This document is a comprehensive engineering design report for the Repair Storm Damage at Mora Road project, prepared by Tetra Tech for a 95% design phase. The project involves extensive hydraulic and structural analysis for stream restoration, focusing on large wood structure stability, boulder and riprap sizing, and scour countermeasures for a 100-year flood event with resiliency considerations.
Key technical analyses include detailed calculations for large wood structures (deflectors, revetments, and large deflectors), with stability evaluations for sliding, buoyancy, rotation, and overturning. The design incorporates western hemlock logs, boulder and soil ballast, and vertical pilings. Critical parameters such as water depth, flow velocity, and bed sediment characteristics were used to determine structural stability, with all proposed structures meeting or exceeding the required safety factors (1.75-2.0) for different failure modes. The design also includes comprehensive scour analysis using multiple methodologies, with a focus on maintaining stream ecosystem functionality while providing erosion protection.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Boulder Sizing
Project Number
Scale
Designed By Date Checked By Date Sheet No:
Define Input Parameters
Average Boundary Shear = psf Max structure value for proposed conditions Boulder Size (D50) = ft
Calculate Minimum Boulder Size Using HRB Method
Based on the figure above, a linear relationship is observed between boulder diameter and the boundary shear stress required to move the material. The below relationship is recommended by HRB for stable material:
Using this relationship for boundary shear, the minimum boulder size for stability is equal to ft
Conclusion
3/3/2025 1 of 2
Objective: Determine Boulder Size for Fish Passage Boulders on Revetment Structures
PROJECT Repair Storm Damage at Mora Road 95% Design 194-1343-0002
SUBJECT Boulder Stability Calculations NA
JV 2/14/2025 AD
Safety Factor = /3 0.9 =5 3.16 OK
Using the HRB method, the selected boulder size is sufficient for the average boundary shear anticipated in the stream simulation channel segment for the 100-yr peak flow with resiliency and the record low tide.
References:
HRB (Highway Research Board). 1970. Tentative Design Procedure for Riprap-Lined Channels. National Academy of Sciences, National Cooperative Highway Research Program, Report 108.
USBR (United States Department of the Interior Bureau of Reclamation, 2007. Rock Ramp Design Guidelines.
https://www.usbr.gov/tsc/techreferences/mands/mands-pdfs/RockRampDesignGuidelines_09-2007_508.pdf
3.8
0.95 g
Project Number
Scale
Designed By Date Checked By Date Sheet No:
Define Input Parameters
Ds = boulder Size (D50) = ft Rock size, 3-ft diameter o = longitudinal bed slope = ft/ft Based on channel design 1 = bank side slope ft/ft Based on channel design deg Based on USBR guideline
0 = bed shear stress = psf Max structure value for proposed conditions
Calculate Safety Factor of Proposed Boulder Size Using USBR Method
Use Equation 7-1 from USBR:
0 = 1 = SF = OK
Conclusion
Using the USBR Method, the selected boulder size provides a sufficient Safety Factor for stability in the stream simulation channel segment for the 100-yr peak flow with resiliency and the record low tide.
Objective: Determine Boulder Size for Fish Passage Boulders on Revetment Structures
PROJECT Repair Storm Damage at Mora Road 95% Design 194-1343-0002
SUBJECT Boulder Stability Calculations NA
JV 2/14/2025 AD
0.3
3/3/2025 2 of 2
References:
HRB (Highway Research Board). 1970. Tentative Design Procedure for Riprap-Lined Channels. National Academy of Sciences, National Cooperative Highway Research Program, Report 108.
USBR (United States Department of the Interior Bureau of Reclamation, 2007. Rock Ramp Design Guidelines.
https://www.usbr.gov/tsc/techreferences/mands/mands-pdfs/RockRampDesignGuidelines_09-2007_508.pdf
0.01
3.8
0.2584 21.959 0.179 2.02 deviation from horizontal = 0 deg Based on USBR guideline
Riprap Sizing
Calculated by: JV Checked by: AD Sheet No: 1 of 2
Estimate D30
Equation: D30 = SfCsCvCt w s w))1/2 V/(K1gd)1/2}2.5 where: D30 = material size in which 30 percent is finer by weight [ft]
Define Input Parameters
Safety Factor Sf = 1.50 Minimum of 1.1, usually 1.1-1.5
Stability Coefficient for Incipient Failure Cs = 0.300 Typical for angular rock
Vertical velocity distribution coefficient Cv = 1.21 Conservative assumption of Cv=1.283-0.2*log(R/W) Centerline bend radius R = 840.00 ft Value used for bend scour analysis
Water surface width W = 350.00 ft Value used for bend scour analysis Ratio R/W = 2.4
Thickness coefficient Ct = 1.00 Assume 1 for 1*D100 or 1.5*D50
Flow depth d = 23.96 ft Average for proposed structure Specific weight of water w = 62.40 lb/ft3
Specific weight of stone s = 165.00 lb/ft3
Local velocity V = 5.85 ft/s Average for proposed structure Gravitational constant g = 32.20 ft/s2
Side slope correction factor K1 = 0.58 Use K1 curve recommended for design Side slope angle 39.0 deg Measured from terrain Angle of repose 40.0 deg Typically 40 degrees
Side slope velocity Vss = 9.02 ft/s Vss = V * {1.74 - 0.52*Log(R/W)}
Calculation Results:
D30 = 0.83 ft D30 = 9.95 Inches
USBR (U.S. Bureau of Reclamation). 2007. Stone Sizing Criteria. Technical Supplement 14C, National Engineering Handbook.
Project: Repair Storm Damage at Mora Road (95% Design)
Subject: Material Sizing Calculations - Embankment
Project No:
Date:
194-1343-0002
2/14/2025
Objective:
Reference(s):
Determine material sizing for embankment based on 2D hydraulic model results for existing conditions.
USACE (U.S. Army Corps of Engineers). 1994. Hydraulic Design of Flood Control Channels. Engineer Manual 1110-2-1601. 30 June 1994.
Calculated by: JV Checked by: AD Sheet No: 2 of 2
Estimate the gradation envelope using the D30 and Table 3-1 from USACE (1994)
D30 = 0.83 ft s = 165.00 lb/ft3
D30 (Lower) = 0.73 ft Table 3-1 D30 (Upper) = 0.85 ft Table 3-1
Gradation Envelope based on Table 3-1
Parameter Stone Weight
(lb)1 Particle
Diameter (in) Particle
Diameter (ft) Percent Finer
D100 (min.) 185 15.47 1.29 100 D50 (min.) 93 12.30 1.02 50 D15 (min.) 29 8.34 0.69 15
D100 (max.) 463 21.00 1.75 100 D50 (max.) 137 13.99 1.17 50 D15 (max.) 69 11.13 0.93 15
Recommended Armor Design:
Minimum D50 = 12.3 in Thickness (1*D100 (max)) = 21.0 in
Notes:
1. Interpolate values from Table 3-1
Objective: Determine material sizing for embankment based on 2D hydraulic model results for existing conditions.
Reference(s):
USACE (U.S. Army Corps of Engineers). 1994. Hydraulic Design of Flood Control Channels. Engineer Manual 1110-2- 1601. 30 June 1994.
USBR (U.S. Bureau of Reclamation). 2007. Stone Sizing Criteria. Technical Supplement 14C, National Engineering Handbook.
