olym115-1_plans_IFB.pdf
PDF 27 MB Posted
- Solicitation number
- 69056725B000015
About this file
This document is an Invitation for Bid (IFB) for a National Park Service project to repair storm damage on Mora Road located at Olympic National Park. The project involves bank stabilization and engineered logjams, with design considerations for anticipated average daily traffic (ADT) in 2025 and 2045. The project is associated with NPS PMIS No. 273171 and involves specific engineering and construction work at the Quillayute Airport and James Pond area. The solicitation (Number 69056725B000015) is being administered by the Department of Transportation Federal Highway Administration, indicating a multi-agency collaboration for infrastructure repair and restoration.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
J. DAVIS
PROJECT MANAGER
C :\U
SE
R
S\
AL
EX
A.
D
EE
P\ D
ES
KT
O P\
M O
R A
R D
\A .1
-A .2
C
O
VE
R
SH
EE
T.
D W
G
PL
O T
D
ET
AI
LS
: D
EE
P, A
LE
XA
A ug us t 2 7, :4
PM
TT
-B O
TH
-M
AI
N
-M O
N O
.C
TB
A.1
NPS PMIS NO. 273171 NPS DRWG NO. 149/195665
NATIONAL
PARK
SERVICE
PROJECT LOCATION
N
Quillayute Airport
James Pond
U. S. DEPARTMENT OF THE INTERIOR
NATIONAL PARK SERVICE
OLYMPIC NATIONAL PARK
REPAIR STORM DAMAGE ON MORA ROAD
TYPE OF CONSTRUCTION:
Bank Stabilization, Engineered Logjams
DESIGN DESIGNATION:
ADT (2025)
ADT (2045)
V e (max)
<500 <600
25 MPH
0.06
SPECIFICATION:
Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-24
FOR
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
WESTERN FEDERAL LANDS HIGHWAY DIVISION
VANCOUVER, WASHINGTON
LENGTH 0.12 MILES
PLANS FOR PROPOSED PROJECT
CLALLAM COUNTY
WASHINGTON
Q ui lla yu te R d
Quill ayu te Rd
M in a S m ith R d
Mora Rd
Mora Rd
Quillayute River
So l D uc R iv er
Bo ga ch ie l R iv er
Quillayute River
Quileute StreetLa Push Rd
La Push Rd
La P us h
Rd
D ic ke y
R iv er
Dick ey
Rive r
Lonesome Creek
See Sheet A.4
OLYMPIC
NATIONAL
PARK
Scale in miles
1 0 1 2 3
PACIFIC
OCEAN
Park B oundary
APPROVED:
Chief of Engineering, Western Federal Lands Highway Division
Park Superintendent Olympic National Park
PLANS PREPARED BY
WA NP OLYM 115(1)
NPS PMIS NO. 273171
A. GENERAL INFORMATION
B. SUMMARY OF QUANTITIES
C. TYPICAL SECTIONS
D. ACCESS AND STAGING
E. BANK STABILIZATION
F. SOIL EROSION AND SEDIMENT CONTROL
G. PLANTINGS
H. TEMPORARY TRAFFIC CONTROL PLAN
S E C T I O N I N D E X
NORTH
CASCADES
NATIONAL
PARK
un d o S t e guP
P A
C
IF
IC
O
C A
E N tS ra it of Juan de F uca
OC LUM BIA R IV E R
A
SN KE R V ERI
M
COLU B
IA
V
RI
ER
Banks Lakes
Moses Lakes
Potholes Reservoir
OLYMPIC
NATIONAL
PARK
MOUNT
RAINIER
N.P.
MOUNT
ST. HELENS
NAT'L VOLC.
MON.
BELLINGHAM
Forks
Aberdeen
Chehalis
Longview
OLYMPIA
TACOMA
SEATTLE
EVERETT
Wenatchee Moses Lake
SPOKANE
Pullman
Pasco
RICHLAND
Kennewick Walla Walla
PORT
ANGELES
Port Townsend
Mt.
