCOUR COUNTERMEASURE MIX) CUYD 940 94 1,034

MileStone: 100% Date Completed: 07/22/25 Report Date: 09/17/25

A M E N D

Line Item No. Pay Item Number

SUMMARY OF QUANTITIES

-S ep

-2

4:

P

M

Remarks and/or Determination of

Estimated Quantity Pay Item Description Unit

Estimated Quantities

C

U se rs \J oh n.

D av is \D es kt op \M or a\

Es tim at e\

[o ly m

5- 1_ su m m ar y-qu an tit ie s_

9.

.2 5.

xl sm

]S he et

PROJECT

B.1WA NP OLYM 115(1)

SHEET

NUMBER

RACHEL.SEIDNER

Completed set by RACHEL.SEIDNER

RACHEL.SEIDNER

Sticky Note Completed set by RACHEL.SEIDNER

RACHEL.SEIDNER

Completed set by RACHEL.SEIDNER movement of typical truck using exit

Construct radius to allow turning stabilization geotextile

Separation-

Filter rock

Existing paved roadway

NO SCALE

NOTE:

STABILIZED CONSTRUCTION EXIT

4.

3.

2.

1.

Adjust length to fit field conditions as approved.

built up sediment.

Minimize tracking onto paved roadway by removing crosses existing drainage ditches.

Provide temporary drainage culvert where entrance

Construct drainage ditches along entrance as directed.

Use this entrance for construction vehicles only.

/e gr es s ar ea w id th of in gr es s

Pr ov id e fu ll

6" min.

50'typical

't yp ica l

CONSTRUCTION EXIT

STABILIZED

157-19W

FP-24

7/2016

WFL STANDARD

:2

A

M M a r c h

S td W c p w w o r k

\d

\W

.d g n

OFFICE OF FEDERAL LANDS HIGHWAY

U.S. DEPARTMENT OF TRANSPORTATION, FHWA

SPECIFICATION

APPROVED FOR USE

PROJECT

NUMBER

SHEET

Proj-Num: WA NP OLYM 115(1)
W157-19: F.11
NPS: NPS PMIS NO. 273171 NPS NO.149/195665

File details come from the government source that posted it. Updated .