Project: Repair Storm Damage at Mora Road (95% Design) Project No: 194-1343-0002
Subject: Material Sizing Calculations - Embankment Date: 2/14/2025
0.00 0.50 1.00 1.50 2.00 2.50
Pe rc en t F in er
Particle Size (ft)
100-Year Riprap Gradation Envelope Using USACE 1994 Gradation Method
Lower Limit Upper Limit
Calculated by: JV Checked by: AD Sheet No: 1 of 2
Estimate D30
Equation: D30 = SfCsCvCt w s w))1/2 V/(K1gd)1/2}2.5 where: D30 = material size in which 30 percent is finer by weight [ft]
Define Input Parameters
Safety Factor Sf = 1.50 Minimum of 1.1, usually 1.1-1.5
Stability Coefficient for Incipient Failure Cs = 0.300 Typical for angular rock
Vertical velocity distribution coefficient Cv = 1.21 Conservative assumption of Cv=1.283-0.2*log(R/W) Centerline bend radius R = 840.00 ft Value used for bend scour analysis
Water surface width W = 350.00 ft Value used for bend scour analysis Ratio R/W = 2.4
Thickness coefficient Ct = 1.00 Assume 1 for 1*D100 or 1.5*D50
Flow depth d = 20.50 ft Average for existing riprap Specific weight of water w = 62.40 lb/ft3
Specific weight of stone s = 165.00 lb/ft3
Local velocity V = 6.06 ft/s Average for existing riprap Gravitational constant g = 32.20 ft/s2
Side slope correction factor K1 = 0.58 Use K1 curve recommended for design Side slope angle 39.0 deg Measured from terrain Angle of repose 40.0 deg Typically 40 degrees
Side slope velocity Vss = 9.35 ft/s Vss = V * {1.74 - 0.52*Log(R/W)}
Calculation Results:
D30 = 0.94 ft D30 = 11.32 Inches
Objective: Determine material sizing for existing riprap based on 2D hydraulic model results for existing conditions.
Reference(s):
USACE (U.S. Army Corps of Engineers). 1994. Hydraulic Design of Flood Control Channels. Engineer Manual 1110-2-1601. 30 June 1994.
USBR (U.S. Bureau of Reclamation). 2007. Stone Sizing Criteria. Technical Supplement 14C, National Engineering Handbook.
Project: Repair Storm Damage at Mora Road (95% Design) Project No: 194-1343-0002
Subject: Material Sizing Calculations - Existing Riprap Date: 2/14/2025
Calculated by: JV Checked by: AD Sheet No: 2 of 2
Estimate the gradation envelope using the D30 and Table 3-1 from USACE (1994)
D30 = 0.94 ft s = 165.00 lb/ft3
D30 (Lower) = 0.85 ft Table 3-1 D30 (Upper) = 0.97 ft Table 3-1
Gradation Envelope based on Table 3-1
Parameter Stone Weight
(lb)1 Particle
Diameter (in) Particle
Diameter (ft) Percent Finer
D100 (min.) 276 17.67 1.47 100 D50 (min.) 138 14.03 1.17 50 D15 (min.) 43 9.51 0.79 15
D100 (max.) 691 24.00 2.00 100 D50 (max.) 205 16.01 1.33 50 D15 (max.) 102 12.68 1.06 15
Recommended Armor Design:
Minimum D50 = 14.0 in Thickness (1*D100 (max)) = 24.0 in
Notes:
1. Interpolate values from Table 3-1
Project: Repair Storm Damage at Mora Road (95% Design) Project No: 194-1343-0002
Subject: Material Sizing Calculations - Existing Riprap Date: 2/14/2025
Objective: Determine material sizing for existing riprap based on 2D hydraulic model results for existing conditions.
Reference(s):
USACE (U.S. Army Corps of Engineers). 1994. Hydraulic Design of Flood Control Channels. Engineer Manual 1110- 2-1601. 30 June 1994.
USBR (U.S. Bureau of Reclamation). 2007. Stone Sizing Criteria. Technical Supplement 14C, National Engineering Handbook.
0.00 0.50 1.00 1.50 2.00 2.50
Pe rc en t F in er
Particle Size (ft)
100-Year Riprap Gradation Envelope Using USACE 1994 Gradation Method
Lower Limit Upper Limit
Scour
JV AD Sheet No:
FHWA (Federal Highway Administration). 2012. Hydraulic Engineering Circular No. 18 - Evaluating Scour at Bridges. Fifth Edition.
Federal Highway Administration. 2009. HEC-23, Bridge Scour and Stream Instability Countermeasures-Third Edition.
U.S. Army Corps of Engineers (USACE). 2021. Approaches for Assessing Riverine Scour.
General Scour (ft)
Pier Scour (ft)
Abutment Scour (ft) Bend Scour (ft)
Total Scour (General+Pier)
(ft)
Total Scour (Abut+Pier+Bend)
(ft)
12.9 3.2 8.7 7.8 16.1 19.7
12.9 3.8 8.7 7.8 16.7 20.3
12.9 3.8 8.7 7.8 16.7 20.3
Project: Repair Storm Damage at Mora Road (95% Design) Project No: 194-1343-0002
Subject: Total Scour Summary Date: 1/24/2025
NRCS (Natural Resources Conservation Service). 2007. Technical Supplement 14B, Scour Calculations.
Deflector
Calculated by: Checked by:
Structure Type
Large Deflector
Objective: Estimate total scour for the proposed design.
Reference(s):
Revetment Log
2/6/2025 P:\194-1343-0002 MORA ROAD REPAIR\Engineering\Analyses\Scour\95 Percent\MoraRoadRepair_General and Local Scour_95%.xlsx
Inputs
Inputs
Units Design Discharge Qd = 126,636
Return Interval 100-cubic feet per second [cfs] year + resiliency adjustment 3,586 cubic meters per second [m3/s]
Flow Width at Design Discharge Wf = 350 feet [ft] 107 meters [m]
Median Size of Bed Material D50 = 14 millimeters [mm] D50 = 0.05 ft
Channel Condition
Part 1: Calculate mean and maximum scour based on the Blodgett (1986) method zt (mean) = KD50 -0.1 ft = best fit curve (fig. TS14B-1) for observed scour (Eq. TS14B-21)1 where:
K (mean) = 1.42 = coefficient of 1.42 for D50 in ft or 0.84 for D50 in mm
D50 = 0.05 ft zt (mean) = 1.9 ft zt (max) = KD50 -0.11 ft = enveloping curve (fig. TS14B-1) for max scour (Eq. TS14B-22)1 where:
K (max) = 6.5 = coefficient of 6.5 for D50 in ft or 3.8 for D50 in mm
D50 = 0.05 ft zt (max) = 9.1 ft
Part 2: Calculate maximum scour using the Lacey (1931) and Blench (1970) methods as suggested by Pemberton and Lara (1984) zt (max) = KQd aWf bD50 c ft (Eq. TS14B-23)1 where:
K = coefficient based on units and channel condition (tables TS14B-8 and TS14B-9) a, b, c = constants based on channel condition (table TS14B-8)
Lacey Blench K = 0.2920 0.5300 a = 0.3333 0.6667 b = 0.0000 -0.6667 c = -0.1667 -0.1092 zt (max) = 9.4 20.2 ft
Table TS14B-8: Constants for Lacey and Blench relations, U.S. units (D50 in mm)
K a b c K a b c Straight reach 0.097 1/3 0.0000 - 1/6 0.530 2/3 - 2/3 -0.1092 Moderate bend 0.195 1/3 0.0000 - 1/6 0.530 2/3 - 2/3 -0.1092 Severe bend 0.292 1/3 0.0000 - 1/6 0.530 2/3 - 2/3 -0.1092 Right angle bend 0.389 1/3 0.0000 - 1/6 1.105 2/3 - 2/3 -0.1092 Vertical rock wall 0.487 1/3 0.0000 - 1/6
Table TS-14B-9: Constant K for Lacey and Blench relations, SI units (D50 in mm) Lacey Blench
K K Straight reach 0.030 0.162 Moderate bend 0.059 0.162 Severe bend 0.089 0.162 Right angle bend 0.119 0.337 Vertical rock wall 0.148 0.000
Objective:
Reference(s):
Project No:
Date:
Project: Repair Storm Damage at Mora Road (95% Design)
Subject: General Scour Calculations
Calculated by:
NRCS (Natural Resources Conservation Service). 2007. Technical Supplement 14B, Scour Calculations.
