FLH Bridge oversized or overload vehicle permit request form.pdf

PDF 297 KB Posted

Attached to
WA NP OLYM 115(1), Repair Storm Damage on Mora Road
Solicitation number
69056725B000015
Issued by

About this file

This document is an FLH Bridge Oversized/Overweight Permit Load Request application form designed for transportation operators seeking permission to move large or heavy loads across bridges. The two-page form requires detailed vehicle configuration information, including dimensions (width, height, length), gross weight, axle specifications, and vehicle configuration sketches from top and side perspectives. The applicant must provide comprehensive details about the load, route, movement date, company information, and contact details, with spaces for agency review and approval. The form emphasizes the importance of complete and legible data, warning that incomplete submissions will be returned for correction.

View the file

Other files

File Type Posted
Bid Tabulation Report_WA NP OLYM 115(1).pdf PDF
Bid Summary_WA NP OLYM 115(1).pdf PDF
QandA_02-02-2026.pdf PDF
Amendment A005.pdf PDF
Amendment A004.pdf PDF
Amendment A003.pdf PDF
QandA_01-27-2026.pdf PDF
Amendment A002.pdf PDF
QandA_01-16-2026.pdf PDF
QandA_01-07-2026.pdf PDF
Interested Vendors List.pdf PDF
Amendment A001.pdf PDF
Mora Road - Hydraulic Memorandum_A001.pdf PDF
QandA_12-31-2025.pdf PDF
olym115-1_ SWPPP.pdf PDF
QandA_12-18-2025.pdf PDF
IFB_69056725B000015.pdf PDF
Mora Road - Hydraulic Memorandum.pdf PDF
olym115-1_control-points.xlsx XLSX spreadsheet
olym115-1_plans_IFB.pdf PDF
WFLHD Construction Contract Administration_FY 23 V2.pdf PDF
olym 115-1_WQMPP.docx DOCX document
olym115-1_untreated-timber-pile-points.xlsx XLSX spreadsheet
Mora Rd_Geotechnical Memorandum_GM6124.pdf PDF
olym115-1_untreated-timber-pile-points.pdf PDF
Mora Rd_Engineering Calculations.pdf PDF
olym115-1_existing-ground-surface and olym115-1_proposed-finish-surface.zip ZIP file
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Revised 8/3/23 Page 1 of 2

FLH BRIDGE OVERSIZED/OVERWEIGHT PERMIT LOAD REQUEST

APPLICATION DATE:

APPLICANTS NAME:

COMPANY NAME:

USDOT#:

PHONE NUMBER:

EMAIL ADDRESS:

DESCRIPTION OF LOAD:

DESCRIPTION OF ROUTE:

DATE OF MOVEMENT:

PERMIT VEHICLE CONFIGURATION

WIDTH: HEIGHT: LENGTH:

GROSS WEIGHT:

(COMPLETE VEHICLE CONFIGURATION SKETCH ON NEXT PAGE)

APPLICANTS SIGNATURE: DATE:

(AGENCY USE ONLY)

REVIEWED BY: DATE:

DENIED APPROVED

PERMIT CONDITIONS:

Revised 8/7/23 Page 2 of 2

VEHICLE TOP VIEW

(w/ dimensions)

VEHICLE SIDE VIEW

(w/ dimensions)

Axle Number TOTAL Axle spacing (ft) WEIGHT (lbs) Load (lbs) per axle No. of Tires per axle

*Adjacent axles carrying the exact same load, dimensions and tires may be grouped in the axle table

A PERMIT SUBMITTED WITH INCOMPLETE, ILLEGIBLE, OR INCONSISTENT DATA WILL BE RETURNED FOR CORRECTION

TOTAL WEIGHT lbsLoad lbs per axle:
Axle Number:
Axle width ft:
Load lbs per axle:
No of Tires per axle:
Axle Number2:
Axle Number3:
Axle Number6:
Axle Number7:
Axle Number8:
Axle width ft2:
Axle width ft3:
Axle width ft4:
Axle width ft5:
Axle width ft6:
Axle width ft7:
Axle Number4:
Axle Number5:
Axle Number5b:
Axle Number9:
Axle width ft8:
Axle width ft9:
Axle width ft10:
Load lbs per axle2:
No of Tires per axle2:
Load lbs per axle3:
No of Tires per axle3:
Load lbs per axle4:
No of Tires per axle4:
Load lbs per axle5:
No of Tires per axle5:
Load lbs per axle6:
No of Tires per axle6:
Load lbs per axle7:
No of Tires per axle7:
Load lbs per axle8:
No of Tires per axle8:
Load lbs per axle9:
No of Tires per axle9:
Load lbs per axle10:
Check Box1: Off
Permit Condition:
height:
length:
Date1:
Name:
Company name:
USDOT #:
Phone #:
Date3:
Date4:
Date2:
Route:
Load Description:
Email address:
Check Box2: Off
width:
GVW:
No of Tires per axle10:
Top view and side view truck:

File details come from the government source that posted it. Updated .