This document is a Questions and Answers (Q&A) file for a federal project titled "Repair Storm Damage on Mora Road" with Project No. WA NP OLYM 115(1). The Q&A addresses three specific inquiries related to the project: (1) confirming that a missing Stormwater Pollution Prevention Plan (SWPPP) has been uploaded to solicitation attachments, (2) clarifying the process for obtaining a plan holders list through SAM.gov, and (3) addressing the publication of an Interested Vendor List (IVL). A fourth question relates to sourcing environmental design materials like log barriers and root wads, with the government noting that material sources for Sections 251 and 647 have not been identified, and the contractor will need to secure all necessary permits and clearances for contractor-located sites and sources.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project No. WA NP OLYM 115(1) Project: Repair Storm Damage on Mora Road
# General Technical Question Answer Date
1 x There is a SWPPP listed in the SCR Section 102 that is missing from SAM.gov.
The SWPPP has been uploaded to the solicitation attachments.
12/18/25
2 X We just wanted to check and see if there was a plan holders list for this project.
The Government does not provide this since bidders may obtain the registered vendors list (aka planholders list) from sam.gov after linking their entity to their registration. If you are signed into SAM.gov with your registered entity and you cannot see the Interested Vendors List, you will need to be assigned the Contract Opportunities Administrator role for your entity in SAM.gov.
If you need additional assistance, you can reach the Federal Service Desk at 866-606- 8220 or https://www.fsd.gov/gsafsd_sp?id=gsa_ind ex.
12/31/25
3 X Can you enable the Interested Vendor List ?
We do not have the system credentials required to enable or disable IVL. However, we will publish the IVL as an attachment to the SAM.gov posting.
1/7/26
Check General or Technical
4 X
Is there a place within the park to source the environment Design log Barriers (medium log, Racking material, and slash) , or the Environmental Design Root Wad (Large log optional root wad, Large log with Root WAD, 25' Min, and Large log with Root Wad, 45' Min)?
Line Items A0460,A0480,A0500, A0520, A0540, A0560.
Per the NTB, material sources for Sections 251 and 647 have not been identified for this project. Secure all permits and clearances for Contractor-located sites and sources. See Subsection 105.02(c).