Checked by:
194-1343-0002
Estimate general scour for proposed design using NRCS calculation methods.
1/24/2025
English
Lacey Blench Condition
Condition
Severe bend
P:\194-1343-0002 MORA ROAD REPAIR\Engineering\Analyses\Scour\95 Percent\MoraRoadRepair_General and Local Scour_95%.xlsx
Inputs Structure Type
Units Pier Shape
Pier Length L= 1.3 feet [ft] 0.4 meters [m] Pier Width a= 1.3 ft 0.4 m
Upstream Flow Depth y1= 29 ft 8.8 m Upstream Average Velocity V1 = 2.5 feet per second [ft/s] 0.8 meters per second [m/s]
Median Size of Bed Material D50 = 14 millimeters [mm] D50 = 0.05 ft D95 = 117.5 millimeters [mm] D95 = 0.39 ft
Bed Conditions Dune Height 0 ft 0.0 m
Angle of attack 10 degrees
Calculate pier scour depth using the following relations:
(Eqns 7.1 and 7.3) where:
Correction factor for pier nose shape from Table 7.11 K1 = 1.0
Correction factor for angle of attack from Table 7.2 or Eqn 7.42 K2 = 1.1 Correction factor for bed condition from Table 7.3 K3 = 1.1
Acceleration of gravity g = 32.2 ft/s2 9.81 m/s2
Froude Number directly upstream of pier Fr1= 0.082 =V1/(g*y1)0.5
Scour depth ys= 3.18 ft 1.0 m
Table 7.1: Correction Factor, K1, for Pier Nose Shape1 Table 7.2: Correction Factor, K2, for Angle of Attack of the Flow2
Shape of Pier Nose K1 Angle L/a = 4 L/a = 8 L/a = 12 Square Nose 1.1 0 1.0 1.0 1.0 Round Nose 1.0 15 1.5 2.0 2.5 Cylindrical 1.0 30 2.0 2.8 3.5
Group of Cylinders 1.0 45 2.3 3.3 4.3 Sharp Nose 0.9 90 2.5 3.9 5.0
(Eqn 7.4) Table 7.3: Increase in Equilibrium Pier Scour Depths, K3, for Bed Condition
Bed Condition Dune Height (ft) K3 Clear-Water Scour N/A 1.1
Plane Bed/Antidune N/A 1.1 Small Dunes 10 > H 1.1
Medium Dunes 30 > H 1.2 Large Dunes H 1.3
Notes
1. Table 7.1 valid for 1 = 1.0.
2. If L/a > 12, then use L/a = 12. Maximum of K2 = 5.0.
Project: Repair Storm Damage at Mora Road (95% Design) Project No: 194-1343-0002
Subject: Pier Scour - Large Deflector Structure Date: 1/24/2025
Objective: Estimate local scour for proposed design using FHWA calculation methods.
Reference(s):
FHWA (Federal Highway Administration). 2012. Hydraulic Engineering Circular No. 18 - Evaluating Scour at Bridges. Fifth Edition.
Large Deflector English
Clear-Water Scour
Cylindrical
Calculated by: Checked by:
P:\194-1343-0002 MORA ROAD REPAIR\Engineering\Analyses\Scour\95 Percent\MoraRoadRepair_General and Local Scour_95%.xlsx
Inputs Structure Type
Units Pier Shape
Pier Length L= 1.3 feet [ft] 0.4 meters [m] Pier Width a= 1.3 ft 0.4 m
Upstream Flow Depth y1= 29 ft 8.8 m Upstream Average Velocity V1 = 3.7 feet per second [ft/s] 1.1 meters per second [m/s]
Median Size of Bed Material D50 = 14 millimeters [mm] D50 = 0.05 ft D95 = 117.5 millimeters [mm] D95 = 0.39 ft
Bed Conditions Dune Height 0 ft 0.0 m
Angle of attack 10 degrees
Calculate pier scour depth using the following relations:
(Eqns 7.1 and 7.3) where:
Correction factor for pier nose shape from Table 7.11 K1 = 1.0
Correction factor for angle of attack from Table 7.2 or Eqn 7.42 K2 = 1.1 Correction factor for bed condition from Table 7.3 K3 = 1.1
Acceleration of gravity g = 32.2 ft/s2 9.81 m/s2
Froude Number directly upstream of pier Fr1= 0.121 =V1/(g*y1)0.5
Scour depth ys= 3.76 ft 1.1 m
Table 7.1: Correction Factor, K1, for Pier Nose Shape1 Table 7.2: Correction Factor, K2, for Angle of Attack of the Flow2
Shape of Pier Nose K1 Angle L/a = 4 L/a = 8 L/a = 12 Square Nose 1.1 0 1.0 1.0 1.0 Round Nose 1.0 15 1.5 2.0 2.5 Cylindrical 1.0 30 2.0 2.8 3.5
Group of Cylinders 1.0 45 2.3 3.3 4.3 Sharp Nose 0.9 90 2.5 3.9 5.0
(Eqn 7.4) Table 7.3: Increase in Equilibrium Pier Scour Depths, K3, for Bed Condition
Bed Condition Dune Height (ft) K3 Clear-Water Scour N/A 1.1
Plane Bed/Antidune N/A 1.1 Small Dunes 10 > H 1.1
Medium Dunes 30 > H 1.2 Large Dunes H 1.3
Notes
1. Table 7.1 valid for 1 = 1.0.
2. If L/a > 12, then use L/a = 12. Maximum of K2 = 5.0.
Project: Repair Storm Damage at Mora Road (95% Design) Project No: 194-1343-0002
Subject: Pier Scour - Deflector Structure Date: 1/24/2025
Objective: Estimate local scour for proposed design using FHWA calculation methods.
Reference(s):
FHWA (Federal Highway Administration). 2012. Hydraulic Engineering Circular No. 18 - Evaluating Scour at Bridges. Fifth Edition.
Deflector English
Cylindrical
Clear-Water Scour
Calculated by: Checked by:
P:\194-1343-0002 MORA ROAD REPAIR\Engineering\Analyses\Scour\95 Percent\MoraRoadRepair_General and Local Scour_95%.xlsx
Inputs Structure Type
Units Pier Shape
Pier Length L= 1.3 feet [ft] 0.4 meters [m] Pier Width a= 1.3 ft 0.4 m
Upstream Flow Depth y1= 29 ft 8.8 m Upstream Average Velocity V1 = 3.7 feet per second [ft/s] 1.1 meters per second [m/s]
Median Size of Bed Material D50 = 14 millimeters [mm] D50 = 0.05 ft D95 = 117.5 millimeters [mm] D95 = 0.39 ft
Bed Conditions Dune Height 0 ft 0.0 m
Angle of attack 10 degrees
Calculate pier scour depth using the following relations:
(Eqns 7.1 and 7.3) where:
Correction factor for pier nose shape from Table 7.11 K1 = 1.0
Correction factor for angle of attack from Table 7.2 or Eqn 7.42 K2 = 1.1 Correction factor for bed condition from Table 7.3 K3 = 1.1
Acceleration of gravity g = 32.2 ft/s2 9.81 m/s2
Froude Number directly upstream of pier Fr1= 0.121 =V1/(g*y1)0.5
Scour depth ys= 3.76 ft 1.1 m
Table 7.1: Correction Factor, K1, for Pier Nose Shape1 Table 7.2: Correction Factor, K2, for Angle of Attack of the Flow2
Shape of Pier Nose K1 Angle L/a = 4 L/a = 8 L/a = 12 Square Nose 1.1 0 1.0 1.0 1.0 Round Nose 1.0 15 1.5 2.0 2.5 Cylindrical 1.0 30 2.0 2.8 3.5
Group of Cylinders 1.0 45 2.3 3.3 4.3 Sharp Nose 0.9 90 2.5 3.9 5.0
(Eqn 7.4) Table 7.3: Increase in Equilibrium Pier Scour Depths, K3, for Bed Condition
Bed Condition Dune Height (ft) K3 Clear-Water Scour N/A 1.1
Plane Bed/Antidune N/A 1.1 Small Dunes 10 > H 1.1
Medium Dunes 30 > H 1.2 Large Dunes H 1.3
Notes
1. Table 7.1 valid for 1 = 1.0.
2. If L/a > 12, then use L/a = 12. Maximum of K2 = 5.0.
Revetment English
Cylindrical
Clear-Water Scour
Calculated by: Checked by: 5 of 7
Objective: Estimate local scour for proposed design using FHWA calculation methods.