Vernon
VANCOUVER
WASHINGTON KEY MAP
YAKIMA
BRITISH COLUMBIA
ID
A H
O
OREGON
CANADA
UNITED STATES
SHEET
NUMBER
PROJECT
WA NP OLYM 115(1)
Quileute Natural Resources
See Sheet A.2 for complete Sheet Index
/S/ Sula Jacobs 7/12/2025
BRENT L COE Digitally signed by BRENT L COE Date: 2025.09.03 12:00:43 -07'00'
RACHEL.SEIDNER
Sticky Note Cancelled set by RACHEL.SEIDNER
NPS PMIS No. 273171 NPS Drwg No. 149/195665
Sheet and Description
Section D Section E Section F Section G Section H
Access and Staging
Bank Stabilization
Soil Erosion and Sediment Control
Plantings Temporary
Traffic Control Plan
Allowance Bid Schedule
A0020 15101-0000 MOBILIZATION LPSM ALL
A0040 15201-0000 CONSTRUCTION SURVEY AND STAKING LPSM ALL
A0060 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL
A0080 15401-0000 CONTRACTOR TESTING LPSM ALL
A0100 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A0120 15705-0100 SOIL EROSION CONTROL, SILT FENCE LNFT 3,560 360 3,920
A0140 15705-1400 SOIL EROSION CONTROL, FIBER ROLL LNFT 75 8 83
A0160 15705-2000 SOIL EROSION CONTROL, FLOATING TURBIDITY CURTAIN LNFT 765 77 842
A0180 15706-1600 SOIL EROSION CONTROL, STABILIZED CONSTRUCTION EXIT EACH 3 3
A0200 20101-0000 CLEARING AND GRUBBING ACRE 1.40 0.14 1.54
A0220 25101-0500 PLACED RIPRAP, CLASS 5 CUYD 8,000 800 8,800
A0240 25101-0500 PLACED RIPRAP, CLASS 5 (VEGETATED) CUYD 2,640 264 2,904
A0260 62501-0000 TURF ESTABLISHMENT (ZONE 1) ACRE 0.20 0.02 0.22
A0280 62602-0000 PLANTINGS (ZONE 2) ACRE 0.80 0.08 0.88
A0300 62602-0000 PLANTINGS (ZONE 3) ACRE 0.10 0.01 0.11
A0320 62801-0000 TEMPORARY STREAM DIVERSION LPSM ALL
A0340 62901-0000 ROLLED EROSION CONTROL PRODUCT SQYD 2,990 299 3,289
A0360 63308-1000 OBJECT MARKER, TYPE 1 (ALUMINUM) EACH 10 10
A0380 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3 EACH 2 2
A0400 63502-1700 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE C EACH 4 4
A0420 63502-2000 TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN EACH 1 1
A0440 63502-3900 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN EACH 6 6
A0460 64703-4000 ENVIRONMENTAL DESIGN, LOG BARRIER (MEDIUM LOG) EACH 63 63
A0480 64703-4000 ENVIRONMENTAL DESIGN, LOG BARRIER (RACKING MATERIAL) EACH 300 30 330
A0500 64703-4000 ENVIRONMENTAL DESIGN, LOG BARRIER (SLASH) EACH 5,800 580 6,380
A0520 64703-5000 ENVIRONMENTAL DESIGN, ROOT WAD (LARGE LOG OPTIONAL ROOT WAD) EACH 79 79
A0540 64703-5000 ENVIRONMENTAL DESIGN, ROOT WAD (LARGE LOG WITH ROOT WAD, 25 FT MIN.) EACH 69 69
A0560 64703-5000 ENVIRONMENTAL DESIGN, ROOT WAD (LARGE LOG WITH ROOT WAD, 45 FT MIN.) EACH 64 7 71
A0580 64703-6000 ENVIRONMENTAL DESIGN, FISH PASSAGE BOULDER (3 FT DIA.) EACH 213 21 234
A0600 64703-6000 ENVIRONMENTAL DESIGN, FISH PASSAGE BOULDER (4 FT DIA.) EACH 144 14 158
A0620 64703-8000 ENVIRONMENTAL DESIGN, BANK STABILIZATION (UNTREATED TIMBER PILE) EACH 78 8 86
A0640 64704-1000 ENVIRONMENTAL DESIGN, STREAMBED MATERIAL (CONSERVED) CUYD 4,260 426 4,686
A0660 64704-1000 ENVIRONMENTAL DESIGN, STREAMBED MATERIAL (SCOUR COUNTERMEASURE MIX) CUYD 940 94 1,034
MileStone: 100% Date Completed: 07/22/25 Report Date: 09/17/25
A M E N D
Line Item No. Pay Item Number
SUMMARY OF QUANTITIES
-S ep
-2
4:
P
M
Remarks and/or Determination of
Estimated Quantity Pay Item Description Unit
Estimated Quantities
C
U se rs \J oh n.
D av is \D es kt op \M or a\
Es tim at e\
[o ly m
5- 1_ su m m ar y-qu an tit ie s_
9.
.2 5.
xl sm
]S he et
PROJECT
B.1WA NP OLYM 115(1)
SHEET
NUMBER
RACHEL.SEIDNER
Completed set by RACHEL.SEIDNER
RACHEL.SEIDNER
Sticky Note Completed set by RACHEL.SEIDNER
RACHEL.SEIDNER
Completed set by RACHEL.SEIDNER movement of typical truck using exit
Construct radius to allow turning stabilization geotextile
Separation-
Filter rock
Existing paved roadway
NO SCALE
NOTE:
STABILIZED CONSTRUCTION EXIT
4.
3.
2.
1.
Adjust length to fit field conditions as approved.
built up sediment.
Minimize tracking onto paved roadway by removing crosses existing drainage ditches.
Provide temporary drainage culvert where entrance
Construct drainage ditches along entrance as directed.
Use this entrance for construction vehicles only.
/e gr es s ar ea w id th of in gr es s
Pr ov id e fu ll
6" min.
50'typical
't yp ica l
CONSTRUCTION EXIT
STABILIZED
157-19W
FP-24
7/2016
WFL STANDARD
:2
A
M M a r c h
S td W c p w w o r k
\d
\W
.d g n
OFFICE OF FEDERAL LANDS HIGHWAY
U.S. DEPARTMENT OF TRANSPORTATION, FHWA
SPECIFICATION
APPROVED FOR USE
PROJECT
NUMBER
SHEET
| Proj-Num: WA NP OLYM 115(1) |
| W157-19: F.11 |
| NPS: NPS PMIS NO. 273171 NPS NO.149/195665 |
File details come from the government source that posted it. Updated .