Reference(s):
FHWA (Federal Highway Administration). 2012. Hydraulic Engineering Circular No. 18 - Evaluating Scour at Bridges. Fifth Edition.
Project: Repair Storm Damage at Mora Road (95% Design) Project No: 194-1343-0002
Subject: Pier Scour - Revetment Structure Date: 1/24/2025
P:\194-1343-0002 MORA ROAD REPAIR\Engineering\Analyses\Scour\95 Percent\MoraRoadRepair_General and Local Scour_95%.xlsx
Inputs Units
Abutment Shape Length of active flow obstructed by embankment L'= 40.0 feet [ft] 12.2 meters [m] Length of embankment projected normal to flow L = 80.0 ft 24.4 m
Flow area of approach cross section obstructed by embankment Ae= 1,285.0 ft2 119.4 m2
Average channel flow depth y1= 29 ft 8.8 m Average floodplain flow depth ya = 16.1 ft 4.9 m
Flow obstructed by abutment and approach embankment Qe= 4600 ft3/s 130.3 m3/s Velocity upstream of embankment Ve = 2.5 feet per second [ft/s] 0.8 meters per second [m/s]
Abutment Angle (Figure 8.5)1 90 degrees
Calculate abutment scour using Froelich (TRB 1989) method:
(Eqn. 8.1) where:
Coefficient for abutment shape from Table 8.1 K1 = 0.55
Coefficient for angle of embankment to flow1 K2 = 1.00 0.13
Acceleration of gravity g = 32.2 ft/s2 9.81 m/s2
Froude Number directly upstream abutment Fr1= 0.110 =Ve/(g*ya) 0.5
Abutment Scour Depth ys= 8.72 ft 2.7 m
Table 8.1: Abutment Shape Coefficients Description K1
Vertical Wall 1.00 Vertical Wall with Wing Walls 0.82
Spill-Through 0.55
Notes
1. If embankment points downstream, Project: Repair Storm Damage at Mora Road (95% Design) Project No: 194-1343-0002
Subject: Abutment Scour Calculations Date: 1/24/2025
Objective: Estimate abutment scour for proposed design using FHWA calculation methods.
Reference(s):
FHWA (Federal Highway Administration). 2012. Hydraulic Engineering Circular No. 18 - Evaluating Scour at Bridges. Fifth Edition.
English Spill-Through
Calculated by: Checked by: 6 of 7
P:\194-1343-0002 MORA ROAD REPAIR\Engineering\Analyses\Scour\95 Percent\MoraRoadRepair_General and Local Scour_95%.xlsx
Method 1 - Maynord Equation Notes:
Developed using high discharges within the channel banks with return intervals of 1-5 years. Overbank depth should be less than 20% of channel depth.
Developed on sand bed streams but agrees reasonably well with limited number of gravel bed data points.
Rc/W from 1.5 to 10 W/Dmnc from 20 to 125
Inputs:
Centerline Radius of the Bend Rc = 840.0 ft
Width of bend W = 350 ft Cross Sectional Area A = 2400.0 ft2
Calculations:
Average water depth upstream of bend Dmnc = 6.9 ft
If Rc mnc
Ratio Ratio used in calculation:
Rc/W 2.4 2.4
W/Dmnc 51.0 51.0
Results:
Maximum Depth of water in the bend Dmxb = 14.4 ft Depth of additional scour below thalweg Scour Depth = 7.6 ft
Method 2 - Thorne Equation Notes:
Developed using high, steady, in-bank flows. Care must be taken if used to calculate scour for greater than bankfull stage.
Encompasses materials ranging from sand to boulders.
Inputs:
Bend radius of curvature Rc = 840.0 ft
Channel top width of upstream cross section W = 350 ft Cross Sectional Area A = 2400.0 ft2
Calculations:
Mean depth of upstream cross section dhUS = 6.9 ft
Rc/W = 2.4 Depth of scour below thalweg Scour Depth 8.5 ft
Reference(s):
Federal Highway Administration. 2009. HEC-23, Bridge Scour and Stream Instability Countermeasures-Third Edition.
U.S. Army Corps of Engineers (USACE). 2021. Approaches for Assessing Riverine Scour.
Project: Repair Storm Damage at Mora Road (95% Design) Project No: 194-1343-0002
Subject: Bend Scour Calculations Date: 1/28/2025
Calculated by: Checked by: 7 of 7
Objective: Estimate bend scour for proposed design.
P:\194-1343-0002 MORA ROAD REPAIR\Engineering\Analyses\Scour\95 Percent\MoraRoadRepair_General and Local Scour_95%.xlsx
Reference(s):
Federal Highway Administration. 2009. HEC-23, Bridge Scour and Stream Instability Countermeasures-Third Edition.
U.S. Army Corps of Engineers (USACE). 2021. Approaches for Assessing Riverine Scour.
Project: Repair Storm Damage at Mora Road (95% Design) Project No: 194-1343-0002
Subject: Bend Scour Calculations Date: 1/28/2025
Calculated by: Checked by: 7 of 7
Objective: Estimate bend scour for proposed design.
USACE Equation Notes:
Engineer Manual 1110-2-1601, Plate B41 Sand or gravel rivers (separate equation for each)
Inputs:
Bend radius of curvature Rc = 840.0 ft
Channel top width of upstream cross section W = 350 ft Cross Sectional Area A = 2400.0 ft2
Max depth in design cross section Dmax = 11.5 ft
Calculations:
Mean depth of upstream cross section dhUS = 6.9 ft
Rc/W = 2.4 Depth of scour below thalweg Scour Depth 7.4 ft for gravel bed rivers
Average scour depth of three methods 7.8 ft
P:\194-1343-0002 MORA ROAD REPAIR\Engineering\Analyses\Scour\95 Percent\MoraRoadRepair_General and Local Scour_95%.xlsx
Large Wood Structure Stability
Calculated by: JV Checked by: AD
Large Deflector Structures - Example Design Details
Large Deflector Structures - Example As-Built Photos
Inputs in blue cells
Inputs
Public Safety Risk High Property Damage Risk High Stability Design Flow Criteria 100-year
Factor of Safety Summary
PParameter Targett FS Designn FS Doess Designn
Meett Target??
(Y/N)
Sliding 1.75 10.15 Y Buoyancy 2.00 2.00 Y Rotation 1.75 1.77 Y
Overturning 1.75 1.93 Y
Sheet No:
194-1343-0002
2/7/2025
Project: Repair Storm Damage at Mora Road (95% Design)
Subject: Large Wood Stability Calculations - Large Deflectors
Project No:
Date:
Objective:
Reference(s):
Summary of large wood stability calculations for large deflector structures.
USBR (U.S. Bureau of Reclamation) & USACE (U.S. Army Corps of Engineers). 2016. National Large Wood Manual - Assessment, Planning, Design, and Maintenance of Large Wood in Fluvial Ecosystems: Restoring Process, Function, and Structure.
USBR. 2014. Large Woody Material - Risk Based Design Guidelines. Reclamation, Managing Water in the West. Pacific Northwest Region Resource & Technical Services.
Inputs in blue cells
Material Properties Median particle diameter D50 = 0.046 ft w = 62.4 lb/ft3 solid = 165 lb/ft3
Unit Weight of Dry Soil Backfill d= 120 lb/ft3
Void Ratio e = 0.38 Porosity n = 0.27 Degree of Saturation Below Water Level S = 100% Weight of Pore Water per ft3 of Sample w = 17.02 lb/ft3
Saturated Unit Weight of Soil sat ( s) = 137.02 lb/ft3
Buoyant (effective) Unit Weight of Soil Backfill soil '= 74.62 lb/ft3 ss = 2.64 Specifc Gravity of Boulders sb = 2.66 Unit Weight of Boulders bou = 146 lb/ft3
Unit Weight of Wood wood = 41 lb/ft3
Coefficients Lift Coefficient CL = 1.5 Drag Coefficient CD = 1.5 Coefficient of Importance Ci = 1 Coefficient of Orientation Co = 0.8 Coefficient of Depth Cd = 1 Coefficient of Blockage Cb = 1 Coefficient of lateral earth pressure ks = 1
Other g = 32.2 ft/s2
Bed Sediment Internal Friction Angle = 36 Degrees Response Ratio for impulsive Loads Rmax = 0.8
Objective: Inputs for general material properties and select constants to be used in subsequent large wood stability calculations.
Reference(s):
USBR (U.S. Bureau of Reclamation) & USACE (U.S. Army Corps of Engineers). 2016. National Large Wood Manual - Assessment, Planning, Design, and Maintenance of Large Wood in Fluvial Ecosystems: Restoring Process, Function, and Structure.
USBR. 2014. Large Woody Material - Risk Based Design Guidelines. Reclamation, Managing Water in the West. Pacific Northwest Region Resource & Technical Services.
Sheet No:
194-1343-0002
Subject: Large Wood Stability Calculations - Large Deflectors Date: 2/7/2025
Project: Repair Storm Damage at Mora Road (95% Design) Project No:
Specific Gravity of Soil
Acceleration due to Gravity
Soil Solid Density Water Density
To estimate the buoyancy force of the wood:
To estimate the effective weight per submerged boulder:
Inputs in blue cells Structure Information - Large Wood
Key "Base" Members Stacked "Middle"
Members Top Members Units hemlock, western hemlock, western hemlock, western
SL = 0.42 0.42 0.42
NL = 18 30 18
DRW = 4 4 4 ft LRW = 4 4 4 ft p = 0.2 0.2 0.2 decimal % DL = 2 2 2 ft
L = 45 45 45 ft V = 142 142 142 ft3
Vtot = 2,560 4,266 2,560 ft3
FBL = 92,643 154,405 92,643 lb
Structure Information - Ballast (Boulders)
Minimum Boulder Size Maximum Boulder Size UUnits
Equivalent Diameter of Boulder DB = 3 4 ft Number of Boulders Submerged NB = 0 0
Number of Boulders Unsubmerged NBU = 0 0 Effective Weight Per Submerged Boulder W' = 1,464 3,471 lb
W = 2,347 5,562 lb Wtot = 0 0 lb
Structure Information - Ballast (Soil) Value Units
Nominal Footprint Area of Soil Backfill ABF= 1261 ft2
ZB = 16 ft Depth of Soil Backfill Unsubmerged ZBU = 0 ft
Vd = 9,386 ft3
Effective (submerged) Weight of Soil Ballast W' = 804,959 lb Unsubmerged (Dry) Weight of Soil Ballast W = 0 lb
Wtot = 804,959 lb
Structure Information - Vertical Piles Number of Vertical Piles in Structure Npiles = 28 Length of Pile Below Scoured Bed Lem= 3 ft Pile Diameter Dp = 1.3 ft
Structure Information - Floating Debris Weight Wdeb = 6000 lbs
Sheet No: 3 of 8
Objective: Inputs for structure specifications to be used in subsequent large wood stability calculations.
Reference(s):
USBR (U.S. Bureau of Reclamation) & USACE (U.S. Army Corps of Engineers). 2016. National Large Wood Manual - Assessment, Planning, Design, and Maintenance of Large Wood in Fluvial Ecosystems: Restoring Process, Function, and Structure.
USBR. 2014. Large Woody Material - Risk Based Design Guidelines. Reclamation, Managing Water in the West. Pacific Northwest Region Resource & Technical Services.
Project: Repair Storm Damage at Mora Road (95% Design) Project No: 194-1343-0002
Subject: Large Wood Stability Calculations - Large Deflectors Date: 2/7/2025
Property
Total Volume of Wood
Total Effective Weight
Property
Weight Per Boulder Total Effective Weight
Depth of Soil Backfill Submerged
Average Rootwad Length
Total Volume Volume Per Member
Net Buoyancy Force
Proportion of Voids in Rootwad Tree Stem Average Diameter
Tree Stem Average Length
Property
Wood Type
Number of Logs with Rootwads Specific Gravity of Wood
Average Rootwad Fan Diameter
NL
Design scenario 100-year
Water Depth on Structure Water Depth on Upstream Face of Wood Structure Yu = 16 feet
Water Depth on Downstream Face of Wood Structure Yd = 16 feet
Velocity Approach Velocity Uo = 6 ft/s
Channel Velocity Vc = 6 ft/s Contracted Section Velocity Uc = 6 ft/s
Submerged Structure Area Perpendicular to Flow Upstream Downstream
Width w = 75 75 feet Depth Y = 16 16 feet
Cross-Sectional Area A = 1200 1200 ft2
Other Distance Above Scoured Bed Applied Load hload= 20 feet
Length from tip to point of rotation (1) Lsp = 75 feet Mean distance of piles to point of rotation (2) Lph = 37 feet
Length of structure parallel to flow Ls = 115 feet
Upstream depth to point of rotation(3) dubury = 4 feet Downstream depth to point of rotation(4) ddbury = 4 feet
Mean Distance from Piles to Point of Rotation (5) Lpv = 50 feet
Bank Embedment Embedded length of structure (6) Lebp = 12 feet
Mean Depth of submerged soil above embedded logs Dsub = 6 feet Number of logs embedded into bank 16
Mean Depth of dry soil above embedded logs Ddry = 0 feet
Channel Embedment Embedded length of structure (6) Lebp = 75 feet
Mean Depth of submerged soil above embedded logs Dsub = 2 feet Number of logs embedded into channel bed 9
Mean Depth of dry soil above embedded logs Ddry = 0 feet
Notes
(1) Length of wood structure from tip in the river to point of rotation in the bank measured perpendicular to flow
(2) Measured perpendicular to flow
(3) Depth at upstream side of structure from channel bottom to point of rotation measured perpendicular to flow
(4) Depth at downstream side of structure from channel bottom to point of rotation measured perpendicular to flow
(5) Measured parallel to flow
(6) Embedded length of wood structure measured perpendicular to flow
Objective: 2D hydraulic modeling results inputs for the design scenario to be used in subsequent large wood stability calculations.
Reference(s):
USBR (U.S. Bureau of Reclamation) & USACE (U.S. Army Corps of Engineers). 2016. National Large Wood Manual - Assessment, Planning, Design, and Maintenance of Large Wood in Fluvial Ecosystems: Restoring Process, Function, and Structure.
USBR. 2014. Large Woody Material - Risk Based Design Guidelines. Reclamation, Managing Water in the West. Pacific Northwest Region Resource & Technical Services.
Sheet No:
194-1343-0002
Subject: Large Wood Stability Calculations - Large Deflectors Date: 2/7/2025
Project: Repair Storm Damage at Mora Road (95% Design) Project No:
Factor of Safety Against Buoyancy
Lift:
Assumptions:
Logs and ballast in structure are fully submerged.
Structure acts as composite structure and is assumed to be fully connected.
Structure can move freely vertically without any binding to the piles.
Lift Force:
Area Perpendicular to Flow A = 1,200 ft2
Approach Velocity Uo = 6.0 ft/s Lift Coefficient CL = 1.5
Lift Force FL = 62,788 lb
Buoyancy Force:
Key "Base" Members 92,643 lb
Stacked "Middle" Members 154,405 lb Top Members 92,643 lb
Total Buoyancy Force FBL = 339,692 lb
Ballast Forces:
Dry wood FLWMd = 0 lb Boulders Fboulders = 0 lb Soil Fsoil = 804,959 lb Total Ballast 804,959 lb
Factor of Safety Against Buoyancy:
FOSb = 2.00
Reference(s):
USBR (U.S. Bureau of Reclamation) & USACE (U.S. Army Corps of Engineers). 2016. National Large Wood Manual - Assessment, Planning, Design, and Maintenance of Large Wood in Fluvial Ecosystems: Restoring Process, Function, and Structure.
USBR. 2014. Large Woody Material - Risk Based Design Guidelines. Reclamation, Managing Water in the West. Pacific Northwest Region Resource & Technical Services.
Project: Repair Storm Damage at Mora Road (95% Design) Project No: 194-1343-0002
Subject: Large Wood Stability Calculations - Large Deflectors Date: 2/7/2025
Sheet No: 5 of 8
Objective: Factor of safety calculations for buoyancy.
Horizontal Forces - Friction, Drag, Impact
Lift: Normal: Friction:
Drag: Impact:
Calculation Parameters
Bed Sediment Friction Angle 36 degrees Bed Stress μbed= 0.73
Submerged Weight of Ballast Wbl(sub)= 804,959 pounds Buoyancy Force Fb = 339,692 pounds
Area Perpendicular to Flow A = 1,200 ft2
Approach Velocity Uo = 6.0 ft/s Drag Coefficient CD = 1.5
Calculation Parameters - Impact Force Weight of debris wdebris = 6000 lbs Channel velocity Vchannel = 6 ft/s
Coefficient of importance Ci = 1 Coefficient of orientation Co = 0.8
Coefficient of depth Cd = 1 Coefficient of blockage Cb = 1
Response ratio for impulsive loads Rmax = 0.8
Acceleration due to gravity g = 32.2 ft/s2
Time from initial velocity to zero velocity 0.03 s
Summary of Forces Force (lbs)
Lift FL= 62,788 Normal Fn= 402,479 Friction Ff= 292,418 Drag Fd= 62,788 Impact Fi= 37,465
Lateral Resistance Forces - Vertical Pilings and Passive Force
Calculation Parameters Number of Vertical Piles N = 28
Sheet No: 6 of 8
Type
Project: Repair Storm Damage at Mora Road (95% Design) Project No: 194-1343-0002
Subject: Large Wood Stability Calculations - Large Deflectors Date: 2/7/2025
Objective: Factor of safety calculations for sliding.
Reference(s):
USBR (U.S. Bureau of Reclamation) & USACE (U.S. Army Corps of Engineers). 2016. National Large Wood Manual - Assessment, Planning, Design, and Maintenance of Large Wood in Fluvial Ecosystems: Restoring Process, Function, and USBR. 2014. Large Woody Material - Risk Based Design Guidelines. Reclamation, Managing Water in the West. Pacific Northwest Region Resource & Technical Services.
Length of Pile Below Scoured Bed Lem= 3.0 ft Pile Diameter Dp = 1.3 ft
Distance Above Scoured Bed Applied Load hload= 20.0 ft
Rankine Coefficient of Passive Earth Pressure: Kp = 3.85
Horizontal Restraint Force from Piles:
Fgh(piles) = 6,141 lbs
Passive Force from Embeddment:
Calculation Parameters - Bank Embedment Mean Depth of dry soil above embedded logs Ddry = 0
Embedded length of structure Lebp = 12 ft Diameter of logs dlog = 2 ft
Number of embedded logs 16 Mean Depth of submerged soil above embedded logs Dsub = 6 ft v = 448 lb/ft2
Fpassive, bank = 331,105 lb
Calculation Parameters - Channel Embedment Mean Depth of dry soil above embedded logs Ddry = 0
Embedded length of structure Lebp = 75 Diameter of logs dlog = 2
Number of embedded logs 9 Mean Depth of submerged soil above embedded logs Dsub = 2 v = 149
Fpassive,bed = 388,013 lb
Assumptions
(1) Average diameter of all logs assumed to apply to logs embedded into the bank.
(2) Key base members that are perpendicular to flow (half of them) are assumed to be embedded in the channel.
(3) Average depths of embedment applied to logs embedded in the bank and channel bed.
Factor of Safety - Sliding
Fsliding = 10.15
Factor of Safety for Rotation
Sum of Driving Moments, MDrotation where:
Fi = impact force Fd = drag force
Fhu = hydrostatic force on upstream side of wood structure Lsp = length of wood structure from tip to point of rotation measured perpendicular to flow
Lebp = embedded length of wood structure measured perpendicular to flow
Force Equations Impact: Drag:
Hydrostatic:
Calculation Parameters Unit weight of water γw = 62.4 lb/ft3
Water Depth on Upstream Face of Wood Structure Yu = 16 ft Upstream area projected normal to flow Au = 1200 ft2
Length from tip to point of rotation Lsp = 75 ft Embedded length of structure Lebp = 12 ft
Summary of Forces Force (lbs)
Impact Fi= 37,465 Drag Fd= 62,788 Hydrostatic Fhu= 599,040
MDrotation = 30,419,225 lb-ft
Sum of Reacting Moments, MRrotation where:
Fhd = hydrostatic force on downstream side of wood structure
Fpassive = passive force acting against drag force due to material behind structure Ff = force due to friction
Fpile-h = force of lateral resistance from piles Lph = Mean distance of piles to point of rotation, measured perpendicular to flow
Force Equations Passive Force from Embedment:
Hydrostatic:
Friction:
Piles:
Reference(s):
USBR (U.S. Bureau of Reclamation) & USACE (U.S. Army Corps of Engineers). 2016. National Large Wood Manual - Assessment, Planning, Design, and Maintenance of Large Wood in Fluvial Ecosystems: Restoring Process, Function, and Structure.
USBR. 2014. Large Woody Material - Risk Based Design Guidelines. Reclamation, Managing Water in the West. Pacific Northwest Region Resource & Technical Services.
Type
Sheet No: 7 of 8
Objective: Factor of safety calculations for rotation.
Project: Repair Storm Damage at Mora Road (95% Design) Project No: 194-1343-0002
Subject: Large Wood Stability Calculations - Large Deflectors Date: 2/7/2025
𝑀𝑅ோ௧௧ ൌ 𝐹ௗ ∗
𝐿௦ 𝐿
𝐹௦௦௩, ∗
𝐿
𝐹௦௦௩,ௗ ∗ 𝐿௦ 𝐹 ∗
𝐿௦ 𝐹ି ∗ 𝐿
Calculation Parameters Unit weight of water γw = 62.4 lb/ft3
Downstream water depth Yd = 16 ft Downstream area projected normal to flow Ad = 1200 ft2
Summary of Forces
Force (lbs) Distance from
POR (ft) Hydrostatic Fhd= 599,040 43.5 Passive Bank Fpassive, bank= 331,105 6 Passive Bed Fpassive, bed= 388,013 37.5 Friction Ff = 292,418 37.5
Lateral Pile Fpile-h= 6,141 37
MRrotation = 53,788,262 lb-ft
FOSrotation = 1.77
Type
Factor of Safety for Overturning
Sum of Driving Moments, MDoverturn where:
Fi = impact force
Yu = depth on upstream face of structure Fd = drag force
Fhu = hydrostatic force on upstream side of wood structure dubury = depth at upstream side of structure from channel bottom to point of rotation measured perpendicular to flow
FL = lift force Fb = buoyancy force LS = length of structure measured parallel to flow
Calculation Parameters Impact force Fi = 37,465 lbs
Upstream Water depth Yu = 16 ft Drag force Fd = 62,788 lbs
Upstream hydrostatic force Fhu = 599,040 lbs Upstream depth to point of rotation dubury = 4 ft
Lift force FL = 62,788 lbs Buoyant Force Fb = 339,692 lbs
Structure length parallel to flow LS = 115 ft
MDoverturn = 30,236,347 lbs
Sum of Reacting Moments, MRoverturn where:
Fhd = hydrostatic force on downstream side of wood structure Yd = depth at downstream side of structure ddbury = depth at downstream side of structure from channel bottom to point of rotation measured perpendicular to flow Fpassive = Passive force Fballast = Force from weight of the ballast material Fpiles-v = Pile skin friction force
Lpv = Mean distance from piles to point of rotation Ls = Length of structure parallel to flow
Calculate pile skin friction force where:
dpiles = diameter of piles Lpiles = embedded length of piles after scour ks = coefficient of lateral earth pressure φ = internal angle of friction of soils γwood = unit weight of wood γsat = saturated unit weight of soil γw = unit weight of water
Calculation Parameters Npiles = number of vertical piles
Number of piles Npiles = 28 Pile diameter dpiles = 1.3 ft
Pile length Lpiles = 3 ft Coefficient of lateral earth pressure ks = 1
Internal friction angle φ = 36 degrees Unit weight of wood γwood = 41 lb/ft3
Reference(s):
USBR (U.S. Bureau of Reclamation) & USACE (U.S. Army Corps of Engineers). 2016. National Large Wood Manual - Assessment, Planning, Design, and Maintenance of Large Wood in Fluvial Ecosystems: Restoring Process, Function, and Structure.
USBR. 2014. Large Woody Material - Risk Based Design Guidelines. Reclamation, Managing Water in the West. Pacific Northwest Region Resource & Technical Services.
Sheet No: 8 of 8
Objective: Factor of safety calculations for overturning.
Project: Repair Storm Damage at Mora Road (95% Design) Project No: 194-1343-0002
Subject: Large Wood Stability Calculations - Large Deflectors Date: 2/7/2025
𝑀𝐷௩௧௨ ൌ 𝐹 ∗ 𝑌௨ 𝑑௨௨௬ 𝐹ௗ ∗
𝑌௨ 𝑑௨௨௬ 𝐹௨ ∗
𝑌௨ 𝑑௨௨௬ 𝐹 𝐹 ∗
𝐿௦
𝑀𝑅௩௧௨ ൌ 𝐹ௗ ∗
𝑌ௗ 𝑑ௗ௨௬ 𝐹௦௦௩,ௗ ∗ 𝑑ௗ௨௬ 𝐹௦௦௩, ∗
𝑌ௗ 𝑑ௗ௨௬
𝐹ି௩ ∗ 𝐿௩ 𝐹௦௧ ∗ 𝐿௦
Saturated unit weight of soil γsat = 137.02 lb/ft3
Unit weight of water γw = 62.4 lb/ft3 σ' = 224 lb/ft2
Fpiles-v = 31,806 lbs
Calculate sum of reacting moments
Calculation Parameters Downstream hydrostatic force Fhd = 599,040 lb
Downstream depth Yd = 16 ft Downstream depth at point of rotation ddbury = 4 ft
Passive force in banks Fpassive,bank = 331,105 lb Passive force in bed Fpassive,bed = 388,013 lb
Fballast = 804,959 lb Lpv= 50 ft
MRoverturn = 58,329,544 lbs
FOSoverturn = 1.93
Deflector Structures - Example Design Details
Deflector Structures - Example As-Built Photos
Inputs in blue cells
Inputs
Public Safety Risk High Property Damage Risk High Stability Design Flow Criteria 100-year
Factor of Safety Summary
PParameter Targett FS Designn FS Doess Designn
Meett Target??
(Y/N)
Sliding 1.75 6.51 Y Buoyancy 2.00 5.99 Y Rotation 1.75 1.75 Y
Overturning 1.75 3.30 Y
Sheet No:
194-1343-0002
2/7/2025
Project: Repair Storm Damage at Mora Road (95% Design)
Subject: Large Wood Stability Calculations - Deflectors
Project No:
Date:
Objective:
Reference(s):
Summary of large wood stability calculations for deflector structures.
USBR (U.S. Bureau of Reclamation) & USACE (U.S. Army Corps of Engineers). 2016. National Large Wood Manual - Assessment, Planning, Design, and Maintenance of Large Wood in Fluvial Ecosystems: Restoring Process, Function, and Structure.
USBR. 2014. Large Woody Material - Risk Based Design Guidelines. Reclamation, Managing Water in the West. Pacific Northwest Region Resource & Technical Services.
Material Properties Median particle diameter D50 = 0.046 ft w = 62.4 lb/ft3 solid = 165 lb/ft3
Unit Weight of Dry Soil Backfill d= 120 lb/ft3
Void Ratio e = 0.38 Porosity n = 0.27 Degree of Saturation Below Water Level S = 100% Weight of Pore Water per ft3 of Sample w = 17.02 lb/ft3
Saturated Unit Weight of Soil sat ( s) = 137.02 lb/ft3
Buoyant (effective) Unit Weight of Soil Backfill soil '= 74.62 lb/ft3 ss = 2.64 Specifc Gravity of Boulders sb = 2.66 Unit Weight of Boulders bou = 146 lb/ft3
Unit Weight of Wood wood = 41 lb/ft3
Coefficients Lift Coefficient CL = 1.5 Drag Coefficient CD = 1.5 Coefficient of Importance Ci = 1 Coefficient of Orientation Co = 0.8 Coefficient of Depth Cd = 1 Coefficient of Blockage Cb = 1 Coefficient of lateral earth pressure ks = 1
Other g = 32.2 ft/s2
Bed Sediment Internal Friction Angle = 36 Degrees Response Ratio for impulsive Loads Rmax = 0.8
Objective: Inputs for general material properties and select constants to be used in subsequent large wood stability calculations.
Reference(s):
USBR (U.S. Bureau of Reclamation) & USACE (U.S. Army Corps of Engineers). 2016. National Large Wood Manual - Assessment, Planning, Design, and Maintenance of Large Wood in Fluvial Ecosystems: Restoring Process, Function, and Structure.
USBR. 2014. Large Woody Material - Risk Based Design Guidelines. Reclamation, Managing Water in the West. Pacific Northwest Region Resource & Technical Services.
Sheet No:
194-1343-0002
Subject: Large Wood Stability Calculations - Deflectors Date: 2/7/2025
Project: Repair Storm Damage at Mora Road (95% Design) Project No:
Specific Gravity of Soil
Acceleration due to Gravity
Soil Solid Density Water Density
To estimate the effective weight per submerged boulder:
Inputs in blue cells Structure Information - Large Wood
Key "Base" Members Stacked "Middle"
Members Top Members Units hemlock, western hemlock, western hemlock, western
SL = 0.42 0.42 0.42
NL = 10 25 0
DRW = 4 4 0 ft LRW = 4 4 0 ft p = 0.2 0.2 0.2 decimal % DL = 2 2 1.5 ft
L = 45 45 30 ft V = 142 142 53 ft3
Vtot = 1,422 3,555 0 ft3
FBL = 51,468 128,671 0 lb
Structure Information - Ballast (Boulders)
Minimum Boulder Size Maximum Boulder Size UUnits
Equivalent Diameter of Boulder DB = 3 4 ft Number of Boulders Submerged NB = 0 0
Number of Boulders Unsubmerged NBU = 0 0 Effective Weight Per Submerged Boulder W' = 1,464 3,471 lb
W = 2,347 5,562 lb Wtot = 0 0 lb
Structure Information - Ballast (Soil) Value Units
Nominal Footprint Area of Soil Backfill ABF= 1600 ft2
ZB = 23 ft Depth of Soil Backfill Unsubmerged ZBU = 0 ft
Vd = 4,977 ft3
Effective (submerged) Weight of Soil Ballast W' = 2,374,853 lb Unsubmerged (Dry) Weight of Soil Ballast W = 0 lb
Wtot = 2,374,853 lb
Structure Information - Vertical Piles Number of Vertical Piles in Structure Npiles = 14 Length of Pile Below Scoured Bed Lem= 5 ft Pile Diameter Dp = 1.3 ft
Structure Information - Floating Debris Weight Wdeb = 6000 lbs
Sheet No: 3 of 8
Objective: Inputs for structure specifications to be used in subsequent large wood stability calculations.
Reference(s):
USBR (U.S. Bureau of Reclamation) & USACE (U.S. Army Corps of Engineers). 2016. National Large Wood Manual - Assessment, Planning, Design, and Maintenance of Large Wood in Fluvial Ecosystems: Restoring Process, Function, and Structure.
USBR. 2014. Large Woody Material - Risk Based Design Guidelines. Reclamation, Managing Water in the West. Pacific Northwest Region Resource & Technical Services.
Project: Repair Storm Damage at Mora Road (95% Design) Project No: 194-1343-0002
Subject: Large Wood Stability Calculations - Deflectors Date: 2/7/2025
Property
Total Volume of Wood
Total Effective Weight
Property
Weight Per Boulder Total Effective Weight
Depth of Soil Backfill Submerged
Average Rootwad Length
Total Volume Volume Per Member
Net Buoyancy Force
Proportion of Voids in Rootwad Tree Stem Average Diameter
Tree Stem Average Length
Property
Wood Type
Number of Logs with Rootwads Specific Gravity of Wood
Average Rootwad Fan Diameter
Design scenario 100-year
Water Depth on Structure Water Depth on Upstream Face of Wood Structure Yu = 23 feet
Water Depth on Downstream Face of Wood Structure Yd = 23 feet
Velocity Approach Velocity Uo = 9 ft/s
Channel Velocity Vc = 9 ft/s Contracted Section Velocity Uc = 9 ft/s
Submerged Structure Area Perpendicular to Flow Upstream Downstream
Width w = 80 80 feet Depth Y = 23 23 feet
Cross-Sectional Area A = 1840 1840 ft2
Other Distance Above Scoured Bed Applied Load hload= 20 feet
Length from tip to point of rotation (1) Lsp = 80 feet Mean distance of piles to point of rotation (2) Lph = 20 feet
Length of structure parallel to flow Ls = 90 feet
Upstream depth to point of rotation(3) dubury = 4 feet Downstream depth to point of rotation(4) ddbury = 4 feet
Mean Distance from Piles to Point of Rotation (5) Lpv = 30 feet
Bank Embedment Embedded length of structure (6) Lebp = 12 feet
Mean Depth of submerged soil above embedded logs Dsub = 6 feet Number of logs embedded into bank 5
Mean Depth of dry soil above embedded logs Ddry = 0 feet
Channel Embedment Embedded length of structure (6) Lebp = 80 feet
Mean Depth of submerged soil above embedded logs Dsub = 2 feet Number of logs embedded into channel bed 5
Mean Depth of dry soil above embedded logs Ddry = 0 feet
Notes
(1) Length of wood structure from tip in the river to point of rotation in the bank measured perpendicular to flow
(2) Measured perpendicular to flow
(3) Depth at upstream side of structure from channel bottom to point of rotation measured perpendicular to flow
(4) Depth at downstream side of structure from channel bottom to point of rotation measured perpendicular to flow
(5) Measured parallel to flow
(6) Embedded length of wood structure measured perpendicular to flow
Objective: 2D hydraulic modeling results inputs for the design scenario to be used in subsequent large wood stability calculations.
Reference(s):
USBR (U.S. Bureau of Reclamation) & USACE (U.S. Army Corps of Engineers). 2016. National Large Wood Manual - Assessment, Planning, Design, and Maintenance of Large Wood in Fluvial Ecosystems: Restoring Process, Function, and Structure.
USBR. 2014. Large Woody Material - Risk Based Design Guidelines. Reclamation, Managing Water in the West. Pacific Northwest Region Resource & Technical Services.
Sheet No:
194-1343-0002
Subject: Large Wood Stability Calculations - Deflectors Date: 2/7/2025
Project: Repair Storm Damage at Mora Road (95% Design) Project No:
Lift:
Assumptions:
Logs and ballast in structure are fully submerged.
Structure acts as composite structure and is assumed to be fully connected.
Structure can move freely vertically without any binding to the piles.
Lift Force:
Area Perpendicular to Flow A = 1,840 ft2
Approach Velocity Uo = 9.0 ft/s Lift Coefficient CL = 1.5
Lift Force FL = 216,617 lb
Buoyancy Force:
Key "Base" Members 51,468 lb
Stacked "Middle" Members 128,671 lb Top Members 0 lb
Total Buoyancy Force FBL = 180,140 lb
Ballast Forces:
Dry wood FLWMd = 0 lb Boulders Fboulders = 0 lb Soil Fsoil = 2,374,853 lb Total Ballast 2,374,853 lb
Factor of Safety Against Buoyancy:
FOSb = 5.99
Reference(s):
USBR (U.S. Bureau of Reclamation) & USACE (U.S. Army Corps of Engineers). 2016. National Large Wood Manual - Assessment, Planning, Design, and Maintenance of Large Wood in Fluvial Ecosystems: Restoring Process, Function, and Structure.
USBR. 2014. Large Woody Material - Risk Based Design Guidelines. Reclamation, Managing Water in the West. Pacific Northwest Region Resource & Technical Services.
Project: Repair Storm Damage at Mora Road (95% Design) Project No: 194-1343-0002
Subject: Large Wood Stability Calculations - Deflectors Date: 2/7/2025
Lift: Normal: Friction:
Drag: Impact:
Calculation Parameters
Bed Sediment Friction Angle 36 degrees Bed Stress μbed= 0.73
Submerged Weight of Ballast Wbl(sub)= 2,374,853 pounds Buoyancy Force Fb = 180,140 pounds
Area Perpendicular to Flow A = 1,840 ft2
Approach Velocity Uo = 9.0 ft/s Drag Coefficient CD = 1.5
Calculation Parameters - Impact Force Weight of debris wdebris = 6000 lbs Channel velocity Vchannel = 9 ft/s
Coefficient of importance Ci = 1 Coefficient of orientation Co = 0.8
Coefficient of depth Cd = 1 Coefficient of blockage Cb = 1
Response ratio for impulsive loads Rmax = 0.8
Acceleration due to gravity g = 32.2 ft/s2
Time from initial velocity to zero velocity 0.03 s
Summary of Forces Force (lbs)
Lift FL= 216,617 Normal Fn= 1,978,096 Friction Ff= 1,437,171 Drag Fd= 216,617 Impact Fi= 56,197
Lateral Resistance Forces - Vertical Pilings and Passive Force
Calculation Parameters Number of Vertical Piles N = 14
Sheet No: 6 of 8
Type
Project: Repair Storm Damage at Mora Road (95% Design) Project No: 194-1343-0002
Subject: Large Wood Stability Calculations - Deflectors Date: 2/7/2025
Objective: Factor of safety calculations for sliding.
Reference(s):
USBR (U.S. Bureau of Reclamation) & USACE (U.S. Army Corps of Engineers). 2016. National Large Wood Manual - Assessment, Planning, Design, and Maintenance of Large Wood in Fluvial Ecosystems: Restoring Process, Function, and USBR. 2014. Large Woody Material - Risk Based Design Guidelines. Reclamation, Managing Water in the West. Pacific Northwest Region Resource & Technical Services.
Length of Pile Below Scoured Bed Lem= 5.0 ft
Distance Above Scoured Bed Applied Load hload= 20.0 ft
Rankine Coefficient of Passive Earth Pressure: Kp = 3.85
Horizontal Restraint Force from Piles:
Fgh(piles) = 13,077 lbs
Passive Force from Embeddment:
Calculation Parameters - Bank Embedment Mean Depth of dry soil above embedded logs Ddry = 0